Swing Space Update
   Board Studied Middle School Facilities for 7+ Yrs

   Countless Community Input Resulted in:

    ◦ Decision to Renovate/Add-On Beginning in 2013

    ◦ Community Approved Bond Levy of $25mm

      73% Voter Approval
   Goal of Board/Administration:

    ◦ Ensure Student and Staff Safety During Construction

    ◦ Continue Academic Excellence

    ◦ Maximize Dollars for Scholastic Benefit

    ◦ Minimize “Sunk Costs”
School districts must:
  ◦ Estimate the expenses of the project first based upon knowledge at
    the time;

  ◦ Determine millage of the bond issue and the cost to voters;

  ◦ Obtain approval from voters;

  ◦ Hire architectural firm and construction manager

  ◦ Develop detailed plans, and then

  ◦ Offer bid packages based upon plans.
   During the bond issue campaign
    ◦ Keep two grades of students in the building and move two
      grades out into modular units.
      The cost estimate was $500,000.
   During the bond issue campaign
    ◦ Keep two grades of students in the building and move two
      grades out into modular units.
      The cost estimate was $500,000.

   After visiting a construction site firsthand (Mariemont
    Elementary), the decision was made to look for an
    alternative solution to house students due to safety and
    academic concerns.
   During the bond issue campaign
    ◦ Keep two grades of students in the building and move two
      grades out into modular units.
      The cost estimate was $500,000.

   After visiting a construction site firsthand (Mariemont
    Elementary), the decision was made to look for an
    alternative solution to house students due to safety and
    academic concerns.

   Locating modular units behind the MS limited
    construction drop-offs and equipment needs.
   Research was done around utilizing space at St. James,
    the Civic Center, and placing modular units on the MS
    site
   Research was done around utilizing space at St. James,
    the Civic Center, and placing modular units on the MS
    site

   The Board’s decision was NOT to proceed due to
    safety/space concerns:
    ◦ Students crossing the Pike several times a day,
    ◦ Sunk Costs to upgrade Civic Center, and
    ◦ Placing modular units on a construction space.
   The next idea evolved around putting modular units on
    the High School baseball field. (September)
    ◦ But, the district needed multiple modular units.
   The next idea evolved around putting modular units on
    the High School baseball field.
    ◦ But, the district needed multiple modular units. (September)


   In fall, Board Decided to go forward:
    ◦ Forward with this site
    ◦ Bid packages for site work and the units issued for a required
      60 day time span.
   The next idea evolved around putting modular units on the
    High School baseball field.
    ◦ But, the district needed multiple modular units. (September)


   In fall, Board Decided to go forward:
    ◦ Forward with this site
    ◦ Bid packages for site work and the units issued for a required 60 day
      time span.


   On December 4th, bids came in at $1.9 million
    ◦ This cost reflects site work ,three modular units, and enhancement of
      the baseball field.
   The Board felt that spending funds on this “soft cost”
    was unreasonably high.
    ◦ Market Sets Rates, Not Estimators

   Contingency funds are available, but board chose to
    save for actual renovation/addition of 90 yr. old
    building (preserve as much of the $25mm as possible)

    ◦ Remember, the district cannot exceed the voted amount of $25
      million.
   At the January 9, 2013 meeting, the Board made the
    decision to not go forward with the modular units at
    Spring Break.

   Additionally, Board decided to shift project start date
    from June 2013 from April 2013.
   The Board authorized Dr. Lang to continue to look at
    options:
    ◦ Negotiate a contract for swing space if needed.
   The Board authorized Dr. Lang to continue to look at
    options
    ◦ Negotiate a contract for swing space if needed.


   Dr. Lang has explored options to house students with:
    Mt. Healthy Schools, Reading Schools, Princeton
    Schools, Winton Woods Schools, Finneytown
    Schools, Greenhills, and the Archdiocese of Cincinnati.
   The Board authorized Dr. Lang to continue to look at
    options
    ◦ Negotiate a contract for swing space if needed.

   Dr. Lang has explored options to house students with: Mt.
    Healthy Schools, Reading Schools, Princeton Schools,
    Winton Woods Schools, Finneytown Schools, Greenhills,
    and the Archdiocese of Cincinnati.

   St. Peter and Paul School in Reading emerged as the best
    option.
   Rising 4th grade students will remain in their home
    Primary school for 5th grade while the renovation is
    underway.

   Rising 5th, 6th, and 7th graders will attend classes at
    St. Peter and Paul in Reading.

      -Temporary Classrooms will augment current school
      buildings.
    This decision ultimately accomplished three
     things:

1.    Moved Construction Timeline from a condensed
      schedule of 14 to 18 Months

1.    Utilize time To Finalize Swing Space Logistics

1.    Redirect Approximately $1mm back into the
      MS Permanent Scholastic Needs
   Logistics Plan Still Being Finalized:

    ◦ Staff/Administration Input

    ◦ City of Wyoming

    ◦ City of Reading

    ◦ First Student Transportation
   We recognize community has many questions to be
    answered

   The Board, Superintendent, and Middle School and
    Primary Principals are working to anticipate and answer
    those questions

   Wyoming is once again asked to make some short-term
    sacrifices for long-term benefit of our students
   Logistical Answers In Development

    ◦ Grade-Based Parent Meetings Beginning in February/March

    ◦ Community Information Session in March/April

    ◦ Complete Plan Released by End of May, 2013
Always keep in mind…we are
committed to ensure….
  Wyoming students will receive a
     Wyoming education with
       Wyoming teachers in a
      safe and secure location.
Photos of the Facilities at St. Peter
             and Paul
   The Board of Education is committed to ensuring student
    safety, preserving academic excellence, and being good
    stewards of the community’s funds.

   The Board, Dr. Lang, and Middle School and Primary
    School Principals Mike Overbey, Chris Heybruch and
    Jennifer Klein, are working diligently to formulate
    detailed plans.

   With the community’s decision to renovate the
    building, we knew planning for swing space would be the
    most difficult process.
We are asking for patience, flexibility,
 and an openness to ideas from the
             community.
Everyone connected with this project
 is trying to reach the best solution
               possible.

Contenu connexe

Similaire à Wyoming City Schools Middle School Swing Space Update, January 28, 2013

Board Meeting Notes Sept 22
Board Meeting Notes Sept 22Board Meeting Notes Sept 22
Board Meeting Notes Sept 22Lisa Jackson
 
September 27, 2011, KCSA Town Hall Meeting
September 27, 2011, KCSA Town Hall MeetingSeptember 27, 2011, KCSA Town Hall Meeting
September 27, 2011, KCSA Town Hall Meetingsvandyk
 
Footscray primary school eco-masterplan ppt-1 (2)
Footscray primary school   eco-masterplan ppt-1 (2)Footscray primary school   eco-masterplan ppt-1 (2)
Footscray primary school eco-masterplan ppt-1 (2)Sheridan Blunt
 
Kingston City School District Superintendent Goals Summary Report
Kingston City School District Superintendent Goals Summary Report Kingston City School District Superintendent Goals Summary Report
Kingston City School District Superintendent Goals Summary Report Preview Freeman
 
Pwcs school board meeting edci 506 esra robinson
Pwcs school board meeting edci 506 esra robinsonPwcs school board meeting edci 506 esra robinson
Pwcs school board meeting edci 506 esra robinsonebr1992
 
Bond Informational Slideshow
Bond Informational SlideshowBond Informational Slideshow
Bond Informational SlideshowKatie Morrow
 
Carolina Housing Slide Doc
Carolina Housing Slide DocCarolina Housing Slide Doc
Carolina Housing Slide DocRachel Grotheer
 
Copy of bond issue
Copy of bond issueCopy of bond issue
Copy of bond issueOCLRE2016
 
Detroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementDetroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementKenneth Burnley
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsLHSBudget
 
Bond Factsheet Dec 1
Bond Factsheet Dec 1Bond Factsheet Dec 1
Bond Factsheet Dec 1Ed Petersen
 
MCPS School Board Meeting - EDCI506
MCPS School Board Meeting - EDCI506MCPS School Board Meeting - EDCI506
MCPS School Board Meeting - EDCI506oneohvt
 
Community Stakeholder Group Recommendation
Community Stakeholder Group Recommendation Community Stakeholder Group Recommendation
Community Stakeholder Group Recommendation bradfordgs
 
Marion Community Schools reconfiguration discussion
Marion Community Schools reconfiguration discussionMarion Community Schools reconfiguration discussion
Marion Community Schools reconfiguration discussionPatricia Gibson
 
Speaking the Language: Using assessment data with different audiences
Speaking the Language: Using assessment data with different audiencesSpeaking the Language: Using assessment data with different audiences
Speaking the Language: Using assessment data with different audiencesStan Dura
 
Spring-Ford High School School Board Meeting Recognition
Spring-Ford High School School Board Meeting Recognition Spring-Ford High School School Board Meeting Recognition
Spring-Ford High School School Board Meeting Recognition John Eckstine
 

Similaire à Wyoming City Schools Middle School Swing Space Update, January 28, 2013 (20)

Board Meeting Notes Sept 22
Board Meeting Notes Sept 22Board Meeting Notes Sept 22
Board Meeting Notes Sept 22
 
September 27, 2011, KCSA Town Hall Meeting
September 27, 2011, KCSA Town Hall MeetingSeptember 27, 2011, KCSA Town Hall Meeting
September 27, 2011, KCSA Town Hall Meeting
 
Footscray primary school eco-masterplan ppt-1 (2)
Footscray primary school   eco-masterplan ppt-1 (2)Footscray primary school   eco-masterplan ppt-1 (2)
Footscray primary school eco-masterplan ppt-1 (2)
 
Kingston City School District Superintendent Goals Summary Report
Kingston City School District Superintendent Goals Summary Report Kingston City School District Superintendent Goals Summary Report
Kingston City School District Superintendent Goals Summary Report
 
Pwcs school board meeting edci 506 esra robinson
Pwcs school board meeting edci 506 esra robinsonPwcs school board meeting edci 506 esra robinson
Pwcs school board meeting edci 506 esra robinson
 
Bond Informational Slideshow
Bond Informational SlideshowBond Informational Slideshow
Bond Informational Slideshow
 
Carolina Housing Slide Doc
Carolina Housing Slide DocCarolina Housing Slide Doc
Carolina Housing Slide Doc
 
Copy of bond issue
Copy of bond issueCopy of bond issue
Copy of bond issue
 
Detroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementDetroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening Statement
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings Recommendations
 
Greenedek
GreenedekGreenedek
Greenedek
 
Renewal Overview
Renewal OverviewRenewal Overview
Renewal Overview
 
Bond Factsheet Dec 1
Bond Factsheet Dec 1Bond Factsheet Dec 1
Bond Factsheet Dec 1
 
MCPS School Board Meeting - EDCI506
MCPS School Board Meeting - EDCI506MCPS School Board Meeting - EDCI506
MCPS School Board Meeting - EDCI506
 
Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)
 
Community Stakeholder Group Recommendation
Community Stakeholder Group Recommendation Community Stakeholder Group Recommendation
Community Stakeholder Group Recommendation
 
PUSD Facilities Steering Committee Recommendations
PUSD Facilities Steering Committee RecommendationsPUSD Facilities Steering Committee Recommendations
PUSD Facilities Steering Committee Recommendations
 
Marion Community Schools reconfiguration discussion
Marion Community Schools reconfiguration discussionMarion Community Schools reconfiguration discussion
Marion Community Schools reconfiguration discussion
 
Speaking the Language: Using assessment data with different audiences
Speaking the Language: Using assessment data with different audiencesSpeaking the Language: Using assessment data with different audiences
Speaking the Language: Using assessment data with different audiences
 
Spring-Ford High School School Board Meeting Recognition
Spring-Ford High School School Board Meeting Recognition Spring-Ford High School School Board Meeting Recognition
Spring-Ford High School School Board Meeting Recognition
 

Dernier

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 

Dernier (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Wyoming City Schools Middle School Swing Space Update, January 28, 2013

  • 2. Board Studied Middle School Facilities for 7+ Yrs  Countless Community Input Resulted in: ◦ Decision to Renovate/Add-On Beginning in 2013 ◦ Community Approved Bond Levy of $25mm  73% Voter Approval
  • 3. Goal of Board/Administration: ◦ Ensure Student and Staff Safety During Construction ◦ Continue Academic Excellence ◦ Maximize Dollars for Scholastic Benefit ◦ Minimize “Sunk Costs”
  • 4. School districts must: ◦ Estimate the expenses of the project first based upon knowledge at the time; ◦ Determine millage of the bond issue and the cost to voters; ◦ Obtain approval from voters; ◦ Hire architectural firm and construction manager ◦ Develop detailed plans, and then ◦ Offer bid packages based upon plans.
  • 5. During the bond issue campaign ◦ Keep two grades of students in the building and move two grades out into modular units.  The cost estimate was $500,000.
  • 6. During the bond issue campaign ◦ Keep two grades of students in the building and move two grades out into modular units.  The cost estimate was $500,000.  After visiting a construction site firsthand (Mariemont Elementary), the decision was made to look for an alternative solution to house students due to safety and academic concerns.
  • 7. During the bond issue campaign ◦ Keep two grades of students in the building and move two grades out into modular units.  The cost estimate was $500,000.  After visiting a construction site firsthand (Mariemont Elementary), the decision was made to look for an alternative solution to house students due to safety and academic concerns.  Locating modular units behind the MS limited construction drop-offs and equipment needs.
  • 8. Research was done around utilizing space at St. James, the Civic Center, and placing modular units on the MS site
  • 9. Research was done around utilizing space at St. James, the Civic Center, and placing modular units on the MS site  The Board’s decision was NOT to proceed due to safety/space concerns: ◦ Students crossing the Pike several times a day, ◦ Sunk Costs to upgrade Civic Center, and ◦ Placing modular units on a construction space.
  • 10. The next idea evolved around putting modular units on the High School baseball field. (September) ◦ But, the district needed multiple modular units.
  • 11. The next idea evolved around putting modular units on the High School baseball field. ◦ But, the district needed multiple modular units. (September)  In fall, Board Decided to go forward: ◦ Forward with this site ◦ Bid packages for site work and the units issued for a required 60 day time span.
  • 12. The next idea evolved around putting modular units on the High School baseball field. ◦ But, the district needed multiple modular units. (September)  In fall, Board Decided to go forward: ◦ Forward with this site ◦ Bid packages for site work and the units issued for a required 60 day time span.  On December 4th, bids came in at $1.9 million ◦ This cost reflects site work ,three modular units, and enhancement of the baseball field.
  • 13. The Board felt that spending funds on this “soft cost” was unreasonably high. ◦ Market Sets Rates, Not Estimators  Contingency funds are available, but board chose to save for actual renovation/addition of 90 yr. old building (preserve as much of the $25mm as possible) ◦ Remember, the district cannot exceed the voted amount of $25 million.
  • 14. At the January 9, 2013 meeting, the Board made the decision to not go forward with the modular units at Spring Break.  Additionally, Board decided to shift project start date from June 2013 from April 2013.
  • 15. The Board authorized Dr. Lang to continue to look at options: ◦ Negotiate a contract for swing space if needed.
  • 16. The Board authorized Dr. Lang to continue to look at options ◦ Negotiate a contract for swing space if needed.  Dr. Lang has explored options to house students with: Mt. Healthy Schools, Reading Schools, Princeton Schools, Winton Woods Schools, Finneytown Schools, Greenhills, and the Archdiocese of Cincinnati.
  • 17. The Board authorized Dr. Lang to continue to look at options ◦ Negotiate a contract for swing space if needed.  Dr. Lang has explored options to house students with: Mt. Healthy Schools, Reading Schools, Princeton Schools, Winton Woods Schools, Finneytown Schools, Greenhills, and the Archdiocese of Cincinnati.  St. Peter and Paul School in Reading emerged as the best option.
  • 18. Rising 4th grade students will remain in their home Primary school for 5th grade while the renovation is underway.  Rising 5th, 6th, and 7th graders will attend classes at St. Peter and Paul in Reading. -Temporary Classrooms will augment current school buildings.
  • 19. This decision ultimately accomplished three things: 1. Moved Construction Timeline from a condensed schedule of 14 to 18 Months 1. Utilize time To Finalize Swing Space Logistics 1. Redirect Approximately $1mm back into the MS Permanent Scholastic Needs
  • 20. Logistics Plan Still Being Finalized: ◦ Staff/Administration Input ◦ City of Wyoming ◦ City of Reading ◦ First Student Transportation
  • 21. We recognize community has many questions to be answered  The Board, Superintendent, and Middle School and Primary Principals are working to anticipate and answer those questions  Wyoming is once again asked to make some short-term sacrifices for long-term benefit of our students
  • 22. Logistical Answers In Development ◦ Grade-Based Parent Meetings Beginning in February/March ◦ Community Information Session in March/April ◦ Complete Plan Released by End of May, 2013
  • 23. Always keep in mind…we are committed to ensure…. Wyoming students will receive a Wyoming education with Wyoming teachers in a safe and secure location.
  • 24. Photos of the Facilities at St. Peter and Paul
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. The Board of Education is committed to ensuring student safety, preserving academic excellence, and being good stewards of the community’s funds.  The Board, Dr. Lang, and Middle School and Primary School Principals Mike Overbey, Chris Heybruch and Jennifer Klein, are working diligently to formulate detailed plans.  With the community’s decision to renovate the building, we knew planning for swing space would be the most difficult process.
  • 36. We are asking for patience, flexibility, and an openness to ideas from the community. Everyone connected with this project is trying to reach the best solution possible.