SlideShare une entreprise Scribd logo
1  sur  44
Télécharger pour lire hors ligne
2012
ANNUAL RESULTS
PRESENTATION //
21 March 2013
21 March 2013 // Page 1
Forward looking statements
This presentation may contain forward-looking statements and
information that both represents management's current
expectations or beliefs concerning future events and are subject
to known and unknown risks and uncertainties.
A number of factors could cause actual results, performance or
events to differ materially from those expressed or implied by
these forward-looking statements.
21 March 2013 // Page 2
Agenda
Strategy and 2012 highlights
Business Units review
Key operated developments
Exploration update
2012 financial results
Summary
Simon Lockett
Robin Allan
Neil Hawkings
Andrew Lodge
Tony Durrant
Simon Lockett
STRATEGY AND 2012 HIGHLIGHTS //
21 March 2013 // Page 4
Delivering on our strategy
• Focus on high quality, high return developments
– Chim Sáo, Huntington, Catcher, Bream,
Sea Lion – FPSOs
– West Natuna, North Sumatra – Asian gas position
• Acquisitions focused on core areas, existing fields,
future developments
– Disposal of non-operated/non-core assets
• Focus on play-opening wells and high impact prospects
– Disciplined spend
• Maintain balance sheet strength and good liquidity
• Production growth to 100,000 boepd and beyond
– Substantial cash flow increases
• Continue growing the underlying value of the business
– NAV/share CAGR >10%
21 March 2013 // Page 5
2012 highlights
• Four projects achieved final sanction
– Targeting first oil/gas in 2014
• Significant progress with the operated
Catcher field
– Final sanction targeted for this year
• Successful entry into Falkland Islands
– Sea Lion development planning
well underway
• Play-opening acreage added in Vietnam,
Falkland Islands and Iraq
– Total prospective resources >2.5 bnboe
• Increased financial strength
– Record profitability
– Strongly rising cash flows
• Production of 57.7 kboepd, 43% increase
BUSINESS UNITS REVIEW //
21 March 2013 // Page 7
Falkland Islands
• Completed purchase of 60% interest
in Rockhopper’s assets for $231
million cash and $770 million carry
• Appointed operator of Rockhopper’s
licence interests in November 2012
• Falkland Islands Business Unit
established in dedicated office
– 70 employees by mid-year
• Attractive fiscal regime with an
effective tax rate of 32.6%
• Sea Lion alone adds approximately
200 mmbbls of net discovered 2C
resources
• Substantial exploration upside
21 March 2013 // Page 8
UK
Operated
• Significantly higher uptime at the Balmoral
facility achieved in 2012
• Solan progressing with 1st phase of
development drilling to commence in April
• Catcher development concept formally agreed;
first oil timing dependent on FPSO tender
process
Non-operated
• Long lead items have been procured for the
Kyle field redevelopment
• Wytch Farm production exceeded budget due
to process plant upgrades, new wells and
workovers
Huntington and Rochelle
• Huntington expected on-stream at the end of
the month
• Rochelle expected on-stream 2/3Q 2013
UK production run rate of 25 kboepd once
Huntington and Rochelle on-stream; doubling to
>50 kboepd once Solan and Catcher on-stream
* Assumes 4Q 2016 for Catcher
21 March 2013 // Page 9
Norway
Bream
• Completed SPA with Skeie to increase
equity in Bream to 40%
• FPSO planned; engineering studies
underway
• Project sanction early 2014
• First oil in 2017 with an initial
production run rate of 35 kbopd
Frøy
• Commercial discussions to develop a
central processing hub continue
Exploration
• Luno II spudded
• Built on Mandal High position through
licensing round and acquisition
Portfolio management
• Non operated discoveries under review
Grosbeak;
Skarfjell extension
Luno II
Mandal High
Froy
Bream
Blabaer
21 March 2013 // Page 10
Pakistan
• Pakistan achieved 2012 production of 15.6 kboepd
• Exploration successes at K-30 and Badhra B North-1
• Further potential to be tested in 2013
21 March 2013 // Page 11
Vietnam
Chim Sáo
• 10.5 mmboe produced in 2012
• Currently producing ~30 kbopd and ~25 mmscf/d
• Addressing power issues which could lead to greater
deliverability
Dua
• 3 well subsea tie back to Chim Sáo
• Installation of main pipeline commenced in
February 2013
• Forecast average gross production rate of
8-10 kbopd in the first 12 months
• First oil targeted for 1H 2014
CRD
• Appraisal well to be drilled in mid-2013
Dua pipe lay February 2013
21 March 2013 // Page 12
Indonesia
Natuna Sea Block A PSC
• Gas sales to Singapore averaged 217 BBtud, up 42%
• Total sales capacity increasing to 400 BBtud
– Anoa Phase 4, Pelikan and Naga
• Year to date market share of 45%
• Rising market share offsets impact of LNG in Singapore
• Lama development plan underway
Kakap PSC
• 2012 gas sales to Singapore averaged 33 BBtud
• Liquids produced averaged 3.5 kbopd in 2012
Block A Aceh
• Focus on improving economics; project sanction by year-end
– Capex estimate of ~$650mm
– Operator’s efforts to secure higher gas prices
progressing well
• Matang well may have a positive impact
Construction of Pelikan/Naga jackets
Anoa phase 4
KEY OPERATED DEVELOPMENTS //
21 March 2013 // Page 14
Solan project update
Key milestones
• Full DECC and partner approvals
received in April
• First oil targeted for Q4 2014; initial
production run rate of 24 kbopd
• Capex ~$20/bbl
Subsurface and drilling
• Detailed reservoir studies ongoing; well
planning complete
• Rig contracted
– Phase 1 April 2013: 2 injectors &
producer upper hole sections
– Phase 2 April 2014: finish drilling 2
producers
Producers
Injectors
Solan reservoir cross section
Solan well plan
21 March 2013 // Page 15
Solan project update
Platform and Subsea
• Platform fabrication commenced at Methil yard, Scotland
• Construction of subsea storage tank commenced in
December in Dubai
• Heavy lift installation in Summer 2014
• Contract for associated subsea flow-lines and control
lines awarded
• Platform manned for first year only, thereafter monthly
maintenance visits
• Operations support contract awarded
Platform fabrication at Methil
Subsea tank fabrication Solan development schematic
21 March 2013 // Page 16
Catcher project update
Key milestones
• JV formally agreed development
concept in December 2012
– Leased FPSO
– Subsea development of three fields
• Sanction targeted for end 2013
• First oil modelled for 2H 2016, subject
to FPSO proposals
Subsurface and drilling
• Reservoir modelling being updated
to optimise subsurface development
and drilling plans
• Rig procurement process to
commence shortly
FPSO and subsea wells
21 March 2013 // Page 17
Catcher project update
FPSO and subsea
• Funded tender for the leased FPSO commenced in February with three FPSO providers
• Subsea FEED is underway
Now FPSO Bids
Project
Sanction
Order Long
Lead Items
FPSO Funded Tender Process
Evaluate Bids
Finalise Contracts
Subsea Feed
Tender Subsea EPCI Contract(s)
Optimise Subsurface Development Plan
Tender Drilling Rig
CATS / Fulmar Negotiations
JV Approval Process
DECC Approval Process
Prepare DECC Field Dev.Plan
Prepare Environmental Statement
2013
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
FPSO
Subsea
Drilling and Subsurface
Select Gas OfftakeRoute
Approvals
21 March 2013 // Page 18
Sea Lion project update
Key milestones
• Concept selection targeted for mid-2013
• Project sanction targeted for mid-2014
• First oil targeted for Q3 2017
Subsurface and drilling
• Detailed static and dynamic reservoir
modelling underway for Sea Lion
• Rig contracting strategy being developed
and discussions with rig companies
commenced
• Evaluating options and timing for satellites
• Planning logistics and base requirements
for the development drilling campaign
21 March 2013 // Page 19
Sea Lion project update
FPSO and subsea
• FPSO market enquiries undertaken to
assess options for conversions and new
builds
• Technical studies ongoing, reviewing FPSO
fatigue life, turret designs and offloading
operability
• Technical reviews undertaken to study option
of gas lift instead of HSPs
• Preliminary topsides designs being assessed
• Design studies underway to assess towed
bundles as an alternative to conventional
flowlines
• Evaluation of contractors for subsea FEED
has commenced
21 March 2013 // Page 20
Reserves and resources –
continuing growth
Independent valuations
• Based on D&M’s value of 2P reserves and RISC’s value of Sea Lion
– $6.5 billion NPV10 at $85/bbl, equivalent to £6/share
– $9.8 billion NPV10 at $105/bbl, equivalent to £10/share
• Excludes other contingent and prospective resources
900
Year end
2007
600
500
400
0
200
300
Year end
2011
100
Reserves and contingent resources
(mmboe)
Production Additions &
Revisions
Year end
2012
2C contingent resources
2P reserves800
700
EXPLORATION OVERVIEW //
21 March 2013 // Page 22
• 12 exploration and appraisal
wells drilled in 2012
– Carnaby discovery
– K-30 and BBN-1
successes
– Anoa Deep discovery,
opened up Lama play
• Three wells currently drilling
– Matang
– Bonneville
– Luno II
• Transforming the exploration portfolio, adding higher
impact plays with significant follow on potential
– Added 1 bnboe prospective resource in 2012
Transforming the exploration portfolio
Q1 Q2 Q3 Q4
Block 121 Ca Voi 120 High
Block 07/03 CRD appraisal N/A TBC
Ca Duc 45 High
Block A Aceh Matang 40 Moderate
Tuna Block Kuda Laut & Singa Laut 100 High
Norway PL359 Luno II 120 Moderate
P1181 Lacewing 58 Moderate
P1430 Bonneville 10 Low
K-32 7 Low
K-36 5 Low
Badhra South Deepening-1 38 High
BBN-1 West 8 Low
Badhra-6 Parh 58 Moderate
Kenya L10A/L10B Contingent well TBC TBC
Mauritania PSC C-10 Tapendar TBC TBC
North Sea
UK
Rest of World
Pakistan
Kadanwari
Badhra-Bhit
Indonesia
Asia
2013 P50 gross unrisked
resource (mmboe) Risk
Vietnam
Weatherford 812
Bredford Dolphin
Maersk Resiliant
SLBRig-23
Century Rig 28
Ocean General
Ocean General
Ocean General
Weatherford 812
SLBRig-23
SLB Rig-60
WilPhoenix
Ocean General
21 March 2013 // Page 23
2013 exploration drilling programme
Contingent Wells
Firm Wells: Rig Contracted
Firm Wells: Rig TBC
All well timings are subject to revision for operational reasons
Wells to watch
Five high impact wells targeting in excess of
150 mmboe of net unrisked prospective resources
Lacewing
21 March 2013 // Page 24
2013 North Sea exploration –
Luno II and Lacewing
PL 359
BCU Time Map
C.I. 100 ms10km
Johan SverdrupLuno/Apollo
Ragnarrock
Luno II Prospect
Luno II (spudded)
• Luno II is on the south west margin of the Utsira high
• Critical risk: reservoir presence
• Gross prospective resource: 30-120-300 mmbo
• Currently drilling
Lacewing (1H 2013)
• HPHT Triassic test; learnings will be applied to UK
and Norway
• Gross prospective resource: 24-58-110 mmboe
• Critical risks: trap effectiveness and reservoir quality
• Well expected to spud April 2013
Inner Moray Firth
Mandal High
Greater Catcher Area
Quad 16
Mesozoic
Luno II
Lacewing
Bonneville
Grosbeak;
Skarfjell
extension
21 March 2013 // Page 25
2013 Nam Con Son programme
Kuda/Singa Laut (2H 2013)
• Faulted dip closed structure up dip from a proven source
kitchen to the east
• Low risk for gas, high risk for commercial oil
• Gross prospective resource: 60-100-140 mmboe
Silver Sillago (Ca Duc) (2H 2013)
• Analogous to Chim Sao
• Critical risk: fault seal
• Gross prospective resource: 20-45-105 mmboe
Ca Duc
NW SE
NW SEBelut Laut-1
TD 4977m
Kuda
Laut
MMU
L.Terumbu
Arang
Gabus
Depth of Top Oligocene
in Gajah Laut Utara
Top Basement
Top NCS
Top Cau
MMU
Dua
2km
Gajah Laut Utara-1
TD 4687m
Singa
Laut
21 March 2013 // Page 26
2013 play-opening well – Ca Voi
• Premier equity 40%
• The Ca Voi prospect is the first test of the
Oligocene play in the Phu Khanh Basin
• High risk well with multiple follow-up potential
• Gross prospective resource: 35-120-190 mmbo
• Well planned for May 2013
121-CV-1X 121-CV-1XNW SW W E
Sea Bed
Mid Miocene
Syn-Rift Unc.
Basement
2km
121-CV-1
Proposed
Surface
Location
21 March 2013 // Page 27
Ca Voi follow on potential
• A successful Whale (Ca Voi) well
de-risks multiple leads
– Swordfish
– East Whale
• Unexplored intra-basinal highs in
the deep water part of Block 121
• Block resource potential >1 bnboe
Deep Water
Leads Area
Basin
Edge
Leads
Block 121 Prospects and Leads
Swordfish
Whale &
East Whale
25km
NESW
Top Miocene
Top Oligocene
Basement
Whale East Whale DW Lead 1 DW Lead 2
21 March 2013 // Page 28
Kenya exploration (2013/14)
L10A & L10B
• Oil (Miocene carbonate) play in the West,
deeper Cretaceous sandstone (gas?) play in
the East
– 5000 km2 of 3D and 1000 km 2D acquired
• Upcoming drilling in 2014, possibly late 2013
• Gross prospective resource: ~1bn boe
Inboard Reef Play
SW NE Kiboko Prospect,
Block L11B
Outboard Plays
Block L10BW E
21 March 2013 // Page 29
Lama play (2014/15)
• Anoa Deep
– ~300 feet of fractured Lama
Sandstones within the Anoa field
– 70-100-150 bcf total gas in place
• Significant follow-on potential
– Gross accessible prospective
resource: ~2TCF
– Exploration drilling in 2014 and
2015
Lama Prospects and Leads
21 March 2013 // Page 30
Mandal High (2014/15)
• Shares similar characteristics to
that of the Utsira High in 2008
– Proven Kitchen to west of High
– Proven Jurassic sands to east
of High
– Hydrocarbons proven in
basement
• Myrhauk prospect is targeted for
drilling in 2014
Premier has access to ~ 200 mmbo of net prospective resources on and around the Mandal High
21 March 2013 // Page 31
Falkland Islands exploration (2014/15)
Fan 2 Fan 3Fan 1
• Defined lead and prospect inventory
• A minimum of 3 exploration wells planned
– Play opening wells to be drilled below existing
Sea Lion sands and in up-dip east flank sands
– 100-250-750 mmboe total resource potential in
multiple stacked targets
Fan 5
Fan 1
Fan 2
Fan 3
Fan 4
Beverly Discovery
Casper South
Discovery
21 March 2013 // Page 32
What should you expect from
exploration in 2013
• Play opening test in East Vietnam
• Key prospects drilled in Nam Con Son and North Sea
• Near field drilling in Catcher, Aceh and Pakistan
• Mature portfolio for 2014/15 drilling
– Kenya
– Norway (Mandal High)
– Indonesia (Lama)
– Falklands
– UK (Inner Moray Firth)
• Exit non-material acreage
• Continue to replenish the portfolio, adding new high
impact plays
FINANCE //
21 March 2013 // Page 34
Record profits
12 months to
31 Dec 2011
Operating costs (US$/bbl)
2012 2011
UK 41.9 39.5
Indonesia 11.2 11.1
Pakistan 2.3 2.4
Vietnam 13.7 16.6
Group 16.2 15.9
Highlights12 months to
31 Dec 2012
Working Interest production (kboepd)
Entitlement production (kboepd)
Realised oil price (US$/bbl) - pre hedge
Realised gas price (US$/mcf) - pre hedge
Sales and other operating revenues
Cost of sales
Gross profit
Exploration/New Business
General and administration costs
Operating profit
Financial items
Profit before taxation
Tax charge/(credit)
Profit after taxation
40.4
37.7
111.9
8.5
US$m
827
(415)
412
(211)
(26)
176
(34)
142
29
171
57.7
51.6
111.4
8.3
US$m
1,409
(743)
666
(187)
(24)
455
(95)
360
(108)
252
• Net impact on 2012 of
US$25 million post-tax
• 17% of 2013 production hedged at
average equivalent of US$105/bbl
• Rolling forward sale programme for
2014 targeting US$110/bbl
Hedging
21 March 2013 // Page 35
Rising cash flows
Cash flow from operations
Taxation
Operating cash flow
Capital expenditure
Acquisitions/disposals, net
Finance and other charges, net
Pre-licence expenditure
Net cash out flow
12 months to
31 Dec 2011
US$m 2012
Development
Exploration
Capital expenditure split (US$m)
772
530
(44)
486
(661)
(90)
(50)
(23)
(338)
12 months to
31 Dec 2012
US$m
1,041
(233)
808
(772)
(210)
(163)
(29)
(366)
2013 Forecast of US$1 billion (development) and US$200 million (exploration)
433
228
661
2011
• Five-year acquisition cost:
– US$6.6/bbl (including carries)
• Five-year development capex
(new projects):
– US$14.3/bbl
• Five-year exploration/appraisal cost
(post tax):
– US$5.4/bbl
Acquisitions, development and
finding costs
585
187
21 March 2013 // Page 36
Group taxation position
Overseas
Prior period provisions/revisions
UK
PRT
CT
Current charge
Deferred tax credits
Tax charge/credit for the year
12 months to
31 Dec 2011
US$m
Allowances brought forward
Net additions
RFES
Tax allowances carried forward
UK Tax Losses/Allowances Position
12 months to
31 Dec 2012
US$m
Tax charge
Tax paying overseas; no UK CT expected until post-2018
Overseas tax position
• Tax paying - Indonesia, Pakistan, Vietnam
• Expected effective rates for 2013:
137.0
(11.9)
83.1
–
208.2
(100.3)
107.9
1,360
398
129
1,887
% of Operating Profit*
Indonesia 50
Pakistan, Vietnam 30-33
60.1
70.0
17.2
–
147.3
(177.0)
(29.7)
As at 31 Dec
US$m
*Before exploration write off
21 March 2013 // Page 37
Cash
Bank debt
Bonds
Convertibles
Net debt position
Gearing
Cash and undrawn facilities
309
(484)
(341)
(228)
(744)
36%
1,116
187
(500)
(577)
(220)
(1,110)
36%
1,110
Average debt costs of 4.6% (fixed) and
2.3% (floating)
Facilities extended post year-end by
US$150 million
Excludes uncommitted facilities of $310
million
Stable balance sheet; continued access to multiple debt markets
Debt maturity profile
(including Letters of Credit)
1 Maturity value of US$245 million
12 months to
31 Dec 2011
US$m
12 months to
31 Dec 2012
US$m
1
2 Net debt/net debt plus equity
2
Strong liquidity and balance sheet position
21 March 2013 // Page 38
Fully funded programme
Funding Outlook
• Significant growth in cash flow
– US$2 billion pa post-Catcher *
– US$2.5 billion pa post-Sea Lion *
• Surplus cash flows 2013-2015* before
discretionary exploration spend
• Gearing position unchanged through to
Sea Lion first oil at US$85/bbl
• Forward profile funded by cash flow and
facilities down to US$65/bbl
2500
Investment Profile (development)
(US$ million)
2014
2250
2000
1750
1500
1250
1000
750
500
0
250
2013 2015 2016 2017
Standby Funding – Sea Lion
Premier
* Assumes US$100/bbl
SUMMARY //
21 March 2013 // Page 40
What can you expect from Premier?
Rapidly rising production and cash flow
(kboepd)
2011 20132012 Sea LionCatcher
40
65-70
58
100+
100
• Growing production
• Quality execution of development
projects
• Increasingly material and higher
impact exploration
• Continuing portfolio management
• Strong growth in cash flow generation
– Commenced cash returns to
shareholders
A continued focus on growing
the underlying NAV/share
APPENDIX //
21 March 2013 // Page 42
End 2012 2P reserves and
contingent resources
Falkland
Islands
Indonesia Norway
Pakistan &
Mauritania
UK Vietnam Total
2P Reserves
On production - 36.2 - 28.2 29.7 28.0 122.1
Approved for
development
- 36.0 - 5.6 19.8 7.0 68.4
Justified for
development
- 25.0 - 0.8 74.3 1.4 101.4
Total Reserves - 97.2 - 34.6 123.7 36.4 291.9
2C
Contingent
Resources
Development
pending
193.7 - 71.5 2.5 4.2 - 271.9
Development un-
clarified / on hold
32.7 68.0 0.1 16.2 16.7 13.2 146.9
Development not
currently viable
6.2 4.9 2.3 12.8 28.7 7.2 62.0
Total Contingent
Resources
232.6 72.9 73.9 31.5 49.6 20.3 480.7
Total Reserves & Contingent
Resources
232.6 170.1 73.9 66.0 173.3 56.8 772.7
Premier Oil Plc
23 Lower Belgrave Street
London
SW1W 0NR
Tel: +44 (0)20 7730 1111
Fax: +44 (0)20 7730 4696
Email: premier@premier-oil.com
www.premier-oil.com
21 March 2013

Contenu connexe

Tendances

Premier oil 2014_hy_presentation
Premier oil 2014_hy_presentationPremier oil 2014_hy_presentation
Premier oil 2014_hy_presentationCompany Spotlight
 
Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013PA Resources AB
 
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITEDApril Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITEDSymposium
 
Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013Company Spotlight
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources AB
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and ProcessingEnbridge Inc.
 
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...Innovation Norway
 
Nal energy corporate presentation - january 2012
Nal energy   corporate presentation - january 2012Nal energy   corporate presentation - january 2012
Nal energy corporate presentation - january 2012NALenergy
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALRichard Exley
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoirOmar Khorshed
 
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectLiquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectMarcellus Drilling News
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids PipelinesEnbridge Inc.
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major ProjectsEnbridge Inc.
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongSantos Ltd
 
petroleum-development-geology
 petroleum-development-geology petroleum-development-geology
petroleum-development-geologyShahnawaz Mustafa
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxyromualdez luis
 
The impact of gas flare commercialization program on the Nigerian domestic g...
The impact of gas flare  commercialization program on the Nigerian domestic g...The impact of gas flare  commercialization program on the Nigerian domestic g...
The impact of gas flare commercialization program on the Nigerian domestic g...Olawunmi Olatunji Msc. FMVA®
 

Tendances (20)

Premier oil 2014_hy_presentation
Premier oil 2014_hy_presentationPremier oil 2014_hy_presentation
Premier oil 2014_hy_presentation
 
Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013Pa resources Pareto O&O Conference 5 sept 2013
Pa resources Pareto O&O Conference 5 sept 2013
 
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITEDApril Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
 
Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentation
 
Kentucky Natural Gas & Oil - Russell
Kentucky Natural Gas & Oil - RussellKentucky Natural Gas & Oil - Russell
Kentucky Natural Gas & Oil - Russell
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
 
Nal energy corporate presentation - january 2012
Nal energy   corporate presentation - january 2012Nal energy   corporate presentation - january 2012
Nal energy corporate presentation - january 2012
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoir
 
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectLiquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
 
Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong Kong
 
petroleum-development-geology
 petroleum-development-geology petroleum-development-geology
petroleum-development-geology
 
SKKmigas
SKKmigasSKKmigas
SKKmigas
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxy
 
The impact of gas flare commercialization program on the Nigerian domestic g...
The impact of gas flare  commercialization program on the Nigerian domestic g...The impact of gas flare  commercialization program on the Nigerian domestic g...
The impact of gas flare commercialization program on the Nigerian domestic g...
 

Similaire à Premier oil13a pres

Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013PA Resources AB
 
Santos indonesia 2014 (linked in)
Santos indonesia 2014 (linked in)Santos indonesia 2014 (linked in)
Santos indonesia 2014 (linked in)Santos Ltd
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013PA Resources AB
 
Unlocking the Economic Potential of South Africa's Oceans
Unlocking the Economic Potential of South Africa's OceansUnlocking the Economic Potential of South Africa's Oceans
Unlocking the Economic Potential of South Africa's OceansDr Lendy Spires
 
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...Symposium
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Company Spotlight
 
Subsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationSubsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationTradeWindsnews
 
Bumi Armada Q2 2013 results presentation
Bumi Armada Q2 2013 results presentationBumi Armada Q2 2013 results presentation
Bumi Armada Q2 2013 results presentationTradeWindsnews
 
Teekay LNG Partners Fourth Quarter and 2012 Earnings Presentation
Teekay LNG Partners Fourth Quarter and 2012 Earnings PresentationTeekay LNG Partners Fourth Quarter and 2012 Earnings Presentation
Teekay LNG Partners Fourth Quarter and 2012 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay LNG Partners Q4 2012 results presentation
Teekay LNG Partners Q4 2012 results presentationTeekay LNG Partners Q4 2012 results presentation
Teekay LNG Partners Q4 2012 results presentationTradeWindsnews
 
Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India Limited
 
REIS 2013 Broken Hill - Centrex Metals ASX:CXM
REIS 2013 Broken Hill - Centrex Metals ASX:CXMREIS 2013 Broken Hill - Centrex Metals ASX:CXM
REIS 2013 Broken Hill - Centrex Metals ASX:CXMSymposium
 
Teekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationTeekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationAltera Infrastructure
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea ProductionLife Cycle Engineering
 
Presentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantPresentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantabhishekthakur309
 
Gas infrastructure development in archipelagic country sampe l. purba
Gas infrastructure development in archipelagic country   sampe l. purbaGas infrastructure development in archipelagic country   sampe l. purba
Gas infrastructure development in archipelagic country sampe l. purbaSampe Purba
 

Similaire à Premier oil13a pres (20)

Annual Results Presentation
Annual Results PresentationAnnual Results Presentation
Annual Results Presentation
 
Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013
 
Santos indonesia 2014 (linked in)
Santos indonesia 2014 (linked in)Santos indonesia 2014 (linked in)
Santos indonesia 2014 (linked in)
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013
 
Unlocking the Economic Potential of South Africa's Oceans
Unlocking the Economic Potential of South Africa's OceansUnlocking the Economic Potential of South Africa's Oceans
Unlocking the Economic Potential of South Africa's Oceans
 
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...
KBL Mining (ASX:KBL) Company Presentation, Symposium Investor Roadshow April ...
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013
 
210512 gas development master plan steering committe meeting
210512 gas development master plan steering committe meeting210512 gas development master plan steering committe meeting
210512 gas development master plan steering committe meeting
 
Q2 Presentation
Q2 PresentationQ2 Presentation
Q2 Presentation
 
Investorupdate sep14
Investorupdate sep14Investorupdate sep14
Investorupdate sep14
 
Subsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationSubsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentation
 
Bumi Armada Q2 2013 results presentation
Bumi Armada Q2 2013 results presentationBumi Armada Q2 2013 results presentation
Bumi Armada Q2 2013 results presentation
 
Teekay LNG Partners Fourth Quarter and 2012 Earnings Presentation
Teekay LNG Partners Fourth Quarter and 2012 Earnings PresentationTeekay LNG Partners Fourth Quarter and 2012 Earnings Presentation
Teekay LNG Partners Fourth Quarter and 2012 Earnings Presentation
 
Teekay LNG Partners Q4 2012 results presentation
Teekay LNG Partners Q4 2012 results presentationTeekay LNG Partners Q4 2012 results presentation
Teekay LNG Partners Q4 2012 results presentation
 
Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013
 
REIS 2013 Broken Hill - Centrex Metals ASX:CXM
REIS 2013 Broken Hill - Centrex Metals ASX:CXMREIS 2013 Broken Hill - Centrex Metals ASX:CXM
REIS 2013 Broken Hill - Centrex Metals ASX:CXM
 
Teekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationTeekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings Presentation
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production
 
Presentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantPresentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plant
 
Gas infrastructure development in archipelagic country sampe l. purba
Gas infrastructure development in archipelagic country   sampe l. purbaGas infrastructure development in archipelagic country   sampe l. purba
Gas infrastructure development in archipelagic country sampe l. purba
 

Plus de Company Spotlight

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsCompany Spotlight
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 

Plus de Company Spotlight (20)

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 

Dernier

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Dernier (20)

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

Premier oil13a pres

  • 2. 21 March 2013 // Page 1 Forward looking statements This presentation may contain forward-looking statements and information that both represents management's current expectations or beliefs concerning future events and are subject to known and unknown risks and uncertainties. A number of factors could cause actual results, performance or events to differ materially from those expressed or implied by these forward-looking statements.
  • 3. 21 March 2013 // Page 2 Agenda Strategy and 2012 highlights Business Units review Key operated developments Exploration update 2012 financial results Summary Simon Lockett Robin Allan Neil Hawkings Andrew Lodge Tony Durrant Simon Lockett
  • 4. STRATEGY AND 2012 HIGHLIGHTS //
  • 5. 21 March 2013 // Page 4 Delivering on our strategy • Focus on high quality, high return developments – Chim Sáo, Huntington, Catcher, Bream, Sea Lion – FPSOs – West Natuna, North Sumatra – Asian gas position • Acquisitions focused on core areas, existing fields, future developments – Disposal of non-operated/non-core assets • Focus on play-opening wells and high impact prospects – Disciplined spend • Maintain balance sheet strength and good liquidity • Production growth to 100,000 boepd and beyond – Substantial cash flow increases • Continue growing the underlying value of the business – NAV/share CAGR >10%
  • 6. 21 March 2013 // Page 5 2012 highlights • Four projects achieved final sanction – Targeting first oil/gas in 2014 • Significant progress with the operated Catcher field – Final sanction targeted for this year • Successful entry into Falkland Islands – Sea Lion development planning well underway • Play-opening acreage added in Vietnam, Falkland Islands and Iraq – Total prospective resources >2.5 bnboe • Increased financial strength – Record profitability – Strongly rising cash flows • Production of 57.7 kboepd, 43% increase
  • 8. 21 March 2013 // Page 7 Falkland Islands • Completed purchase of 60% interest in Rockhopper’s assets for $231 million cash and $770 million carry • Appointed operator of Rockhopper’s licence interests in November 2012 • Falkland Islands Business Unit established in dedicated office – 70 employees by mid-year • Attractive fiscal regime with an effective tax rate of 32.6% • Sea Lion alone adds approximately 200 mmbbls of net discovered 2C resources • Substantial exploration upside
  • 9. 21 March 2013 // Page 8 UK Operated • Significantly higher uptime at the Balmoral facility achieved in 2012 • Solan progressing with 1st phase of development drilling to commence in April • Catcher development concept formally agreed; first oil timing dependent on FPSO tender process Non-operated • Long lead items have been procured for the Kyle field redevelopment • Wytch Farm production exceeded budget due to process plant upgrades, new wells and workovers Huntington and Rochelle • Huntington expected on-stream at the end of the month • Rochelle expected on-stream 2/3Q 2013 UK production run rate of 25 kboepd once Huntington and Rochelle on-stream; doubling to >50 kboepd once Solan and Catcher on-stream * Assumes 4Q 2016 for Catcher
  • 10. 21 March 2013 // Page 9 Norway Bream • Completed SPA with Skeie to increase equity in Bream to 40% • FPSO planned; engineering studies underway • Project sanction early 2014 • First oil in 2017 with an initial production run rate of 35 kbopd Frøy • Commercial discussions to develop a central processing hub continue Exploration • Luno II spudded • Built on Mandal High position through licensing round and acquisition Portfolio management • Non operated discoveries under review Grosbeak; Skarfjell extension Luno II Mandal High Froy Bream Blabaer
  • 11. 21 March 2013 // Page 10 Pakistan • Pakistan achieved 2012 production of 15.6 kboepd • Exploration successes at K-30 and Badhra B North-1 • Further potential to be tested in 2013
  • 12. 21 March 2013 // Page 11 Vietnam Chim Sáo • 10.5 mmboe produced in 2012 • Currently producing ~30 kbopd and ~25 mmscf/d • Addressing power issues which could lead to greater deliverability Dua • 3 well subsea tie back to Chim Sáo • Installation of main pipeline commenced in February 2013 • Forecast average gross production rate of 8-10 kbopd in the first 12 months • First oil targeted for 1H 2014 CRD • Appraisal well to be drilled in mid-2013 Dua pipe lay February 2013
  • 13. 21 March 2013 // Page 12 Indonesia Natuna Sea Block A PSC • Gas sales to Singapore averaged 217 BBtud, up 42% • Total sales capacity increasing to 400 BBtud – Anoa Phase 4, Pelikan and Naga • Year to date market share of 45% • Rising market share offsets impact of LNG in Singapore • Lama development plan underway Kakap PSC • 2012 gas sales to Singapore averaged 33 BBtud • Liquids produced averaged 3.5 kbopd in 2012 Block A Aceh • Focus on improving economics; project sanction by year-end – Capex estimate of ~$650mm – Operator’s efforts to secure higher gas prices progressing well • Matang well may have a positive impact Construction of Pelikan/Naga jackets Anoa phase 4
  • 15. 21 March 2013 // Page 14 Solan project update Key milestones • Full DECC and partner approvals received in April • First oil targeted for Q4 2014; initial production run rate of 24 kbopd • Capex ~$20/bbl Subsurface and drilling • Detailed reservoir studies ongoing; well planning complete • Rig contracted – Phase 1 April 2013: 2 injectors & producer upper hole sections – Phase 2 April 2014: finish drilling 2 producers Producers Injectors Solan reservoir cross section Solan well plan
  • 16. 21 March 2013 // Page 15 Solan project update Platform and Subsea • Platform fabrication commenced at Methil yard, Scotland • Construction of subsea storage tank commenced in December in Dubai • Heavy lift installation in Summer 2014 • Contract for associated subsea flow-lines and control lines awarded • Platform manned for first year only, thereafter monthly maintenance visits • Operations support contract awarded Platform fabrication at Methil Subsea tank fabrication Solan development schematic
  • 17. 21 March 2013 // Page 16 Catcher project update Key milestones • JV formally agreed development concept in December 2012 – Leased FPSO – Subsea development of three fields • Sanction targeted for end 2013 • First oil modelled for 2H 2016, subject to FPSO proposals Subsurface and drilling • Reservoir modelling being updated to optimise subsurface development and drilling plans • Rig procurement process to commence shortly FPSO and subsea wells
  • 18. 21 March 2013 // Page 17 Catcher project update FPSO and subsea • Funded tender for the leased FPSO commenced in February with three FPSO providers • Subsea FEED is underway Now FPSO Bids Project Sanction Order Long Lead Items FPSO Funded Tender Process Evaluate Bids Finalise Contracts Subsea Feed Tender Subsea EPCI Contract(s) Optimise Subsurface Development Plan Tender Drilling Rig CATS / Fulmar Negotiations JV Approval Process DECC Approval Process Prepare DECC Field Dev.Plan Prepare Environmental Statement 2013 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec FPSO Subsea Drilling and Subsurface Select Gas OfftakeRoute Approvals
  • 19. 21 March 2013 // Page 18 Sea Lion project update Key milestones • Concept selection targeted for mid-2013 • Project sanction targeted for mid-2014 • First oil targeted for Q3 2017 Subsurface and drilling • Detailed static and dynamic reservoir modelling underway for Sea Lion • Rig contracting strategy being developed and discussions with rig companies commenced • Evaluating options and timing for satellites • Planning logistics and base requirements for the development drilling campaign
  • 20. 21 March 2013 // Page 19 Sea Lion project update FPSO and subsea • FPSO market enquiries undertaken to assess options for conversions and new builds • Technical studies ongoing, reviewing FPSO fatigue life, turret designs and offloading operability • Technical reviews undertaken to study option of gas lift instead of HSPs • Preliminary topsides designs being assessed • Design studies underway to assess towed bundles as an alternative to conventional flowlines • Evaluation of contractors for subsea FEED has commenced
  • 21. 21 March 2013 // Page 20 Reserves and resources – continuing growth Independent valuations • Based on D&M’s value of 2P reserves and RISC’s value of Sea Lion – $6.5 billion NPV10 at $85/bbl, equivalent to £6/share – $9.8 billion NPV10 at $105/bbl, equivalent to £10/share • Excludes other contingent and prospective resources 900 Year end 2007 600 500 400 0 200 300 Year end 2011 100 Reserves and contingent resources (mmboe) Production Additions & Revisions Year end 2012 2C contingent resources 2P reserves800 700
  • 23. 21 March 2013 // Page 22 • 12 exploration and appraisal wells drilled in 2012 – Carnaby discovery – K-30 and BBN-1 successes – Anoa Deep discovery, opened up Lama play • Three wells currently drilling – Matang – Bonneville – Luno II • Transforming the exploration portfolio, adding higher impact plays with significant follow on potential – Added 1 bnboe prospective resource in 2012 Transforming the exploration portfolio
  • 24. Q1 Q2 Q3 Q4 Block 121 Ca Voi 120 High Block 07/03 CRD appraisal N/A TBC Ca Duc 45 High Block A Aceh Matang 40 Moderate Tuna Block Kuda Laut & Singa Laut 100 High Norway PL359 Luno II 120 Moderate P1181 Lacewing 58 Moderate P1430 Bonneville 10 Low K-32 7 Low K-36 5 Low Badhra South Deepening-1 38 High BBN-1 West 8 Low Badhra-6 Parh 58 Moderate Kenya L10A/L10B Contingent well TBC TBC Mauritania PSC C-10 Tapendar TBC TBC North Sea UK Rest of World Pakistan Kadanwari Badhra-Bhit Indonesia Asia 2013 P50 gross unrisked resource (mmboe) Risk Vietnam Weatherford 812 Bredford Dolphin Maersk Resiliant SLBRig-23 Century Rig 28 Ocean General Ocean General Ocean General Weatherford 812 SLBRig-23 SLB Rig-60 WilPhoenix Ocean General 21 March 2013 // Page 23 2013 exploration drilling programme Contingent Wells Firm Wells: Rig Contracted Firm Wells: Rig TBC All well timings are subject to revision for operational reasons Wells to watch Five high impact wells targeting in excess of 150 mmboe of net unrisked prospective resources
  • 25. Lacewing 21 March 2013 // Page 24 2013 North Sea exploration – Luno II and Lacewing PL 359 BCU Time Map C.I. 100 ms10km Johan SverdrupLuno/Apollo Ragnarrock Luno II Prospect Luno II (spudded) • Luno II is on the south west margin of the Utsira high • Critical risk: reservoir presence • Gross prospective resource: 30-120-300 mmbo • Currently drilling Lacewing (1H 2013) • HPHT Triassic test; learnings will be applied to UK and Norway • Gross prospective resource: 24-58-110 mmboe • Critical risks: trap effectiveness and reservoir quality • Well expected to spud April 2013 Inner Moray Firth Mandal High Greater Catcher Area Quad 16 Mesozoic Luno II Lacewing Bonneville Grosbeak; Skarfjell extension
  • 26. 21 March 2013 // Page 25 2013 Nam Con Son programme Kuda/Singa Laut (2H 2013) • Faulted dip closed structure up dip from a proven source kitchen to the east • Low risk for gas, high risk for commercial oil • Gross prospective resource: 60-100-140 mmboe Silver Sillago (Ca Duc) (2H 2013) • Analogous to Chim Sao • Critical risk: fault seal • Gross prospective resource: 20-45-105 mmboe Ca Duc NW SE NW SEBelut Laut-1 TD 4977m Kuda Laut MMU L.Terumbu Arang Gabus Depth of Top Oligocene in Gajah Laut Utara Top Basement Top NCS Top Cau MMU Dua 2km Gajah Laut Utara-1 TD 4687m Singa Laut
  • 27. 21 March 2013 // Page 26 2013 play-opening well – Ca Voi • Premier equity 40% • The Ca Voi prospect is the first test of the Oligocene play in the Phu Khanh Basin • High risk well with multiple follow-up potential • Gross prospective resource: 35-120-190 mmbo • Well planned for May 2013 121-CV-1X 121-CV-1XNW SW W E Sea Bed Mid Miocene Syn-Rift Unc. Basement 2km 121-CV-1 Proposed Surface Location
  • 28. 21 March 2013 // Page 27 Ca Voi follow on potential • A successful Whale (Ca Voi) well de-risks multiple leads – Swordfish – East Whale • Unexplored intra-basinal highs in the deep water part of Block 121 • Block resource potential >1 bnboe Deep Water Leads Area Basin Edge Leads Block 121 Prospects and Leads Swordfish Whale & East Whale 25km NESW Top Miocene Top Oligocene Basement Whale East Whale DW Lead 1 DW Lead 2
  • 29. 21 March 2013 // Page 28 Kenya exploration (2013/14) L10A & L10B • Oil (Miocene carbonate) play in the West, deeper Cretaceous sandstone (gas?) play in the East – 5000 km2 of 3D and 1000 km 2D acquired • Upcoming drilling in 2014, possibly late 2013 • Gross prospective resource: ~1bn boe Inboard Reef Play SW NE Kiboko Prospect, Block L11B Outboard Plays Block L10BW E
  • 30. 21 March 2013 // Page 29 Lama play (2014/15) • Anoa Deep – ~300 feet of fractured Lama Sandstones within the Anoa field – 70-100-150 bcf total gas in place • Significant follow-on potential – Gross accessible prospective resource: ~2TCF – Exploration drilling in 2014 and 2015 Lama Prospects and Leads
  • 31. 21 March 2013 // Page 30 Mandal High (2014/15) • Shares similar characteristics to that of the Utsira High in 2008 – Proven Kitchen to west of High – Proven Jurassic sands to east of High – Hydrocarbons proven in basement • Myrhauk prospect is targeted for drilling in 2014 Premier has access to ~ 200 mmbo of net prospective resources on and around the Mandal High
  • 32. 21 March 2013 // Page 31 Falkland Islands exploration (2014/15) Fan 2 Fan 3Fan 1 • Defined lead and prospect inventory • A minimum of 3 exploration wells planned – Play opening wells to be drilled below existing Sea Lion sands and in up-dip east flank sands – 100-250-750 mmboe total resource potential in multiple stacked targets Fan 5 Fan 1 Fan 2 Fan 3 Fan 4 Beverly Discovery Casper South Discovery
  • 33. 21 March 2013 // Page 32 What should you expect from exploration in 2013 • Play opening test in East Vietnam • Key prospects drilled in Nam Con Son and North Sea • Near field drilling in Catcher, Aceh and Pakistan • Mature portfolio for 2014/15 drilling – Kenya – Norway (Mandal High) – Indonesia (Lama) – Falklands – UK (Inner Moray Firth) • Exit non-material acreage • Continue to replenish the portfolio, adding new high impact plays
  • 35. 21 March 2013 // Page 34 Record profits 12 months to 31 Dec 2011 Operating costs (US$/bbl) 2012 2011 UK 41.9 39.5 Indonesia 11.2 11.1 Pakistan 2.3 2.4 Vietnam 13.7 16.6 Group 16.2 15.9 Highlights12 months to 31 Dec 2012 Working Interest production (kboepd) Entitlement production (kboepd) Realised oil price (US$/bbl) - pre hedge Realised gas price (US$/mcf) - pre hedge Sales and other operating revenues Cost of sales Gross profit Exploration/New Business General and administration costs Operating profit Financial items Profit before taxation Tax charge/(credit) Profit after taxation 40.4 37.7 111.9 8.5 US$m 827 (415) 412 (211) (26) 176 (34) 142 29 171 57.7 51.6 111.4 8.3 US$m 1,409 (743) 666 (187) (24) 455 (95) 360 (108) 252 • Net impact on 2012 of US$25 million post-tax • 17% of 2013 production hedged at average equivalent of US$105/bbl • Rolling forward sale programme for 2014 targeting US$110/bbl Hedging
  • 36. 21 March 2013 // Page 35 Rising cash flows Cash flow from operations Taxation Operating cash flow Capital expenditure Acquisitions/disposals, net Finance and other charges, net Pre-licence expenditure Net cash out flow 12 months to 31 Dec 2011 US$m 2012 Development Exploration Capital expenditure split (US$m) 772 530 (44) 486 (661) (90) (50) (23) (338) 12 months to 31 Dec 2012 US$m 1,041 (233) 808 (772) (210) (163) (29) (366) 2013 Forecast of US$1 billion (development) and US$200 million (exploration) 433 228 661 2011 • Five-year acquisition cost: – US$6.6/bbl (including carries) • Five-year development capex (new projects): – US$14.3/bbl • Five-year exploration/appraisal cost (post tax): – US$5.4/bbl Acquisitions, development and finding costs 585 187
  • 37. 21 March 2013 // Page 36 Group taxation position Overseas Prior period provisions/revisions UK PRT CT Current charge Deferred tax credits Tax charge/credit for the year 12 months to 31 Dec 2011 US$m Allowances brought forward Net additions RFES Tax allowances carried forward UK Tax Losses/Allowances Position 12 months to 31 Dec 2012 US$m Tax charge Tax paying overseas; no UK CT expected until post-2018 Overseas tax position • Tax paying - Indonesia, Pakistan, Vietnam • Expected effective rates for 2013: 137.0 (11.9) 83.1 – 208.2 (100.3) 107.9 1,360 398 129 1,887 % of Operating Profit* Indonesia 50 Pakistan, Vietnam 30-33 60.1 70.0 17.2 – 147.3 (177.0) (29.7) As at 31 Dec US$m *Before exploration write off
  • 38. 21 March 2013 // Page 37 Cash Bank debt Bonds Convertibles Net debt position Gearing Cash and undrawn facilities 309 (484) (341) (228) (744) 36% 1,116 187 (500) (577) (220) (1,110) 36% 1,110 Average debt costs of 4.6% (fixed) and 2.3% (floating) Facilities extended post year-end by US$150 million Excludes uncommitted facilities of $310 million Stable balance sheet; continued access to multiple debt markets Debt maturity profile (including Letters of Credit) 1 Maturity value of US$245 million 12 months to 31 Dec 2011 US$m 12 months to 31 Dec 2012 US$m 1 2 Net debt/net debt plus equity 2 Strong liquidity and balance sheet position
  • 39. 21 March 2013 // Page 38 Fully funded programme Funding Outlook • Significant growth in cash flow – US$2 billion pa post-Catcher * – US$2.5 billion pa post-Sea Lion * • Surplus cash flows 2013-2015* before discretionary exploration spend • Gearing position unchanged through to Sea Lion first oil at US$85/bbl • Forward profile funded by cash flow and facilities down to US$65/bbl 2500 Investment Profile (development) (US$ million) 2014 2250 2000 1750 1500 1250 1000 750 500 0 250 2013 2015 2016 2017 Standby Funding – Sea Lion Premier * Assumes US$100/bbl
  • 41. 21 March 2013 // Page 40 What can you expect from Premier? Rapidly rising production and cash flow (kboepd) 2011 20132012 Sea LionCatcher 40 65-70 58 100+ 100 • Growing production • Quality execution of development projects • Increasingly material and higher impact exploration • Continuing portfolio management • Strong growth in cash flow generation – Commenced cash returns to shareholders A continued focus on growing the underlying NAV/share
  • 43. 21 March 2013 // Page 42 End 2012 2P reserves and contingent resources Falkland Islands Indonesia Norway Pakistan & Mauritania UK Vietnam Total 2P Reserves On production - 36.2 - 28.2 29.7 28.0 122.1 Approved for development - 36.0 - 5.6 19.8 7.0 68.4 Justified for development - 25.0 - 0.8 74.3 1.4 101.4 Total Reserves - 97.2 - 34.6 123.7 36.4 291.9 2C Contingent Resources Development pending 193.7 - 71.5 2.5 4.2 - 271.9 Development un- clarified / on hold 32.7 68.0 0.1 16.2 16.7 13.2 146.9 Development not currently viable 6.2 4.9 2.3 12.8 28.7 7.2 62.0 Total Contingent Resources 232.6 72.9 73.9 31.5 49.6 20.3 480.7 Total Reserves & Contingent Resources 232.6 170.1 73.9 66.0 173.3 56.8 772.7
  • 44. Premier Oil Plc 23 Lower Belgrave Street London SW1W 0NR Tel: +44 (0)20 7730 1111 Fax: +44 (0)20 7730 4696 Email: premier@premier-oil.com www.premier-oil.com 21 March 2013