GEORGETOWN ISD
2010 BOND PROGRAM UPDATE




        J U N E 2 011
                           Huckabee
2010 BOND PROGRAM UPDATE




                                                        TABLE OF CONTENTS

                               East View High School Phase 2 Additions, Package 1          3

                               East View High School Phase 2 Additions, Package 2          7

                               New Warehouse Facility                                      9

                               Annie Purl Elementary School Roof and HVAC Modifications   12

                               Georgetown High School Additions and Renovations           13




                                                                                               Huckabee
Georgetown Independent School District                                                                2
2010 BOND PROGRAM UPDATE                                                                                                        General Contractor



                                  EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
                                                          Contract Amount: $5,321,000

                                                                                                         Mezzanine
                                                                                                                                         Mechanical
                                                                                                          Storage




                                                                                                                                                      Weight	Room




                                                                                                                                                                                             Junior	Varsity	Football	
                                                                                                                                                                                                 Locker	Room
                                                                                                Main	
                              B                                                         Mech.
                                                                                                Elec.
                                                                                                        Storage                                                     Meeting	Room

                                       D                                                                                      Office         Training
                                  C                                                                                                                                                                            Stor.
                                                                                                            Laundry
                          A
                                                                                                                               Head	                     AV	                       IDF
                                                                                                                               Coach                    Stor.                      Elec.
                                            A.	   New	Football	Field	House                                                     Secre-
                                                                                                                                                                          Lockers Jan.        Freshman	Football	
                                            B.	   New	Concession/Restroom	Bldg          Varsity	Football	Locker	Room            tary                  Coaches	                                   Locker	Room
                                            C.	   New	Grandstands	for	2,500
                                            D.	   New	Field	Events

Site Plan                                                                                                                Football Field House - Floor Plan

                                                                                                                         Mechanical     Electrical
                                                                                                                                                                                   Storage




                                                                                                                                                                        Storage    Storage




                                                                                                                                                                            Concession
                                                                                                                          Women                          Men




                                                                                                          Ticket-
                                                                                                                                                 In               Out




                                                                                                            ing
                                                                                                                    In                 Out
                                                                                                                                                        Family	
                                                                                                                                                          RR



                                                                                                            Stadium Restroom/Concession - Floor Plan
Conceptual 3D Rendering                                                                                                                                                      Huckabee
Georgetown Independent School District                                                                                                                                                                             3
2010 BOND PROGRAM UPDATE                                                                 General Contractor




                                      EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1
                                                                              PROGRESS REPORT

     SITE
                                                                                                                            MILESTONE DATES
     •	 The	final	grading	has	started	on	the	East	side	of	the	site	and	progress	will	           Schematic Design Presentation                        November 11, 2010
          continue	to	be	made	towards	the	South	side	of	the	site.
     •	 The	sport	light	poles	have	been	installed.                                              Architect Signs Documents                            November 24, 2010
                                                                                                Pre-Proposal Meeting                                 December 8, 2010
     CONCESSION	BUILDING
     •	 The	exterior	masonry	is	complete	and	the	interior	is	80	percent	complete.	The	          Proposal Part A Due                                  December 21, 2010
        plumbing	and	electrical	work	will	continue.	                                            Proposal Part B Due                                  December 22, 2010
     •	 The	metal	roof	material	has	been	installed	and	the	trim	installation	has	started.	
                                                                                                Proposal Evaluations                                 January 4, 2011
     FIELD	HOUSE
                                                                                                General Contractor Recommendation to School Board    January 10, 2011
     •	 The	metal	building	is	being	installed	and	the	placement	of	the	roof	has	started.	
     •	 The	interior	masonry	walls	for	the	mezzanine	are	complete.                              First Owner/CO Meeting                               February 15, 2011
     •	 The	plumbing	and	electrical	are	currently	being	installed.
                                                                                                Construction Start Date                              February 18, 2011
     FIELD/TRACK                                                                                Building Permit Issued                               March 16, 2011
     •	 The	field	has	been	laser	graded.	The	liner	and	base	stone	have	been	installed	
         along	with	the	field	drainage	system.	
                                                                                                Substantial Completion (Field/Track and Bleachers)   August 1, 2011
     •	 The	inside	and	outside	track	curbs	are	complete.                                        Substantial Completion (Buildings)                   August 15, 2011
     •	 The	track	base	is	being	installed	and	the	asphalt	for	the	running	surface	will	be	
         installed	this	week.
     •	 The	approved	turf	layout	has	been	sent	to	the	manufacturer.	It	will	be	two	to	four	
         weeks	until	the	turf	delivery.		

     BLEACHERS	&	PRESS	BOX
     •	 Overall,	the	grandstands	are	90	percent	complete.	The	grandstand	piers	are	
        complete.	The	press	box	framing	is	scheduled	to	begin	in	two	weeks.	




                                                                                                                                                     Huckabee
Georgetown Independent School District                                                                                                                                    4
2010 BOND PROGRAM UPDATE


                           EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1



                                                                                       Parking          Football
                                                                                                      Field House




                                              High Jump
                                                                                          Bleachers                 Concession/Restroom
                                                                                                                          Building
                                                                            Field


                                     Discus

                                                          Shot Put



                                                                                Discus




                                                                    Aerial
                                                          (Photo taken May 19, 2011)
                                                                                                                                     Huckabee
Georgetown Independent School District                                                                                                      5
2010 BOND PROGRAM UPDATE


                                EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1




         Overall View of Football Field                      Football Field and Bleachers




         Concession/Restroom Building                        Football Field House
                                                                                            Huckabee
Georgetown Independent School District                                                             6
2010 BOND PROGRAM UPDATE                                                                                                              General Contractor




                                                     EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
                                                                                                                         Contract Amount: $25,574,000
                                         I
                                                                                                                                                                                                                                                     New Athletic Addition
                                I
                                                             J
                                                         H
                                                                     H

                                                                                           F

                                                                                       G                 J
                                                                 H


                                                                                                                 J
                                                                                                                                                                                First Floor
                Bid Package 1
                                                                                               A


                                                                                                    B                J
                                                                          Existing East View
                                                 J                           High School                     B
                                                                                                                            A. New Athletic Addition
                                                                                                                            B. New Fine Arts Addition                                                                                                     New Fine Arts Addition
                                                     D
                                                         E                                                                  C. New Academic Addition
                                                                 C
                                                                                                                            D. New CTE Building
                                                                                                                                                                   New Academic Addition
                                                                                                                            E. New ROTC Addition (Alt.)
                                    CR
                                         10                                                                                 F. New Tennis Courts
                                             4
                                                                                                 ay
                                                                                                    29                      G. New Tennis Building
                                                                                               hw
                                                                                        Hig                                 H. New Baseball/Softball Fieldhouse,
                                                                                                                               Bleachers, Lighting & Pressbox
                                                                                                                            I. New Practice Fields
                                                                                                                            J. New Parking (1,070 spaces)




                                                                                                                                                                                                     New Academic Addition




                                                                         CTE Building


                                                                                                                                                                                           Second Floor                      New CTE/ROTC Addition




Academic Wing                                                            Softball Field House                                                                                                                                              Huckabee
Georgetown Independent School District                                                                                                                                                                                                                                       7
2010 BOND PROGRAM UPDATE                                                            General Contractor




                           EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2
                                               PROGRESS REPORT

                                                                                              MILESTONE DATES
                                                                 Schematic Design Presentation                               January 1, 2011
                                                                 Architect Signs Documents                                   March 8, 2011
                                                                 Building Permit Application Submittal                       March 15, 2011
                                                                 Site Plan Application Submittal                             March 17, 2011
                                                                 Pre-Proposal Meeting                                        March 22, 2011
                                                                 Tour with General Contractors at East View Ninth Grade Center March 30, 2011
                                                                 Proposal Part A Due                                         April 7, 2011
                                                                 Proposal Part B Due                                         April 8, 2011
                                                                 Proposal Evaluations                                        April 11, 2011
                                                                 Received City Building Dept.. Plan Review Comments          April 14, 2011
                                                                 General Contractor Recommendation to School Board           April 18, 2011
                                                                 Received City Planning Dept.. Plan Review Comments          April 25, 2011
                                                                 Construction Start Date                                     May 19, 2011
                                                                 First Owner/CO Meeting                                      May 24, 2011
                                                                 Building Permit Issued                                      June 1, 2011
                                                                 Substantial Completion                                      June 27, 2012




                                                                                                                             Huckabee
Georgetown Independent School District                                                                                                            8
2010 BOND PROGRAM UPDATE                                                       General Contractor




                                                  NEW WAREHOUSE FACILITY
                                                                 Contract Amount: $641,000




                             Shed
                                                    Existing Support
                                                        Services




                                                                                                                              ALTERNATE #2




                 Warehouse                                                                                                 Shop - Floor Plan
                  Facility



                                                                                                   ALTERNATE #1


                                                                                         Warehouse Facility - Floor Plan

                                                 Existing Bus Wash Bay




                                    Site Plan                                                                                   Huckabee
Georgetown Independent School District                                                                                                              9
2010 BOND PROGRAM UPDATE                                                             General Contractor




                                                             NEW WAREHOUSE FACILITY
                                                                       PROGRESS REPORT

     SITE
                                                                                                                    MILESTONE DATES
     •	 Building	pad	and	site	utilities	are	in	place.                                    Schematic Design Presentation                           January 10, 2011
     BUILDING                                                                            Architect Signs Documents                               January 12, 2011
     •	 Underground	plumbing	is	in	place.	                                               Building Permit Application Submittal                   January 25, 2011
     •	 Ninety	percent	of	the	concrete	grade	beams	have	been	excavated.	
     •	 Concrete	slab	pour	is	scheduled	for	mid-July.	                                   Proposal Part A Due                                     February 15, 2011
                                                                                         Proposal Part B Due                                     February 16, 2011
                                                                                         Site Plan Application Submittal                         February 17, 2011
                                                                                         Proposal Evaluations                                    February 17, 2011
                                                                                         Landscaping Plans Approved                              March 1, 2011
                                                                                         General Contractor Recommendation to School Board       March 7, 2011
                                                                                         Job Coordination Meeting                                March 25, 2011
                                                                                         Grading/Utilities Permit Received                       March 31, 2011
                                                                                         First Amended Administrative Exception Submitted        April 18, 2011
                                                                                         Second Amended Administrative Exception Submitted       April 20, 2011
                                                                                         Final Planning Dept. Comments Received                  April 25, 2011
                                                                                         Building Permit Issued                                  April 28, 2011
                                                                                         First Owner/CO Meeting                                  May 5, 2011
                                                                                         Construction Start Date                                 May 9, 2011
                                                                                         Substantial Completion                                  August 12, 2011


                                                                                                                                             Huckabee
Georgetown Independent School District                                                                                                                               10
2010 BOND PROGRAM UPDATE


                                               NEW WAREHOUSE FACILITY




         Building Pad - Warehouse Facility                   Building Pad - Three-Sided Storage Building




                                                                                                           Huckabee
Georgetown Independent School District                                                                           11
2010 BOND PROGRAM UPDATE                                                                     General Contractor




                     ANNIE PURL ELEMENTARY SCHOOL ROOF AND HVAC MODIFICATIONS
                                                                         Contract Amount: $229,000


                                                                                                                               MILESTONE DATES
                                                                                                     Schematic Design Presentation                        January 10, 2011
                                                                                                     Architect Signs Documents                            February 3, 2011
                                            A
                                                                                                     Pre-Proposal Meeting                                 February 9, 2011
          B                                              B
         HVAC Unit                                       HVAC Unit
                                                                                                     Proposal Part A Due                                  February 22, 2011
                                                                                                     Proposal Part B Due                                  February 23, 2011
                                                                                                     Proposal Evaluations                                 February 24, 2011
                                                                                                     Building Permit Issued                               March 2, 2011
                                                                                                     General Contractor Recommended to School Board       March 7, 2011
                                                                A.	   Replace	Roof
                                                                B.	   New	HVAC	Units                 First Owner/CO Meeting                               May 24, 2011
                          A                      A              C.	   New	Metal	Coping	on	Parapets
                                                                D.	   New	Gutter	and	Downspouts      Construction Start Date                              June 6, 2011
                                                                                                     Substantial Completion                               August 12, 2011

                     C




                                 B
                         HVAC Unit                   D

                                        A




                                     Roof Plan
                                                                                                                                                      Huckabee
Georgetown Independent School District                                                                                                                                        12
2010 BOND PROGRAM UPDATE                                   Construction Manager




                                GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
                                                                                                                      BAIRD WILLIAMS
                                                                                                                      CONSTRUCTION

                                                                                                                      Project Manager




                    CTE Wing




                                             Cafeteria
                                                                                                                          Athletics
                                                                                                       Auditorium
                                  Academic                                   Athletics     Athletics
                                                           Computer
                                                             Labs
                    Science
                     Labs




                                Library
                                                                                                                           Athletics
            Special Education                                                            Academic



                                                                      Fine
                                                                      Arts




                                                                                                                     Huckabee
Georgetown Independent School District                                                                                                     13
2010 BOND PROGRAM UPDATE                                                             Construction Manager




                                 GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS
                                                                                                                                                         BAIRD WILLIAMS
                                                                                                                                                         CONSTRUCTION

                                                                                                                                                         Project Manager
                                  MILESTONE DATES
        Design Kick-off Meeting with Librarian, Science Dept..
                                                                   February 28, 2011
        and Nurse
        Design Kick-off Meeting with Athletics                     March 1, 2011
        Initial Construction Phasing with Stakeholders             March 3, 2011
        Design Kick-off Meeting with Special Education             March 4, 2011         First Meeting with District, Architect, Project Manager
                                                                                                                                                   April 19, 2011
                                                                                         and Construction Manager
        Design Kick-off Meeting with Administration                March 10, 2011
                                                                                         Site Logistics Survey with District, Architect, Project
        Advertisement for Construction Manager at Risk RFQ         March 12, 2011                                                                  April 29, 2011
                                                                                         Manager and Construction Manager
        Received Construction Manager at Risk Step 1
                                                                   March 29, 2011        Schematic Design Presentation                             June 6, 2011
        (Qualifications)
                                                                                         Architect Signs Documents                                 August 19, 2011
        Evaluation Team Grades and Develops Recommended
                                                                   March 30, 2011        First Owner/CO Meeting                                    TBD
        Short List
        Facility Assessment of ADA, Code and Existing Conditions   March 29 - 30, 2011   Construction Start Date                                   October 13, 2011
        School Board Receives Recommended Short List               April 4, 2011         Substantial Completion                                    July 2013
        Step 2 of RFQ Submitted to Short Listed Contractors
                                                                   April 5, 2011
        (Fees and General Conditions)
        Fees and General Conditions due by 3 PM                    April 8, 2011
        Board of Trustees Select Construction Manager at Risk      April 18, 2011




                                                                                                                                                         Huckabee
Georgetown Independent School District                                                                                                                                       14

Contenu connexe

En vedette (7)

Huckabee Construction Update April 2012
Huckabee Construction Update April 2012Huckabee Construction Update April 2012
Huckabee Construction Update April 2012
 
Huckabee Update 02-06-2012
Huckabee Update 02-06-2012Huckabee Update 02-06-2012
Huckabee Update 02-06-2012
 
Huckabee Project Update 12-05-11
Huckabee Project Update 12-05-11Huckabee Project Update 12-05-11
Huckabee Project Update 12-05-11
 
10-03-11 Huckabee Update
10-03-11 Huckabee Update10-03-11 Huckabee Update
10-03-11 Huckabee Update
 
SHW Construction Update - April 2012
SHW Construction Update - April 2012SHW Construction Update - April 2012
SHW Construction Update - April 2012
 
Huckabee Update 01-10-2012
Huckabee Update 01-10-2012Huckabee Update 01-10-2012
Huckabee Update 01-10-2012
 
07-25-2011 Georgetown High School
07-25-2011 Georgetown High School07-25-2011 Georgetown High School
07-25-2011 Georgetown High School
 

Plus de Georgetown Independent School District

Plus de Georgetown Independent School District (20)

Financial Presentation July 2014
Financial Presentation July 2014Financial Presentation July 2014
Financial Presentation July 2014
 
Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014Georgetown ISD Financial Presentation June 2014
Georgetown ISD Financial Presentation June 2014
 
Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11Georgetown ISD Elementary School #11
Georgetown ISD Elementary School #11
 
2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation2013-2014 Budget Update Presentation
2013-2014 Budget Update Presentation
 
AEIS 2012 Georgetown ISD Presentation
AEIS 2012 Georgetown ISD PresentationAEIS 2012 Georgetown ISD Presentation
AEIS 2012 Georgetown ISD Presentation
 
AYP 2012 Georgetown ISD Presentation
AYP 2012 Georgetown ISD PresentationAYP 2012 Georgetown ISD Presentation
AYP 2012 Georgetown ISD Presentation
 
Huckabee Presentat
Huckabee PresentatHuckabee Presentat
Huckabee Presentat
 
Schools First Financial Reports
Schools First Financial ReportsSchools First Financial Reports
Schools First Financial Reports
 
Tax Ratification Election Presentation
Tax Ratification Election PresentationTax Ratification Election Presentation
Tax Ratification Election Presentation
 
03-26-12 McCoy Project Update
03-26-12 McCoy Project Update03-26-12 McCoy Project Update
03-26-12 McCoy Project Update
 
03-26-12 Huckabee Project Update
03-26-12 Huckabee Project Update03-26-12 Huckabee Project Update
03-26-12 Huckabee Project Update
 
STAAR High School Presentation
STAAR High School PresentationSTAAR High School Presentation
STAAR High School Presentation
 
STAAR Grade 3-8 Presentation
STAAR Grade 3-8 PresentationSTAAR Grade 3-8 Presentation
STAAR Grade 3-8 Presentation
 
AYP 2010-2011 Presentation
AYP 2010-2011 PresentationAYP 2010-2011 Presentation
AYP 2010-2011 Presentation
 
AEIS Report Presentation
AEIS Report PresentationAEIS Report Presentation
AEIS Report Presentation
 
SHW Update 02-06-2012
SHW Update 02-06-2012SHW Update 02-06-2012
SHW Update 02-06-2012
 
SHW Update 01-10-2012
SHW Update 01-10-2012SHW Update 01-10-2012
SHW Update 01-10-2012
 
A Report to Citizens
A Report to CitizensA Report to Citizens
A Report to Citizens
 
SHW Project Update 12-05-11
SHW Project Update 12-05-11SHW Project Update 12-05-11
SHW Project Update 12-05-11
 
SHW Update -11/07/2011
SHW Update -11/07/2011SHW Update -11/07/2011
SHW Update -11/07/2011
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Dernier (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 

06-06-2011 Huckabee Project Update

  • 1. GEORGETOWN ISD 2010 BOND PROGRAM UPDATE J U N E 2 011 Huckabee
  • 2. 2010 BOND PROGRAM UPDATE TABLE OF CONTENTS East View High School Phase 2 Additions, Package 1 3 East View High School Phase 2 Additions, Package 2 7 New Warehouse Facility 9 Annie Purl Elementary School Roof and HVAC Modifications 12 Georgetown High School Additions and Renovations 13 Huckabee Georgetown Independent School District 2
  • 3. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1 Contract Amount: $5,321,000 Mezzanine Mechanical Storage Weight Room Junior Varsity Football Locker Room Main B Mech. Elec. Storage Meeting Room D Office Training C Stor. Laundry A Head AV IDF Coach Stor. Elec. A. New Football Field House Secre- Lockers Jan. Freshman Football B. New Concession/Restroom Bldg Varsity Football Locker Room tary Coaches Locker Room C. New Grandstands for 2,500 D. New Field Events Site Plan Football Field House - Floor Plan Mechanical Electrical Storage Storage Storage Concession Women Men Ticket- In Out ing In Out Family RR Stadium Restroom/Concession - Floor Plan Conceptual 3D Rendering Huckabee Georgetown Independent School District 3
  • 4. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1 PROGRESS REPORT SITE MILESTONE DATES • The final grading has started on the East side of the site and progress will Schematic Design Presentation November 11, 2010 continue to be made towards the South side of the site. • The sport light poles have been installed. Architect Signs Documents November 24, 2010 Pre-Proposal Meeting December 8, 2010 CONCESSION BUILDING • The exterior masonry is complete and the interior is 80 percent complete. The Proposal Part A Due December 21, 2010 plumbing and electrical work will continue. Proposal Part B Due December 22, 2010 • The metal roof material has been installed and the trim installation has started. Proposal Evaluations January 4, 2011 FIELD HOUSE General Contractor Recommendation to School Board January 10, 2011 • The metal building is being installed and the placement of the roof has started. • The interior masonry walls for the mezzanine are complete. First Owner/CO Meeting February 15, 2011 • The plumbing and electrical are currently being installed. Construction Start Date February 18, 2011 FIELD/TRACK Building Permit Issued March 16, 2011 • The field has been laser graded. The liner and base stone have been installed along with the field drainage system. Substantial Completion (Field/Track and Bleachers) August 1, 2011 • The inside and outside track curbs are complete. Substantial Completion (Buildings) August 15, 2011 • The track base is being installed and the asphalt for the running surface will be installed this week. • The approved turf layout has been sent to the manufacturer. It will be two to four weeks until the turf delivery. BLEACHERS & PRESS BOX • Overall, the grandstands are 90 percent complete. The grandstand piers are complete. The press box framing is scheduled to begin in two weeks. Huckabee Georgetown Independent School District 4
  • 5. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1 Parking Football Field House High Jump Bleachers Concession/Restroom Building Field Discus Shot Put Discus Aerial (Photo taken May 19, 2011) Huckabee Georgetown Independent School District 5
  • 6. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1 Overall View of Football Field Football Field and Bleachers Concession/Restroom Building Football Field House Huckabee Georgetown Independent School District 6
  • 7. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Contract Amount: $25,574,000 I New Athletic Addition I J H H F G J H J First Floor Bid Package 1 A B J Existing East View J High School B A. New Athletic Addition B. New Fine Arts Addition New Fine Arts Addition D E C. New Academic Addition C D. New CTE Building New Academic Addition E. New ROTC Addition (Alt.) CR 10 F. New Tennis Courts 4 ay 29 G. New Tennis Building hw Hig H. New Baseball/Softball Fieldhouse, Bleachers, Lighting & Pressbox I. New Practice Fields J. New Parking (1,070 spaces) New Academic Addition CTE Building Second Floor New CTE/ROTC Addition Academic Wing Softball Field House Huckabee Georgetown Independent School District 7
  • 8. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 PROGRESS REPORT MILESTONE DATES Schematic Design Presentation January 1, 2011 Architect Signs Documents March 8, 2011 Building Permit Application Submittal March 15, 2011 Site Plan Application Submittal March 17, 2011 Pre-Proposal Meeting March 22, 2011 Tour with General Contractors at East View Ninth Grade Center March 30, 2011 Proposal Part A Due April 7, 2011 Proposal Part B Due April 8, 2011 Proposal Evaluations April 11, 2011 Received City Building Dept.. Plan Review Comments April 14, 2011 General Contractor Recommendation to School Board April 18, 2011 Received City Planning Dept.. Plan Review Comments April 25, 2011 Construction Start Date May 19, 2011 First Owner/CO Meeting May 24, 2011 Building Permit Issued June 1, 2011 Substantial Completion June 27, 2012 Huckabee Georgetown Independent School District 8
  • 9. 2010 BOND PROGRAM UPDATE General Contractor NEW WAREHOUSE FACILITY Contract Amount: $641,000 Shed Existing Support Services ALTERNATE #2 Warehouse Shop - Floor Plan Facility ALTERNATE #1 Warehouse Facility - Floor Plan Existing Bus Wash Bay Site Plan Huckabee Georgetown Independent School District 9
  • 10. 2010 BOND PROGRAM UPDATE General Contractor NEW WAREHOUSE FACILITY PROGRESS REPORT SITE MILESTONE DATES • Building pad and site utilities are in place. Schematic Design Presentation January 10, 2011 BUILDING Architect Signs Documents January 12, 2011 • Underground plumbing is in place. Building Permit Application Submittal January 25, 2011 • Ninety percent of the concrete grade beams have been excavated. • Concrete slab pour is scheduled for mid-July. Proposal Part A Due February 15, 2011 Proposal Part B Due February 16, 2011 Site Plan Application Submittal February 17, 2011 Proposal Evaluations February 17, 2011 Landscaping Plans Approved March 1, 2011 General Contractor Recommendation to School Board March 7, 2011 Job Coordination Meeting March 25, 2011 Grading/Utilities Permit Received March 31, 2011 First Amended Administrative Exception Submitted April 18, 2011 Second Amended Administrative Exception Submitted April 20, 2011 Final Planning Dept. Comments Received April 25, 2011 Building Permit Issued April 28, 2011 First Owner/CO Meeting May 5, 2011 Construction Start Date May 9, 2011 Substantial Completion August 12, 2011 Huckabee Georgetown Independent School District 10
  • 11. 2010 BOND PROGRAM UPDATE NEW WAREHOUSE FACILITY Building Pad - Warehouse Facility Building Pad - Three-Sided Storage Building Huckabee Georgetown Independent School District 11
  • 12. 2010 BOND PROGRAM UPDATE General Contractor ANNIE PURL ELEMENTARY SCHOOL ROOF AND HVAC MODIFICATIONS Contract Amount: $229,000 MILESTONE DATES Schematic Design Presentation January 10, 2011 Architect Signs Documents February 3, 2011 A Pre-Proposal Meeting February 9, 2011 B B HVAC Unit HVAC Unit Proposal Part A Due February 22, 2011 Proposal Part B Due February 23, 2011 Proposal Evaluations February 24, 2011 Building Permit Issued March 2, 2011 General Contractor Recommended to School Board March 7, 2011 A. Replace Roof B. New HVAC Units First Owner/CO Meeting May 24, 2011 A A C. New Metal Coping on Parapets D. New Gutter and Downspouts Construction Start Date June 6, 2011 Substantial Completion August 12, 2011 C B HVAC Unit D A Roof Plan Huckabee Georgetown Independent School District 12
  • 13. 2010 BOND PROGRAM UPDATE Construction Manager GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS BAIRD WILLIAMS CONSTRUCTION Project Manager CTE Wing Cafeteria Athletics Auditorium Academic Athletics Athletics Computer Labs Science Labs Library Athletics Special Education Academic Fine Arts Huckabee Georgetown Independent School District 13
  • 14. 2010 BOND PROGRAM UPDATE Construction Manager GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS BAIRD WILLIAMS CONSTRUCTION Project Manager MILESTONE DATES Design Kick-off Meeting with Librarian, Science Dept.. February 28, 2011 and Nurse Design Kick-off Meeting with Athletics March 1, 2011 Initial Construction Phasing with Stakeholders March 3, 2011 Design Kick-off Meeting with Special Education March 4, 2011 First Meeting with District, Architect, Project Manager April 19, 2011 and Construction Manager Design Kick-off Meeting with Administration March 10, 2011 Site Logistics Survey with District, Architect, Project Advertisement for Construction Manager at Risk RFQ March 12, 2011 April 29, 2011 Manager and Construction Manager Received Construction Manager at Risk Step 1 March 29, 2011 Schematic Design Presentation June 6, 2011 (Qualifications) Architect Signs Documents August 19, 2011 Evaluation Team Grades and Develops Recommended March 30, 2011 First Owner/CO Meeting TBD Short List Facility Assessment of ADA, Code and Existing Conditions March 29 - 30, 2011 Construction Start Date October 13, 2011 School Board Receives Recommended Short List April 4, 2011 Substantial Completion July 2013 Step 2 of RFQ Submitted to Short Listed Contractors April 5, 2011 (Fees and General Conditions) Fees and General Conditions due by 3 PM April 8, 2011 Board of Trustees Select Construction Manager at Risk April 18, 2011 Huckabee Georgetown Independent School District 14