Register and pay before 17th December 2010 to save up to £200 for the Global Floating LNG Summit 2011 conference on 25-26 January 2011 in London. The summit will provide in-depth analysis and operator-led case studies on floating liquefaction technology and perfecting ship-to-ship LNG transfers. Expert participants will discuss developing offshore gas reserves with FLNG and bypassing expensive infrastructure.
Plant propagation: Sexual and Asexual propapagation.pptx
Global Floating LNG Summit 2011 - Agenda
1. Register and pay before 17th December 2010 and save up to £200
GLOBAL FLOATING
LNG SUMMIT 2011
Unlock offshore gas reserves, monetise stranded
fields and bypass expensive infrastructure
This year’s expert
participants include:
Quote Senior Vice President - Operations
FLNGSLIDE Excelerate Energy L.P.
to receive a
20% discount Manager Concept Development
on your FLEX LNG
2-Day Conference: 25th-26th January 2011
www.globalflngsummit.com
conference Vice President
Pre Conference Workshop: 24th January 2011 ticket LNG Marine Operations
America Square Conference Centre, London, UK E.ON Ruhrgas
Floating Liquid Natural Gas represents a significant and yet
untapped revenue stream. The Global FLNG Summit will provide Director
operator led, in-depth analysis on how to: Methane Services
BG Group
• Perfect ship-to-ship transfer with the latest technical developments
• Utilise the latest advances in floating re-gas and liquefaction LNG Business
Development Manager
technology Centrica
• Ensure that your FLNG project is safety compliant from its inception
with direct guidance from the HSE General Manager
Sigtto
• Build the business case for FLNG investment with a 360 degree
assessment of the financial and legal requirements Head of LNG
Energy & Power Ltd
“Excellent discussions on the high impact issues.” Emerging Technology Lead
Michael Harbeson, Conoco Phillips HSE
Plus in depth interactive pre conference workshops FLNG Consultant
Workshop A: Workshop B
Norwegian Petroleum Society
24th Jan 09:00 – 12:00 24th Jan 13:00 – 16:00
What’s missing for the sanction of the Joint Venture Contracting Senior Research Fellow
first Floating Liquefaction Vessel?
Energy and Power Ltd
Allocating interests and risk between
participants The Oxford Institute for
Leader to be announced Energy Studies
Media Partners: Supported by: Sponsored by:
Telephone: Fax: Email: Visit:
+44 (0)20 7368 9300 +44 (0)20 7368 9301 enquire@iqpc.co.uk www.globalflngsummit.com
2. Workshop Day Monday 24th January 2011
Workshop A 09.00 - 12.00 AM
What’s missing for the sanction of the first Floating
Liquefaction Vessel?
The industry has been studying floating liquefaction for the past 40 years and a lot of money has been spent on
engineering studies but still no sanctioned project. It has been mentioned that one company alone has spent around
$500 million to date on their concept but still no orders.
This workshop will summarise the current options on offer and then look at the issues that are likely preventing approval
of the first project.
Namely;
• The need for an economic solution that will generate a profit to stakeholders;
• The main technical issues and how they can be mitigated
• The main commercial issues and how they can be addressed
• The need to comply with the project development ‘gated’ process for smooth energy company buy-in and approval;
• The project execution strategy to be adopted, particularly for new technology;
• The lessons learned from the recent successful floating storage and regasification projects and how they could be
applied to benefit floating liquefaction projects;
Your workshop leader:
Brian Songhurst, Director LNG, Energy and Power
Lunch 12:00 – 13:00
Workshop B 13.00 - 16.00 PM
Joint Ventures Contracting
Joint ventures and partnering are emerging as important tools in developing successful FLNG projects. Success or failure
in the development of an FLNG project may ultimately depend on a coherent alignment of interests and the appropriate
allocation of risks between participants. We will examine and explore joint venture and partnering issues and challenges
in the context of FLNG projects.
• Identify and manage legal risks in FLNG joint ventures
• Get to grips with key documentation in FLNG joint venture arrangements
• Discuss ownership and management of property issues, including IP
• Resolve joint venture disputes in the energy sector
This interactive workshop will give you an in-depth understanding of the fundamental issues relevant to structuring joint
ventures in the context of an FLNG project.
Workshop Leader to be Announced
About Oil & Gas IQ
“The event brought together Become a member of Oil and Gas IQ and receive complimentary
resources that will keep you at the forefront of industry change, access
all the known players in the to our growing library of multi-media presentations, an email newsletter
updating you on new content that has aggregated news feed from over
field and really demonstrated 1000 global news sources industry and special member only discounts
on events. Become a member at: www.oilandgasiq.com
their expertise.”
Steve Hamblett, RINA UK LTD
Telephone: Fax: Email: Visit:
+44 (0)20 7368 9300 +44 (0)20 7368 9301 enquire@iqpc.co.uk www.globalflngsummit.com
3. Conference Day One Tuesday 25th January 2011
08:30 Registration and welcome coffee 12:30 Extracting stranded gas - new approaches
• earn what developments have been made in other regions
L
09:00 Chairman’s opening remarks • ear how cutting edge technology is opening up new opportunities
H
• stablish what progress still needs to be made to make capitalising
E
09:15 The outlook for global gas: Setting the context on remaining pockets a reality
for FLNG Amrit Bhat
• Understand the ‘Supply Glut’; its scale, duration and impact on your business Methane Service Director
• Find out how post recession supply and demand fundamentals will effect BG Group*
your business
• Develop a clear understanding of the World’s future LNG needs 13:15 Lunch and Networking Break
• Assess the challenges and opportunities for FLNG and you can deal with them
Howard Rogers
Senior Research Fellow Technical Focus Sessions
Oxford Institute of Energy Studies
14:15 Tandem and side-by-side transfer, evaluate
10:00 FLNG Beyond the Hype – Discover the latest the merits of each approach
developments in FLNG technology • ow to operate in varying climactic conditions
H
• View the concepts currently on offer for floating liquefaction • aximise the effectiveness of cryogenic flexible hosing
M
• Hear where the first FLNG projects are likely to be located • erfect deployment and connection methods
P
• hat tangible successes have been achieved to date in the development
W Captain Mark K. Lane
of FLNG? Senior Vice President - Operations
• earn from successful FSRU projects and the elements that can be
L Excelerate Energy L.P.
transferred to planned LNG-FPSOs
• stablish the crucial steps that need to be taken to accelerate the first
E 15.00 Adoption of new technologies for floating LNG;
floating liquefaction project The development of a LNG Test and Technology
Brian Songhurst Centre:
Director LNG • nderstanding the Technology development needs for floating LNG
U
Energy and Power production, regasification and small scale supply
• mploy testing and modelling within LNG to validate safety and reliability
E
of new technologies and equipment
10:45 Speed Networking Ice Breaker Session • ear what lessons have been learned from testing and qualification of
H
Short-list your top business partners and form essential contacts.
LNG transfer hoses
You will have the opportunity to exchange details with every member
of the delegate audience- so that you have already identified your Bas van den Beemt
business prospects as the Summit gets underway Business developer Oil and Gas
TNO Science and Industry
15:45 Coffee and networking break
11:15 Coffee and networking break
16:30 Optimise your FLNG powering solution and
11:45 Key Legal Issues for Joint Ventures service operation
and Partnering in a successful FLNG Project •
Ensure an effective synergy between your core product and system
• dentify, allocate and manage legal risk in FLNG joint ventures
I •
Devise a dynamic maintenance plan
• evelopment of Technology & Ownership and use of property, including IP
D •
Explore the latest technology solutions
• nderstanding the procurement and construction process
U Alexandre Eykerman
For speaker updates visit www.globalflngsummit.com Sales Director Ship Power
Wärtsilä Switzerland
17:15 Chairman’s summary and close of conference day one
* Subject to final confirmation
“It was good to hear the opinion
of the variouselements of the
LNG-FSPOvalue chain”
Arata Nakamura, Inpex Corporation
Telephone: Fax: Email: Visit:
+44 (0)20 7368 9300 +44 (0)20 7368 9301 enquire@iqpc.co.uk www.globalflngsummit.com
4. Conference Day Two Wednesday 26th January 2011
08:30 Registration and welcome coffee 13:45 Problem Solving Session Conversion of existing
09:00 Chairman’s opening remarks
LNG Ships
• conversion a viable alternative to building an FLNG facility from
Is
scratch?
09:15 Ship based regasification - from the regulator’s • out if your existing infrastructure can successfully accommodate
Find
perspective necessary topside facilities
• ind our how LNG imports contribute to UK energy mix
F •
What potential challenges could conversion create?
• ear about the UK regulator’s experience in shore-side regasification
H
Chris Spilsbury
and in LNG imports from ships
Engineering Consultant
• Establish how the increasing interest in ship-based regasification is
BG Group*
proving to be a challenging development
• dentify how responsible regulators assess the hazards, risks and
I
necessary responses to enable the safe introduction and expansion
14.30 Unconventional LNG - Changing the shape
of this process into the UK of the business
• dentify the key success factors for unconventional LNG projects
I
Taff Powell
• hat insights can we learn from CSG LNG for FLNG?
W
Emerging Technologies Lead
• ow much of a role will FLNG play in future Global LNG Business?
H
HSE
Giles Farrer
Analyst - Global LNG
10:00 Panel Session - FLNG Risk Mitigation Wood Mackenzie
• ind out to perform risk assessments associated with using new
F
technology before its implementation 15:15 Coffee and networking break
• Discover the pitfalls of being part of the first wave of operators
of FLNG facilities 15:45 Panel Discussion and Open Floor Interactive
• Balance the pros and cons so that you can decide if the risk is justifiable
Session: Creating the business case for FLNG
Taff Powell In roundtables – use the knowledge and opinions gathered over the last
Emerging Technologies Lead two days to inform the creation of a business case for FLNG. Each group
HSE will need to identify…
William Wayne • he possible risks to be mitigated
T
General Manager • ajor costs to be covered
M
SIGGTO • he overall financial justification for investment
T
Nicholas Jones
10:45 Coffee and networking break Concept Development Manager
FLEX LNG
11:15 Chatham House Rules Frederic Venner
A closed session where you can discuss those sensitive and burning Vice President LNG Marine Operations
issues. This will be an Audio Visual free session in which everything that E.ON*
is said is off the record. Questions collected from the networking sessions Captain Mark Lane
on day 1 will be put to the group and answered with complete anonymity. Vice President of Operations
A perfect opportunity to voice that controversial theory! Excellerate Energy
12:00 Problem Solving Session – Financing
16:30 Wrap-up session: Looking forward –
• alculate the realistic costs associated with putting an FLNG ship
C what’s next for the industry?
into operation •
Move forward by taking account of history and ascertaining the timelines
• hould banks or other investors be approached to raise capital?
S that applied to early LNG projects and FPSO projects
• ow much risk can be mitigated by spreading financing options?
H • s projects begin to ascertain what the next challenge will be as
A
companies look past the FEED stage
Nicholas Jones
• e ready to deal with the operation specific risks with practical steps
B
Concept Development Manager
to address them
FLEX LNG
17:15 Chairman’s summary and close of main conference
12.45 Lunch and networking break
* Subject to final confirmation
Who should attend • Director of FLNG • Vice President Offshore • Vice-President Gas
the Global FLNG • Head of LNG • Naval Architects • Emerging Technologies
Lead
Summit? • Business Development
Manager
• Senior Project Manager
Telephone: Fax: Email: Visit:
+44 (0)20 7368 9300 +44 (0)20 7368 9301 enquire@iqpc.co.uk www.globalflngsummit.com
5. GLOBAL
FLOATING LNG
SUMMIT 2011
The Developing World of FLNG
Company: Shell/Statoil Company: Shell Company: Petronas Company: Shell
Field: Nnwa Doro Field: NEMed Location: Offshore Field: Prelude
Location: Offshore Nigeria Location: Offshore Egypt Malaysia Location: Browse Basin,
Australia
Company: Inpex
Field: Abadi
Size: 10 TCF
Location: Offshore Indonesia
Company: Teekay, ML
Field: Kitimat Company: Talisman
Location: Offshore Canada Field: Pandora, Rift
Location: PNG
Company: BG
Field: Block 5c
Size: 1.5 TCF Company: Woodside
Location: Offshore Trinidad Field: Sunrise
Location: Timor Sea
Company: Petrobras
Field: Tupi and Guara
Location: Pre-salt
discoveries, offshore Brazil Company: FLEX LNG
Field: Chuditch, Bilby, Wombat
Location: Timor Sea
Company: Ophir
Field: Lykos and Fortuna
Size: 1.5 TCF - 3TCF Company: Tullow Oil Company: PTTEP Company: GDF Suez
Location: Offshore Equatorial Field: Kudu Field: Coogee, Cash, and Santos
Guinea Location: Offshore
Namibia
Maple
Location: Timor Sea
Field: Petrel, Tern and
Frigate Potential FLNG
Location: Bonaparte
Basin, Australia
Projects as of 2009
Why is this THE ONLY FLNG Summit you need Maximise Your Involvement:
Sponsorship and Exhibition Opportunities
to attend this year? The Global Floating LNG Summit 2011 will provide you with the
unique opportunity to profile the solutions that operators are looking
• Operator led case studies and discussion for. By sponsoring you will gain invaluable face-face exposure with
the key decision makers over a prolonged period. This event is the
• Insight on the only FLNG projects on the market right now perfect opportunity to promote your services in an environment that
is both business and information orientated it is the perfect setting
for social interaction and networking. A focus on getting you direct
•Cutting edge analysis on optimum FLNG vessel design access to the key decision makers across leading organisations will
and technology solutions ensure that your investment is well placed. We understand that the
needs of all our sponsors and exhibitors will differ. That’s why we
don’t limit you to specific packages. For more information contact
• Implementation strategies for successful FLNG projects Marija Pocekutova on 0207 368 9778 or email her at
sponsorship@iqpc.co.uk and she will be able to tailor make
• Meet global decision makers and key solution providers a package suited to your company’s strategies and needs.
Telephone: Fax: Email: Visit:
+44 (0)20 7368 9300 +44 (0)20 7368 9301 enquire@iqpc.co.uk www.globalflngsummit.com