Discussion Outline
   Intro and Background
   Clipper Windpower
   Definitions
   Deployment Methods
       Management by Objective
       Hoshin Kanri
       Balanced Score Card
   Quality Management Systems that Support Strategy Deployment
       ISO
       Baldrige
   Discussion Points
   “The Mind of the Lean Manager” by Jim Womack
   Resources and References


                                                                  2
My Background and Experience
   Education
       B.A. in Business Management from UNI
       Working on Masters of Manufacturing Operations at Kettering
   Work Experience
       Human Resource Intern at Beef Products Inc. (Waterloo)
       Department Manager for Pella Windows and Doors. (Clear Lake)
           Developed interest and passion for Continuous Improvement
       Quality Supervisor for Beef Products Inc. (Waterloo)
       Assembly Supervisor for Clipper in March 2007 (Cedar Rapids)
       Continuous Improvement Manager for Clipper in November 2009



                                                                        3
Clipper Windpower
   Company Incorporated in 2001
   Manufacturing began at Cedar Rapids in 2006
       2006 - 8 units produced
       2007 - 137 units produced
       2008 - 289 units produced
       2009 projecting 117 units (no orders cancelled, only delays)
   Approximately 280 employees in Cedar Rapids
       Approx. 190 assembly
       Others include Engineering, Quality, RMDC, Clipper Fleet Service, etc.
   The Facility is 330,000 sq. ft.
   Manufacturing the 2.5 MW Liberty Wind Turbine
       Gearbox, Hub, Machine Base, Rectifiers, Parts Containers Assembled
       Nacelle, Towers, Generators, Transformers, etc. outsourced
                                                                           4
Clipper Windpower Continued
   As a whole, Clipper is in the Energy Business
   The Cedar Rapids Operations is generally
    considered a Heavy Manufacturing facility
   The process is entirely assembly based
       no material processing or fabrication work
   The company is in the process of developing a 7.5 to
    10 MW offshore wind turbine
   Projected Capacity of the Cedar Rapids facility is
    approx. 550-600 turbines per year
                                                           5
The Disclaimer
   Not an Strategy Deployment expert
   Interest in Learning about Strategy Deployment
   That interest all too quickly transformed into an
    opportunity to lead this IQC network meeting
   I’ve been dedicating extra time to this particular topic
   I’ve collected and condensed some SD information
   Many of you probably have relevant experience
       Please, stop me at any time for discussion or if you’d like to
        contribute by further clarifying a particular item.

                                                                   6
Focus of Today’s Discussion
   When suggesting that we discuss strategy deployment, I was
    most interested in the transition from planning to action.
   Effectively moving from Plan to Do in the PDCA cycle.


My Approach
   Basic Overview of the different Methods
   Tools associated with those methods
   Open Discussion
   Thought Provoking Article

                                                                 7
Why Focus on Strategy Deployment?
   The feeling of many good but unaligned goals
   The need for a consistent top-to-bottom message
   The importance of management effectively communicating
    directives in a way that all can engage with and implement.
   The importance of knowing what activities align with goals.
   It’s a Criteria for Performance Excellence (Baldrige)
          Strategic Planning and Business Results are two key criteria for
           performance excellence
   The transition away from command and control, and the
    frustrating that may accompany it.
   Bottom line, it’s a necessary part of realizing success.

                                                                              8
Definitions
   Strategy –
       Is a plan of action designed to achieve a particular goal.
           The word strategy has a strong military connotation.
                Strategy is different from tactics.
   Deployment –
       To arrange in a position of readiness, or to move strategically or
        appropriately.
           Again, deployment has a strong military connotation
           In business, it stands for a methodical procedure of introducing an activity,
            process, program, or system to all applicable areas of an organization
   Strategic Management –
       Developing, evaluating and making decisions that will enable an
        organization to achieve its long-term objectives
                                                                                      9
What is Strategy Deployment?
   The nervous system of a business system

   Guides planning and action across an organization’s
    total value stream

   Provides a closed circuit between an organization’s
    business needs and day-to-day activities.



                                                          10
Pre-requisites to Deployment
   Company Philosophy and Quality Policy
   Basic Strategic Planning
       Vision and Mission
       Values Statement
       SWOT Analysis
           Strengths, Weaknesses, Opportunities, and Threats
   Any others?

                                                                11
Discussion Points
   Questions we should be asking as strategic planners.
       How widely understood is our company’s mission and/or vision and the
        company’s top strategy among our employees?
           Are certain industries better at this than others? If so, why?

       Does your company have a published set of values or beliefs?
           How widely known are they?
           Do they make a difference?

   The answers to these simple questions will serve as indicators
    of the company’s ability to effectively deploy a strategy.
       A commander can’t effectively deploy troops without each of them
        clearly understanding the mission.
                                                                             12
Methods of Deployment
   Management by Objectives
       Cascading Objectives and Goals
       SMART Goals
           Specific
           Measurable
           Achievable
           Relevant
           Time bound
   Hoshin Kanri
       Catchball, A3-X, and A3-T
   Balanced Score Card
                                         13
Management By Objective (MBO)
   The Principles of Management by Objective
       Cascading of organizational goals and objectives
           Mission Critical Objectives at the CEO Level
           Mission Critical Objectives at the Plant Level

       Specific objectives for each member
           Cascaded Goals through Success Factors

       Performance evaluation and provide feedback
           Performance Evaluation System
                                                             14
Management By Objective
   Important features and advantages of MBO are:
       Motivation –
           Involving employees in the whole process of goal setting and
            increasing employee empowerment increases employee job
            satisfaction and commitment.
       Better communication and Coordination –
           Frequent reviews and interactions between superiors and
            subordinates helps to maintain relationships within the enterprise
            and also solve many problems faced during the period.
       Clarity of goals –
           The concept of SMART goals

                                                                             15
Limitations and Arguments Against
   Over-emphasizes setting of goals, as opposed to the
    working of a plan
   Could lead companies to evaluate employees by
    comparing them to the “ideal employee”
   “What gets measured gets done”
   W. Edwards Deming
       argued that a lack of understanding of systems commonly
        results in the misapplication of objectives


                                                              16
Discussion Points
   When done properly MBO ideally:
       improves motivation and communication
       involves employees in goals setting
       provides frequent feedback on performance

   Is this typically what would be found if a company’s MBO
    process were reviewed?

   Does MBO provide an opportunity for all employees to
    provide their input and understand their importance?

   Any other challenges or short comings experienced by those
    who have utilized or been a part of MBO?
                                                                 17
Definitions
   Hoshin = direction, a course, a policy, a plan, an aim
   Kanri = management, administration, or control
   Hoshin Kanri – A method of implementing strategy
    to get the right thing done.
   Often referred to as:
       Policy deployment, Strategic Initiatives, Management By
        Policy, Hoshin Planning, Policy Management, Managing
        for Results, Strategic Deployment and Goal Deployment.


                                                              18
Hoshin Kanri
   Purpose and Usage–
       Long term strategic planning for systems
       Developing shared strategic goals (compare Balanced Score Card)
       Continuous organizational improvement
       Cascading or deploying top management policies
        and targets down the management hierarchy



                                                                      19
Hoshin Kanri
   Steps and Skills Required
       Planning and Communication
           Get Involvement
           Set the course
           X-Chart
       Project Initiation and Execution
           Two Deployment Styles or Target – Top-down and Bottom-up
               “Catch Ball” Target Deployment
           Project Charter
           Standard Process for follow through
       Reflection
           Review of what worked and what didn’t work

                                                                       20
Hoshin Kanri
   Hoshin Kanri can be thought of as the application of Deming's Plan-Do-
    Check-Act (PDCA) cycle to the management process.

   The PDCA cycle represents a generic approach to continual improvement
    of activities and processes.

   PLAN = a plan of action is developed to address a problem.
   DO = the plan is implemented.
   CHECK = information is collected on the control parameters.
   ACT = the results are analyzed. Corrective action is identified.



                                                                             21
Hoshin Kanri
   Three key elements
       Catchball
       Project Charter (A3-T)
       X-Charts (A3-X)




                                 22
Catchball
   A participative approach to decision-making.
   Used in policy deployment to communicate across management levels
    when setting annual business objectives.
   The analogy to tossing a ball back and forth emphasizes the interactive
    nature of policy deployment.
   Used when establishing the terms of the organizational contracts or
    project charters.
   Provides employees with an opportunity to review the plan and
    objective and to respond with their thoughts and ideas.




                                                                              23
Project Charter (A3-T)
   Boil things down to one page
   Clarifies that no one person can accomplish a strategy
   Very reminiscent of PDCA and DMAIC




                                                             24
25
X-Charts (A3-X)
   A bundle of contracts called team charters
   A visual tool for planning
   Can appear complex at first
   Becomes simple quickly
   The key is the Linkage of high and low
    level action with people and results
   Mostly an aid to communication
                                                 26
27
Strategy Area

•Contains the highest level mandates
•Start here
•Should link directly to corporate strategy, one level above the
group for which you are planning.




                                                                   28
Metrics Area

•Fill this in second
•Put in standard and/or mandated
operational figures your group needs to

meet




                                          29
Tactics Area

•Work on this third
•Will lay out specific projects
•Will become the basis for managing implementation
                                                     30
Team Members Area

•Work on this fourth
•List Names of the people who will be responsible for
implementing the tactics


•Use proper names, not titles



                                                        31
Connectional Areas

•The absolute key to making this work
•Forces reflection, debate and conversation in an open manner.
•Do these last, in a back-and-forth manner, with others on your team and in
your company




                                                                              32
Strategy-to-Tactics Correlation

•Does a tactic really support one or more
strategies?


•Is there a more effective tactic?
•Is there a non-necessary tactic?
•Do you really understand the individual strategy
                                                    33

statements?
Tactics-to-Metrics Correlation

& Contribution

•Does a tactic improve a specific metric's)?
•Will it move the metric adequately?
•Does each metric have some tactic to
improve it?
                                               34
•Do you really understand the individual
Tactics-to-Team Member

Accountability

•Does each tactic have a skilled person to lead it?
•Does one individual have too many tactics to lead?
•Are there other people who need to be listed?
•Does each individual understand his/her              35


accountability?
Metrics-to-Results

Correlation/Contribution

•Does each metric contribute to one or
more financial results which we value?


•How much does each metric contribute?
•Are we measuring the right things in our
results?


•Can we compare plan to actual over the
period covered by the plan?


                                            36
Strategy-to-Results Correlation

•Does each strategy contribute to one or
more financial results which we value?


•How much does each strategy contribute?
•Is a strategy “for show” or for results (e.g.
a Super Bowl ad)?




                                                 37
38
Hoshin Kanri
   Strengths                       Limitations
       Focuses organization            A rigid implementation
        on the vital few                 is necessary
       Communication of a              Requires a long term
        shared vision                    commitment
       Creates alignment               Relatively Static – the
        through participation            breakthrough objective
       Encourages cross                 must be stable during a
        functional cooperation           5 year period
       Planning is systematic
                                                               39
Discussion Points
   How many currently use or have experience with
    this method of planning and deployment utilized?

   Where HK has been utilized, was it well structured
    and routine or informal and possibly haphazard?

   In what ways was it’s use effective or ineffective?

   Would you recommend this system to others? Why?
                                                          40
Balanced Score Card
   A Strategic planning and management system
       May mean different things to different people (the BSC spectrum)
           From a Performance Measurement Framework = Dashboard
           To a Robust Organization-wide Strategic Planning, Mgmt, and
            Communication System
   Originated by Drs. Robert Kaplan and David Norton as a
    performance measurement framework
   Added strategic non-financial performance measures to
    traditional financial metrics to give managers a “balanced”
    view of performance.
   The “new” balanced scorecard transforms an organization’s
    strategic plan from a document into “marching orders.”
                                                                           41
Balanced Score Card
   View the
    organization
    from four
    perspectives
   Develop
    Metrics
   Collect Data
   Analyze Data
    to each
    perspective
   PDCA
                      42
Balanced Score Card Continued
   Why Implement a Balanced Scorecard?
       Increase focus on strategy and results
       Improve organizational performance by measuring what
        matters
       Align organization strategy with the work people do on a
        day-to-day basis
       Focus on the drivers of future performance
       Improve communication of the organization’s Vision and
        Strategy
       Prioritize Projects / Initiatives
                                                               43
Balanced Score Card Continued
   Scorecards simply for organizing measures aren’t justified.
   Start with the end in mind, focus on the desired results
   Stephen Covey – “People and their managers are working so
    hard to be sure things are done right , that they hardly have
    time to decide if they are doing the right things.”
   Developing a balanced scorecard system is like putting a
    puzzle together
       The pieces are strategic components
       They have to be checked for fit




                                                                    44
Recall Lou Novikoff, a.k.a.“The Mad
Russian”, Chicago Cubs, 1940s
   Stole third base with
    the bases loaded
   “I got a good jump” he
    explained.
   Unfortunately, there is
    no point in being fast at
    doing the wrong thing.

                                      45
BSC Continued
   The major system components:
       Engaged Leadership                  Customers and Stakeholders
       Interactive Communications and      Customer Value Proposition
        Change                              Strategy, Strategic
       Management                           Objectives, and Initiatives
       Vision and Mission                  Performance Measures
       Core Values                         Performance Information
       Organization Weaknesses and          Reporting
        Strengths                           Rewards and Recognition
                                            Evaluation



                                                                       46
Questions and Discussion?
   How many currently use or have experience with the
    BSC method of planning and deployment?

   Do you notice any added benefits or disadvantages
    of Hoshin Kanri vs. Balanced Score Card?

   If we aren’t using either method, what else is being
    done in order to fill this need?

                                                           47
Quality Measurement Systems that
Support Strategy Deployment
Baldrige Criteria                                      ISO Standards
      1. Leadership                                         1. Customer Focus
      2. Strategic Planning                                 2. Leadership
      3. Customer and Market Focus                          3. Involvement of People
      4. Measurement, Analysis, and                         4. Process Approach
            Knowledge Management                            5. Systems Approach to Management
      5. Human Resources                                    6. Fact Based Decision Making
      6. Process Management                                 7. Mutually Beneficial Supplier
      7. Results                                            Relationship

2.2 Strategy Deployment:                               With ISO-
How do you deploy your strategy? Describe how          The concentration is on the quality systems
       your organization converts its strategic
       objectives into action plans. Summarize your    Takes an adoption of process approach
       organization’s action plans, how are they
       deployed, and KEY action plan performance
       measures or indicators. Project your            With Baldrige-
       organization’s future performance relative to   Performance excellence for entire organization
       KEY comparisons on these performance
       measures or indicators.                         Focus upon business results

                                                                                                        48
Discussion Topics
   How many have experience working for companies
    that utilize either ISO and/or Baldrige?

   Does it seem that one system is utilized more often
    or more commonly accepted? Why?

   Does the industry affect which system is utilized?
       What else might affect which system is selected?
       Is there a need for the use of both systems?
                                                           49
Discussion Points
   All methods seem to have a distinct tie back
    to Plan-Do-Check-Act
       Are we informally utilizing these methods on a
        daily basis, in some cases without realizing it?
       If so, would it be beneficial to formalize and
        document the process?
       If so, what ways can we go about that or how
        have you seen it done in the past?

                                                           50
The Mind of the Lean Manager
    Thoughts from Jim Womack
   Finding companies with X-Charts, completed A3 analysis,
    and all the elements of standardized work.
       What’s missing?
           Success in Achieving the Goals
           Inability to actually read and interpret A3
           No standardized work or not following it
   Lean management techniques are quickly becoming tools
    (which are necessary).
   Every manager loves a tool because it seems to provide a
    short cuts to doing a better job.
   They can’t achieve their potential results or even any results
    without managers with a lean state of mind to wield them.
                                                                     51
What is a lean state of mind?
    The Lean manager embraces the role of problem solver

    The Lean manager realizes the no manager at a higher level can
     or should solve a problem at a lower level.
        Instead assign responsibility to the manager at the lower level

    The Lean manager believes that all problem solving is about
     experimentation by PDCA

    The Lean manager knows that no problem is ever solved for ever



                                                                           52
Other Sources of Information
   Books In IQC’s Library
       Hoshin Kanri: Policy Deployment for Successful
        TQM - Yoji Akao
       The Balanced Score Card – Translating Strategy
        into Action
       Kaizen Sketch Book
           http://www.kaicomm.com/KaizenSketchbook.html
       And Multiple Others….

                                                           53
Hoshin Kanri for the Lean Enterprise
   Technical description of Hoshin
   Has a CD with all forms
   Good resource; tough reading




                                       54
Getting the Right Things
Done
   Novel style, a la “The Goal”
   Author has terrific experience
   Has excellent examples




                                     55
Leadership and Self-Deception
   Deals with root cause of people
    problems
   Novel style
   You can use it instantly
   “Outside the Box” Thinking




                                      56
Resources and References
   Balanced Scorecard and Hoshin Kanri by Marketing Partners, Inc.
        http://www.mpicompanies.com/PDFs/Balanced%20Scorecard%20and%20Hoshin%20Kanri.pdf
   Management Coaching and Training Services
        http://www.mcts.com/Hoshin-Kanri.htm
   Hoshin Kanri – Lean Strategic Planning by Joe Ely
        Director of Operations for Cook Biotech
   Baldrigeplus.com
         http://www.baldrigeplus.com/Exhibits/Exhibit%20-%20Catchball%20processes.pdf
   Strategy Deployment in Action: One Executive’s Perspective
         http://www.lean.org/Events/WebinarHome.cfm (Lean Enterprise Institute)
         Pascal Dennis and Dave Brule II
   Balanced Score Card Institute
        http://www.balancedscorecard.org/BSCResources/AbouttheBalancedScorecard/tabid/55/Default.aspx
   Management By Objective
        http://www.12manage.com/methods_smart_management_by_objectives.html
   The Mind of the Lean Manager
        Jim Womack – Founder and Chairman of Lean Enterprise Institue


                                                                                                         57

Contenu connexe

Tendances

Introduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksIntroduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksMehul Kapadia
 
Introduction to strategy deployment
Introduction to strategy deploymentIntroduction to strategy deployment
Introduction to strategy deploymentLightconsulting
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsRob Betcher
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubRichardNowack
 
Scaled Agile Framework® and Objective Key Results
Scaled Agile Framework® and Objective Key ResultsScaled Agile Framework® and Objective Key Results
Scaled Agile Framework® and Objective Key ResultsScaled Innovation
 
New Lean-Agile Coach Self-Assessment - detailed descriptions v3
New Lean-Agile Coach Self-Assessment - detailed descriptions v3New Lean-Agile Coach Self-Assessment - detailed descriptions v3
New Lean-Agile Coach Self-Assessment - detailed descriptions v3Luca Minudel
 
Lean and Agile SAP
Lean and Agile SAPLean and Agile SAP
Lean and Agile SAPJason Fair
 
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.Boardroom Metrics
 
Strategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleStrategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleFrank-G. Adler
 
Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and PracticesJosef Scherer
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceIntland Software GmbH
 
An Introduction to Scaled Agile Framework (SAFe)
An Introduction to Scaled Agile Framework (SAFe)An Introduction to Scaled Agile Framework (SAFe)
An Introduction to Scaled Agile Framework (SAFe)CA Technologies
 
Building a culture of collaborative innovation
Building a culture of collaborative innovation Building a culture of collaborative innovation
Building a culture of collaborative innovation Kaali Dass PMP, PhD.
 
[Trung Hoang] Shu-Ha-Ri applied to Agile team
[Trung Hoang] Shu-Ha-Ri applied to Agile team[Trung Hoang] Shu-Ha-Ri applied to Agile team
[Trung Hoang] Shu-Ha-Ri applied to Agile teamTrung Hoang Nhac
 
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridgeWebinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridgeSaket Bansal
 
Portfolio management lean canvas
Portfolio management lean canvasPortfolio management lean canvas
Portfolio management lean canvasBrad Swanson
 

Tendances (20)

Introduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksIntroduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile Frameworks
 
Introduction to strategy deployment
Introduction to strategy deploymentIntroduction to strategy deployment
Introduction to strategy deployment
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
 
Scaled Agile Framework® and Objective Key Results
Scaled Agile Framework® and Objective Key ResultsScaled Agile Framework® and Objective Key Results
Scaled Agile Framework® and Objective Key Results
 
New Lean-Agile Coach Self-Assessment - detailed descriptions v3
New Lean-Agile Coach Self-Assessment - detailed descriptions v3New Lean-Agile Coach Self-Assessment - detailed descriptions v3
New Lean-Agile Coach Self-Assessment - detailed descriptions v3
 
Lean and Agile SAP
Lean and Agile SAPLean and Agile SAP
Lean and Agile SAP
 
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
 
Agile overview
Agile overviewAgile overview
Agile overview
 
Strategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleStrategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training Module
 
Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and Practices
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® Practitioner
 
RTE Presentation
RTE PresentationRTE Presentation
RTE Presentation
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practice
 
An Introduction to Scaled Agile Framework (SAFe)
An Introduction to Scaled Agile Framework (SAFe)An Introduction to Scaled Agile Framework (SAFe)
An Introduction to Scaled Agile Framework (SAFe)
 
Building a culture of collaborative innovation
Building a culture of collaborative innovation Building a culture of collaborative innovation
Building a culture of collaborative innovation
 
Agile Coaching Canvas
Agile Coaching CanvasAgile Coaching Canvas
Agile Coaching Canvas
 
[Trung Hoang] Shu-Ha-Ri applied to Agile team
[Trung Hoang] Shu-Ha-Ri applied to Agile team[Trung Hoang] Shu-Ha-Ri applied to Agile team
[Trung Hoang] Shu-Ha-Ri applied to Agile team
 
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridgeWebinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
 
Portfolio management lean canvas
Portfolio management lean canvasPortfolio management lean canvas
Portfolio management lean canvas
 

Similaire à Strategy deployment

Ssw coaching for high performance training for corporate executives
Ssw coaching for high performance training for corporate executivesSsw coaching for high performance training for corporate executives
Ssw coaching for high performance training for corporate executivesSoft Skills World
 
Strategy & Execution Program Overview
Strategy & Execution Program OverviewStrategy & Execution Program Overview
Strategy & Execution Program OverviewKelly Petrock
 
Strategic management for epipl managers
Strategic management for epipl managersStrategic management for epipl managers
Strategic management for epipl managersRaghavan VP
 
Part 2 Essenial Budgeting
Part 2 Essenial BudgetingPart 2 Essenial Budgeting
Part 2 Essenial BudgetingIyad Attari
 
ch1_Strategic Leadership (4).pptx
ch1_Strategic Leadership (4).pptxch1_Strategic Leadership (4).pptx
ch1_Strategic Leadership (4).pptxZeeshanZahoorSyed
 
ch1_Strategic Leadership (3).pptx
ch1_Strategic Leadership (3).pptxch1_Strategic Leadership (3).pptx
ch1_Strategic Leadership (3).pptxZeeshanZahoorSyed
 
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...Latera1
 
1 introduction-to-strategyppt4057
1 introduction-to-strategyppt40571 introduction-to-strategyppt4057
1 introduction-to-strategyppt4057Manoj Jaiswal
 
1 introduction to strategy
1 introduction to strategy1 introduction to strategy
1 introduction to strategyhina456
 
Leadership in Total Quality Management.pptx
Leadership in Total Quality Management.pptxLeadership in Total Quality Management.pptx
Leadership in Total Quality Management.pptxAnumWasim2
 
EFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesEFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesChris Hakes
 
Introduction to strategic management
Introduction to strategic managementIntroduction to strategic management
Introduction to strategic managementBibhuti Kumar
 
Introduction to Balanced Scorecard - Large Group Orientation
Introduction to Balanced Scorecard - Large Group OrientationIntroduction to Balanced Scorecard - Large Group Orientation
Introduction to Balanced Scorecard - Large Group OrientationGlen Alleman
 

Similaire à Strategy deployment (20)

Ssw coaching for high performance training for corporate executives
Ssw coaching for high performance training for corporate executivesSsw coaching for high performance training for corporate executives
Ssw coaching for high performance training for corporate executives
 
ICANS 2011
ICANS 2011ICANS 2011
ICANS 2011
 
Strategy & Execution Program Overview
Strategy & Execution Program OverviewStrategy & Execution Program Overview
Strategy & Execution Program Overview
 
B308
B308B308
B308
 
Strategic management for epipl managers
Strategic management for epipl managersStrategic management for epipl managers
Strategic management for epipl managers
 
Part 2 Essenial Budgeting
Part 2 Essenial BudgetingPart 2 Essenial Budgeting
Part 2 Essenial Budgeting
 
Contemporary Ln Od
Contemporary Ln OdContemporary Ln Od
Contemporary Ln Od
 
The Art of Strategic Planning for Leaders.pdf
The Art of Strategic Planning for Leaders.pdfThe Art of Strategic Planning for Leaders.pdf
The Art of Strategic Planning for Leaders.pdf
 
ch1_Strategic Leadership (4).pptx
ch1_Strategic Leadership (4).pptxch1_Strategic Leadership (4).pptx
ch1_Strategic Leadership (4).pptx
 
ch1_Strategic Leadership (3).pptx
ch1_Strategic Leadership (3).pptxch1_Strategic Leadership (3).pptx
ch1_Strategic Leadership (3).pptx
 
8 a bsc
8 a bsc8 a bsc
8 a bsc
 
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...
Enkkhancing Our Strategic Execution Culture (EOSEC)_Facilitator Guide_V1.0_20...
 
1 introduction-to-strategyppt4057
1 introduction-to-strategyppt40571 introduction-to-strategyppt4057
1 introduction-to-strategyppt4057
 
1 introduction to strategy
1 introduction to strategy1 introduction to strategy
1 introduction to strategy
 
1 introduction to strategy
1 introduction to strategy1 introduction to strategy
1 introduction to strategy
 
Leadership in Total Quality Management.pptx
Leadership in Total Quality Management.pptxLeadership in Total Quality Management.pptx
Leadership in Total Quality Management.pptx
 
EFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesEFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good Practices
 
Introduction to strategic management
Introduction to strategic managementIntroduction to strategic management
Introduction to strategic management
 
Introduction to Balanced Scorecard - Large Group Orientation
Introduction to Balanced Scorecard - Large Group OrientationIntroduction to Balanced Scorecard - Large Group Orientation
Introduction to Balanced Scorecard - Large Group Orientation
 
Strategic Planning & Management
Strategic Planning & ManagementStrategic Planning & Management
Strategic Planning & Management
 

Dernier

rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 

Dernier (20)

rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 

Strategy deployment

  • 1. Strategy Deployment A discussion of both methods and challenges 1
  • 2. Discussion Outline  Intro and Background  Clipper Windpower  Definitions  Deployment Methods  Management by Objective  Hoshin Kanri  Balanced Score Card  Quality Management Systems that Support Strategy Deployment  ISO  Baldrige  Discussion Points  “The Mind of the Lean Manager” by Jim Womack  Resources and References 2
  • 3. My Background and Experience  Education  B.A. in Business Management from UNI  Working on Masters of Manufacturing Operations at Kettering  Work Experience  Human Resource Intern at Beef Products Inc. (Waterloo)  Department Manager for Pella Windows and Doors. (Clear Lake)  Developed interest and passion for Continuous Improvement  Quality Supervisor for Beef Products Inc. (Waterloo)  Assembly Supervisor for Clipper in March 2007 (Cedar Rapids)  Continuous Improvement Manager for Clipper in November 2009 3
  • 4. Clipper Windpower  Company Incorporated in 2001  Manufacturing began at Cedar Rapids in 2006  2006 - 8 units produced  2007 - 137 units produced  2008 - 289 units produced  2009 projecting 117 units (no orders cancelled, only delays)  Approximately 280 employees in Cedar Rapids  Approx. 190 assembly  Others include Engineering, Quality, RMDC, Clipper Fleet Service, etc.  The Facility is 330,000 sq. ft.  Manufacturing the 2.5 MW Liberty Wind Turbine  Gearbox, Hub, Machine Base, Rectifiers, Parts Containers Assembled  Nacelle, Towers, Generators, Transformers, etc. outsourced 4
  • 5. Clipper Windpower Continued  As a whole, Clipper is in the Energy Business  The Cedar Rapids Operations is generally considered a Heavy Manufacturing facility  The process is entirely assembly based  no material processing or fabrication work  The company is in the process of developing a 7.5 to 10 MW offshore wind turbine  Projected Capacity of the Cedar Rapids facility is approx. 550-600 turbines per year 5
  • 6. The Disclaimer  Not an Strategy Deployment expert  Interest in Learning about Strategy Deployment  That interest all too quickly transformed into an opportunity to lead this IQC network meeting  I’ve been dedicating extra time to this particular topic  I’ve collected and condensed some SD information  Many of you probably have relevant experience  Please, stop me at any time for discussion or if you’d like to contribute by further clarifying a particular item. 6
  • 7. Focus of Today’s Discussion  When suggesting that we discuss strategy deployment, I was most interested in the transition from planning to action.  Effectively moving from Plan to Do in the PDCA cycle. My Approach  Basic Overview of the different Methods  Tools associated with those methods  Open Discussion  Thought Provoking Article 7
  • 8. Why Focus on Strategy Deployment?  The feeling of many good but unaligned goals  The need for a consistent top-to-bottom message  The importance of management effectively communicating directives in a way that all can engage with and implement.  The importance of knowing what activities align with goals.  It’s a Criteria for Performance Excellence (Baldrige)  Strategic Planning and Business Results are two key criteria for performance excellence  The transition away from command and control, and the frustrating that may accompany it.  Bottom line, it’s a necessary part of realizing success. 8
  • 9. Definitions  Strategy –  Is a plan of action designed to achieve a particular goal.  The word strategy has a strong military connotation.  Strategy is different from tactics.  Deployment –  To arrange in a position of readiness, or to move strategically or appropriately.  Again, deployment has a strong military connotation  In business, it stands for a methodical procedure of introducing an activity, process, program, or system to all applicable areas of an organization  Strategic Management –  Developing, evaluating and making decisions that will enable an organization to achieve its long-term objectives 9
  • 10. What is Strategy Deployment?  The nervous system of a business system  Guides planning and action across an organization’s total value stream  Provides a closed circuit between an organization’s business needs and day-to-day activities. 10
  • 11. Pre-requisites to Deployment  Company Philosophy and Quality Policy  Basic Strategic Planning  Vision and Mission  Values Statement  SWOT Analysis  Strengths, Weaknesses, Opportunities, and Threats  Any others? 11
  • 12. Discussion Points  Questions we should be asking as strategic planners.  How widely understood is our company’s mission and/or vision and the company’s top strategy among our employees?  Are certain industries better at this than others? If so, why?  Does your company have a published set of values or beliefs?  How widely known are they?  Do they make a difference?  The answers to these simple questions will serve as indicators of the company’s ability to effectively deploy a strategy.  A commander can’t effectively deploy troops without each of them clearly understanding the mission. 12
  • 13. Methods of Deployment  Management by Objectives  Cascading Objectives and Goals  SMART Goals  Specific  Measurable  Achievable  Relevant  Time bound  Hoshin Kanri  Catchball, A3-X, and A3-T  Balanced Score Card 13
  • 14. Management By Objective (MBO)  The Principles of Management by Objective  Cascading of organizational goals and objectives  Mission Critical Objectives at the CEO Level  Mission Critical Objectives at the Plant Level  Specific objectives for each member  Cascaded Goals through Success Factors  Performance evaluation and provide feedback  Performance Evaluation System 14
  • 15. Management By Objective  Important features and advantages of MBO are:  Motivation –  Involving employees in the whole process of goal setting and increasing employee empowerment increases employee job satisfaction and commitment.  Better communication and Coordination –  Frequent reviews and interactions between superiors and subordinates helps to maintain relationships within the enterprise and also solve many problems faced during the period.  Clarity of goals –  The concept of SMART goals 15
  • 16. Limitations and Arguments Against  Over-emphasizes setting of goals, as opposed to the working of a plan  Could lead companies to evaluate employees by comparing them to the “ideal employee”  “What gets measured gets done”  W. Edwards Deming  argued that a lack of understanding of systems commonly results in the misapplication of objectives 16
  • 17. Discussion Points  When done properly MBO ideally:  improves motivation and communication  involves employees in goals setting  provides frequent feedback on performance  Is this typically what would be found if a company’s MBO process were reviewed?  Does MBO provide an opportunity for all employees to provide their input and understand their importance?  Any other challenges or short comings experienced by those who have utilized or been a part of MBO? 17
  • 18. Definitions  Hoshin = direction, a course, a policy, a plan, an aim  Kanri = management, administration, or control  Hoshin Kanri – A method of implementing strategy to get the right thing done.  Often referred to as:  Policy deployment, Strategic Initiatives, Management By Policy, Hoshin Planning, Policy Management, Managing for Results, Strategic Deployment and Goal Deployment. 18
  • 19. Hoshin Kanri  Purpose and Usage–  Long term strategic planning for systems  Developing shared strategic goals (compare Balanced Score Card)  Continuous organizational improvement  Cascading or deploying top management policies and targets down the management hierarchy 19
  • 20. Hoshin Kanri  Steps and Skills Required  Planning and Communication  Get Involvement  Set the course  X-Chart  Project Initiation and Execution  Two Deployment Styles or Target – Top-down and Bottom-up  “Catch Ball” Target Deployment  Project Charter  Standard Process for follow through  Reflection  Review of what worked and what didn’t work 20
  • 21. Hoshin Kanri  Hoshin Kanri can be thought of as the application of Deming's Plan-Do- Check-Act (PDCA) cycle to the management process.  The PDCA cycle represents a generic approach to continual improvement of activities and processes.  PLAN = a plan of action is developed to address a problem.  DO = the plan is implemented.  CHECK = information is collected on the control parameters.  ACT = the results are analyzed. Corrective action is identified. 21
  • 22. Hoshin Kanri  Three key elements  Catchball  Project Charter (A3-T)  X-Charts (A3-X) 22
  • 23. Catchball  A participative approach to decision-making.  Used in policy deployment to communicate across management levels when setting annual business objectives.  The analogy to tossing a ball back and forth emphasizes the interactive nature of policy deployment.  Used when establishing the terms of the organizational contracts or project charters.  Provides employees with an opportunity to review the plan and objective and to respond with their thoughts and ideas. 23
  • 24. Project Charter (A3-T)  Boil things down to one page  Clarifies that no one person can accomplish a strategy  Very reminiscent of PDCA and DMAIC 24
  • 25. 25
  • 26. X-Charts (A3-X)  A bundle of contracts called team charters  A visual tool for planning  Can appear complex at first  Becomes simple quickly  The key is the Linkage of high and low level action with people and results  Mostly an aid to communication 26
  • 27. 27
  • 28. Strategy Area •Contains the highest level mandates •Start here •Should link directly to corporate strategy, one level above the group for which you are planning. 28
  • 29. Metrics Area •Fill this in second •Put in standard and/or mandated operational figures your group needs to meet 29
  • 30. Tactics Area •Work on this third •Will lay out specific projects •Will become the basis for managing implementation 30
  • 31. Team Members Area •Work on this fourth •List Names of the people who will be responsible for implementing the tactics •Use proper names, not titles 31
  • 32. Connectional Areas •The absolute key to making this work •Forces reflection, debate and conversation in an open manner. •Do these last, in a back-and-forth manner, with others on your team and in your company 32
  • 33. Strategy-to-Tactics Correlation •Does a tactic really support one or more strategies? •Is there a more effective tactic? •Is there a non-necessary tactic? •Do you really understand the individual strategy 33 statements?
  • 34. Tactics-to-Metrics Correlation & Contribution •Does a tactic improve a specific metric's)? •Will it move the metric adequately? •Does each metric have some tactic to improve it? 34 •Do you really understand the individual
  • 35. Tactics-to-Team Member Accountability •Does each tactic have a skilled person to lead it? •Does one individual have too many tactics to lead? •Are there other people who need to be listed? •Does each individual understand his/her 35 accountability?
  • 36. Metrics-to-Results Correlation/Contribution •Does each metric contribute to one or more financial results which we value? •How much does each metric contribute? •Are we measuring the right things in our results? •Can we compare plan to actual over the period covered by the plan? 36
  • 37. Strategy-to-Results Correlation •Does each strategy contribute to one or more financial results which we value? •How much does each strategy contribute? •Is a strategy “for show” or for results (e.g. a Super Bowl ad)? 37
  • 38. 38
  • 39. Hoshin Kanri  Strengths  Limitations  Focuses organization  A rigid implementation on the vital few is necessary  Communication of a  Requires a long term shared vision commitment  Creates alignment  Relatively Static – the through participation breakthrough objective  Encourages cross must be stable during a functional cooperation 5 year period  Planning is systematic 39
  • 40. Discussion Points  How many currently use or have experience with this method of planning and deployment utilized?  Where HK has been utilized, was it well structured and routine or informal and possibly haphazard?  In what ways was it’s use effective or ineffective?  Would you recommend this system to others? Why? 40
  • 41. Balanced Score Card  A Strategic planning and management system  May mean different things to different people (the BSC spectrum)  From a Performance Measurement Framework = Dashboard  To a Robust Organization-wide Strategic Planning, Mgmt, and Communication System  Originated by Drs. Robert Kaplan and David Norton as a performance measurement framework  Added strategic non-financial performance measures to traditional financial metrics to give managers a “balanced” view of performance.  The “new” balanced scorecard transforms an organization’s strategic plan from a document into “marching orders.” 41
  • 42. Balanced Score Card  View the organization from four perspectives  Develop Metrics  Collect Data  Analyze Data to each perspective  PDCA 42
  • 43. Balanced Score Card Continued  Why Implement a Balanced Scorecard?  Increase focus on strategy and results  Improve organizational performance by measuring what matters  Align organization strategy with the work people do on a day-to-day basis  Focus on the drivers of future performance  Improve communication of the organization’s Vision and Strategy  Prioritize Projects / Initiatives 43
  • 44. Balanced Score Card Continued  Scorecards simply for organizing measures aren’t justified.  Start with the end in mind, focus on the desired results  Stephen Covey – “People and their managers are working so hard to be sure things are done right , that they hardly have time to decide if they are doing the right things.”  Developing a balanced scorecard system is like putting a puzzle together  The pieces are strategic components  They have to be checked for fit 44
  • 45. Recall Lou Novikoff, a.k.a.“The Mad Russian”, Chicago Cubs, 1940s  Stole third base with the bases loaded  “I got a good jump” he explained.  Unfortunately, there is no point in being fast at doing the wrong thing. 45
  • 46. BSC Continued  The major system components:  Engaged Leadership  Customers and Stakeholders  Interactive Communications and  Customer Value Proposition Change  Strategy, Strategic  Management Objectives, and Initiatives  Vision and Mission  Performance Measures  Core Values  Performance Information  Organization Weaknesses and Reporting Strengths  Rewards and Recognition  Evaluation 46
  • 47. Questions and Discussion?  How many currently use or have experience with the BSC method of planning and deployment?  Do you notice any added benefits or disadvantages of Hoshin Kanri vs. Balanced Score Card?  If we aren’t using either method, what else is being done in order to fill this need? 47
  • 48. Quality Measurement Systems that Support Strategy Deployment Baldrige Criteria ISO Standards 1. Leadership 1. Customer Focus 2. Strategic Planning 2. Leadership 3. Customer and Market Focus 3. Involvement of People 4. Measurement, Analysis, and 4. Process Approach Knowledge Management 5. Systems Approach to Management 5. Human Resources 6. Fact Based Decision Making 6. Process Management 7. Mutually Beneficial Supplier 7. Results Relationship 2.2 Strategy Deployment: With ISO- How do you deploy your strategy? Describe how The concentration is on the quality systems your organization converts its strategic objectives into action plans. Summarize your Takes an adoption of process approach organization’s action plans, how are they deployed, and KEY action plan performance measures or indicators. Project your With Baldrige- organization’s future performance relative to Performance excellence for entire organization KEY comparisons on these performance measures or indicators. Focus upon business results 48
  • 49. Discussion Topics  How many have experience working for companies that utilize either ISO and/or Baldrige?  Does it seem that one system is utilized more often or more commonly accepted? Why?  Does the industry affect which system is utilized?  What else might affect which system is selected?  Is there a need for the use of both systems? 49
  • 50. Discussion Points  All methods seem to have a distinct tie back to Plan-Do-Check-Act  Are we informally utilizing these methods on a daily basis, in some cases without realizing it?  If so, would it be beneficial to formalize and document the process?  If so, what ways can we go about that or how have you seen it done in the past? 50
  • 51. The Mind of the Lean Manager Thoughts from Jim Womack  Finding companies with X-Charts, completed A3 analysis, and all the elements of standardized work.  What’s missing?  Success in Achieving the Goals  Inability to actually read and interpret A3  No standardized work or not following it  Lean management techniques are quickly becoming tools (which are necessary).  Every manager loves a tool because it seems to provide a short cuts to doing a better job.  They can’t achieve their potential results or even any results without managers with a lean state of mind to wield them. 51
  • 52. What is a lean state of mind?  The Lean manager embraces the role of problem solver  The Lean manager realizes the no manager at a higher level can or should solve a problem at a lower level.  Instead assign responsibility to the manager at the lower level  The Lean manager believes that all problem solving is about experimentation by PDCA  The Lean manager knows that no problem is ever solved for ever 52
  • 53. Other Sources of Information  Books In IQC’s Library  Hoshin Kanri: Policy Deployment for Successful TQM - Yoji Akao  The Balanced Score Card – Translating Strategy into Action  Kaizen Sketch Book  http://www.kaicomm.com/KaizenSketchbook.html  And Multiple Others…. 53
  • 54. Hoshin Kanri for the Lean Enterprise  Technical description of Hoshin  Has a CD with all forms  Good resource; tough reading 54
  • 55. Getting the Right Things Done  Novel style, a la “The Goal”  Author has terrific experience  Has excellent examples 55
  • 56. Leadership and Self-Deception  Deals with root cause of people problems  Novel style  You can use it instantly  “Outside the Box” Thinking 56
  • 57. Resources and References  Balanced Scorecard and Hoshin Kanri by Marketing Partners, Inc.  http://www.mpicompanies.com/PDFs/Balanced%20Scorecard%20and%20Hoshin%20Kanri.pdf  Management Coaching and Training Services  http://www.mcts.com/Hoshin-Kanri.htm  Hoshin Kanri – Lean Strategic Planning by Joe Ely  Director of Operations for Cook Biotech  Baldrigeplus.com  http://www.baldrigeplus.com/Exhibits/Exhibit%20-%20Catchball%20processes.pdf  Strategy Deployment in Action: One Executive’s Perspective  http://www.lean.org/Events/WebinarHome.cfm (Lean Enterprise Institute)  Pascal Dennis and Dave Brule II  Balanced Score Card Institute  http://www.balancedscorecard.org/BSCResources/AbouttheBalancedScorecard/tabid/55/Default.aspx  Management By Objective  http://www.12manage.com/methods_smart_management_by_objectives.html  The Mind of the Lean Manager  Jim Womack – Founder and Chairman of Lean Enterprise Institue 57

Notes de l'éditeur

  1. Key Criteria for Performance Excellence – Leadership, Strategic Planning, Customer and Market Focus, Information and Analysis, Human Resource Focus, Process Management, and Business Results. Information Resource: http://www.baldrige.nist.gov/PDF_files/Issue_Sheet_SS.pdf
  2. Strategy VS Tactics - In military terms, tactics is concerned with the conduct of an engagement while strategy is concerned with how different engagements are linked. In other words, how a battle is fought is a matter of tactics: whether it should be fought at all is a matter of strategy. Strategic Management - is the process of specifying the organization’s mission, vision and objectives, developing policies and plans, often in terms of projects and programs, which are designed to achieve these objectives, and then allocating resources to implement the policies and plans, projects and programs While preparing this discussion, I found the military definitions interesting and useful. In some ways, they helped me clarify my thoughts that seem to all to easily become jumbled up and over lapping with all of the different business words, phrases, new ideas, various definitions and interpretations. Strategy = A plan of action (i.e whether or not to fight the battle) Tactics = The method(s) of actually carrying out the action (i.e. how a battle is fought) Deployment = Preparing, arranging, and positioning to move appropriately (i.e. a level between strategy and tactic = the process of transferring the plan into action)
  3. Yesterday, the Clipper Assembly Supervisors were discussing systems with Gary Nesteby. Gary mentioned that the human body is an excellent example of a system. Especially when thinking about the brain’s influence or control over the many sub-systems within the body. When taking this one step further and thinking about what actually carries out the brain’s direction we realize it’s our nervous system. The nervous system transforms our thoughts, ideas, and plans into action. What serves that purpose in each of our company’s? What is your company’s nervous system? Strategic Planning is the brain envisioning what needs to happen and how it needs to happen, but what actually communicates and transforms the vision into actions and reality?
  4. The Hoshin process developed in Japan during the 1960’s from quality management practices at the Bridgestone Tire Company, Toyota, Nippon Denso, Komatsu, and Matsushita. It was strongly influenced by the PDCA cycle of Deming, Management by Objectives of Peter Drucker, and the lectures by Dr. Juran on general management. The term was widely accepted in Japan by the 1970’s While the phrase balanced scorecard was coined in the early 1990s, the roots of the this type of approach are deep, and include the pioneering work of General Electric on performance measurement reporting in the 1950’s and the work of French process engineers (who created the Tableau de Bord – literally, a "dashboard" of performance measures) in the early part of the 20th century SMART Goals part of Peter Drucker’s Management by Objective – Originated 1954
  5. First Outlined by Peter Drucker in 1954 in his book “The practice of Management.” MBO relies on the defining of objectives for each employee and then to compare and to direct their performance against the objectives which have been set. It aims to increase the performance of the organization by matching organizational goals with the objectives of subordinates throughout the organization. Ideally, employees receive strong input to identify their objectives, time lines for completion, etc. MBO include continuous tracking of the processes and providing feedback to reach the objectives.
  6. If I’m marketing or encouraging this I’d suggest that Benefits and Advantages of MBO are Motivation, Improved Communication and Coordination, and clarity of goals. In my own opinion, these are the marketing traits that can be difficult to realize without effective application. We can all buy the diet pills from TV, but the fine print always say “results may vary” and “intended for use with diet and exercise.” For the information I was able to collect, these are the thought that came to my head regarding the advantages of MBO. It seems that they’re only realized when the most difficult parts of making it happen (the diet and exercise or the employee involvement and follow-up) are actually pursued. Unfortunately, those items are typically the ones that should already be taking place.
  7. Point 7 of Deming's 14 Points encourages managers to abandon objectives in favor of leadership because he felt that a leader with an understanding of systems was more likely to guide workers to an appropriate solution than the incentive of an objective
  8. The purpose of Hoshin Kanri (or Policy Deployment) is to make it possible to get away from the status quo and make a major performance improvement by analyzing current problems and deploying strategies that respond to environmental conditions. Policy Deployment cascades, or deploys, top management policies and targets down the management hierarchy. At each level, the policy is translated into policies, targets and actions for the next level down. With Policy Deployment, top management vision can be translated into a set of coherent, consistent, understandable and attainable policies and actions that can be applied at all levels of the company and in all functions of the company. When these actions and policies are applied, they result in a vision becoming a reality - and major, continual improvement in performance. At the beginning of the Policy Deployment process, top management sets the overall vision and the annual high-level policies and targets for the company. At each level moving downward, managers and employees participate in the definition—from the overall vision and their annual targets—of the strategy and detailed action plan they will use to attain their targets. They also define the measures that will be used to demonstrate that they have successfully achieved their targets. Then, targets, in turn are passed on to the next level down. Each level under top management is, in turn, involved with the level above it to make sure that its proposed strategy corresponds to requirements. Regular reviews take place to identify progress and problems, and to initiate corrective action. Policy Deployment ensures that everyone in the company is made aware of the overall vision and targets, and the way that these are translated into specific requirements for their own behavior and activities
  9. PDCA implies that once one cycle of the sequence is completed with the ' ACT ' step (in which corrective action is identified), the ' PLAN ' step (in which a plan to address how corrective action will be generated) of the next cycle should be started. Plan = Corresponding control points and control parameters are created. The plan is reviewed and agreed. Do = Implement the plan Check = The actual results are compared to the expected results. Act = Causes of any differences between expected and actual results are identified, discussed and agreed.
  10. .
  11. “ Ideas generated at one level of an organization are passed up or down to people at other organization levels. Those receiving the idea ‘catch’ it, modify it so that it is relevant to the work done at their level, and pass it along to another level. This is called catchball . A major benefit of catchball is that it helps to vertically integrate an organization. Communication is enhanced, people participate in developing ideas, and when the ideas are implemented, the chances of success are high because people at all levels in the organization shaped it so that it would work best in their environment. Each person will know how his or her work relates to the strategic and tactical operation of the business.
  12. Information Source - http://www.baldrige.nist.gov/PDF_files/Issue_Sheet_SS.pdf