SlideShare une entreprise Scribd logo
1  sur  95
Area Planning Studio l 2013

V A S N A

W A R D

Masters in Planning 2013-2015 CEPT University Ahmedabad
Area Planning Studio - 2013

Vasna Ward

Vasna

Wards in Ahmedabad city
Area Planning Studio - 2013

Vasna Ward

Total area of ward:- 4.8 sqkm
Total population:- 123116
Sex ratio :- 945 females per 1000 males
Literacy rate :- 77%
Working population:-37%
Average household size:- 4.5 people

Existing FSI :- 1.8
Consumed FSI :- 0.75
Gross Residential Density:- 25,649 persons/sqkm
Net Residential Density:- 73,283 persons/sqkm
Introduction- Demographic data
Area Planning Studio - 2013

Vasna Ward

Ambavadi

Paldi

Vasna Ward
APMC

Sarkhej
Industrial Zone

Vasna Ward
Area Planning Studio - 2013

Vasna Ward

New TP

TP schemes at Vasna Ward
Area Planning Studio - 2013

Vasna Ward

Vasna ward

The Green Belt
Area Planning Studio - 2013

Vasna Ward

The Green Belt
Area Planning Studio - 2013

Open Lands

Vasna Ward

Residential
Neighborhood

Commercial

Residential
Neighborhood

Slums

Village &
Tomb

Commercial

Open Lands

District Mapping on the basis of Imageability
Area Planning Studio - 2013

Vasna Ward

Macro level:
• Social Infrastructure
• Physical Infrastructure
Meso/Micro level :
• Large green field
development
• Neighborhood
development
• Address the slums
• Vasna road
commercial scope

Ward
boundary

Concern areas / Purview of Proposals
Area Planning Studio - 2013

Vasna Ward

TOD belt

Meso/Micro level :
• Large green field
development
• Neighborhood
development
• Address the slums
• Vasna road
commercial scope

TOD belt

TOD belt
BRTS
Ward boundary
Metro Line

Macro level:
• Social Infrastructure
• Physical Infrastructure

Considerations from the
DP 2021:
• BRTS / Mega Metro /
TOD
• FSI Regulations

Metro station

Concern areas / Purview of Proposals
Area Planning Studio - 2013

Vasna Ward

Road Networking
Macro level
Area Planning Studio - 2013

Vasna Ward

Cul-de-sacs
Incomplete circulation
Traffic concentration on
Vasna Road
Underdevelopment

Encroachment

Existing Road Network
Area Planning Studio - 2013

Vasna Ward

More distributed through
& local traffic
Complete road network
Better local circulation

Development in
undeveloped areas

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

Proposed Road Network
Area Planning Studio - 2013

Vasna Ward

Plotting for TOD
Macro level
Area Planning Studio - 2013

Vasna Ward

Plotting for TOD
Area Planning Studio - 2013

Vasna Ward

B

B
B
B

B

B

B

BRTS stations
MRTS stations

Plotting for TOD
Area Planning Studio - 2013

Vasna Ward

M

M

M

Variables
Permissible Uses

2.70

Maximum F.S.I.

Plotting for TOD
Area Planning Studio - 2013

Vasna Ward

Realizing the inherent & future
commercial potential of Vasna road
Meso level
Area Planning Studio - 2013

Vasna Ward
Concerns for Vasna road
• Inter transit integration (BRTS/MRTS)

• Transit integration with the immediate surroundings
• Commercial potential of the Vasna road
Area Planning Studio - 2013
Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

Vasna Ward

1. Inter Transit integration

TOD Zone - 1

Proposals/Regulations for TOD zones
Composite Transit routes & stations
• BRTS & MRTS
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Source – www.ahmedabadbrts.com

Typical c/s with BRTS Corridor adopted in Ahmedabad
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Integration of metro line with ROW at New Delhi

Source – www.jaintvcom
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Carriage way

BRTS

Metro

BRTS

BRTS – MRTS integration - Cross section Type - 1

Carriage way
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Carriage way

Metro

BRTS

BRTS

Metro

BRTS – MRTS integration - Cross section Type - 2

Carriage way
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Carriage way

BRTS

BRTS

Metro

BRTS – MRTS integration - Cross section Type - 3

Carriage way
Area Planning Studio - 2013

Vasna Ward

Existing

1. Inter Transit integration

Strengthen
Proposed (immediately)
Proposed (in long term)
TOD Zone - 1

Proposed Transit stations

• BRTS stop
• Provision for Mega metro station with
vehicular parking, para-transit, service
road & other complimenting activities
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Service road requirement at
kaushambi station, New delhi

Source – Google Earth
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

One of the metro stations at New Delhi

Source – www.dreamstime.com
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Source – i.ndtvimg.com

One of the metro stations at New Delhi
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Underpass at Metro stations

Source – www.dreamstime.com
Area Planning Studio - 2013

Vasna Ward

1. Inter Transit integration

Underpass at Metro stations

Source – www.dreamstime.com
Area Planning Studio - 2013

Vasna Ward

Platform

Platform

Concourse

underpass
underpass

BRTS lane

BRTS stop

BRTS lane

Carriage way

Schematic section showing proposed Inter-transit circulation
• Inter transit integration (BRTS/MRTS)

• Transit integration with the immediate surroundings
• Commercial potential of the Vasna road
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

2. Transit integration with surrounding

TOD Zone - 1
Metor station & Plaza

Proposed Plaza
Along with the space provisions for metro station &
its allied activities
Propose plaza around APMC metro station
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

2. Transit integration with surrounding

TOD Zone - 1
Metor station & Plaza

Proposed Plaza
Majorly, hardscape/softscape open spaces with small
amount of building blocks
Majorly pedestrianized
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

2. Transit integration with surrounding

TOD Zone - 1
Metor station & Plaza

Proposed Plaza
Activities to be planned for:
Shopping/
Recreation
Eating

Recreation

Transition
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

2. Transit integration with surrounding

TOD Zone - 1
Metor station & Plaza

Proposed Plaza
Release the road off high pedestrian traffic
Also would accommodate high demand of informal
commercial sector thereby minimizing disturbance to
the through traffic
Area Planning Studio - 2013

Vasna Ward

2. Transit integration with surrounding

Metro Station

Concourse

BRTS

Underpass

Right of Way

Plaza

Schematic Transverse section along Metro/ROW & Plaza
Area Planning Studio - 2013

Vasna Ward

2. Transit integration with surrounding

Pioneer Square, Portland, USA

Source – Google Earth
Suggested by – Mr. Jignesh Mehta
Area Planning Studio - 2013

Vasna Ward

2. Transit integration with surrounding

Bukit Bintang station, Kuala Lumpur
Monorail, Kuala Lumpur

Suggested by – Mehrnaz
• Inter transit integration (BRTS/MRTS)

• Transit integration with the immediate surroundings
• Commercial potential of the Vasna road
Area Planning Studio - 2013
Reds
1.Ocassional needs
2. City wide target group
3. specialized/ recognized @ for
certain services
4. Emergence: frontage provided by
state highway (dynamic)
5. Built form: Repetitive/ spread-out high visibility - similar line of business
6. give & take: employment to people
around - consumption at city level

Suburb
relation

Commercial Spillover

Vasna Ward

Residential
Neighborhoods

1

Residential
Neighborhoods
Greens
1. Frequent needs
2. Neighbourhood level target
group
3. Basic regular
4. Emergence: due to static
residential concentrations
5. Built form: individual units
catering to specific group /
altogether different group
6. give & take: consumption at
neighbourhoods around
Area Planning Studio - 2013

Vasna Ward

1
Area Planning Studio - 2013

Vasna Ward

1
Area Planning Studio - 2013

Vasna Ward

Unregulated
Housing (Slums)

Very good
Community life

2

Fairly Good
condition of
Structures

Slums

Short term proposal
In-Situ upgradation
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

1. Commercial development oriented proposal

TOD Zone - 1
Metor station & Plaza

Pedestrian Parking
pathway
bay
3.0m
2.5m

Carriage way
6.5m

Carriage way
6.5m

Parking Pedestrian
bay
pathway
2.5m
3.0m

Proposed ROW of 24M wide service road

Proposed Service Road
Wide Service road to felicitate commercial development
gradually in the TOD Zone – 1
Until market forces work towards commercial
development of the area, immediate construction of the
service road would provide additional commercial
frontage for informal & specialized commercial markets
Area Planning Studio - 2013
Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

Vasna Ward

1. Commercial development oriented proposal

TOD Zone - 1
Metor station & Plaza

Pedestrian Streets (NMTs)
Additional public area has been created in form of
Completely pedestrianized streets to cater to the huge
demand of informal commercial sector that will be
attracted to the place.
Might also be used for 2-wheeler parking
Area Planning Studio - 2013
Existing
Strengthen
Proposed (immediately)
Proposed (in long term)

Vasna Ward

1. Commercial development oriented proposal

TOD Zone - 1
Metor station & Plaza

Freight Oriented Commercial Activities (Red)
Designing favorable ROW to attract Transport
oriented commercial activities which require
specialized vehicle loading/unloading spaced
Appropriate location for its sustenance
Area Planning Studio - 2013

Vasna Ward

1. Commercial development oriented proposal

Trans. Oriented
commercial

Trans. Oriented
commercial
Loading /
Pedestrian
unloading bays pathway

Carriage way

Pedestrian
pathway

Loading /
unloading bays

Proposed ROW for Transport oriented commercial activities

Freight Oriented Commercial Activities (Red)
Designing favorable ROW to attract Transport
oriented commercial activities which require
specialized vehicle loading/unloading spaced
Appropriate location for its sustenance
Area Planning Studio - 2013

Vasna Ward

1. Commercial development oriented proposal

Design / Regulation / Policies for ‘Vasna road’ facing plots
Interactive Threshold between Private & Public property
Building construction permitted upto road front edge of the plot, inculding Chajja
Projections, Balconies, Ar. projections, Hoardings or any other horizontal projections
Area Planning Studio - 2013

Vasna Ward

1. Commercial development oriented proposal

Design / Regulation / Policies for ‘Vasna road’ facing plots
Minimum 4.5m wide covered public/common passage on ‘Vasna Road’ side of the
building on the ground floor
This is intended to accommodate commercial spillover from the building
The floor height of the passage shall be min. 200mm more than pedestrian
pathway/Footpath
Area Planning Studio - 2013

Vasna Ward

Offices

Offices

Retail
Retail

Pedestrian Parking
bay
pathway
4m
2.4m

Carriage way
6.25m

BRTS Corridor

MRTS

8m

2.7m

Carriage way
6.25m

Parking Pedestrian
bay
pathway
2.4m
4m

Proposed ROW of 36M wide Vasna Road

Design / Regulation / Policies for ‘Vasna road’ facing plots
Minimum 4.5m wide covered public/common passage on ‘Vasna Road’ side of the
building on the ground floor
This is intended to accommodate commercial spillover from the building
The floor height of the passage shall be min. 200mm more than pedestrian
pathway/Footpath
Area Planning Studio - 2013

Vasna Ward

Offices

Offices

Retail
Retail

Pedestrian Parking
bay
pathway
4m
2.4m

Carriage way
6.25m

BRTS Corridor

MRTS

8m

2.7m

Carriage way
6.25m

Parking Pedestrian
bay
pathway
2.4m
4m

Proposed ROW of 36M wide Vasna Road

Design / Regulation / Policies for ‘Vasna road’ facing plots
Types of Commercial activities permitted up to G+2:
above G+2:
• Goods Activities Shopping
Office Oriented
• Service Oriented Shopping
• Restaurant type activity
*Use classification adopted from APA. LBCS standards
Area Planning Studio - 2013

Vasna Ward

Promoting higher degree of utility &
services at residential neighborhood
Meso level
Area Planning Studio - 2013

Private

Vasna Ward

Semi-public

Public

Inspiration from large block sizes in other parts of Vasna
Assures appropriate separation of both street & residential activities
Gradual transition from public to private provides room for spillover from both ends
Area Planning Studio - 2013

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)
Pedestrian (NMT routes)

Promoting pedestrian routes in Neighborhoods

Vasna Ward
Area Planning Studio - 2013

Vasna Ward

Commercial
emergence

Emergence of commercial activities at strategic location at Vasna ward
Area Planning Studio - 2013

Vasna Ward

2.70

Pertaining to the wide range of uses permitted by AUDA DP 2012
Area Planning Studio - 2013

Vasna Ward

Map of North Vasna showing emergence of informal markets
Area Planning Studio - 2013

Vasna Ward

Residential Neighborhood

•
•

Residential Neighborhood

Residential Neighborhood

Spatial Intervention for Informal
Commercial
Increase in share of Public land

Residential Neighborhood

Provisions to accommodate informal commercial activities, coupled with a
completing design solution
Area Planning Studio - 2013

Vasna Ward

Existing
Strengthen
Proposed (immediately)
Proposed (in long term)
Pedestrian (NMT routes)
Informal activities

Provisions to accommodate informal commercial activities, coupled with a
completing design solution
Area Planning Studio - 2013

Vasna Ward

Badi Chaupar, Jaipur, Rajasthan

Source – Google Earth
Suggested by – Mr. Jignesh Mehta
Existing park
Proposed garden in TP
Proposed playgrounds in TP
Proposed open spaces in tp
Proposed parks
Proposed linear parks

Open spaces-parks and playgrounds
Area Planning Studio - 2013

Unregularized housing
(Slums)

Vasna Ward
Area Planning Studio - 2013

Vasna Ward

GUPTA NAGAR & PRAVIN NAGAR
Total Households:2214
Total Population:10750

JAWAHAR NAGAR
Total Households:750
Total Population:2275
Area:17240 sq. m.

33% OF TOTAL WARD AREA IS
UNDER SLUM.

SORAI NAGAR
Total Households:710
Total Population:3875
Area Planning Studio - 2013

Vasna Ward

COEXISTENCE

To promote practices to absorb slums/ unregularized
housing into regularized residential neighbourhood
Area Planning Studio - 2013

Vasna Ward

JAWAHAR NAGAR – PRESENT SCENARIO

WASTE MANAGEMENT
PROBLEM AND UNHYGIENIC
SURROUNDING

LACK OF PACCA HOUSES

LACK OF PROPER
INFRASTRUCTURE
Area Planning Studio - 2013

Vasna Ward

JAWAHAR NAGAR – SLUM REDEVELOPMENT

SLUM REDEVELOPMENT
TOTAL AREA COVERED
HOUSEHOLD

(IN SQ. MT.)
17240
750

AREA FOR SINGLE UNIT

35

NO. OF UNITS IN A BLOCK

16

AREA OF BLOCK

225

TOTAL DWELLING UNITS

750

TOTAL BUILDING BLOCKS

47

TOTAL BUILTUP AREA FOR SLUM
COMMON AREA
TOTAL AREA REQUIRED FOR SLUM
REDEVELOPMENT

10575
3173
SLUM AFTER REDEVELOPMENT

13748
Area Planning Studio - 2013

Vasna Ward

GUPTA NAGAR & PRAVIN NAGAR – PRESENT SCENARIO

PACCA HOUSE STRUCTURE

SNP IMPLEMENTED BUT STILL…….

LACK IN MANAGEMENT OF
INFRASTRUCTURE
GOOD COMMUNITY LIFE
Area Planning Studio - 2013
GUPTA NAGAR & PRAVIN NAGAR – SLUM UPGRADATION

INTERNAL ROAD CONNECTIVITY
PROPER INFRASTRUCTURE FACILITY
STREET LIGHTNING

Vasna Ward
Area Planning Studio - 2013

Vasna Ward

Incentivizing developers to promote
housing for Economically Weaker sections
Area Planning Studio - 2013

Vasna Ward

Total FSI = [1.8 + (FSI for EWSH / 2)]
*** To a maximum of Total FSI = 2.25 ***

1.8

1.8
1.4

0.4

1.2

0.6

1.6 = 2.0

1.5 = 2.1

1.8
0.8

1.8
1.0
1.4 = 2.2

0.9

0.9
1.35 = 2.25

Incentivizing developers to promote housing for Economically Weaker sections
Area Planning Studio - 2013

Vasna Ward

AMC
NSDP

FUNDING

NGO’s

HUDCO
Area Planning Studio - 2013

Solid Waste Management

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Open Dumping

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward
Area Planning Studio - 2013

Vasna Ward

Final Proposal Plan
ESTIMATION – COSTING – FINANCE
SHORT TERM
PROPOSALS
SHORT TERM PROPOSAL COSTS - ROADS

24m ROADS
Total Area of Construction
Unit Rate

2,01,600 sqm
Rs.1400/sqm

Total Cost

Rs.28,22,40,000

18m ROADS
Total Area of Construction
Unit Rate

1,99,800 sqm
Rs.1150/sqm

Total Cost

Rs. 22,97,70,000

Final Cost of Road Infrastructure Development

Rs. 51,20,10,000
SHORT TERM COST-SLUM REDEVELOPMENT
BUILT UP AREA
Total Area Requirement
Unit Slab Rate

10,600 sqm
Rs.14,600/sqm

Total Cost

Rs.15,47,60,000
OPEN AREAS

Total Area Requirement
Unit Rate

3200 sqm
Rs.1500/sqm

Total Cost

Rs. 48,00,000

Final Cost of Slum In-Situ Development

Rs. 15,95,60,000
SHORT TERM PROPOSAL COSTS

ROAD INFRASTRUCTURE

Final Cost of Road Infrastructure Development

Rs. 51,20,10,000

SLUM REDEVELOPMENT
Final Cost of Slum In-Situ Development

Rs. 15,95,60,000

FINAL COST OF SHORT TERM PROPOSAL

Rs. 67.16 crores
LONG TERM
PROPOSALS
LONG TERM PROPOSAL COSTS

ROAD INFRASTRUCTURE
15m Roads
Total Area Requirement
Unit Rate
Final Cost*

87,000 sqm
Rs. 1150/sqm
Rs. 10.00 crores
*Rates and Final figures may vary depending upon
the period of implementation and
the adjustments for inflation
and other factors
Area Planning Studio - 2013

Vasna Ward

Final Proposal Plan
Thank you!

V A S N A

W A R D

Kevin A, Maitry S, Pratham P, Rakhi D, Rashmi B

Contenu connexe

Tendances

Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
Malvika Jaishal
 

Tendances (20)

Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master Plan
 
Regional plan 2021 ncr
Regional plan 2021 ncrRegional plan 2021 ncr
Regional plan 2021 ncr
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalore
 
Planning NCR
Planning NCRPlanning NCR
Planning NCR
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
Land Pooling Models in India.pptx
Land Pooling Models in India.pptxLand Pooling Models in India.pptx
Land Pooling Models in India.pptx
 
Master plan
Master planMaster plan
Master plan
 
Area Appreciation - Gagan Vihar
Area Appreciation - Gagan ViharArea Appreciation - Gagan Vihar
Area Appreciation - Gagan Vihar
 
Master Plan 2021 for Delhi
Master Plan 2021 for DelhiMaster Plan 2021 for Delhi
Master Plan 2021 for Delhi
 
Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development Plan
 
LAP Project Concept
LAP Project ConceptLAP Project Concept
LAP Project Concept
 
Development plan patna
Development plan patnaDevelopment plan patna
Development plan patna
 
URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master Plan
 
Urban villages(india)
Urban villages(india)Urban villages(india)
Urban villages(india)
 
Tcpo
TcpoTcpo
Tcpo
 
Report
ReportReport
Report
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan review
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
 

En vedette

Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmati
Syam M
 

En vedette (10)

District Strategic Planning in Zones 30 and 31: A Process for Successful Mul...
District Strategic Planning in Zones 30 and 31:  A Process for Successful Mul...District Strategic Planning in Zones 30 and 31:  A Process for Successful Mul...
District Strategic Planning in Zones 30 and 31: A Process for Successful Mul...
 
Portfolio
PortfolioPortfolio
Portfolio
 
Area Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, GujaratArea Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, Gujarat
 
Yamuna sports complex
Yamuna sports complexYamuna sports complex
Yamuna sports complex
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmati
 
Urban re planning of Sampaloc District
Urban re planning of Sampaloc DistrictUrban re planning of Sampaloc District
Urban re planning of Sampaloc District
 
Urban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power PointUrban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power Point
 
Urban Planning Portfolio
Urban Planning PortfolioUrban Planning Portfolio
Urban Planning Portfolio
 
Land use planning
Land use planningLand use planning
Land use planning
 
Ahmedabad
Ahmedabad Ahmedabad
Ahmedabad
 

Similaire à local area plan, Vasna ward, Ahmedabad

Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
WRI Ross Center for Sustainable Cities
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final
Altamash Khan
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
Heemanish Midde
 
Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15
Sahil Singh Kapoor
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, Qatar
Walter Bone, RLA ASLA
 

Similaire à local area plan, Vasna ward, Ahmedabad (20)

Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
 
NJ Future Forum 2012 Complete Streets Cotter
NJ Future Forum 2012 Complete Streets CotterNJ Future Forum 2012 Complete Streets Cotter
NJ Future Forum 2012 Complete Streets Cotter
 
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
Sustainable Transport Trends & Opportunities for Indian Cities - Planning for...
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
 
CV_Anas Mohammad
CV_Anas MohammadCV_Anas Mohammad
CV_Anas Mohammad
 
A Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete IntersectionsA Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete Intersections
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
 
Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15
 
EMBARQ
EMBARQEMBARQ
EMBARQ
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
Kane County 529 PACE Route Study Presentation 2010
Kane County 529 PACE Route Study Presentation 2010Kane County 529 PACE Route Study Presentation 2010
Kane County 529 PACE Route Study Presentation 2010
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, Qatar
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.
 
Sustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanySustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and Germany
 
My Portfolio
My PortfolioMy Portfolio
My Portfolio
 
Planning for operations in Queensland
Planning for operations in QueenslandPlanning for operations in Queensland
Planning for operations in Queensland
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger Services
 

Plus de Pratham Pincha

Plus de Pratham Pincha (10)

Municipal Finance - Income & Expenditure
Municipal Finance - Income & ExpenditureMunicipal Finance - Income & Expenditure
Municipal Finance - Income & Expenditure
 
Revisiting the Optimal City Size argument
Revisiting the Optimal City Size argumentRevisiting the Optimal City Size argument
Revisiting the Optimal City Size argument
 
Development Plan of Mehsana, Gujarat
Development Plan of Mehsana, GujaratDevelopment Plan of Mehsana, Gujarat
Development Plan of Mehsana, Gujarat
 
NCR Residential Market Analysis 2014
NCR Residential Market Analysis 2014NCR Residential Market Analysis 2014
NCR Residential Market Analysis 2014
 
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
 
Human dimension & cities - The Human Scale
Human dimension & cities - The Human ScaleHuman dimension & cities - The Human Scale
Human dimension & cities - The Human Scale
 
Governance & Financial assessment of Mehsana Municipality 13-14
Governance & Financial assessment of Mehsana Municipality 13-14Governance & Financial assessment of Mehsana Municipality 13-14
Governance & Financial assessment of Mehsana Municipality 13-14
 
Institutional framework for Spatial Planning and Development in Gujarat
Institutional framework for Spatial Planning and Development in GujaratInstitutional framework for Spatial Planning and Development in Gujarat
Institutional framework for Spatial Planning and Development in Gujarat
 
Maharashtra regional town planning act (1966)
Maharashtra regional town planning act (1966)Maharashtra regional town planning act (1966)
Maharashtra regional town planning act (1966)
 
Biogas Generation as a Means to Boost Self sufficiency of a Rural Settlement ...
Biogas Generation as a Means to Boost Self sufficiency of a Rural Settlement ...Biogas Generation as a Means to Boost Self sufficiency of a Rural Settlement ...
Biogas Generation as a Means to Boost Self sufficiency of a Rural Settlement ...
 

Dernier

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Dernier (20)

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 

local area plan, Vasna ward, Ahmedabad

  • 1. Area Planning Studio l 2013 V A S N A W A R D Masters in Planning 2013-2015 CEPT University Ahmedabad
  • 2. Area Planning Studio - 2013 Vasna Ward Vasna Wards in Ahmedabad city
  • 3. Area Planning Studio - 2013 Vasna Ward Total area of ward:- 4.8 sqkm Total population:- 123116 Sex ratio :- 945 females per 1000 males Literacy rate :- 77% Working population:-37% Average household size:- 4.5 people Existing FSI :- 1.8 Consumed FSI :- 0.75 Gross Residential Density:- 25,649 persons/sqkm Net Residential Density:- 73,283 persons/sqkm Introduction- Demographic data
  • 4. Area Planning Studio - 2013 Vasna Ward Ambavadi Paldi Vasna Ward APMC Sarkhej Industrial Zone Vasna Ward
  • 5. Area Planning Studio - 2013 Vasna Ward New TP TP schemes at Vasna Ward
  • 6. Area Planning Studio - 2013 Vasna Ward Vasna ward The Green Belt
  • 7. Area Planning Studio - 2013 Vasna Ward The Green Belt
  • 8. Area Planning Studio - 2013 Open Lands Vasna Ward Residential Neighborhood Commercial Residential Neighborhood Slums Village & Tomb Commercial Open Lands District Mapping on the basis of Imageability
  • 9. Area Planning Studio - 2013 Vasna Ward Macro level: • Social Infrastructure • Physical Infrastructure Meso/Micro level : • Large green field development • Neighborhood development • Address the slums • Vasna road commercial scope Ward boundary Concern areas / Purview of Proposals
  • 10. Area Planning Studio - 2013 Vasna Ward TOD belt Meso/Micro level : • Large green field development • Neighborhood development • Address the slums • Vasna road commercial scope TOD belt TOD belt BRTS Ward boundary Metro Line Macro level: • Social Infrastructure • Physical Infrastructure Considerations from the DP 2021: • BRTS / Mega Metro / TOD • FSI Regulations Metro station Concern areas / Purview of Proposals
  • 11. Area Planning Studio - 2013 Vasna Ward Road Networking Macro level
  • 12. Area Planning Studio - 2013 Vasna Ward Cul-de-sacs Incomplete circulation Traffic concentration on Vasna Road Underdevelopment Encroachment Existing Road Network
  • 13. Area Planning Studio - 2013 Vasna Ward More distributed through & local traffic Complete road network Better local circulation Development in undeveloped areas Existing Strengthen Proposed (immediately) Proposed (in long term) Proposed Road Network
  • 14. Area Planning Studio - 2013 Vasna Ward Plotting for TOD Macro level
  • 15. Area Planning Studio - 2013 Vasna Ward Plotting for TOD
  • 16. Area Planning Studio - 2013 Vasna Ward B B B B B B B BRTS stations MRTS stations Plotting for TOD
  • 17. Area Planning Studio - 2013 Vasna Ward M M M Variables Permissible Uses 2.70 Maximum F.S.I. Plotting for TOD
  • 18. Area Planning Studio - 2013 Vasna Ward Realizing the inherent & future commercial potential of Vasna road Meso level
  • 19. Area Planning Studio - 2013 Vasna Ward
  • 20. Concerns for Vasna road • Inter transit integration (BRTS/MRTS) • Transit integration with the immediate surroundings • Commercial potential of the Vasna road
  • 21. Area Planning Studio - 2013 Existing Strengthen Proposed (immediately) Proposed (in long term) Vasna Ward 1. Inter Transit integration TOD Zone - 1 Proposals/Regulations for TOD zones Composite Transit routes & stations • BRTS & MRTS
  • 22. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Source – www.ahmedabadbrts.com Typical c/s with BRTS Corridor adopted in Ahmedabad
  • 23. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Integration of metro line with ROW at New Delhi Source – www.jaintvcom
  • 24. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Carriage way BRTS Metro BRTS BRTS – MRTS integration - Cross section Type - 1 Carriage way
  • 25. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Carriage way Metro BRTS BRTS Metro BRTS – MRTS integration - Cross section Type - 2 Carriage way
  • 26. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Carriage way BRTS BRTS Metro BRTS – MRTS integration - Cross section Type - 3 Carriage way
  • 27. Area Planning Studio - 2013 Vasna Ward Existing 1. Inter Transit integration Strengthen Proposed (immediately) Proposed (in long term) TOD Zone - 1 Proposed Transit stations • BRTS stop • Provision for Mega metro station with vehicular parking, para-transit, service road & other complimenting activities
  • 28. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Service road requirement at kaushambi station, New delhi Source – Google Earth
  • 29. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration One of the metro stations at New Delhi Source – www.dreamstime.com
  • 30. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Source – i.ndtvimg.com One of the metro stations at New Delhi
  • 31. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Underpass at Metro stations Source – www.dreamstime.com
  • 32. Area Planning Studio - 2013 Vasna Ward 1. Inter Transit integration Underpass at Metro stations Source – www.dreamstime.com
  • 33. Area Planning Studio - 2013 Vasna Ward Platform Platform Concourse underpass underpass BRTS lane BRTS stop BRTS lane Carriage way Schematic section showing proposed Inter-transit circulation
  • 34. • Inter transit integration (BRTS/MRTS) • Transit integration with the immediate surroundings • Commercial potential of the Vasna road
  • 35. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) 2. Transit integration with surrounding TOD Zone - 1 Metor station & Plaza Proposed Plaza Along with the space provisions for metro station & its allied activities Propose plaza around APMC metro station
  • 36. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) 2. Transit integration with surrounding TOD Zone - 1 Metor station & Plaza Proposed Plaza Majorly, hardscape/softscape open spaces with small amount of building blocks Majorly pedestrianized
  • 37. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) 2. Transit integration with surrounding TOD Zone - 1 Metor station & Plaza Proposed Plaza Activities to be planned for: Shopping/ Recreation Eating Recreation Transition
  • 38. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) 2. Transit integration with surrounding TOD Zone - 1 Metor station & Plaza Proposed Plaza Release the road off high pedestrian traffic Also would accommodate high demand of informal commercial sector thereby minimizing disturbance to the through traffic
  • 39. Area Planning Studio - 2013 Vasna Ward 2. Transit integration with surrounding Metro Station Concourse BRTS Underpass Right of Way Plaza Schematic Transverse section along Metro/ROW & Plaza
  • 40. Area Planning Studio - 2013 Vasna Ward 2. Transit integration with surrounding Pioneer Square, Portland, USA Source – Google Earth Suggested by – Mr. Jignesh Mehta
  • 41. Area Planning Studio - 2013 Vasna Ward 2. Transit integration with surrounding Bukit Bintang station, Kuala Lumpur Monorail, Kuala Lumpur Suggested by – Mehrnaz
  • 42. • Inter transit integration (BRTS/MRTS) • Transit integration with the immediate surroundings • Commercial potential of the Vasna road
  • 43. Area Planning Studio - 2013 Reds 1.Ocassional needs 2. City wide target group 3. specialized/ recognized @ for certain services 4. Emergence: frontage provided by state highway (dynamic) 5. Built form: Repetitive/ spread-out high visibility - similar line of business 6. give & take: employment to people around - consumption at city level Suburb relation Commercial Spillover Vasna Ward Residential Neighborhoods 1 Residential Neighborhoods Greens 1. Frequent needs 2. Neighbourhood level target group 3. Basic regular 4. Emergence: due to static residential concentrations 5. Built form: individual units catering to specific group / altogether different group 6. give & take: consumption at neighbourhoods around
  • 44. Area Planning Studio - 2013 Vasna Ward 1
  • 45. Area Planning Studio - 2013 Vasna Ward 1
  • 46. Area Planning Studio - 2013 Vasna Ward Unregulated Housing (Slums) Very good Community life 2 Fairly Good condition of Structures Slums Short term proposal In-Situ upgradation
  • 47. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) 1. Commercial development oriented proposal TOD Zone - 1 Metor station & Plaza Pedestrian Parking pathway bay 3.0m 2.5m Carriage way 6.5m Carriage way 6.5m Parking Pedestrian bay pathway 2.5m 3.0m Proposed ROW of 24M wide service road Proposed Service Road Wide Service road to felicitate commercial development gradually in the TOD Zone – 1 Until market forces work towards commercial development of the area, immediate construction of the service road would provide additional commercial frontage for informal & specialized commercial markets
  • 48. Area Planning Studio - 2013 Existing Strengthen Proposed (immediately) Proposed (in long term) Vasna Ward 1. Commercial development oriented proposal TOD Zone - 1 Metor station & Plaza Pedestrian Streets (NMTs) Additional public area has been created in form of Completely pedestrianized streets to cater to the huge demand of informal commercial sector that will be attracted to the place. Might also be used for 2-wheeler parking
  • 49. Area Planning Studio - 2013 Existing Strengthen Proposed (immediately) Proposed (in long term) Vasna Ward 1. Commercial development oriented proposal TOD Zone - 1 Metor station & Plaza Freight Oriented Commercial Activities (Red) Designing favorable ROW to attract Transport oriented commercial activities which require specialized vehicle loading/unloading spaced Appropriate location for its sustenance
  • 50. Area Planning Studio - 2013 Vasna Ward 1. Commercial development oriented proposal Trans. Oriented commercial Trans. Oriented commercial Loading / Pedestrian unloading bays pathway Carriage way Pedestrian pathway Loading / unloading bays Proposed ROW for Transport oriented commercial activities Freight Oriented Commercial Activities (Red) Designing favorable ROW to attract Transport oriented commercial activities which require specialized vehicle loading/unloading spaced Appropriate location for its sustenance
  • 51. Area Planning Studio - 2013 Vasna Ward 1. Commercial development oriented proposal Design / Regulation / Policies for ‘Vasna road’ facing plots Interactive Threshold between Private & Public property Building construction permitted upto road front edge of the plot, inculding Chajja Projections, Balconies, Ar. projections, Hoardings or any other horizontal projections
  • 52. Area Planning Studio - 2013 Vasna Ward 1. Commercial development oriented proposal Design / Regulation / Policies for ‘Vasna road’ facing plots Minimum 4.5m wide covered public/common passage on ‘Vasna Road’ side of the building on the ground floor This is intended to accommodate commercial spillover from the building The floor height of the passage shall be min. 200mm more than pedestrian pathway/Footpath
  • 53. Area Planning Studio - 2013 Vasna Ward Offices Offices Retail Retail Pedestrian Parking bay pathway 4m 2.4m Carriage way 6.25m BRTS Corridor MRTS 8m 2.7m Carriage way 6.25m Parking Pedestrian bay pathway 2.4m 4m Proposed ROW of 36M wide Vasna Road Design / Regulation / Policies for ‘Vasna road’ facing plots Minimum 4.5m wide covered public/common passage on ‘Vasna Road’ side of the building on the ground floor This is intended to accommodate commercial spillover from the building The floor height of the passage shall be min. 200mm more than pedestrian pathway/Footpath
  • 54. Area Planning Studio - 2013 Vasna Ward Offices Offices Retail Retail Pedestrian Parking bay pathway 4m 2.4m Carriage way 6.25m BRTS Corridor MRTS 8m 2.7m Carriage way 6.25m Parking Pedestrian bay pathway 2.4m 4m Proposed ROW of 36M wide Vasna Road Design / Regulation / Policies for ‘Vasna road’ facing plots Types of Commercial activities permitted up to G+2: above G+2: • Goods Activities Shopping Office Oriented • Service Oriented Shopping • Restaurant type activity *Use classification adopted from APA. LBCS standards
  • 55. Area Planning Studio - 2013 Vasna Ward Promoting higher degree of utility & services at residential neighborhood Meso level
  • 56. Area Planning Studio - 2013 Private Vasna Ward Semi-public Public Inspiration from large block sizes in other parts of Vasna Assures appropriate separation of both street & residential activities Gradual transition from public to private provides room for spillover from both ends
  • 57. Area Planning Studio - 2013 Existing Strengthen Proposed (immediately) Proposed (in long term) Pedestrian (NMT routes) Promoting pedestrian routes in Neighborhoods Vasna Ward
  • 58. Area Planning Studio - 2013 Vasna Ward Commercial emergence Emergence of commercial activities at strategic location at Vasna ward
  • 59. Area Planning Studio - 2013 Vasna Ward 2.70 Pertaining to the wide range of uses permitted by AUDA DP 2012
  • 60. Area Planning Studio - 2013 Vasna Ward Map of North Vasna showing emergence of informal markets
  • 61. Area Planning Studio - 2013 Vasna Ward Residential Neighborhood • • Residential Neighborhood Residential Neighborhood Spatial Intervention for Informal Commercial Increase in share of Public land Residential Neighborhood Provisions to accommodate informal commercial activities, coupled with a completing design solution
  • 62. Area Planning Studio - 2013 Vasna Ward Existing Strengthen Proposed (immediately) Proposed (in long term) Pedestrian (NMT routes) Informal activities Provisions to accommodate informal commercial activities, coupled with a completing design solution
  • 63. Area Planning Studio - 2013 Vasna Ward Badi Chaupar, Jaipur, Rajasthan Source – Google Earth Suggested by – Mr. Jignesh Mehta
  • 64. Existing park Proposed garden in TP Proposed playgrounds in TP Proposed open spaces in tp Proposed parks Proposed linear parks Open spaces-parks and playgrounds
  • 65. Area Planning Studio - 2013 Unregularized housing (Slums) Vasna Ward
  • 66. Area Planning Studio - 2013 Vasna Ward GUPTA NAGAR & PRAVIN NAGAR Total Households:2214 Total Population:10750 JAWAHAR NAGAR Total Households:750 Total Population:2275 Area:17240 sq. m. 33% OF TOTAL WARD AREA IS UNDER SLUM. SORAI NAGAR Total Households:710 Total Population:3875
  • 67. Area Planning Studio - 2013 Vasna Ward COEXISTENCE To promote practices to absorb slums/ unregularized housing into regularized residential neighbourhood
  • 68. Area Planning Studio - 2013 Vasna Ward JAWAHAR NAGAR – PRESENT SCENARIO WASTE MANAGEMENT PROBLEM AND UNHYGIENIC SURROUNDING LACK OF PACCA HOUSES LACK OF PROPER INFRASTRUCTURE
  • 69. Area Planning Studio - 2013 Vasna Ward JAWAHAR NAGAR – SLUM REDEVELOPMENT SLUM REDEVELOPMENT TOTAL AREA COVERED HOUSEHOLD (IN SQ. MT.) 17240 750 AREA FOR SINGLE UNIT 35 NO. OF UNITS IN A BLOCK 16 AREA OF BLOCK 225 TOTAL DWELLING UNITS 750 TOTAL BUILDING BLOCKS 47 TOTAL BUILTUP AREA FOR SLUM COMMON AREA TOTAL AREA REQUIRED FOR SLUM REDEVELOPMENT 10575 3173 SLUM AFTER REDEVELOPMENT 13748
  • 70. Area Planning Studio - 2013 Vasna Ward GUPTA NAGAR & PRAVIN NAGAR – PRESENT SCENARIO PACCA HOUSE STRUCTURE SNP IMPLEMENTED BUT STILL……. LACK IN MANAGEMENT OF INFRASTRUCTURE GOOD COMMUNITY LIFE
  • 71. Area Planning Studio - 2013 GUPTA NAGAR & PRAVIN NAGAR – SLUM UPGRADATION INTERNAL ROAD CONNECTIVITY PROPER INFRASTRUCTURE FACILITY STREET LIGHTNING Vasna Ward
  • 72. Area Planning Studio - 2013 Vasna Ward Incentivizing developers to promote housing for Economically Weaker sections
  • 73. Area Planning Studio - 2013 Vasna Ward Total FSI = [1.8 + (FSI for EWSH / 2)] *** To a maximum of Total FSI = 2.25 *** 1.8 1.8 1.4 0.4 1.2 0.6 1.6 = 2.0 1.5 = 2.1 1.8 0.8 1.8 1.0 1.4 = 2.2 0.9 0.9 1.35 = 2.25 Incentivizing developers to promote housing for Economically Weaker sections
  • 74. Area Planning Studio - 2013 Vasna Ward AMC NSDP FUNDING NGO’s HUDCO
  • 75. Area Planning Studio - 2013 Solid Waste Management Vasna Ward
  • 76. Area Planning Studio - 2013 Vasna Ward
  • 77. Area Planning Studio - 2013 Vasna Ward
  • 78. Area Planning Studio - 2013 Vasna Ward
  • 79. Area Planning Studio - 2013 Open Dumping Vasna Ward
  • 80. Area Planning Studio - 2013 Vasna Ward
  • 81. Area Planning Studio - 2013 Vasna Ward
  • 82. Area Planning Studio - 2013 Vasna Ward
  • 83. Area Planning Studio - 2013 Vasna Ward
  • 84. Area Planning Studio - 2013 Vasna Ward
  • 85. Area Planning Studio - 2013 Vasna Ward
  • 86. Area Planning Studio - 2013 Vasna Ward Final Proposal Plan
  • 87. ESTIMATION – COSTING – FINANCE
  • 89. SHORT TERM PROPOSAL COSTS - ROADS 24m ROADS Total Area of Construction Unit Rate 2,01,600 sqm Rs.1400/sqm Total Cost Rs.28,22,40,000 18m ROADS Total Area of Construction Unit Rate 1,99,800 sqm Rs.1150/sqm Total Cost Rs. 22,97,70,000 Final Cost of Road Infrastructure Development Rs. 51,20,10,000
  • 90. SHORT TERM COST-SLUM REDEVELOPMENT BUILT UP AREA Total Area Requirement Unit Slab Rate 10,600 sqm Rs.14,600/sqm Total Cost Rs.15,47,60,000 OPEN AREAS Total Area Requirement Unit Rate 3200 sqm Rs.1500/sqm Total Cost Rs. 48,00,000 Final Cost of Slum In-Situ Development Rs. 15,95,60,000
  • 91. SHORT TERM PROPOSAL COSTS ROAD INFRASTRUCTURE Final Cost of Road Infrastructure Development Rs. 51,20,10,000 SLUM REDEVELOPMENT Final Cost of Slum In-Situ Development Rs. 15,95,60,000 FINAL COST OF SHORT TERM PROPOSAL Rs. 67.16 crores
  • 93. LONG TERM PROPOSAL COSTS ROAD INFRASTRUCTURE 15m Roads Total Area Requirement Unit Rate Final Cost* 87,000 sqm Rs. 1150/sqm Rs. 10.00 crores *Rates and Final figures may vary depending upon the period of implementation and the adjustments for inflation and other factors
  • 94. Area Planning Studio - 2013 Vasna Ward Final Proposal Plan
  • 95. Thank you! V A S N A W A R D Kevin A, Maitry S, Pratham P, Rakhi D, Rashmi B