UBIT Maintenance Support and Capabilities
What is a UBIT?
 Under Bridge Inspection Truck (UBIT)
 This vehicle is capable of articulating in a variety of positions
to accommodate and facilitate both Inspection and
Maintenance.
 No outriggers are required while bucket is deployed (Counter
weights)
 Truck is still mobile and free to move while bucket is deployed.
State Tasking
Perrine Bridge in Twin
Falls
 State Bridge Inspectors
will require the UBIT for a
total of 86 bridge
inspections throughout
the state of Idaho this
year. At times multiple
bridges can be completed
in one day, while others
require days to complete,
or more than a days drive
to get to.
Mission of the UBIT
Work Orders Traffic Control
 Your Forman will
create the work order
based on the Activity
being performed.
M151-M159 supporting
bridge maintenance, or
M419 in support of
inspection.
 There should be a work
order to cover M420
for all of your Traffic
Control functions for
Maintenance, and
Inspection.
TAMS? Not yet, but we are working on it.
Cleaning M159 Retrofits M155
Maintenance Support Activities M151-M159
Future Asset Aspen Aerials B-32
Aspen Aerials B-32
Bucket Accessories
 120v outlet in platform and at deck
 12V LED floodlights (2) in platform
 Video system including 3 cameras, installed on T2, facing
down, B3, facing platform and at rear of truck. Monitor
installed in cab.
 ½” airline in platform, connected from chassis brake
system
 HOTSY electrically driven pressure washer; 39
gpm@2000psi (6hp)
 (2) LED boom lights, for nighttime operation, installed
on B1 and B2.
B-32 Flight Diagram
3 days training in Boise, ID
 Aspen Aerial will be providing a 3 day training class
on the basics of operation for the B-32 UBIT. There
will be limited seats for all the district to provide 1
maybe 2 TTOs to be trained on basic operations.
 Provided the District can provide an Operator,
approved by the BAME, the District will have the
option of independent use of the B-32 for
maintenance activities for extended periods.
 (Provided B-32 is not employed by Bridge Asset Management)
Go to the Intranet.
Under Divisions, select
Engineering Product and Plans.
UBIT Calendar Scheduling 101
Click on Bridge.
Click on Bridge Asset
Management, under Sites.
UBIT Calendar Scheduling 101
The UBIT Calendar is right under Lists,
just click.
Review the UBIT calendar and find dates that
are open, or in your Area. We may have some
flexibility to meet District Maintenance needs.
UBIT Calendar Scheduling 101
Request the dates you would like to use
the UBIT for maintenance or
Inspection.
Once you request it, your not stuck
with it. We are flexible on getting
the UBIT where you need it to
support State and Local Assets.
UBIT Calendar Scheduling 101
Summer Winter
Year-round Truck Availability
Summery
Questions?

Contenu connexe

Similaire à UBIT Maintenance Support and Capabilities

Thermography presentation bulldozer undercarriage
Thermography presentation   bulldozer undercarriageThermography presentation   bulldozer undercarriage
Thermography presentation bulldozer undercarriageVikingServices
 
CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work ZonesAcey Roberts
 
Automatic speed controller in real time vehicles.
Automatic speed controller in real time vehicles.Automatic speed controller in real time vehicles.
Automatic speed controller in real time vehicles.Jinto George
 
ttt-link-105-datasheet
ttt-link-105-datasheetttt-link-105-datasheet
ttt-link-105-datasheetMarc Flitton
 
Industry Mobilty Solutions
Industry Mobilty SolutionsIndustry Mobilty Solutions
Industry Mobilty Solutionsindusaviation
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdfxmumiao
 
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...Motionics, LLC
 
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...Albatroz engineering - Engineering solutions for Overhead Line Inspections an...
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...Luís Raposo
 

Similaire à UBIT Maintenance Support and Capabilities (10)

Thermography presentation bulldozer undercarriage
Thermography presentation   bulldozer undercarriageThermography presentation   bulldozer undercarriage
Thermography presentation bulldozer undercarriage
 
CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work Zones
 
Automatic speed controller in real time vehicles.
Automatic speed controller in real time vehicles.Automatic speed controller in real time vehicles.
Automatic speed controller in real time vehicles.
 
ttt-link-105-datasheet
ttt-link-105-datasheetttt-link-105-datasheet
ttt-link-105-datasheet
 
CB30C Rugged COM Express Safe Computer
CB30C Rugged COM Express Safe ComputerCB30C Rugged COM Express Safe Computer
CB30C Rugged COM Express Safe Computer
 
Industry Mobilty Solutions
Industry Mobilty SolutionsIndustry Mobilty Solutions
Industry Mobilty Solutions
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdf
 
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...
Case Study - VTK Fan/Blower Vibration Analysis & Rotor Balancing w/ Motionics...
 
2 cdc190022c0206
2 cdc190022c02062 cdc190022c0206
2 cdc190022c0206
 
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...Albatroz engineering - Engineering solutions for Overhead Line Inspections an...
Albatroz engineering - Engineering solutions for Overhead Line Inspections an...
 

UBIT Maintenance Support and Capabilities

  • 1. UBIT Maintenance Support and Capabilities
  • 2. What is a UBIT?  Under Bridge Inspection Truck (UBIT)  This vehicle is capable of articulating in a variety of positions to accommodate and facilitate both Inspection and Maintenance.  No outriggers are required while bucket is deployed (Counter weights)  Truck is still mobile and free to move while bucket is deployed.
  • 3. State Tasking Perrine Bridge in Twin Falls  State Bridge Inspectors will require the UBIT for a total of 86 bridge inspections throughout the state of Idaho this year. At times multiple bridges can be completed in one day, while others require days to complete, or more than a days drive to get to. Mission of the UBIT
  • 4. Work Orders Traffic Control  Your Forman will create the work order based on the Activity being performed. M151-M159 supporting bridge maintenance, or M419 in support of inspection.  There should be a work order to cover M420 for all of your Traffic Control functions for Maintenance, and Inspection. TAMS? Not yet, but we are working on it.
  • 5. Cleaning M159 Retrofits M155 Maintenance Support Activities M151-M159
  • 6. Future Asset Aspen Aerials B-32
  • 8. Bucket Accessories  120v outlet in platform and at deck  12V LED floodlights (2) in platform  Video system including 3 cameras, installed on T2, facing down, B3, facing platform and at rear of truck. Monitor installed in cab.  ½” airline in platform, connected from chassis brake system  HOTSY electrically driven pressure washer; 39 gpm@2000psi (6hp)  (2) LED boom lights, for nighttime operation, installed on B1 and B2.
  • 10. 3 days training in Boise, ID  Aspen Aerial will be providing a 3 day training class on the basics of operation for the B-32 UBIT. There will be limited seats for all the district to provide 1 maybe 2 TTOs to be trained on basic operations.  Provided the District can provide an Operator, approved by the BAME, the District will have the option of independent use of the B-32 for maintenance activities for extended periods.  (Provided B-32 is not employed by Bridge Asset Management)
  • 11. Go to the Intranet. Under Divisions, select Engineering Product and Plans. UBIT Calendar Scheduling 101
  • 12. Click on Bridge. Click on Bridge Asset Management, under Sites. UBIT Calendar Scheduling 101
  • 13. The UBIT Calendar is right under Lists, just click. Review the UBIT calendar and find dates that are open, or in your Area. We may have some flexibility to meet District Maintenance needs. UBIT Calendar Scheduling 101
  • 14. Request the dates you would like to use the UBIT for maintenance or Inspection. Once you request it, your not stuck with it. We are flexible on getting the UBIT where you need it to support State and Local Assets. UBIT Calendar Scheduling 101