SlideShare une entreprise Scribd logo
1  sur  48
School District of Beloit
REFERENDUM PRESENTATION




      IMAGINE BELOIT
1.   History/Challenge and Opportunity
2.   The cost
3.   The physical plants
4.   Educational Advantages
5.   Fiscal Responsibility and Savings
6.   Economic Development
7.   April 3, 2012
Board of Education:

• Facility study 1998
• Architectural drawings 2008
Board of Education challenge:

  •   8 buildings built before 1928
  •   Newest building built: 1965
  •   Last major improvements: 1994
  •   Non-functional pool: 1968
  •   Deteriorating facilities
Board of Education Opportunity:

    • 1994 bonds maturing in 2012
    • Lowest interest rates in history
    • Extremely competitive
      construction industry driving costs
      down
    • Perfect storm
2012-2013 Tax Impact
              On a $70 Million Dollar Referendum
              Under Current Funding Aid Formula
                  Estimated Interest at 3.5%
Home Value                Annual Cost          Monthly Cost

$75,000*                  $ 67.50                   $5.63

• State reimburses District $45 million or 64% of the bond issue
• Increased 12 of the last 14 years
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Success Breeds Success

•   National AP Honor Roll, 1 of 367
•   National Blue Ribbon, Gaston, 1 of 305
•   National GPA award, Girls Swim, 20th
•   National GPA award, Boys Swim, 6th
•   National Jazz Competition, top 15
•   RTI program receiving state and national
    attention
Referendum Plan: Physical Plants
Renovate six elementary schools to PK-3
1. More and larger classrooms for consolidation/team
   teaching
2. Create intervention rooms
3. More gym space
4. Needed repairs
    •Roofing               •Security Upgrade
    •Boiler Systems/HVAC   •Parking/Drop off
    •Building Envelope     •Playgrounds
    •Needed Furnishings    •Technology


5. Food prep and serving areas
Primary Schools
  Cost Approximately $31 million
Approximately 440 Students/Building

East              West
  Todd    $6.0M    Converse $5.6M
  Merrill 4.4M     Hackett   5.1M
  Robinson 5.6M    Gaston    4.2M
Todd
Merrill
Robinson
Converse
Hackett
Gaston
Aldrich and McNeel


$10M to be allocated from maintenance
    savings over the next 5 years

 Fewer students after reconfiguration
Middle School Demographics
Free Lunch by Middle School



Aldrich:                85.89%
Cunningham:             79.83%
McNeel:                 80.34%
Southeast School:       70.51%


Diversity by Middle School


Aldrich:   Black - 34.6% White - 32.0% Hispanic - 32.3% AmerIndian - .1% Asian - 1%
Cunningham:Black - 21.7% White - 46.6% Hispanic - 31.5% AmerIndian - .2% Asian - 0%
McNeel:    Black - 28.3% White - 44.5% Hispanic - 26.7% AmerIndian - .1% Asian - .4%
Southeast: Black - 25.3% White - 38.4% Hispanic - 32.6% AmerIndian - .9% Asian - 2.8%
McNeel
Aldrich
New Cunningham 4-8
 Cost Approximately $16 million

• Cunningham 60% increase in square
  footage
• Land area sufficient for expansion
• Large amount of green space remaining
  after expansion
New Cunningham
New SE Intermediate School 4-8
 Cost Approximately $16 million

• Corner of Lee Lane and Milwaukee Rd
• Collaborative partnership with Beloit
  Health Systems
New SE Intermediate
New SE Intermediate
Intermediate School Design
1. Separate wings for 4,5,6 and 7,8
2. Separate entrances/pickup and drop off areas
3. Shared spaces for:
  –   Music
  –   Art
  –   Phy Ed
  –   ELL
  –   Special Education
  –   Library Media
Beloit Memorial High School

•   New Swimming Pool – 8 lane
•   Conference and Sectional meets
•   Locker rooms male and female
•   Community Changing Room
•   Bleachers for 500 + people at pool level
•   All mechanical-Electrical-Plumbing
•   Pool Room Heating and Ventilation
•   Used daily from 6AM to 8PM
Tennis Courts

•   Tear up existing Tennis Courts
•   Relocate west of student parking
•   8 tennis courts complex
•   Tournaments
Life Center
• New equipment relocated from class rooms
• Level playing field for Big 8 athletics
• Relocate to existing pool area
• Current weight room transformed to
  wrestling and/or dance or yoga studio
• Fight childhood obesity
• Lower health care costs of district
  employees
High School
High School
Future Use of District-Owned Buildings
• Buildings Available for    • Possible Uses
  Retirement or Repurposing:    – District Office
   –   Royce                       – Charter School (RCAA)
   –   McLenegan                   – Learning Academy
   –   Kolak                       – Sale to outside party
   –   Morgan
   –   Wright
   –   Burdge
Educational Advantages
PK-3 Grade Alignment
       Educational Advantages

• Six PK-3 Schools
• Alignment of resources for learning to read
• Collaborative opportunities
• Intense focus on developmental needs of the
  young child
• Dedicated Art and Music areas
PK-3 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
4-8 Grade Alignment
         Educational Advantages
• “Elemiddle” approach
  – Makes smaller grades 6-8, approx 150 per grade
• Alignment of resources for reading to learn
• Use of other resources and shared classrooms
 (e.g. Gym, Tech Ed, Music, Art)
4-8 Grade Alignment
         Educational Advantages
• Collaborative opportunities for
• 4-6 and 7-8 wings
• Culture change in a building with younger and
  older students
• More opportunities to be involved in sports and
  extracurricular activities with smaller classes.
4-8 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
The Cost
Primary schools =        $31 million
Intermediate schools =   $32 million
Secondary School =       $ 7 million
                Total=   $70 million

$45 million reimbursed by the State
These are estimated permanent reductions that would assist
   us with our budget challenges in each year going forward.
Cost Savings Area                                          Estimated Annual Cost Savings If
                                                                 Referendum Passes

Rent                                                   $             128,007.00
Utilities (Gas, Electric, Water, Sewer, Storm Water)   $              66,232.00
Reduction of Personnel                                 $           1,019,582.00
Facility and Building Maintenance                      $             978,780.00
Property Services                                      $              28,334.00
Technology Savings-Fiber Lease /Phone
Lines                                                  $              10,446.00
Transportation                                         $              35,730.00
Staff Travel                                           $              30,000.00
   Grand Total                                         $           2,297,111.00
Referendum versus Operating Cost
 • Referendum is a stand-alone loan fund
   – Must be for capital improvements only
   – Not used for operating budget or salaries

 • Yearly Operating budget is effected only by
   the savings incurred by improvements
   – Helps offset the budget challenges we will
     continue to face due to decreasing funding
Fiscal Responsibility
25


20


15
                                           Actual Levy collected
10                                         1995 Levy adjusted for inflation


 5


 0
 1990   1995   2000   2005   2010   2015
2012-2013 Tax Impact
              On a $70 Million Dollar Referendum
              Under Current Funding Aid Formula
                  Estimated Interest at 3.5%
Home Value                Annual Cost          Monthly Cost

$75,000*                  $ 67.50                   $5.63

• State reimburses District $45 million or 64% of the bond issue
• Increased 12 of the last 14 years
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Economic Development
• Schools are one of the most
  important reasons for business
  start-ups and expansion
• More new employees stay in Beloit
• Higher property values
• Increased community pride
• Local construction jobs
• $45 million in outside investment
•   Chamber of Commerce: ENDORSED
•   GBEDC: ENDORSED
•   City Council: ENDORSED
•   Beloit 2020: ENDORSED
•   Outside tourism revenue $50/$140
•   Improved image to non-Beloiters
•   Continue Beloit improvements
•   $45MM in outside investment
Discussion
VOTE

April 3, 2012

Contenu connexe

Similaire à Imagine power point.3 (1)

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013maitlandyoursay
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIndependence EDC
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSDaaronjacoby
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012rcox726
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Michael McDermott
 
School Funding and Property Taxes
School Funding and Property TaxesSchool Funding and Property Taxes
School Funding and Property TaxesJeffMcLynch1
 
Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014TheChamber
 
Dana Dykhouse presentation
Dana Dykhouse presentationDana Dykhouse presentation
Dana Dykhouse presentationJeff Zahn
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude SchoolDude
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09guest08a3ab
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014KEPHART
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding RequestMSCSA
 
Diverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsDiverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsSightlines
 
Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015dmampo
 

Similaire à Imagine power point.3 (1) (20)

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Levy presentation2
Levy presentation2Levy presentation2
Levy presentation2
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
levy2
levy2levy2
levy2
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013
 
2012 usd263 bond
2012 usd263 bond2012 usd263 bond
2012 usd263 bond
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues Presentations
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSD
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012
 
School Funding and Property Taxes
School Funding and Property TaxesSchool Funding and Property Taxes
School Funding and Property Taxes
 
Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014Manitowoc Public School District Referendum Presentaiton 10-6-2014
Manitowoc Public School District Referendum Presentaiton 10-6-2014
 
Dana Dykhouse presentation
Dana Dykhouse presentationDana Dykhouse presentation
Dana Dykhouse presentation
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding Request
 
Diverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities DemandsDiverse Perspectives on Managing Facilities Demands
Diverse Perspectives on Managing Facilities Demands
 
Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015Presentations, MPO Policy Committee, May 28, 2015
Presentations, MPO Policy Committee, May 28, 2015
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Dernier (20)

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Imagine power point.3 (1)

  • 1. School District of Beloit REFERENDUM PRESENTATION IMAGINE BELOIT
  • 2. 1. History/Challenge and Opportunity 2. The cost 3. The physical plants 4. Educational Advantages 5. Fiscal Responsibility and Savings 6. Economic Development 7. April 3, 2012
  • 3. Board of Education: • Facility study 1998 • Architectural drawings 2008
  • 4. Board of Education challenge: • 8 buildings built before 1928 • Newest building built: 1965 • Last major improvements: 1994 • Non-functional pool: 1968 • Deteriorating facilities
  • 5. Board of Education Opportunity: • 1994 bonds maturing in 2012 • Lowest interest rates in history • Extremely competitive construction industry driving costs down • Perfect storm
  • 6. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Increased 12 of the last 14 years • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 7. Success Breeds Success • National AP Honor Roll, 1 of 367 • National Blue Ribbon, Gaston, 1 of 305 • National GPA award, Girls Swim, 20th • National GPA award, Boys Swim, 6th • National Jazz Competition, top 15 • RTI program receiving state and national attention
  • 9. Renovate six elementary schools to PK-3 1. More and larger classrooms for consolidation/team teaching 2. Create intervention rooms 3. More gym space 4. Needed repairs •Roofing •Security Upgrade •Boiler Systems/HVAC •Parking/Drop off •Building Envelope •Playgrounds •Needed Furnishings •Technology 5. Food prep and serving areas
  • 10. Primary Schools Cost Approximately $31 million Approximately 440 Students/Building East West Todd $6.0M Converse $5.6M Merrill 4.4M Hackett 5.1M Robinson 5.6M Gaston 4.2M
  • 11. Todd
  • 17. Aldrich and McNeel $10M to be allocated from maintenance savings over the next 5 years Fewer students after reconfiguration
  • 18. Middle School Demographics Free Lunch by Middle School Aldrich: 85.89% Cunningham: 79.83% McNeel: 80.34% Southeast School: 70.51% Diversity by Middle School Aldrich: Black - 34.6% White - 32.0% Hispanic - 32.3% AmerIndian - .1% Asian - 1% Cunningham:Black - 21.7% White - 46.6% Hispanic - 31.5% AmerIndian - .2% Asian - 0% McNeel: Black - 28.3% White - 44.5% Hispanic - 26.7% AmerIndian - .1% Asian - .4% Southeast: Black - 25.3% White - 38.4% Hispanic - 32.6% AmerIndian - .9% Asian - 2.8%
  • 21. New Cunningham 4-8 Cost Approximately $16 million • Cunningham 60% increase in square footage • Land area sufficient for expansion • Large amount of green space remaining after expansion
  • 23. New SE Intermediate School 4-8 Cost Approximately $16 million • Corner of Lee Lane and Milwaukee Rd • Collaborative partnership with Beloit Health Systems
  • 26. Intermediate School Design 1. Separate wings for 4,5,6 and 7,8 2. Separate entrances/pickup and drop off areas 3. Shared spaces for: – Music – Art – Phy Ed – ELL – Special Education – Library Media
  • 27. Beloit Memorial High School • New Swimming Pool – 8 lane • Conference and Sectional meets • Locker rooms male and female • Community Changing Room • Bleachers for 500 + people at pool level • All mechanical-Electrical-Plumbing • Pool Room Heating and Ventilation • Used daily from 6AM to 8PM
  • 28. Tennis Courts • Tear up existing Tennis Courts • Relocate west of student parking • 8 tennis courts complex • Tournaments
  • 29. Life Center • New equipment relocated from class rooms • Level playing field for Big 8 athletics • Relocate to existing pool area • Current weight room transformed to wrestling and/or dance or yoga studio • Fight childhood obesity • Lower health care costs of district employees
  • 32. Future Use of District-Owned Buildings • Buildings Available for • Possible Uses Retirement or Repurposing: – District Office – Royce – Charter School (RCAA) – McLenegan – Learning Academy – Kolak – Sale to outside party – Morgan – Wright – Burdge
  • 34. PK-3 Grade Alignment Educational Advantages • Six PK-3 Schools • Alignment of resources for learning to read • Collaborative opportunities • Intense focus on developmental needs of the young child • Dedicated Art and Music areas
  • 35. PK-3 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 36. 4-8 Grade Alignment Educational Advantages • “Elemiddle” approach – Makes smaller grades 6-8, approx 150 per grade • Alignment of resources for reading to learn • Use of other resources and shared classrooms (e.g. Gym, Tech Ed, Music, Art)
  • 37. 4-8 Grade Alignment Educational Advantages • Collaborative opportunities for • 4-6 and 7-8 wings • Culture change in a building with younger and older students • More opportunities to be involved in sports and extracurricular activities with smaller classes.
  • 38. 4-8 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 39. The Cost Primary schools = $31 million Intermediate schools = $32 million Secondary School = $ 7 million Total= $70 million $45 million reimbursed by the State
  • 40. These are estimated permanent reductions that would assist us with our budget challenges in each year going forward. Cost Savings Area Estimated Annual Cost Savings If Referendum Passes Rent $ 128,007.00 Utilities (Gas, Electric, Water, Sewer, Storm Water) $ 66,232.00 Reduction of Personnel $ 1,019,582.00 Facility and Building Maintenance $ 978,780.00 Property Services $ 28,334.00 Technology Savings-Fiber Lease /Phone Lines $ 10,446.00 Transportation $ 35,730.00 Staff Travel $ 30,000.00 Grand Total $ 2,297,111.00
  • 41. Referendum versus Operating Cost • Referendum is a stand-alone loan fund – Must be for capital improvements only – Not used for operating budget or salaries • Yearly Operating budget is effected only by the savings incurred by improvements – Helps offset the budget challenges we will continue to face due to decreasing funding
  • 42. Fiscal Responsibility 25 20 15 Actual Levy collected 10 1995 Levy adjusted for inflation 5 0 1990 1995 2000 2005 2010 2015
  • 43. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Increased 12 of the last 14 years • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 45. • Schools are one of the most important reasons for business start-ups and expansion • More new employees stay in Beloit • Higher property values • Increased community pride • Local construction jobs • $45 million in outside investment
  • 46. Chamber of Commerce: ENDORSED • GBEDC: ENDORSED • City Council: ENDORSED • Beloit 2020: ENDORSED • Outside tourism revenue $50/$140 • Improved image to non-Beloiters • Continue Beloit improvements • $45MM in outside investment

Notes de l'éditeur

  1. Welcome. Thank the community for their support of our programs.