Most people involved in construction industry disputes want them resolved on their

merits as quickly and cheaply as possible. Experience teaches that unless arbitration is

well managed by reasonable parties, it can take just as long and be just as expensive as

litigation, without the same rights of appeal if it goes badly.



In “fast-track” arbitrations the parties and the arbitrator craft a procedure that compresses

a full arbitration into a finite period of time. Just as with a fast-tracked building project,

the key to success with a fast-tracked arbitration is through ‘just in time’ planning and a

high level of co-operation among the parties and the arbitrator.



Even complex construction cases can be arbitrated in 100 days if the parties, their counsel

and the arbitrator work together. There are well established rules for such arbitrations in

the United Kingdom and in the United States which are readily adaptable in Canada.



Before considering fast-track arbitration, consider the following:

           •   The Parties.    Fast-track arbitration only works if the parties have an

               equal commitment to the process and equal resources to carry out that

               commitment. Fast-track arbitrations compress not only the time of the

               arbitration, but the period of financial burden, so that the parties will have

               to make resources available to resolve the dispute during an intense 4 – 6




                                 Copyright © 2008, Glaholt LLP
2


               month period. There is no opportunity to ‘ease the pain’ by spreading the

               cost or human resources burden over a longer period of time.

           •   Their Lawyers.         Fast-track arbitrations require lawyers to make a

               number of very important decisions such as: what witnesses to call, what

               witnesses to dispense with; and what examinations to conduct, what

               examinations to dispense with.         Only experienced lawyers can make

               decisions like this with confidence. Lawyers on fast-track arbitrations

               must be willing to put everything aside to work within the aggressive

               schedule required of fast track arbitrations.

           •   The Arbitrator(s).     The hard part for the arbitrator is to be sure that by

               “fast-tracking” the arbitration, the parties are still given an equal right to

               make their cases and meet the cases made against them. The arbitrator has

               to know when and how to hold the parties to their schedule and when and

               how to allow more time.           Fast-track arbitrations usually require the

               arbitrator to issue a reasoned Award on a very compressed schedule,

               sometimes within weeks of the close of the hearing. This is a serious

               commitment on the arbitrator’s part and has to be considered carefully.




Summary arbitration procedures were created and refined in the United Kingdom as a

reaction to the imposition of statutory adjudication in that country.1 The U.K.’s Society

of Construction Arbitrators’ Construction Industry Model Arbitration Rules (CIMAR)2




                                Copyright © 2008, Glaholt LLP
3


require a decision by the Arbitrator within 100 days of the earlier of the Defence (or

Defence to Counterclaim) or the date the Arbitrator gives the first order for directions,

which has to occur under this model within 7 days of appointment. The model rules ban

unproduced documentary evidence at the hearing without leave. The maximum possible

hearing duration is 10 working days, to occur not more than 28 days after pleadings and

exchange of documents with final written argument to be filed within 7 days from the end

of the evidentiary portion of the hearing.        The JCT Supplementary and Advisory

Procedures under the JCT edition of CIMAR contain advisory procedures under which

the arbitrator must, within 14 days after the time for submission of written statements

concludes, and after consultation with the parties, give directions with regard to the future

course of the proceedings.3 Under CIMAR rules, the Arbitrator has 30 days following

written submissions to render a final Award.         In order to do so, the Arbitrator is

specifically empowered with inquisitorial jurisdiction.4 Such construction arbitrations

already happen in Canada on an ad hoc basis.5



Notes:



1. See Glaholt, “Has the Time Come for the ‘100 Day Construction Arbitration’ in

Canada?” (2007), 59 C.L.R. (3d) 1; Darling: What is the future for arbitration in the light

of adjudication? TeCBAR Review, March 2002.

2. The CIMAR model 100 day arbitration rules and standard form arbitration agreement

can be found at www.arbitrators-society.org.

3. See Rule 9.4. of the JTC Supplementary and Advisory Procedures.




                                Copyright © 2008, Glaholt LLP
4


4. See Uff, “100-Day Arbitration: Is the Construction Industry Ready for It?”,

www.keatingchambers.com/resources/publications/2005/ju_100day_arb.aspx?searchText

=cimar.

5. See Glaholt, “Has the Time Come for the ‘100 Day Construction Arbitration’ in

Canada?” (2007), 59 C.L.R. (3d) 1.




                              Copyright © 2008, Glaholt LLP

Contenu connexe

Tendances

ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoor
ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj KapoorARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoor
ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoorcmmindia2017
 
Eversheds case update - Al Nehayan v Kent
Eversheds case update - Al Nehayan v Kent Eversheds case update - Al Nehayan v Kent
Eversheds case update - Al Nehayan v Kent Emily Rivett
 
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONSAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONOluwaseyi Bamigboye
 
The preliminary conference and directions hearings
The preliminary conference and directions hearingsThe preliminary conference and directions hearings
The preliminary conference and directions hearingsBrian Decelis
 
Arbitration Proceeding (Working Guidlines)
Arbitration Proceeding (Working Guidlines)Arbitration Proceeding (Working Guidlines)
Arbitration Proceeding (Working Guidlines)SME Technologist
 
Consumer Protection Act 1986
Consumer Protection Act 1986Consumer Protection Act 1986
Consumer Protection Act 1986Dr. Vikas Khakare
 
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2A&C Act - CHAPTER III - Kapl Dev Bahl rev 2
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2cmmindia2017
 
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTURE
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTUREADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTURE
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTUREcmmindia2017
 
Law of Arbitration by Niddhi Parmar
Law of Arbitration by Niddhi ParmarLaw of Arbitration by Niddhi Parmar
Law of Arbitration by Niddhi ParmarNiddhi Parmar
 
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...Dr K M SONI
 
Arbitration and conciliation act
Arbitration and conciliation actArbitration and conciliation act
Arbitration and conciliation actDr. Arun Mittal
 
Law arbiration
Law arbirationLaw arbiration
Law arbirationRAJULUCKEY
 
Arbitration presentation - Capt M. V. Naik
Arbitration presentation - Capt M. V. NaikArbitration presentation - Capt M. V. Naik
Arbitration presentation - Capt M. V. Naikcmmindia2017
 
Slides adr asgnment oct 2010 latest
Slides adr asgnment oct 2010 latestSlides adr asgnment oct 2010 latest
Slides adr asgnment oct 2010 latestHusna Rodzi
 
Arbitration and Conciliation Act
Arbitration and Conciliation ActArbitration and Conciliation Act
Arbitration and Conciliation ActRohit Saraswat
 
Convention on the Recognition and Enforcement of Foreign Arbitral Awards
Convention on the Recognition and Enforcement of Foreign Arbitral Awards Convention on the Recognition and Enforcement of Foreign Arbitral Awards
Convention on the Recognition and Enforcement of Foreign Arbitral Awards Joyce Williams
 

Tendances (20)

ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoor
ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj KapoorARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoor
ARBITRATION & CONCILIATION ACT 2015 Capt. Pankaj Kapoor
 
Eversheds case update - Al Nehayan v Kent
Eversheds case update - Al Nehayan v Kent Eversheds case update - Al Nehayan v Kent
Eversheds case update - Al Nehayan v Kent
 
Ex. 107
Ex. 107Ex. 107
Ex. 107
 
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONSAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
 
The preliminary conference and directions hearings
The preliminary conference and directions hearingsThe preliminary conference and directions hearings
The preliminary conference and directions hearings
 
Arbitration Proceeding (Working Guidlines)
Arbitration Proceeding (Working Guidlines)Arbitration Proceeding (Working Guidlines)
Arbitration Proceeding (Working Guidlines)
 
Consumer Protection Act 1986
Consumer Protection Act 1986Consumer Protection Act 1986
Consumer Protection Act 1986
 
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2A&C Act - CHAPTER III - Kapl Dev Bahl rev 2
A&C Act - CHAPTER III - Kapl Dev Bahl rev 2
 
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTURE
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTUREADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTURE
ADR - 5TH MAY - Cpt. BHATIA (F) - 5th LECTURE
 
Law of Arbitration by Niddhi Parmar
Law of Arbitration by Niddhi ParmarLaw of Arbitration by Niddhi Parmar
Law of Arbitration by Niddhi Parmar
 
Arbitration 2
Arbitration 2Arbitration 2
Arbitration 2
 
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...
Appointment of arbitrator as per The Arbitration and Conciliation (Amendment)...
 
Arbitration and conciliation act
Arbitration and conciliation actArbitration and conciliation act
Arbitration and conciliation act
 
NCAT_paper3_costs
NCAT_paper3_costsNCAT_paper3_costs
NCAT_paper3_costs
 
Law arbiration
Law arbirationLaw arbiration
Law arbiration
 
Arbitration presentation - Capt M. V. Naik
Arbitration presentation - Capt M. V. NaikArbitration presentation - Capt M. V. Naik
Arbitration presentation - Capt M. V. Naik
 
Slides adr asgnment oct 2010 latest
Slides adr asgnment oct 2010 latestSlides adr asgnment oct 2010 latest
Slides adr asgnment oct 2010 latest
 
LE&TRAN.Judgement-enforcement
LE&TRAN.Judgement-enforcementLE&TRAN.Judgement-enforcement
LE&TRAN.Judgement-enforcement
 
Arbitration and Conciliation Act
Arbitration and Conciliation ActArbitration and Conciliation Act
Arbitration and Conciliation Act
 
Convention on the Recognition and Enforcement of Foreign Arbitral Awards
Convention on the Recognition and Enforcement of Foreign Arbitral Awards Convention on the Recognition and Enforcement of Foreign Arbitral Awards
Convention on the Recognition and Enforcement of Foreign Arbitral Awards
 

En vedette

Fotos rudyard web
Fotos rudyard webFotos rudyard web
Fotos rudyard webikro8989
 
Political Assassinations
Political AssassinationsPolitical Assassinations
Political Assassinationsguest096bb49
 
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)Win to Win - Business Consultants
 
Urbano Vagabundo
Urbano VagabundoUrbano Vagabundo
Urbano VagabundoPaulo Maia
 
Fast Track Project Management Success w/ Project 2013
Fast Track Project Management Success w/ Project 2013Fast Track Project Management Success w/ Project 2013
Fast Track Project Management Success w/ Project 2013Dux Raymond Sy
 
MALDIVES
MALDIVESMALDIVES
MALDIVESHome
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

En vedette (8)

Fotos rudyard web
Fotos rudyard webFotos rudyard web
Fotos rudyard web
 
Political Assassinations
Political AssassinationsPolitical Assassinations
Political Assassinations
 
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)
Γυναικεία Επιχειρηματικότητα 2013 - Συχνές Ερωτήσεις (22/3/2013)
 
Urbano Vagabundo
Urbano VagabundoUrbano Vagabundo
Urbano Vagabundo
 
Fast Track Project Management Success w/ Project 2013
Fast Track Project Management Success w/ Project 2013Fast Track Project Management Success w/ Project 2013
Fast Track Project Management Success w/ Project 2013
 
MALDIVES
MALDIVESMALDIVES
MALDIVES
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similaire à Fast track arbitration

Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesSarah Fox
 
In Dire Need of Resolution
In Dire Need of ResolutionIn Dire Need of Resolution
In Dire Need of ResolutionRoland Schroeder
 
161102 iplit 091016 watkins
161102 iplit 091016 watkins161102 iplit 091016 watkins
161102 iplit 091016 watkinsziplula
 
Preparing for an Arbitration
Preparing for an ArbitrationPreparing for an Arbitration
Preparing for an ArbitrationFinancial Poise
 
ADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxzulkiflimohdzain1
 
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfSEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfJaphethK
 
Meet the Adjudicator
Meet the Adjudicator Meet the Adjudicator
Meet the Adjudicator NiallLawless
 
Dispute resolution clause Overview
Dispute resolution clause OverviewDispute resolution clause Overview
Dispute resolution clause OverviewAbdelrahman Eldosh
 
International Contracts Symposium - Drafting ADR Clauses
International Contracts Symposium - Drafting ADR ClausesInternational Contracts Symposium - Drafting ADR Clauses
International Contracts Symposium - Drafting ADR ClausesDavid L. Kreider, Esq. (???)
 
Patrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsPatrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsResolution Institute
 
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...TheGimhan123
 
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the Arbitration
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the ArbitrationALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the Arbitration
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the ArbitrationFinancial Poise
 
Saving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationSaving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationOluwaseyi Bamigboye
 

Similaire à Fast track arbitration (20)

Drafting Arbitration Clause
Drafting Arbitration ClauseDrafting Arbitration Clause
Drafting Arbitration Clause
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction Disputes
 
Arbitration Act in Bangladesh
Arbitration Act in BangladeshArbitration Act in Bangladesh
Arbitration Act in Bangladesh
 
Adr
AdrAdr
Adr
 
In Dire Need of Resolution
In Dire Need of ResolutionIn Dire Need of Resolution
In Dire Need of Resolution
 
Mediation and conciliation and companies acts, 2013 - NCLT
Mediation and conciliation and companies acts, 2013 - NCLT Mediation and conciliation and companies acts, 2013 - NCLT
Mediation and conciliation and companies acts, 2013 - NCLT
 
161102 iplit 091016 watkins
161102 iplit 091016 watkins161102 iplit 091016 watkins
161102 iplit 091016 watkins
 
Preparing for an Arbitration
Preparing for an ArbitrationPreparing for an Arbitration
Preparing for an Arbitration
 
ADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptx
 
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfSEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
 
Mediation and conciliation and companies acts, 2013 - NCLT
Mediation and conciliation and companies acts, 2013 - NCLTMediation and conciliation and companies acts, 2013 - NCLT
Mediation and conciliation and companies acts, 2013 - NCLT
 
Robert Hunt
Robert HuntRobert Hunt
Robert Hunt
 
Meet the Adjudicator
Meet the Adjudicator Meet the Adjudicator
Meet the Adjudicator
 
Arbitration notes
Arbitration notesArbitration notes
Arbitration notes
 
Dispute resolution clause Overview
Dispute resolution clause OverviewDispute resolution clause Overview
Dispute resolution clause Overview
 
International Contracts Symposium - Drafting ADR Clauses
International Contracts Symposium - Drafting ADR ClausesInternational Contracts Symposium - Drafting ADR Clauses
International Contracts Symposium - Drafting ADR Clauses
 
Patrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsPatrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution Boards
 
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
 
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the Arbitration
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the ArbitrationALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the Arbitration
ALTERNATIVE DISPUTE RESOLUTION 2022_ Handling the Arbitration
 
Saving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationSaving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial Arbitration
 

Dernier

Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 

Dernier (20)

Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 

Fast track arbitration

  • 1. 1 Fast-Track Arbitration Most people involved in construction industry disputes want them resolved on their merits as quickly and cheaply as possible. Experience teaches that unless arbitration is well managed by reasonable parties, it can take just as long and be just as expensive as litigation, without the same rights of appeal if it goes badly. In “fast-track” arbitrations the parties and the arbitrator craft a procedure that compresses a full arbitration into a finite period of time. Just as with a fast-tracked building project, the key to success with a fast-tracked arbitration is through ‘just in time’ planning and a high level of co-operation among the parties and the arbitrator. Even complex construction cases can be arbitrated in 100 days if the parties, their counsel and the arbitrator work together. There are well established rules for such arbitrations in the United Kingdom and in the United States which are readily adaptable in Canada. Before considering fast-track arbitration, consider the following: • The Parties. Fast-track arbitration only works if the parties have an equal commitment to the process and equal resources to carry out that commitment. Fast-track arbitrations compress not only the time of the arbitration, but the period of financial burden, so that the parties will have to make resources available to resolve the dispute during an intense 4 – 6 Copyright © 2008, Glaholt LLP
  • 2. 2 month period. There is no opportunity to ‘ease the pain’ by spreading the cost or human resources burden over a longer period of time. • Their Lawyers. Fast-track arbitrations require lawyers to make a number of very important decisions such as: what witnesses to call, what witnesses to dispense with; and what examinations to conduct, what examinations to dispense with. Only experienced lawyers can make decisions like this with confidence. Lawyers on fast-track arbitrations must be willing to put everything aside to work within the aggressive schedule required of fast track arbitrations. • The Arbitrator(s). The hard part for the arbitrator is to be sure that by “fast-tracking” the arbitration, the parties are still given an equal right to make their cases and meet the cases made against them. The arbitrator has to know when and how to hold the parties to their schedule and when and how to allow more time. Fast-track arbitrations usually require the arbitrator to issue a reasoned Award on a very compressed schedule, sometimes within weeks of the close of the hearing. This is a serious commitment on the arbitrator’s part and has to be considered carefully. Summary arbitration procedures were created and refined in the United Kingdom as a reaction to the imposition of statutory adjudication in that country.1 The U.K.’s Society of Construction Arbitrators’ Construction Industry Model Arbitration Rules (CIMAR)2 Copyright © 2008, Glaholt LLP
  • 3. 3 require a decision by the Arbitrator within 100 days of the earlier of the Defence (or Defence to Counterclaim) or the date the Arbitrator gives the first order for directions, which has to occur under this model within 7 days of appointment. The model rules ban unproduced documentary evidence at the hearing without leave. The maximum possible hearing duration is 10 working days, to occur not more than 28 days after pleadings and exchange of documents with final written argument to be filed within 7 days from the end of the evidentiary portion of the hearing. The JCT Supplementary and Advisory Procedures under the JCT edition of CIMAR contain advisory procedures under which the arbitrator must, within 14 days after the time for submission of written statements concludes, and after consultation with the parties, give directions with regard to the future course of the proceedings.3 Under CIMAR rules, the Arbitrator has 30 days following written submissions to render a final Award. In order to do so, the Arbitrator is specifically empowered with inquisitorial jurisdiction.4 Such construction arbitrations already happen in Canada on an ad hoc basis.5 Notes: 1. See Glaholt, “Has the Time Come for the ‘100 Day Construction Arbitration’ in Canada?” (2007), 59 C.L.R. (3d) 1; Darling: What is the future for arbitration in the light of adjudication? TeCBAR Review, March 2002. 2. The CIMAR model 100 day arbitration rules and standard form arbitration agreement can be found at www.arbitrators-society.org. 3. See Rule 9.4. of the JTC Supplementary and Advisory Procedures. Copyright © 2008, Glaholt LLP
  • 4. 4 4. See Uff, “100-Day Arbitration: Is the Construction Industry Ready for It?”, www.keatingchambers.com/resources/publications/2005/ju_100day_arb.aspx?searchText =cimar. 5. See Glaholt, “Has the Time Come for the ‘100 Day Construction Arbitration’ in Canada?” (2007), 59 C.L.R. (3d) 1. Copyright © 2008, Glaholt LLP