Meeting Long-Term Water
 Demands for Houston and
    Surrounding Areas
         Jun Chang, P.E., D.WRE
              Deputy Director
Department of Public Works and Engineering
              City of Houston
               Oct. 21, 2010
First, a brief history…
Scenic Houston circa 1891
Houston Water Works

• 1878: The Mayor and City Council franchised a
  private contractor to build a water system (Houston
  Water Works) taking water from Buffalo Bayou.
• Private artesian wells were the alternative to bayou
  water. The Gulf Coast aquifer is Houston’s ground
  water source. This aquifer was estimated to be the
  third largest in the country, extending from Florida to
  Mexico.
• Over the course of the next several decades
  Houston Water Works converted to artesian water.
• 1906: The City purchased the Houston Water Works
  to improve water quality and citizen’s service.
Houston Water System

• Early 1940’s Land Subsidence Benchmark re-leveling results
       Baytown Area had subsided 3.2 feet
       Texas City Area had subsided 1.6 feet
• The Houston Chamber of Commerce in 1947 commissioned a
  systematic Regional Water Study to support Houston’s future
  growth
• With the discovery that one of the major causes of land
  subsidence was excessive ground water pumping; plus
  anticipated population growth, Houston’s acquired surface
  water sources and constructed dams with River Authorities:

Surface Water Reservoirs

1954 Lake Houston – dam on the San Jacinto River east fork
1969 Lake Livingston dam on Trinity River – southwest of Livingston
1973 Lake Conroe – dam on the San Jacinto River
2002 Land and water rights acquired for Allen’s Creek Reservoir
Houston Surface Water Supply - Reservoirs




                           Lake
                          Houston




       Allen’s
       Creek
Houston Water System
• Houston has also invested in surface water treatment
  plants:
  - 1953 East Water Purification Plant I
  - 1985 East Water Purification Plant II
  - 1989 Southeast Water Purification Plant - Original
  - 2001 Southeast Water Purification Plant Expansion I
  - 2005 Northeast Water Purification Plant – Phase I
  - 2006 Northeast Water Purification Plant – Phase II
  - 2011? Southeast Water Purification Plant Expansion II
• Regional Subsidence Districts established strict goals for
  three Houston counties to convert predominant water
  source of ground water to surface water
   – 1975 Harris-Galveston Subsidence District
   – 1989 Fort Bend Subsidence District
• Surface Water Conversion
   – 1985 SWTP started
City of Houston Transmission Water Lines Constructed




                   SWTP $740 million spent from 1985 to present
Houston Water System

• Surface Water Treatment Facilities & Capacities
   – East Water Plant - 350 MGD
   – Southeast Water Purification Plant – 120 (200)
     MGD
   – Northeast Water Purification Plant – 80 MGD
• 7 Distribution Re-pump Stations
• Ground Water Facilities
   – 134 Water Wells
   – 58 Pumping Stations
   – 98 Storage Tanks
Houston Water System

• Deliver annual (2009) average of 347 MGD
  of water (Max. 585 MGD)
• Service 470,000 customer accounts
    1,162,720 connections
    2,940,000 residents

• Maintain 7,480 miles of water lines
• 54,000 Fire Hydrants
• 150,000 Valves
Let’s plan for the future…
Long Range Planning Considerations

                         Water Rights (Supply)




Demands (Customers)                                Conveyance System
                                                      (Raw Water)




    Treatment and Pressurizing          Transmission and Distribution
  (Plants and Re-Pump Stations)               (Treated Water)
What is the driving force?
Region H Water Planning Group
  S.B. 1, 75th Legislature, defined state water planning
  process
  Sixteen regions in state
  Region H: Parts or all of fifteen counties
  Require Regional Water Plan by January 2001
  Regional Water Plans become State Water Plan 2002
  Regional Water Plan updated regularly
  Current Planning Cycle (2007-2011)
                           (2007-
  All projects requiring state approval or permits must be
  included in State Water Plan after 2002
  Board consists of 23 members appointed by Texas Water
  Development Board (TWDB) representing eleven interests
Region H
Harris-
   Harris-Galveston Subsidence District


Established in 1975 by 64th Legislature
The Board has 19 members (Mayor of
Houston appoints six members)
Issues permits to withdraw groundwater in
Harris / Galveston Counties
Proponent of active water conservation
programs
Latest Regulatory Plan adopted April 14, 1999
Three Regulatory Areas
Subsidence in Feet
                                                                                                    1906 - 1995
                                                                        Data Source: National Geodetic Survey
                                                                          Contour Interpretations: HGCSD
                                        1


                                                2
                                            3
                                                4
                                                    5
                                                        6



                                                                    7
                                    6                                                   9
                                                            6           10
                        3   4
                                5
                                                                8       9
              1     2
                                                                                    7


                                                                             6

                                                                                    5

                                                                                4
                                                                                            4
                                                                                    3           6
                                                                            2




                                                                                    1



                                                                                                          HGCSD GWMP
Map contoured in 1 Foot Intervals
Area 3 Predicted Subsidence
                                            1995 - 2030

                                   4
                           3           5
                       2                               4

                                                           3   2
                                                                       1
                                           5

                                   5

                                               4
                                       5               3
                                                   3
                                                           3


                               2                                   2

                                                                       1




Data Source: Fugro-McClelland CSD96
Contour Interpretations: HGCSD
Harris-Galveston Subsidence District
                        Surface Water Conversion Plan


Conversion Requirements
                                 Area 3
•    Area I    90%
•    Area II   80%
•    Area III
      – 30% by 2010
      – 70% by 2020                     Area 2
      – 80% by 2030
                                                   Area 1

    COH 2009 Surface Water Conversion
    Area I: 100%
    Area II: 87%
    Area III: 45%
City of Houston Surface Water Conversion
Who are our partners?
Strategic Suppliers, Resources & Alliances
                             Trinity River
                      Authority (Including Big 5)
                           Lake Livingston
                                                      Coastal Water
 San Jacinto River                                      Authority
     Authority                                      Conveyance canals,
   Lake Conroe                                        pumps & pipes



   Galveston Bay
                                                       Brazos River
Fresh Water Inflows
                                                        Authority
       Group
                                                      (Allens Creek)
Health of the Bay &
 Wastewater Reuse
                             Texas Water
                         Development Board
                         Region H Planning &
                              Financing
Who are our customers?
COH Treated & Untreated Water Customers

                                     Harris
                                     County
                                     MUDs
                     Commercial                       SE Plant
                      Industrial                      Co-Parts




                                      COH                          Strategic
              Houston                                              Partners
                                      Water
              Citizens                                               Water
                                    Resources                      Authorities




                          Local
                                                        Large
                         Cities &
                                                      Industrial
                         Villages
                                      Local
                                      Cities




   Treated Water Customers                      Untreated Water Customers
Strategic Customers
                               North Harris County
                                Water Authority




West Harris County
                                                                  Central Harris County
 Water Authority
                                                                   Water Authority




             Southeast WPP                           North Fort Bend County
             Co-Participants                         Regional Water Authority
What are the future demands?
Houston Water Master Plan
                                Average Day Demand for City of Houston

                         1400
                                                                            1200
                         1200                                       1080
  Average Demand (MGD)




                                                        970
                         1000
                                              840
                          800          715
                                646
                          600

                          400

                          200

                           0
                                1985   1990    2000          2010    2020     2030
                                                      Year                  Average Day Demand
Water Demand Forecast
                             COH 1996 Study
                                                                    Water Demand Forecast
                   500


                                Demand using 9 - year regression     TWDB

                                Demand using 13 - year regression    Montgomery Watson

                                Actual Demand                        Modified TWDB

                   450          HGCSD/COH-UH
Water Demand MGD




                   400




                   350




                   300
                         1984      1987       1990       1993       1996     1999        2002   2005   2008   2011   2014   2017   2020
                                                                                         Year
COH 2006 Updated Study
                                  ARC Regression Method
                          Actual Historical Demand      ARC Regression Line

                 450
                 430
                 410
                 390           Linear Regression
    Flow (MGD)




                 370
                 350
                 330
                 310
                 290
                 270
                 250
                   1980    1985       1990       1995      2000      2005     2010
                                                Year




Average Rate of Change (ARC) Method used for Regression Analysis
City’s Pumpage Reports was used from 1983 through 2005
Growth Factor calculated from this analysis is 1.01
City of Houston and Water Authorities Water Demand Projections
Do we have enough water?
Houston Water Supply
SURFACE WATER RIGHTS
San Jacinto River Basin
Lake Conroe                    60 MGD
Lake Houston                   150 MGD + 12 MGD* + 36MGD*
Trinity River Basin
Lake Livingston                806 MGD
Dayton Canal                   34 MGD
Wallisville                    34 MGD
Barbers Hill Canal             40 MGD
Brazos River
Allens Creek                   62 MGD
Total Permitted Water Rights   1,234 MGD
Permit pending                 143 MGD (Bayous)
                               519 MGD (Reuse)
AVAILABLE GROUND WATER          235 MGD    Per Subsidence Rules

TOTAL WATER AVAILABLE          2,131 MGD
*Recently Permitted
TOTAL Surface Water Supply & Demand Forecast

                          2000
                                                                                                      PENDING #5827 reuse +519 MGD

                          1800


                          1600

                                                                                     PENDING #5826 bayous +143 MGD
                          1400

                                                 San Jacinto Run of River +36 MGD
Million Gallons per Day




                          1200
                                  Permitted Water Rights
                                   Lk Conroe, Lk Houston,
                                  Lk Livingston, Wallisville,
                          1000   Barber's Hill, Dayton Canal                            Pending Surface
                                      and Allens Creek.
                                          1197 MGD                                      Water Contracts
                          800


                          600

                                                                City of Houston
                          400                                   Surface Water
                                                                    Demand
                          200


                            0
                            2010                                  2020                2030                     2040                  2050
Surface Water Rights
      Approximately
1.2 Billion Gallons per Day
Allens Creek Reservoir
• Location
  – 3000 feet upstream of Allens Creek
  – near Wallis (southern tip of Austin County)
• History
  – planned and permitted cooling lake
  – Houston Lighting & Power in 1974
• Operation
  – capture yield of Allens Creek
  – diversions from the Brazos River of flood flows
• Cost Estimates
  – depends on diversion site selected
  – current estimate $200 million without mitigation
Pertinent Information
• Yield studies
  – diverts Brazos River flood flows
  – 99,650 Acre-feet per year (89MGD) with
    2,200 cfs diversion
  – safe yield: 87,800 AF/Yr
• Surface Area/Volume
  – 7,003 acres; 145,533 AF
• Pool Elevation (normal) - 121 ft msl
• Dam: earth-filled embankment, 23,000 feet;
  max height - 53 feet; elevation 134 ft msl
Allens Creek Reservoir
• Authorized by 76(R) SB1593 (Sept 1999)
  Construction shall commerce no later than
  September 1, 2018
  TCEQ may extend the deadline for good cause
• BRA executes option with Reliant Energy
  (November 1999)
• Site conveyed to BRA by Warranty Deed (January
  2000)
• TCEQ reissued original permit (Feb 2000)
• BRA-Houston Agreement (April 2000)
  COH owns 70% of water rights (62MGD) and BRA
  owns 30% (27MGD)
• TWDB financed the land acquisition and water
  rights permit amended (2002)
• COH and BRA negotiate project terms/schedule
  (Nov. 2009 ~ ?)
Is our water at the right place?
COASTAL WATER
 Raw Water                                     LEGEND:
                                                                                   AUTHORITY
Conveyance                                                 CANAL


                                                            PIPELINE


                                                            ROADWAY




  System                                                    COUNTY
                                                            LINE

                                                            INDUSTRIAL
                                                            AREAS




                                                                                                                                                                                90




                                                                                                                                                                                                                         TRINITY RIVER PUMP STATION




                                                                                            N
                                                                                        O
                                                                                      ST
                                                                                     U
                                                                                                                                                                                                                                          TR




                                                                                     O
                                                                                                                                                                                                                                               IN




                                                                                    H
                                                                                                                                                                                                                                                    IT




                                                                               KE
                                                                                                                                                                                                                                                         Y




                                                                             LA
                                                                                                                                                                                                                                                             R
                                                                                                                                                                                                                                                                 IV
                                                                                                                                                                                                                                                                      ER
                                                          LAKE HOUSTON                                                                                                                                    146
                                                           PUMP STATION




                                                                                                                                                  LIBE
                                                                                                                                                     HAR
                                                                                                                                                                      MAINTENANCE




                                                                                                                                                      RTY
                                                                                                     SA                                                                 FACILITY




                                                                                                                                                        RIS
                                                                                                       N




                                                                                                                                                          CO
                                                                                                                                                            COU


                                                                                                                                                            UN
                                                                                                           JA




                                                                                                                                                              TY
                                                                                                             CIN




                                                                                                                                                                NTY
                                                                                                                                                                                                                        LIBERTY COUNTY
                                                                                                                                                                                                                        CHAMBERS COUNTY




                                                                                                              TO
                                                                                                               R IVE
                                                                                                                    R
                                                                                                                                                                                     CH
                                                                                                                                                                                       AM
                                                                                                                                                                                            BE
                                                                                                                                                                                                 RS
                                                                                                                                                                                                                                                                           WALLISVILLE




                                                                                                                                                                                                      COUNTY
                                                     90                                                                                                                                                                                                                    RESERVOIR




                                                                                                                                                                                                 OU
                                                                                                                                                                                                                            10




                                                                                                                                                                                              BAY
                                                                             8




                                                                                                                                                                                          R
                                                                                                                                                                       10




                                                                                                                                                                                       DA
                                                                                                                                                                                      CE
                                                                                                                                LYNCHBURG PUMP STATION
                                                              10                                                                 AND RESERVOIR
                                                                                                                                                                                                                 2354
                                      EAST WATER
                                                                                                                                      SHIP CHANNEL CROSSING
                                      PURIFICATION
                                      PLANT                                                                               HO
                                                                                                                            US
                                                                          N SH                                                TO                        BAYTOWN
                                                                   S TO        IP                                               N
                                                            HOU                      C HA
                                                                                            NN EL
                                                                                                                                                                 146
                                                                                                                                          SH
                                                                              225                                                            IP
                                                                                                                                                                                                                                         TRINITY
                                                                                          DEER PARK                                                          CH
                                                                                                                                                                  AN
                                                                                                                                                                    NE
                                                                                                                                                                                                                                           BAY
                                                                                                                          225
                                                                                                                                                                            L

                                               RED BLUFF WATER
                                               TREATMENT PLANT
                                                                                                                          BAYPORT
                                                                                                                        PUMP STATION

                                                                                     PASADENA
                                                              SOUTH EAST WATER
                                                              PURIFICATION PLANT                                                    146
                                                                                                                                                                                                                COASTAL WATER AUTHORITY
                                                                                                                                                                                                                        OF TEXAS

Trinity River Pumping Station                                                            ELLINGTON
                                                                                         FIELD




                                File: Gen Vicinity Overview w Frame.dwg
2020 Surface Water Supply and Demand             Lake
               (in MGD)                          Conroe
                                                   60
                                                                          Trinity
          NHCRWA/                                          60?
                                                                          River
          CHCRWA                                                           806
           116 (82)                           115 (35)

                           34                               Lake
                                        NEWPP
WHCRWA                                                     Houston
                                   46     80              150+12+36=198
 79(51)
                             COH         Raw Water
                             371            60

                                   256(46)           23                       200
                                                                  327
                      28         EWPP
NFBWA
 20(1)                            350

                19
                                                 Co-Part
                                                  131
                           69           SEWPP
                                         200
Luce Bayou Inter-Basin Transfer Project

In Region H and State Water Plan
Trinity River to Lake Houston (San Jacinto River)
    Diversion at Capers Ridge
    3.6 miles of dual 108” pipeline
    24 mile long canal
Cost estimated at $294 million, including right-of-way, engineering and
construction
The project will be financed by TWDB deferred low interest loans
All four Regional Water Authorities will share the cost proportion to their
respective 2040 demand
CWA is contracted with the City to implement the project
Contractually guaranteed to be in service by June 2019
The project will be built to its ultimate capacity but pumps will be installed in
phases
Estimated LBIBT Project Cost
Cost Sharing of Luce Bayou Project

City of Houston                                          69.8%

North Harris County Regional Water Authority             13.7%

Central Harris County Regional Water Authority            0.5%

West Harris County Regional Water Authority               9.5%

North Fort Bend Water Authority                           6.5%

                                                 Total   100.0%
LBIBT Project Status

Resolution of Take Point                                                      Completed June 2009




Complete property boundary surveying/acquisition                              31-Dec-10


Complete environmental field work                                             Feb-10


Joint Evaluation Meeting                                                      10-Feb-10




Complete Preliminary Engineering in support of 404 Submittal                  31-Mar-10


Submit 404 Application to USACOE                                              31-Mar-10




Receive/Respond to Agency Questions and Comments on 404 Application           July 1, 2010 to receipt of permit


Receive 404 Permit from USACOE                                                April 2011 to March 2012




Complete Preliminary Engineering Report for CWA/COH/Co-Participant Approval   Jul-10
What about treatment plants
and transmission systems?
Northeast Water Purification Plant Expansion




     Current Capacity – 80 MGD
     Capacity After Expansion – 300 MGD
     Year Needed – No Later than June of 2019
     Estimated Expansion Cost – $350 to $700 M
     Cost will be shared by Regional Water
     Authorities
City of Houston Transmission Water Lines Constructed and Proposed




                               SWTP $93 million proposed FY 11 to 14
Questions?

Contenu connexe

Tendances (7)

Westbridge Energy Presentation July 2012
Westbridge Energy Presentation July 2012Westbridge Energy Presentation July 2012
Westbridge Energy Presentation July 2012
 
Water Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaWater Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, California
 
PA-09-02 - County Initiated - Land Use Map Corrections & Updates
PA-09-02 -  County Initiated - Land Use Map Corrections & UpdatesPA-09-02 -  County Initiated - Land Use Map Corrections & Updates
PA-09-02 - County Initiated - Land Use Map Corrections & Updates
 
IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16IID ASCE_Red Hill Bay projecy-10.26a.16
IID ASCE_Red Hill Bay projecy-10.26a.16
 
Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006
 
Bursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportBursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal Report
 
Overview Of Process
Overview Of ProcessOverview Of Process
Overview Of Process
 

Plus de Southeast Chapter of Texas AWWA

Hidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspfHidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspf
Southeast Chapter of Texas AWWA
 
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
Southeast Chapter of Texas AWWA
 

Plus de Southeast Chapter of Texas AWWA (20)

Setawwa presentation shale as a cost driver
Setawwa presentation   shale as a cost driverSetawwa presentation   shale as a cost driver
Setawwa presentation shale as a cost driver
 
Setawwa presentation 062211
Setawwa presentation 062211Setawwa presentation 062211
Setawwa presentation 062211
 
Water Quality Managements Developments: Nutrients and Bacteria
Water Quality Managements Developments: Nutrients and BacteriaWater Quality Managements Developments: Nutrients and Bacteria
Water Quality Managements Developments: Nutrients and Bacteria
 
Surface Water Conversion - City of Sugar Land
Surface Water Conversion - City of Sugar LandSurface Water Conversion - City of Sugar Land
Surface Water Conversion - City of Sugar Land
 
How Utilities Get Control of Their Distribution Systems
How Utilities Get Control of Their Distribution SystemsHow Utilities Get Control of Their Distribution Systems
How Utilities Get Control of Their Distribution Systems
 
NFBWA Reuse and Conservation Considerations
NFBWA Reuse and Conservation ConsiderationsNFBWA Reuse and Conservation Considerations
NFBWA Reuse and Conservation Considerations
 
2010 10-21 setawwa sponsor list
2010 10-21 setawwa sponsor list2010 10-21 setawwa sponsor list
2010 10-21 setawwa sponsor list
 
2010-08-26 SE Chapter TAWWA Business Meeting
2010-08-26 SE Chapter TAWWA Business Meeting2010-08-26 SE Chapter TAWWA Business Meeting
2010-08-26 SE Chapter TAWWA Business Meeting
 
Setawwa 2010, 29-58 choules
Setawwa   2010, 29-58 choulesSetawwa   2010, 29-58 choules
Setawwa 2010, 29-58 choules
 
Setawwa 2010, 1-29 choules
Setawwa   2010, 1-29 choulesSetawwa   2010, 1-29 choules
Setawwa 2010, 1-29 choules
 
Hidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspfHidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspf
 
Tom 030810 Setawwa
Tom 030810 SetawwaTom 030810 Setawwa
Tom 030810 Setawwa
 
G Oradat 030810 Setawwa
G Oradat 030810 SetawwaG Oradat 030810 Setawwa
G Oradat 030810 Setawwa
 
M Lowry 030810 Setawwa
M Lowry 030810 SetawwaM Lowry 030810 Setawwa
M Lowry 030810 Setawwa
 
T Bennett 030810 Setawwa
T Bennett 030810 SetawwaT Bennett 030810 Setawwa
T Bennett 030810 Setawwa
 
Wh Espey 021810 Setawwa
Wh Espey 021810 SetawwaWh Espey 021810 Setawwa
Wh Espey 021810 Setawwa
 
2009-08-28 City Operations: Energy Use and Emissions
2009-08-28 City Operations: Energy Use and Emissions2009-08-28 City Operations: Energy Use and Emissions
2009-08-28 City Operations: Energy Use and Emissions
 
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
 
2009-02-17 Seminar - City of Sugar Land - Surface Water Conversion
2009-02-17 Seminar - City of Sugar Land - Surface Water Conversion2009-02-17 Seminar - City of Sugar Land - Surface Water Conversion
2009-02-17 Seminar - City of Sugar Land - Surface Water Conversion
 
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Dernier (20)

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 

2010 10-21 meeting long term water demands

  • 1. Meeting Long-Term Water Demands for Houston and Surrounding Areas Jun Chang, P.E., D.WRE Deputy Director Department of Public Works and Engineering City of Houston Oct. 21, 2010
  • 2. First, a brief history…
  • 4. Houston Water Works • 1878: The Mayor and City Council franchised a private contractor to build a water system (Houston Water Works) taking water from Buffalo Bayou. • Private artesian wells were the alternative to bayou water. The Gulf Coast aquifer is Houston’s ground water source. This aquifer was estimated to be the third largest in the country, extending from Florida to Mexico. • Over the course of the next several decades Houston Water Works converted to artesian water. • 1906: The City purchased the Houston Water Works to improve water quality and citizen’s service.
  • 5. Houston Water System • Early 1940’s Land Subsidence Benchmark re-leveling results Baytown Area had subsided 3.2 feet Texas City Area had subsided 1.6 feet • The Houston Chamber of Commerce in 1947 commissioned a systematic Regional Water Study to support Houston’s future growth • With the discovery that one of the major causes of land subsidence was excessive ground water pumping; plus anticipated population growth, Houston’s acquired surface water sources and constructed dams with River Authorities: Surface Water Reservoirs 1954 Lake Houston – dam on the San Jacinto River east fork 1969 Lake Livingston dam on Trinity River – southwest of Livingston 1973 Lake Conroe – dam on the San Jacinto River 2002 Land and water rights acquired for Allen’s Creek Reservoir
  • 6. Houston Surface Water Supply - Reservoirs Lake Houston Allen’s Creek
  • 7. Houston Water System • Houston has also invested in surface water treatment plants: - 1953 East Water Purification Plant I - 1985 East Water Purification Plant II - 1989 Southeast Water Purification Plant - Original - 2001 Southeast Water Purification Plant Expansion I - 2005 Northeast Water Purification Plant – Phase I - 2006 Northeast Water Purification Plant – Phase II - 2011? Southeast Water Purification Plant Expansion II • Regional Subsidence Districts established strict goals for three Houston counties to convert predominant water source of ground water to surface water – 1975 Harris-Galveston Subsidence District – 1989 Fort Bend Subsidence District • Surface Water Conversion – 1985 SWTP started
  • 8. City of Houston Transmission Water Lines Constructed SWTP $740 million spent from 1985 to present
  • 9. Houston Water System • Surface Water Treatment Facilities & Capacities – East Water Plant - 350 MGD – Southeast Water Purification Plant – 120 (200) MGD – Northeast Water Purification Plant – 80 MGD • 7 Distribution Re-pump Stations • Ground Water Facilities – 134 Water Wells – 58 Pumping Stations – 98 Storage Tanks
  • 10. Houston Water System • Deliver annual (2009) average of 347 MGD of water (Max. 585 MGD) • Service 470,000 customer accounts 1,162,720 connections 2,940,000 residents • Maintain 7,480 miles of water lines • 54,000 Fire Hydrants • 150,000 Valves
  • 11. Let’s plan for the future…
  • 12. Long Range Planning Considerations Water Rights (Supply) Demands (Customers) Conveyance System (Raw Water) Treatment and Pressurizing Transmission and Distribution (Plants and Re-Pump Stations) (Treated Water)
  • 13. What is the driving force?
  • 14. Region H Water Planning Group S.B. 1, 75th Legislature, defined state water planning process Sixteen regions in state Region H: Parts or all of fifteen counties Require Regional Water Plan by January 2001 Regional Water Plans become State Water Plan 2002 Regional Water Plan updated regularly Current Planning Cycle (2007-2011) (2007- All projects requiring state approval or permits must be included in State Water Plan after 2002 Board consists of 23 members appointed by Texas Water Development Board (TWDB) representing eleven interests
  • 16.
  • 17. Harris- Harris-Galveston Subsidence District Established in 1975 by 64th Legislature The Board has 19 members (Mayor of Houston appoints six members) Issues permits to withdraw groundwater in Harris / Galveston Counties Proponent of active water conservation programs Latest Regulatory Plan adopted April 14, 1999 Three Regulatory Areas
  • 18. Subsidence in Feet 1906 - 1995 Data Source: National Geodetic Survey Contour Interpretations: HGCSD 1 2 3 4 5 6 7 6 9 6 10 3 4 5 8 9 1 2 7 6 5 4 4 3 6 2 1 HGCSD GWMP Map contoured in 1 Foot Intervals
  • 19. Area 3 Predicted Subsidence 1995 - 2030 4 3 5 2 4 3 2 1 5 5 4 5 3 3 3 2 2 1 Data Source: Fugro-McClelland CSD96 Contour Interpretations: HGCSD
  • 20. Harris-Galveston Subsidence District Surface Water Conversion Plan Conversion Requirements Area 3 • Area I 90% • Area II 80% • Area III – 30% by 2010 – 70% by 2020 Area 2 – 80% by 2030 Area 1 COH 2009 Surface Water Conversion Area I: 100% Area II: 87% Area III: 45%
  • 21. City of Houston Surface Water Conversion
  • 22. Who are our partners?
  • 23. Strategic Suppliers, Resources & Alliances Trinity River Authority (Including Big 5) Lake Livingston Coastal Water San Jacinto River Authority Authority Conveyance canals, Lake Conroe pumps & pipes Galveston Bay Brazos River Fresh Water Inflows Authority Group (Allens Creek) Health of the Bay & Wastewater Reuse Texas Water Development Board Region H Planning & Financing
  • 24. Who are our customers?
  • 25. COH Treated & Untreated Water Customers Harris County MUDs Commercial SE Plant Industrial Co-Parts COH Strategic Houston Partners Water Citizens Water Resources Authorities Local Large Cities & Industrial Villages Local Cities Treated Water Customers Untreated Water Customers
  • 26. Strategic Customers North Harris County Water Authority West Harris County Central Harris County Water Authority Water Authority Southeast WPP North Fort Bend County Co-Participants Regional Water Authority
  • 27. What are the future demands?
  • 28. Houston Water Master Plan Average Day Demand for City of Houston 1400 1200 1200 1080 Average Demand (MGD) 970 1000 840 800 715 646 600 400 200 0 1985 1990 2000 2010 2020 2030 Year Average Day Demand
  • 29. Water Demand Forecast COH 1996 Study Water Demand Forecast 500 Demand using 9 - year regression TWDB Demand using 13 - year regression Montgomery Watson Actual Demand Modified TWDB 450 HGCSD/COH-UH Water Demand MGD 400 350 300 1984 1987 1990 1993 1996 1999 2002 2005 2008 2011 2014 2017 2020 Year
  • 30. COH 2006 Updated Study ARC Regression Method Actual Historical Demand ARC Regression Line 450 430 410 390 Linear Regression Flow (MGD) 370 350 330 310 290 270 250 1980 1985 1990 1995 2000 2005 2010 Year Average Rate of Change (ARC) Method used for Regression Analysis City’s Pumpage Reports was used from 1983 through 2005 Growth Factor calculated from this analysis is 1.01
  • 31. City of Houston and Water Authorities Water Demand Projections
  • 32. Do we have enough water?
  • 33. Houston Water Supply SURFACE WATER RIGHTS San Jacinto River Basin Lake Conroe 60 MGD Lake Houston 150 MGD + 12 MGD* + 36MGD* Trinity River Basin Lake Livingston 806 MGD Dayton Canal 34 MGD Wallisville 34 MGD Barbers Hill Canal 40 MGD Brazos River Allens Creek 62 MGD Total Permitted Water Rights 1,234 MGD Permit pending 143 MGD (Bayous) 519 MGD (Reuse) AVAILABLE GROUND WATER 235 MGD Per Subsidence Rules TOTAL WATER AVAILABLE 2,131 MGD *Recently Permitted
  • 34. TOTAL Surface Water Supply & Demand Forecast 2000 PENDING #5827 reuse +519 MGD 1800 1600 PENDING #5826 bayous +143 MGD 1400 San Jacinto Run of River +36 MGD Million Gallons per Day 1200 Permitted Water Rights Lk Conroe, Lk Houston, Lk Livingston, Wallisville, 1000 Barber's Hill, Dayton Canal Pending Surface and Allens Creek. 1197 MGD Water Contracts 800 600 City of Houston 400 Surface Water Demand 200 0 2010 2020 2030 2040 2050
  • 35. Surface Water Rights Approximately 1.2 Billion Gallons per Day
  • 36. Allens Creek Reservoir • Location – 3000 feet upstream of Allens Creek – near Wallis (southern tip of Austin County) • History – planned and permitted cooling lake – Houston Lighting & Power in 1974 • Operation – capture yield of Allens Creek – diversions from the Brazos River of flood flows • Cost Estimates – depends on diversion site selected – current estimate $200 million without mitigation
  • 37. Pertinent Information • Yield studies – diverts Brazos River flood flows – 99,650 Acre-feet per year (89MGD) with 2,200 cfs diversion – safe yield: 87,800 AF/Yr • Surface Area/Volume – 7,003 acres; 145,533 AF • Pool Elevation (normal) - 121 ft msl • Dam: earth-filled embankment, 23,000 feet; max height - 53 feet; elevation 134 ft msl
  • 38.
  • 39.
  • 40. Allens Creek Reservoir • Authorized by 76(R) SB1593 (Sept 1999) Construction shall commerce no later than September 1, 2018 TCEQ may extend the deadline for good cause • BRA executes option with Reliant Energy (November 1999) • Site conveyed to BRA by Warranty Deed (January 2000) • TCEQ reissued original permit (Feb 2000) • BRA-Houston Agreement (April 2000) COH owns 70% of water rights (62MGD) and BRA owns 30% (27MGD) • TWDB financed the land acquisition and water rights permit amended (2002) • COH and BRA negotiate project terms/schedule (Nov. 2009 ~ ?)
  • 41. Is our water at the right place?
  • 42. COASTAL WATER Raw Water LEGEND: AUTHORITY Conveyance CANAL PIPELINE ROADWAY System COUNTY LINE INDUSTRIAL AREAS 90 TRINITY RIVER PUMP STATION N O ST U TR O IN H IT KE Y LA R IV ER LAKE HOUSTON 146 PUMP STATION LIBE HAR MAINTENANCE RTY SA FACILITY RIS N CO COU UN JA TY CIN NTY LIBERTY COUNTY CHAMBERS COUNTY TO R IVE R CH AM BE RS WALLISVILLE COUNTY 90 RESERVOIR OU 10 BAY 8 R 10 DA CE LYNCHBURG PUMP STATION 10 AND RESERVOIR 2354 EAST WATER SHIP CHANNEL CROSSING PURIFICATION PLANT HO US N SH TO BAYTOWN S TO IP N HOU C HA NN EL 146 SH 225 IP TRINITY DEER PARK CH AN NE BAY 225 L RED BLUFF WATER TREATMENT PLANT BAYPORT PUMP STATION PASADENA SOUTH EAST WATER PURIFICATION PLANT 146 COASTAL WATER AUTHORITY OF TEXAS Trinity River Pumping Station ELLINGTON FIELD File: Gen Vicinity Overview w Frame.dwg
  • 43. 2020 Surface Water Supply and Demand Lake (in MGD) Conroe 60 Trinity NHCRWA/ 60? River CHCRWA 806 116 (82) 115 (35) 34 Lake NEWPP WHCRWA Houston 46 80 150+12+36=198 79(51) COH Raw Water 371 60 256(46) 23 200 327 28 EWPP NFBWA 20(1) 350 19 Co-Part 131 69 SEWPP 200
  • 44. Luce Bayou Inter-Basin Transfer Project In Region H and State Water Plan Trinity River to Lake Houston (San Jacinto River) Diversion at Capers Ridge 3.6 miles of dual 108” pipeline 24 mile long canal Cost estimated at $294 million, including right-of-way, engineering and construction The project will be financed by TWDB deferred low interest loans All four Regional Water Authorities will share the cost proportion to their respective 2040 demand CWA is contracted with the City to implement the project Contractually guaranteed to be in service by June 2019 The project will be built to its ultimate capacity but pumps will be installed in phases
  • 45.
  • 46.
  • 48. Cost Sharing of Luce Bayou Project City of Houston 69.8% North Harris County Regional Water Authority 13.7% Central Harris County Regional Water Authority 0.5% West Harris County Regional Water Authority 9.5% North Fort Bend Water Authority 6.5% Total 100.0%
  • 49. LBIBT Project Status Resolution of Take Point Completed June 2009 Complete property boundary surveying/acquisition 31-Dec-10 Complete environmental field work Feb-10 Joint Evaluation Meeting 10-Feb-10 Complete Preliminary Engineering in support of 404 Submittal 31-Mar-10 Submit 404 Application to USACOE 31-Mar-10 Receive/Respond to Agency Questions and Comments on 404 Application July 1, 2010 to receipt of permit Receive 404 Permit from USACOE April 2011 to March 2012 Complete Preliminary Engineering Report for CWA/COH/Co-Participant Approval Jul-10
  • 50. What about treatment plants and transmission systems?
  • 51. Northeast Water Purification Plant Expansion Current Capacity – 80 MGD Capacity After Expansion – 300 MGD Year Needed – No Later than June of 2019 Estimated Expansion Cost – $350 to $700 M Cost will be shared by Regional Water Authorities
  • 52.
  • 53. City of Houston Transmission Water Lines Constructed and Proposed SWTP $93 million proposed FY 11 to 14