SlideShare une entreprise Scribd logo
1  sur  12
Source: Impact Signs
http://www.impactsigns.com
 You probably spent a good bit of money
having your custom metal signs or custom
metal letter signs made so it’s important to
know how to install them properly so they
hence your business, and work to build
your brand.
Copyright ImpactSigns.com
Copyright ImpactSigns.com
Office
walls
Metal
walls
Glass
walls
Brick
walls
For more sign letter sample photos: http://www.impactsigns.com/three-dimensional-sign-letters
 Custom metal signs can be installed fairly
easily, regardless of which method your
sign manufacturer uses as its installation
method. In most cases, the manufacturer
will supply specific installation instructions
as well as any hardware and installation
patterns needed.
Copyright ImpactSigns.com
 The most common methods of installing
metal letters and logos are via flush stud
mount or stud mounted with spacers.
Copyright ImpactSigns.com
Flush Stud Mount
Stud Mounted With Spacers
The two methods are similar, with each using studs
inserted into drilled holes, but the second uses
spacers between the wall and the letter, whereas
flush mounted places the letters flush against the
wall.
Here’s a step-by-step outline of how to install a
metal sign.
Copyright ImpactSigns.com
 Step One:
Clean the wall surface and place the
installation pattern on the wall where you
plan to install the sign. Use a level to ensure
the sign is installed at a straight level
height.
Copyright ImpactSigns.com
 Step Two:
Use a pencil to mark each spot where holes
will be drilled in the wall.
 Step Three:
Drill holes in each marked spot. When done,
remove pattern from the wall.
Copyright ImpactSigns.com
 Step Four:
Place the adhesive that came with your sign
into the holes for one letter.
 Step Five:
If using spacers, place the spacers on the
studs that protrude from the back of each
letter, so that the spacers sit between the
wall and the letters.
Copyright ImpactSigns.com
 Step Six:
Holding the letter in line with the pre-
drilled holes, place the studs on the back of
the letter into the adhesive-filled holes in
the wall.
Repeat with each letter
Copyright ImpactSigns.com
 Some metal signs may require attaching
one or two rails to the wall using a similar
method as above, and then simply sliding
the metal letters into the rails. The key to
successful installation is to use and level a
pattern before drilling any holes.
Copyright ImpactSigns.com
Copyright ImpactSigns.com
 For more information on installing your
custom metal letters signs or in having one
made for your company, contact us today!
◦ Impact Architectural Signs
2215 South Wolf Road
Hillside, IL 60162
◦ Phone: +1 (800) 492-1201
Fax: +1 (708) 492-0136
◦ impact@impactsigns.com

Contenu connexe

Plus de Impact Architectural Signs (7)

Christien jorgensen final
Christien jorgensen finalChristien jorgensen final
Christien jorgensen final
 
Bayard rustin final
Bayard rustin finalBayard rustin final
Bayard rustin final
 
Barbara jordan final
Barbara jordan finalBarbara jordan final
Barbara jordan final
 
Barbara gittings final
Barbara gittings finalBarbara gittings final
Barbara gittings final
 
Alvin ailey final
Alvin ailey finalAlvin ailey final
Alvin ailey final
 
Reinaldo arenas final
Reinaldo arenas finalReinaldo arenas final
Reinaldo arenas final
 
Bronze Memorial Plaques - How Effective Layout and Balanced Design Improves R...
Bronze Memorial Plaques - How Effective Layout and Balanced Design Improves R...Bronze Memorial Plaques - How Effective Layout and Balanced Design Improves R...
Bronze Memorial Plaques - How Effective Layout and Balanced Design Improves R...
 

Dernier

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Dernier (20)

How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 

How to install custom metal letter signs

  • 2.  You probably spent a good bit of money having your custom metal signs or custom metal letter signs made so it’s important to know how to install them properly so they hence your business, and work to build your brand. Copyright ImpactSigns.com
  • 3. Copyright ImpactSigns.com Office walls Metal walls Glass walls Brick walls For more sign letter sample photos: http://www.impactsigns.com/three-dimensional-sign-letters
  • 4.  Custom metal signs can be installed fairly easily, regardless of which method your sign manufacturer uses as its installation method. In most cases, the manufacturer will supply specific installation instructions as well as any hardware and installation patterns needed. Copyright ImpactSigns.com
  • 5.  The most common methods of installing metal letters and logos are via flush stud mount or stud mounted with spacers. Copyright ImpactSigns.com Flush Stud Mount Stud Mounted With Spacers
  • 6. The two methods are similar, with each using studs inserted into drilled holes, but the second uses spacers between the wall and the letter, whereas flush mounted places the letters flush against the wall. Here’s a step-by-step outline of how to install a metal sign. Copyright ImpactSigns.com
  • 7.  Step One: Clean the wall surface and place the installation pattern on the wall where you plan to install the sign. Use a level to ensure the sign is installed at a straight level height. Copyright ImpactSigns.com
  • 8.  Step Two: Use a pencil to mark each spot where holes will be drilled in the wall.  Step Three: Drill holes in each marked spot. When done, remove pattern from the wall. Copyright ImpactSigns.com
  • 9.  Step Four: Place the adhesive that came with your sign into the holes for one letter.  Step Five: If using spacers, place the spacers on the studs that protrude from the back of each letter, so that the spacers sit between the wall and the letters. Copyright ImpactSigns.com
  • 10.  Step Six: Holding the letter in line with the pre- drilled holes, place the studs on the back of the letter into the adhesive-filled holes in the wall. Repeat with each letter Copyright ImpactSigns.com
  • 11.  Some metal signs may require attaching one or two rails to the wall using a similar method as above, and then simply sliding the metal letters into the rails. The key to successful installation is to use and level a pattern before drilling any holes. Copyright ImpactSigns.com
  • 12. Copyright ImpactSigns.com  For more information on installing your custom metal letters signs or in having one made for your company, contact us today! ◦ Impact Architectural Signs 2215 South Wolf Road Hillside, IL 60162 ◦ Phone: +1 (800) 492-1201 Fax: +1 (708) 492-0136 ◦ impact@impactsigns.com