BIM within design and construction is well established. In order for the benefits to make
the transition into the Operation and Maintenance, FM needs to be fully involved. This
is understood and (at least by the BIM community) supported but, what does FM really
need? Has anyone asked the right questions? In this short presentation, the author
starts the discussion from the other (FM) side of the fence.
1
BIM is here. It has already happened but, it feels like the shockwave is just reaching the
FM community. Of course, some are much more advanced than others but, generally
speaking, BIM is a three letter word that many people have heard of but have yet to
understand ‘what’s in it for me?’
2
FM must become more involved in the BIM process. There are ample opportunities for
FM to comment and advise on operational considerations throughout the design and
build process.
3
However; unless there are a suite of BIM ready CAFM applications with which to
capitalise on this information, why would either FM or Architects and Construction
specialists see it as a priority?
4
One thing that FM doesn’t need is more work. It also doesn’t need new applications to
learn, rollout and pay for. 3D graphics are fantastic but, largely window dressing unless
they interact directly with the model giving the FM the ability to recall technical
information, asset history, documentation and servicing/inspection tasks. They must
also be able to interface with the richness of today’s CAFM solutions. Many of these
solutions have been developed over many years and would be difficult to replicate
effectively from current BIM viewer solutions.
FM needs the ability to identify equipment quickly, visualise routine maintenance tasks
without disturbing the workplace thereby reducing disruption, speeding up maintenance
delivery, reducing wasted time due to unforeseen obstacles and potentially enabling this
to be coordinated across geographically dispersed groups or individuals.
All this needs to be presented in a format that can be used by existing systems. 2016 is
the target for level 2 BIM to be embedded in the public sector but, from an FM
perspective, this is nothing new. CAFM systems have been importing information from
spreadsheets for many years so Cobie is not a transformational concept in this respect.
What is required is a standard that can be used by any vendor to provide the rich data
set available from the BIM process. This standard already exists and is commonly used
in design and construction. I refer to the IFC format. Cobie is a subset of IFC therefore,
accepting IFC is the route to success for CAFM. Does this need to include a 3D view?
Ideally, yes but, it’s not the end of the world if not.
5
The ability to accept IFC (and perhaps other) exports from current design software will
capture additional spatial information that is useful to FM. Note that this means the
data and not necessarily the 3D element as this may not always be required by the end
user. Indeed, do you have to have a 3D view to meet Level 2 BIM?
In an ideal world, an integrated viewer such as in MainManager or ArchiFM would be
preferable but, this will develop or evolve as applications grow and interface with more
BIM projects.
There is also the option to link to a third party viewer if an integrated option isn’t
required which can still be useful for discussions and planning purposes.
We should remember that the biggest issue CAFM customers face at present is data
collection. The aspiration to provide the organisation with a rich, accurate and effective
application that manages the estate is fairly common however; we see very few real life
examples of a fully implemented asset management strategy as either the time or cost
of collecting the information proves prohibitive.
6
Imagine the hours that are spent by architects, designers and engineers in selecting and
collecting products that are sustainable, cost effective and provide the best fit solution?
Imagine a world where this is automated by being able to pick items or systems from a
library (NBS?) which not only shows a 3D picture of the item but also its technical
specifications, links to documentation, links to statutory, mandatory and routine
maintenance tasks. Imagine if the risk assessments and method statements were
available for this equipment. Imagine if you could plan the work you needed to do right
down to the tools you need, the equipment you need to access the location before you
even left the workshop?
7
What about a 3D model of a piece of equipment with information on part numbers,
suppliers and costs? How useful would that be to a technician tasked with maintaining
it?
All of the above is possible now. The trouble is that it all exists in disparate and
unconnected mix of traditional and new systems.
8
BIM, we believe, is the catalyst that FM needs to bring it into a new age. Sound a bit
sensationalist? A bit melodramatic? Imagine what the first traditionalists said when the
first 3D design application was demonstrated. Although 3D design hasn’t reached every
architects practice or design engineering company, it is now seen as the standard rather
than the exception.
9
Any organisation who designs and builds. What is the point of collecting a complete
picture of a building during the first 5% of its life in order to discard it for the remaining
95%?
Any organisation who delivers FM services. Imagine the competitive advantage of being
able to remove the ‘asset data collection’ line from a tender or bid.
Any organisation who owns physical assets. You’ve just paid a large amount of money
for a building to be designed and constructed in the most cost effective and sustainable
way possible. Why would you not want that information to be made available to the
people who will maintain it for you?
All CAFM software developers. The market relies on competition and diversity but,
customers will be asking for this functionality very soon (if they are not already). The
richness is in the data, it always has been. The fact that we might be able to use some of
this data to create a virtual building is the icing on the cake.
10
11

Contenu connexe

Tendances

Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
jk tan
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
The alternative bim triangle
The alternative bim triangleThe alternative bim triangle
The alternative bim triangle
Zolna Murray
 
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
Kashif Mahbub
 

Tendances (20)

Top 5 trends reshaping the process of building information modeling
Top 5 trends reshaping the process of building information modelingTop 5 trends reshaping the process of building information modeling
Top 5 trends reshaping the process of building information modeling
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
 
10 points and the benefits of bim
10 points and the benefits of bim10 points and the benefits of bim
10 points and the benefits of bim
 
PI Munich Conference: Single BOM
PI Munich Conference: Single BOMPI Munich Conference: Single BOM
PI Munich Conference: Single BOM
 
Bim contracts
Bim contractsBim contracts
Bim contracts
 
Bim and its integration with fm systems
Bim and its integration with fm systemsBim and its integration with fm systems
Bim and its integration with fm systems
 
Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
The Commercial Worth of BIM in Construction Sector
The Commercial Worth of BIM in Construction SectorThe Commercial Worth of BIM in Construction Sector
The Commercial Worth of BIM in Construction Sector
 
Top opportunities to leverage a vr based workflow in bim enabled projects and...
Top opportunities to leverage a vr based workflow in bim enabled projects and...Top opportunities to leverage a vr based workflow in bim enabled projects and...
Top opportunities to leverage a vr based workflow in bim enabled projects and...
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Where is the mbom ?
Where is the mbom ?Where is the mbom ?
Where is the mbom ?
 
Nw b im_hub_-_march2013
Nw b im_hub_-_march2013Nw b im_hub_-_march2013
Nw b im_hub_-_march2013
 
Build Source-Company_Profile
Build Source-Company_ProfileBuild Source-Company_Profile
Build Source-Company_Profile
 
BIMStorm Definition With BIMStorm Australia Canberra Info
BIMStorm Definition With BIMStorm Australia Canberra InfoBIMStorm Definition With BIMStorm Australia Canberra Info
BIMStorm Definition With BIMStorm Australia Canberra Info
 
Cad Design Services
Cad Design ServicesCad Design Services
Cad Design Services
 
The alternative bim triangle
The alternative bim triangleThe alternative bim triangle
The alternative bim triangle
 
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
Doxee - Xplor webinar: An introduction to Self-Serve Customer Communication M...
 
A behind the scene look at Britam Digital Transformation
A behind the scene look at Britam Digital TransformationA behind the scene look at Britam Digital Transformation
A behind the scene look at Britam Digital Transformation
 

En vedette

Prentacion de el blog - Mayra Paola
Prentacion de el blog - Mayra PaolaPrentacion de el blog - Mayra Paola
Prentacion de el blog - Mayra Paola
mayrapaolac2
 
Taller n 2
Taller  n 2Taller  n 2
Taller n 2
LUISA147
 
Infografis ujian-nasional-2015-argb
Infografis ujian-nasional-2015-argbInfografis ujian-nasional-2015-argb
Infografis ujian-nasional-2015-argb
Aries M
 
Silabus logam kurikul
Silabus logam kurikulSilabus logam kurikul
Silabus logam kurikul
Aries M
 
Sheryl presentation 5 26 11 version 5 sh2
Sheryl presentation 5 26 11 version 5 sh2Sheryl presentation 5 26 11 version 5 sh2
Sheryl presentation 5 26 11 version 5 sh2
Taylor Johnson
 

En vedette (20)

Brief (1)
Brief (1)Brief (1)
Brief (1)
 
Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?
 
Prentacion de el blog - Mayra Paola
Prentacion de el blog - Mayra PaolaPrentacion de el blog - Mayra Paola
Prentacion de el blog - Mayra Paola
 
πλουτωνας
πλουτωναςπλουτωνας
πλουτωνας
 
Taller n 2
Taller  n 2Taller  n 2
Taller n 2
 
Week 12
Week 12Week 12
Week 12
 
NittyGritty
NittyGrittyNittyGritty
NittyGritty
 
ερμης
ερμηςερμης
ερμης
 
αγρια ζωα
αγρια ζωααγρια ζωα
αγρια ζωα
 
κεφ4
κεφ4κεφ4
κεφ4
 
Home town sustainability
Home town sustainabilityHome town sustainability
Home town sustainability
 
Infografis ujian-nasional-2015-argb
Infografis ujian-nasional-2015-argbInfografis ujian-nasional-2015-argb
Infografis ujian-nasional-2015-argb
 
Fiba translations
Fiba translationsFiba translations
Fiba translations
 
Efecto del agente espesante en la liberación de tirosol de natillas
Efecto del agente espesante en la liberación de tirosol de natillas Efecto del agente espesante en la liberación de tirosol de natillas
Efecto del agente espesante en la liberación de tirosol de natillas
 
Silabus logam kurikul
Silabus logam kurikulSilabus logam kurikul
Silabus logam kurikul
 
Towers
TowersTowers
Towers
 
Mathematical Finance
Mathematical Finance Mathematical Finance
Mathematical Finance
 
1234mokuit
1234mokuit1234mokuit
1234mokuit
 
MainManager CAFM Software from FM180.com
MainManager CAFM Software from FM180.comMainManager CAFM Software from FM180.com
MainManager CAFM Software from FM180.com
 
Sheryl presentation 5 26 11 version 5 sh2
Sheryl presentation 5 26 11 version 5 sh2Sheryl presentation 5 26 11 version 5 sh2
Sheryl presentation 5 26 11 version 5 sh2
 

Similaire à F-BIM - The argument for FM involvement in BIM

CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
Est
 

Similaire à F-BIM - The argument for FM involvement in BIM (20)

The FM Contribution to BIM
The FM Contribution to BIMThe FM Contribution to BIM
The FM Contribution to BIM
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry
 
Five Things You Need to Know about the Future of Building
Five Things You Need to Know about the Future of BuildingFive Things You Need to Know about the Future of Building
Five Things You Need to Know about the Future of Building
 
Building information modeling and fm is the way forward
Building information modeling and fm is the way forwardBuilding information modeling and fm is the way forward
Building information modeling and fm is the way forward
 
Bimarabia3en
Bimarabia3enBimarabia3en
Bimarabia3en
 
BIM for FM - What FM should know about BIM
BIM for FM - What FM should know about BIMBIM for FM - What FM should know about BIM
BIM for FM - What FM should know about BIM
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
Bi marabia11 en
Bi marabia11 enBi marabia11 en
Bi marabia11 en
 
Plannerly with the Calgary BIM Community cBIMc - BuildingSmart Affiliate
Plannerly with the Calgary BIM Community cBIMc - BuildingSmart AffiliatePlannerly with the Calgary BIM Community cBIMc - BuildingSmart Affiliate
Plannerly with the Calgary BIM Community cBIMc - BuildingSmart Affiliate
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
 
Omni Class 2010 11 Chapter
Omni Class 2010 11 ChapterOmni Class 2010 11 Chapter
Omni Class 2010 11 Chapter
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
 
4D bim
4D bim4D bim
4D bim
 
IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and Operators
 
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdf
THE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdfTHE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdf
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdf
 
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIMExploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
 
8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptx8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptx
 

Plus de Steve Owen MBA CBIFM

Plus de Steve Owen MBA CBIFM (6)

Asset management culture - A change of approach
Asset management culture - A change of approachAsset management culture - A change of approach
Asset management culture - A change of approach
 
Fm180 bim 2014 powerpoint show
Fm180 bim 2014 powerpoint showFm180 bim 2014 powerpoint show
Fm180 bim 2014 powerpoint show
 
MainManager Specifications
MainManager SpecificationsMainManager Specifications
MainManager Specifications
 
Main manager brochure 2014
Main manager brochure 2014Main manager brochure 2014
Main manager brochure 2014
 
MainManager Cleaning module
MainManager Cleaning moduleMainManager Cleaning module
MainManager Cleaning module
 
MainManager CAFM product overview
MainManager CAFM product overviewMainManager CAFM product overview
MainManager CAFM product overview
 

Dernier

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 

Dernier (20)

Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 

F-BIM - The argument for FM involvement in BIM

  • 1. BIM within design and construction is well established. In order for the benefits to make the transition into the Operation and Maintenance, FM needs to be fully involved. This is understood and (at least by the BIM community) supported but, what does FM really need? Has anyone asked the right questions? In this short presentation, the author starts the discussion from the other (FM) side of the fence. 1
  • 2. BIM is here. It has already happened but, it feels like the shockwave is just reaching the FM community. Of course, some are much more advanced than others but, generally speaking, BIM is a three letter word that many people have heard of but have yet to understand ‘what’s in it for me?’ 2
  • 3. FM must become more involved in the BIM process. There are ample opportunities for FM to comment and advise on operational considerations throughout the design and build process. 3
  • 4. However; unless there are a suite of BIM ready CAFM applications with which to capitalise on this information, why would either FM or Architects and Construction specialists see it as a priority? 4
  • 5. One thing that FM doesn’t need is more work. It also doesn’t need new applications to learn, rollout and pay for. 3D graphics are fantastic but, largely window dressing unless they interact directly with the model giving the FM the ability to recall technical information, asset history, documentation and servicing/inspection tasks. They must also be able to interface with the richness of today’s CAFM solutions. Many of these solutions have been developed over many years and would be difficult to replicate effectively from current BIM viewer solutions. FM needs the ability to identify equipment quickly, visualise routine maintenance tasks without disturbing the workplace thereby reducing disruption, speeding up maintenance delivery, reducing wasted time due to unforeseen obstacles and potentially enabling this to be coordinated across geographically dispersed groups or individuals. All this needs to be presented in a format that can be used by existing systems. 2016 is the target for level 2 BIM to be embedded in the public sector but, from an FM perspective, this is nothing new. CAFM systems have been importing information from spreadsheets for many years so Cobie is not a transformational concept in this respect. What is required is a standard that can be used by any vendor to provide the rich data set available from the BIM process. This standard already exists and is commonly used in design and construction. I refer to the IFC format. Cobie is a subset of IFC therefore, accepting IFC is the route to success for CAFM. Does this need to include a 3D view? Ideally, yes but, it’s not the end of the world if not. 5
  • 6. The ability to accept IFC (and perhaps other) exports from current design software will capture additional spatial information that is useful to FM. Note that this means the data and not necessarily the 3D element as this may not always be required by the end user. Indeed, do you have to have a 3D view to meet Level 2 BIM? In an ideal world, an integrated viewer such as in MainManager or ArchiFM would be preferable but, this will develop or evolve as applications grow and interface with more BIM projects. There is also the option to link to a third party viewer if an integrated option isn’t required which can still be useful for discussions and planning purposes. We should remember that the biggest issue CAFM customers face at present is data collection. The aspiration to provide the organisation with a rich, accurate and effective application that manages the estate is fairly common however; we see very few real life examples of a fully implemented asset management strategy as either the time or cost of collecting the information proves prohibitive. 6
  • 7. Imagine the hours that are spent by architects, designers and engineers in selecting and collecting products that are sustainable, cost effective and provide the best fit solution? Imagine a world where this is automated by being able to pick items or systems from a library (NBS?) which not only shows a 3D picture of the item but also its technical specifications, links to documentation, links to statutory, mandatory and routine maintenance tasks. Imagine if the risk assessments and method statements were available for this equipment. Imagine if you could plan the work you needed to do right down to the tools you need, the equipment you need to access the location before you even left the workshop? 7
  • 8. What about a 3D model of a piece of equipment with information on part numbers, suppliers and costs? How useful would that be to a technician tasked with maintaining it? All of the above is possible now. The trouble is that it all exists in disparate and unconnected mix of traditional and new systems. 8
  • 9. BIM, we believe, is the catalyst that FM needs to bring it into a new age. Sound a bit sensationalist? A bit melodramatic? Imagine what the first traditionalists said when the first 3D design application was demonstrated. Although 3D design hasn’t reached every architects practice or design engineering company, it is now seen as the standard rather than the exception. 9
  • 10. Any organisation who designs and builds. What is the point of collecting a complete picture of a building during the first 5% of its life in order to discard it for the remaining 95%? Any organisation who delivers FM services. Imagine the competitive advantage of being able to remove the ‘asset data collection’ line from a tender or bid. Any organisation who owns physical assets. You’ve just paid a large amount of money for a building to be designed and constructed in the most cost effective and sustainable way possible. Why would you not want that information to be made available to the people who will maintain it for you? All CAFM software developers. The market relies on competition and diversity but, customers will be asking for this functionality very soon (if they are not already). The richness is in the data, it always has been. The fact that we might be able to use some of this data to create a virtual building is the icing on the cake. 10