Hydel Power
Types of Hydro Turbines
Reaction, Impulse, Mixed Flow
Axial for Low Head (3-33 meters)
Radial or Combined Flow
Kaplan – Variable pitch blades – High efficiency at off load
conditions
Francis – radial, mixed flow – 5-500 meter heads – poor at off
load conditions
Pelton Wheel – Impulse turbine > 50 meter head – high
efficiency over wide range
Fixed Bladed Propeller ~ High efficiency at design conditions
Poor at low flow rates
Three Gorges Dam – Yangtze River - China
Installed capacity 22.5 GW - 32 Main Turbines of 700 MW
Capacity factor 0.45
Height 181 m
Length 2,335 m
Crest width 40 m
Base width 115 m
Spillway capacity 16,000 m3
/s
Reservoir Capacity 39.3 km3
Catchment Area 1,000,000 km2
Surface area 1,045 km2
Normal elevation 175 m
Reservoir length 600 km
Max. reservoir width 1.1 km
Pelton Wheel – Impulse Turbine
Francis – Reaction Turbine
Kaplan – Reaction Turbine
Principle
Po = ρQgH (Watts)
Rain fall > 40 cm/y desired
Ha = Ht - Hf
Q = ⌠ u dA
u ≈ 0.8 us (for rectangular cross section)
Pelton Wheel
F = 2ρQj (uj – uc) Force experienced by the cup
Pj = F uc = 2ρQj (uj – uc) uc Power transferred to one cup
Maximum for uc/ uj = 0.5
Hence Pj = ρ Qj uj
2
/ 2 100% efficiency
Uj
2
= 2g Ha Bernoulli’s Principle
Pm = ηm ρ Qj (2gHa) / 2 = ηm ρ (a uj) (2gHa ) /2
= ηm ρ a (2gHa)3/2
/ 2 Power from one nozzle
= ηm ρ a n (2gHa)3/2
/ 2 for n nozzles
2 ≤ n ≤ 4
Angular Velocity and Turbine Size
Since uc = Rω R = 0.5 uj / ω
R = 0.5 (2gHa)1/2
/ ω
Radius of the nozzle
r2
= Pm / (ηmρnπ(gHa)3/2
(2)1/2
)
Hence r / R = 0.68 (ηmn) -1/2
δ
Where δ = Pm
1/2
ω / [ ρ1/2
(gHa)5/4
] Shape Number
Peak Efficiencies of Various Turbines w.r.t.
Shape Number
Banki Turbine – Cross flow
η = 0.9, δ = 0.11
Hence ω1 = δ ρ1/2
(gHa)5/4
/ Pm
1/2
= 0.11 x (1000)1/2
(9.8 x 81)5/4
/ (160000)1/2
= 36 Rad/s
Further, R = uj / 2ω = (2gHa)1/2
/ 2ω = 40 / 2ω = 0.55 m
Similarly, ω2 = 1.1 Rad/s, R = 4.5 m
Therefore, Pelton wheels rotate slowly with low heads –
Suitable only with low heads and small flows
World Hydro Electricity Generation (Twh/year)
Hydro Power Capacity by Region
Hydraulic Ramp Pump
Social & Environmental Aspects
 Multiple applications – Water storage, fishing,
recreation, bird sanctuaries, river flow control, flood
mitigation
 Debt burden – high capital investment, public
displacement, destruction of eco-systems, loss of
historical and cultural heritage, inequitable sharing of
costs and benefits
 Small reservoirs and Run-of-River projects
considered having less environmental impacts – China
having large numbers
S.
No
Power
Station
Installed
Capacity
(MW)
1. Tarbela 3,578
2. Ghazi
Barotha
1,450
3. Mangla 1,000
4. Warsak 243
5. Chashma 184
6. Khan
Khwar
72
7. Duber
Khwar
130
8. Allai
Khwar
121
9. Others 178
Total
Capacity
6,956
Currently Installed Hydel Power Capacity in Pakistan
S.
No
.
Power
Station
Capaci
ty
(MW)
Expect
ed
Compl
etion
1. Jinnah
Hydropow
er
96 Dec.
2012
2. Gomal
Zam Dam
17.4 Feb.
2013
3. Golen-Gol 106 Feb.
2015
4. Neelum
Jhelum
969 Oct.
2015
Total 1188.4
Near completion hydel power projects in Pakistan
S.
No
.
Project River Water
Storage
(MAF)
Power
Capacity
(MW)
1. Diamer Basha Indus 8.1 4500
2. Kurram-Tangi Kurram 1.2 84
3. Tarbela-4th
Extetnsion
Indus 1410
4. Munda Swat 1.3 740
5. Kohala Jhelum RoR* 1100
6. Bunji Indus RoR* 7100
7. Dasu Indus 1.15 4320
8. Lower Spat Gah Indus RoR* 496
9. Lower Palas
Valley
Indus RoR* 665
10. Mahl Jhelum RoR* 600
Total Capacity 11.75 21015
Identified
Sites
whose
Feasibility
Study is
Complete
Current National News
 7 – Wind Projects of 450 MW in the pipeline
 50 MW by FFC erected one – 25 out of 33 towers
manufactured in Pakistan
 Blades will be locally manufactured in the next
phase
 220 MW of Solar Grid applications in the pipeline @
25c/kWh
 14000 Biogas plants under installation by Dutch
Govt.
What Choices Do We Have ?
 The shift in the energy sources is viewed as both a
challenge and an enormous opportunity
 The choice we face is either prosperity or decline
 We can either remain an importer of oil at increasingly
higher costs or to become an exporter of clean energy
 We can allow the climate change to wreck unnatural
havoc across the landscape or we can create jobs
working to prevent its worst effects
 The nations that will lead the world in creating new
energy sources will be the nations that lead the 21st
century global economy

Contenu connexe

Tendances

THIRED YEAR MINI PROJECT PPT
THIRED YEAR MINI PROJECT PPTTHIRED YEAR MINI PROJECT PPT
THIRED YEAR MINI PROJECT PPT
MATHAVAN S
 
Presentationkam
PresentationkamPresentationkam
Presentationkam
Kami Leo
 

Tendances (20)

Hydropower
HydropowerHydropower
Hydropower
 
Horizontal axis wind turbine
Horizontal axis wind turbineHorizontal axis wind turbine
Horizontal axis wind turbine
 
Modeling and Analysis of Wind Energy Conversion Systems Using Matlab
Modeling and Analysis of Wind Energy Conversion Systems Using MatlabModeling and Analysis of Wind Energy Conversion Systems Using Matlab
Modeling and Analysis of Wind Energy Conversion Systems Using Matlab
 
Review 4
Review 4Review 4
Review 4
 
Highway Wind Turbine Electricity generation PPT.
Highway Wind Turbine Electricity generation PPT.Highway Wind Turbine Electricity generation PPT.
Highway Wind Turbine Electricity generation PPT.
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
THIRED YEAR MINI PROJECT PPT
THIRED YEAR MINI PROJECT PPTTHIRED YEAR MINI PROJECT PPT
THIRED YEAR MINI PROJECT PPT
 
Summer Training Presentation
Summer Training PresentationSummer Training Presentation
Summer Training Presentation
 
Solar energy
Solar energySolar energy
Solar energy
 
Wind power
Wind powerWind power
Wind power
 
my seminor report on turbine
my seminor report on turbinemy seminor report on turbine
my seminor report on turbine
 
Hydro Electric project
Hydro Electric projectHydro Electric project
Hydro Electric project
 
Nhpc
NhpcNhpc
Nhpc
 
W
WW
W
 
Control of wind turbines
Control of wind turbinesControl of wind turbines
Control of wind turbines
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Presentationkam
PresentationkamPresentationkam
Presentationkam
 
Vertical axis wind turbine
Vertical axis wind turbineVertical axis wind turbine
Vertical axis wind turbine
 
Et wind
Et windEt wind
Et wind
 
Design of Adjustable Blade Wind Turbine for Constant Generated Power
Design of Adjustable Blade Wind Turbine for Constant Generated PowerDesign of Adjustable Blade Wind Turbine for Constant Generated Power
Design of Adjustable Blade Wind Turbine for Constant Generated Power
 

En vedette (12)

Chanakya
ChanakyaChanakya
Chanakya
 
Hydel power
Hydel power Hydel power
Hydel power
 
Hydroelectric power
Hydroelectric power Hydroelectric power
Hydroelectric power
 
Hydro-Electric Power
Hydro-Electric PowerHydro-Electric Power
Hydro-Electric Power
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power ppt
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Types of turbine & thier application
Types of turbine & thier applicationTypes of turbine & thier application
Types of turbine & thier application
 

Similaire à Renewable energy course#06

Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
U.E.T Lahore Pakistan
 

Similaire à Renewable energy course#06 (20)

Presention ppt
Presention pptPresention ppt
Presention ppt
 
Philippe Anglaret the VP Business Development for Alstom Nuclear (Atoms for t...
Philippe Anglaret the VP Business Development for Alstom Nuclear (Atoms for t...Philippe Anglaret the VP Business Development for Alstom Nuclear (Atoms for t...
Philippe Anglaret the VP Business Development for Alstom Nuclear (Atoms for t...
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
Wajahat ppt on ac shop
Wajahat ppt on ac shopWajahat ppt on ac shop
Wajahat ppt on ac shop
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
 
PPT ON THERMAL POWER PLANT
PPT ON THERMAL POWER PLANTPPT ON THERMAL POWER PLANT
PPT ON THERMAL POWER PLANT
 
Electro Static Precipitator for Spent Wash Application.
Electro Static Precipitator for Spent Wash Application.Electro Static Precipitator for Spent Wash Application.
Electro Static Precipitator for Spent Wash Application.
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...
 
C012611420
C012611420C012611420
C012611420
 
Dev
DevDev
Dev
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Hydro POWER PLANT
Hydro POWER PLANTHydro POWER PLANT
Hydro POWER PLANT
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 

Plus de Syed_Sajjad_Raza

Renewable energy course#05
Renewable energy course#05Renewable energy course#05
Renewable energy course#05
Syed_Sajjad_Raza
 
Renewable energy course#04
Renewable energy course#04Renewable energy course#04
Renewable energy course#04
Syed_Sajjad_Raza
 
Renewable energy course#02 gen
Renewable energy course#02 genRenewable energy course#02 gen
Renewable energy course#02 gen
Syed_Sajjad_Raza
 
Renewable energy course#02
Renewable energy course#02Renewable energy course#02
Renewable energy course#02
Syed_Sajjad_Raza
 
Renewable energy course#01
Renewable energy course#01Renewable energy course#01
Renewable energy course#01
Syed_Sajjad_Raza
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
Syed_Sajjad_Raza
 
Renewable energy course#03
Renewable energy course#03Renewable energy course#03
Renewable energy course#03
Syed_Sajjad_Raza
 

Plus de Syed_Sajjad_Raza (7)

Renewable energy course#05
Renewable energy course#05Renewable energy course#05
Renewable energy course#05
 
Renewable energy course#04
Renewable energy course#04Renewable energy course#04
Renewable energy course#04
 
Renewable energy course#02 gen
Renewable energy course#02 genRenewable energy course#02 gen
Renewable energy course#02 gen
 
Renewable energy course#02
Renewable energy course#02Renewable energy course#02
Renewable energy course#02
 
Renewable energy course#01
Renewable energy course#01Renewable energy course#01
Renewable energy course#01
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
 
Renewable energy course#03
Renewable energy course#03Renewable energy course#03
Renewable energy course#03
 

Dernier

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 

Dernier (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Renewable energy course#06

  • 2. Types of Hydro Turbines Reaction, Impulse, Mixed Flow Axial for Low Head (3-33 meters) Radial or Combined Flow Kaplan – Variable pitch blades – High efficiency at off load conditions Francis – radial, mixed flow – 5-500 meter heads – poor at off load conditions Pelton Wheel – Impulse turbine > 50 meter head – high efficiency over wide range Fixed Bladed Propeller ~ High efficiency at design conditions Poor at low flow rates
  • 3. Three Gorges Dam – Yangtze River - China Installed capacity 22.5 GW - 32 Main Turbines of 700 MW Capacity factor 0.45 Height 181 m Length 2,335 m Crest width 40 m Base width 115 m Spillway capacity 16,000 m3 /s Reservoir Capacity 39.3 km3 Catchment Area 1,000,000 km2 Surface area 1,045 km2 Normal elevation 175 m Reservoir length 600 km Max. reservoir width 1.1 km
  • 4. Pelton Wheel – Impulse Turbine
  • 7. Principle Po = ρQgH (Watts) Rain fall > 40 cm/y desired Ha = Ht - Hf Q = ⌠ u dA u ≈ 0.8 us (for rectangular cross section)
  • 8. Pelton Wheel F = 2ρQj (uj – uc) Force experienced by the cup Pj = F uc = 2ρQj (uj – uc) uc Power transferred to one cup Maximum for uc/ uj = 0.5 Hence Pj = ρ Qj uj 2 / 2 100% efficiency
  • 9. Uj 2 = 2g Ha Bernoulli’s Principle Pm = ηm ρ Qj (2gHa) / 2 = ηm ρ (a uj) (2gHa ) /2 = ηm ρ a (2gHa)3/2 / 2 Power from one nozzle = ηm ρ a n (2gHa)3/2 / 2 for n nozzles 2 ≤ n ≤ 4
  • 10. Angular Velocity and Turbine Size Since uc = Rω R = 0.5 uj / ω R = 0.5 (2gHa)1/2 / ω Radius of the nozzle r2 = Pm / (ηmρnπ(gHa)3/2 (2)1/2 ) Hence r / R = 0.68 (ηmn) -1/2 δ Where δ = Pm 1/2 ω / [ ρ1/2 (gHa)5/4 ] Shape Number
  • 11. Peak Efficiencies of Various Turbines w.r.t. Shape Number
  • 12.
  • 13.
  • 14. Banki Turbine – Cross flow
  • 15. η = 0.9, δ = 0.11 Hence ω1 = δ ρ1/2 (gHa)5/4 / Pm 1/2 = 0.11 x (1000)1/2 (9.8 x 81)5/4 / (160000)1/2 = 36 Rad/s Further, R = uj / 2ω = (2gHa)1/2 / 2ω = 40 / 2ω = 0.55 m Similarly, ω2 = 1.1 Rad/s, R = 4.5 m Therefore, Pelton wheels rotate slowly with low heads – Suitable only with low heads and small flows
  • 16. World Hydro Electricity Generation (Twh/year)
  • 17. Hydro Power Capacity by Region
  • 19. Social & Environmental Aspects  Multiple applications – Water storage, fishing, recreation, bird sanctuaries, river flow control, flood mitigation  Debt burden – high capital investment, public displacement, destruction of eco-systems, loss of historical and cultural heritage, inequitable sharing of costs and benefits  Small reservoirs and Run-of-River projects considered having less environmental impacts – China having large numbers
  • 20. S. No Power Station Installed Capacity (MW) 1. Tarbela 3,578 2. Ghazi Barotha 1,450 3. Mangla 1,000 4. Warsak 243 5. Chashma 184 6. Khan Khwar 72 7. Duber Khwar 130 8. Allai Khwar 121 9. Others 178 Total Capacity 6,956 Currently Installed Hydel Power Capacity in Pakistan
  • 21. S. No . Power Station Capaci ty (MW) Expect ed Compl etion 1. Jinnah Hydropow er 96 Dec. 2012 2. Gomal Zam Dam 17.4 Feb. 2013 3. Golen-Gol 106 Feb. 2015 4. Neelum Jhelum 969 Oct. 2015 Total 1188.4 Near completion hydel power projects in Pakistan
  • 22. S. No . Project River Water Storage (MAF) Power Capacity (MW) 1. Diamer Basha Indus 8.1 4500 2. Kurram-Tangi Kurram 1.2 84 3. Tarbela-4th Extetnsion Indus 1410 4. Munda Swat 1.3 740 5. Kohala Jhelum RoR* 1100 6. Bunji Indus RoR* 7100 7. Dasu Indus 1.15 4320 8. Lower Spat Gah Indus RoR* 496 9. Lower Palas Valley Indus RoR* 665 10. Mahl Jhelum RoR* 600 Total Capacity 11.75 21015 Identified Sites whose Feasibility Study is Complete
  • 23. Current National News  7 – Wind Projects of 450 MW in the pipeline  50 MW by FFC erected one – 25 out of 33 towers manufactured in Pakistan  Blades will be locally manufactured in the next phase  220 MW of Solar Grid applications in the pipeline @ 25c/kWh  14000 Biogas plants under installation by Dutch Govt.
  • 24. What Choices Do We Have ?  The shift in the energy sources is viewed as both a challenge and an enormous opportunity  The choice we face is either prosperity or decline  We can either remain an importer of oil at increasingly higher costs or to become an exporter of clean energy  We can allow the climate change to wreck unnatural havoc across the landscape or we can create jobs working to prevent its worst effects  The nations that will lead the world in creating new energy sources will be the nations that lead the 21st century global economy