SlideShare une entreprise Scribd logo
1  sur  56
BIM Making the Facility
Manager’s Life Easier:
Techniques to Reduce Risk on Your Next
Project and Protect Your Investment


                Eric Peabody    Suj Mishra
                eric@dpsf.com   suj@dpsf.com
                415 777-3737    415 777-3737
Agenda
           Quick Overview
                What is BIM, how does it work
           Reduce Risk
                Use the Risk=Cost equation to benefit
                everyone
           Prove it!
                Experimental data on three identical
                projects
           Use BIM in FM today
                Free tools to implement BIM now
The Design Partnership LLP 
Architects + Planners
Quick Overview of BIM




The Design Partnership LLP 
Architects + Planners
Project Delivery Improvement
                  Automatic Document Coordination

                  3D Systems Coordination

                  Virtual Building Simulation

                  Direct Fabrication

The Design Partnership LLP 
Architects + Planners
BIM is a 3D Database




The Design Partnership LLP 
Architects + Planners
A Federated Model




The Design Partnership LLP 
Architects + Planners
3D Laser Survey




The Design Partnership LLP 
Architects + Planners
Clash Detection &
                    Coordination


Structural
Plan




                               Where is the
                               coordination
                                  error?
Mechanical
Plan
The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners
Direct Fabrication




The Design Partnership LLP 
Architects + Planners            Images courtesy of Marelich Mechanical
Direct Fabrication




The Design Partnership LLP 
Architects + Planners
Prefabrication




The Design Partnership LLP 
Architects + Planners
Just-in-time Delivery




The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners          Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners
Reduce Risk




The Design Partnership LLP 
Architects + Planners
The Big BIM/IPD/Lean Idea




The Design Partnership LLP 
Architects + Planners
Increase in Architect’s
                  Exposure
 Unknown Consequences Of Sharing BIM
  Information
 Design Only Information In BIM Model
 Extensive Pre-coordination
 Fabrication From Design Models

 Increased Exposure to Risk

The Design Partnership LLP 
Architects + Planners
Decrease in Contractor’s
                Risk
 Reduced Coordination Errors
 Reduced Unknown Conditions
 More Efficient Workflow
 Cooperation & Collaboration
 Reduced Contingency

 Increased Confidence &  Reduced Risk

The Design Partnership LLP 
Architects + Planners
Decrease in Owner’s Risk
 Reduced Bids Due To Reduced
  Contractor Risks
 Reduced Risk Of
     – Change Orders From Unknown Conditions
     – Coordination Changes
     – Fighting Among AEC Entities
 Reduced User Changes Due To Better
  Pre-visualization And Planning

Design Partnership LLPRisk
The
    Reduced 
Architects + Planners
Architect’s Exposure 
                             However
                        Architect’s Risk 


 Reduced Risk for All = Reduced
             Cost


The Design Partnership LLP 
Architects + Planners
Prove it!




The Design Partnership LLP 
Architects + Planners
7




9



10
Experimental Controls

Experimental Variables
                         BIM Use                                 Area*      Start**   Architect

Cath Lab 7               CAD                               720 SF           2006

Cath Lab 9               2”                            1,173 SF             2009
                         Standard
Cath Lab                 Everything                    1,060 SF             2010
10
*Results expressed per SF to normalize this variable
**Cost values escalated to 2010 relative value to normalize this variable
Cath Lab 7
                                CAD Only




The Design Partnership LLP 
Architects + Planners
7
Cath Lab 7: Siemens Biplane Cath Lab
    Project Area: 720 Gross Square Feet   Construction Start: 2006
Procedure Room: 600 Net Square Feet                BIM Use: None
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
The delay was caused…by the
          over-head structural and M/E/P/FP
          not being coordinated. The
          majority of the overhead had to be
          re-designed.              DPR
                                   Construction




The Design Partnership LLP 
Architects + Planners
Cath Lab 9
                                BIM to 2”




The Design Partnership LLP 
Architects + Planners
9
Cath Lab 9: Siemens Biplane Hybrid OR
    Project Area: 1,173 Gross Square Feet   Construction Start: 2009
Procedure Room: 821 Net Square Feet                  BIM Use: Model to 2”
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
Cath Lab 10
                          BIM Everything




The Design Partnership LLP 
Architects + Planners
10
Cath Lab 10: Siemens Biplane Pediatric Cath Lab
    Project Area: 1060 Gross Square Feet    Construction Start: 2010
Procedure Room: 717 Net Square Feet                  BIM Use: Model Everything
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
Results




The Design Partnership LLP 
Architects + Planners
Construction Cost
                          BIM Use         % from
                                            CAD

Cath Lab 7                CAD
Cath Lab 9                2” Standard   -15.0%
Cath Lab                  Everything
*All figures in 2010 Relative Value      -4.1%
10
Change Order
                          BIM Use       % of Total
Cost 7 CAD
Cath Lab                                 12.4%
Cath Lab 9                2” Standard     8.1%
Cath Lab                   Everything   <0.1%
10
*All figures in 2010 Relative Value



The Design Partnership LLP 
Architects + Planners
Construction             BIM Use                        Construction       Days/SF    % from

Schedule
Cath Lab 7 CAD                                           8.40 mo        0.23 D/SF
                                                                                        CAD



Cath Lab 9               2” Standard                     8.50 mo        0.15 D/SF    -34.8%
Cath Lab                 Everything                      8.45 mo        0.16 D/SF    -30.4%
10
All Costs
                         Survey                 All      Construction     Margin**      Total
                                         Services*                  $
Cath Lab 7                                  18.5%                                     18.5%
Cath Lab 9                 1.6%             27.3%            (15.0%)      (22.0%)    (23.3%)
Cath Lab 10                1.6%             18.5%
*All design professional fees, including non-BIM fees
                                                              (4.1%)      (18.6%)    (17.9%)
**Cath lab contribution margin of ~$8,000 per day



The Design Partnership LLP 
Architects + Planners
Conclusions
Save up to 23% on project costs
Complete project 35% faster
Drop change order rate to <0.1%
44% fewer RFIs




The Design Partnership LLP 
Architects + Planners
Federated Model
                                        REVIT




            3D CADD                               REVIT



                               NAVISWORKS




                  ABS                           CADD/REVIT

The Design Partnership LLP 
Architects + Planners
Use BIM in FM Today
           BIM model from construction
           phase
           Navisworks Freedom
           Smart Tags linked to (E) systems
           QR codes linked to (E) systems




The Design Partnership LLP 
Architects + Planners
Free Tools
    Navisworks Freedom: Model
    Navigation
    QR reader: QR Droid or Adobe AIR
    QR Code Generator: Kaywa.com




The Design Partnership LLP 
Architects + Planners
Thanks. Questions?
Find the slides from this presentation on SlideShare.
Search for us by name: TheDesignPartnership
Or by our public profile: http://www.slideshare.net/TheDesignPartnership




                                Eric Peabody                      Suj Mishra
                                eric@dpsf.com                     suj@dpsf.com
                                415 777-3737                      415 777-3737

Contenu connexe

Tendances

EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
Ahmad Balawi
 

Tendances (20)

BIM for FACILITY MANAGEMENT:It is useful for construction?
BIM for FACILITY MANAGEMENT:It is useful for construction? BIM for FACILITY MANAGEMENT:It is useful for construction?
BIM for FACILITY MANAGEMENT:It is useful for construction?
 
BIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM Corporation
BIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM CorporationBIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM Corporation
BIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM Corporation
 
EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)
 
Role of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practiceRole of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practice
 
Bim For The Building Product Mfr Presentation Sml
Bim For The Building Product Mfr Presentation   SmlBim For The Building Product Mfr Presentation   Sml
Bim For The Building Product Mfr Presentation Sml
 
Facility Management & Smarter Buildings - PCTY 2011
Facility Management & Smarter Buildings - PCTY 2011Facility Management & Smarter Buildings - PCTY 2011
Facility Management & Smarter Buildings - PCTY 2011
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09
 
Change the Way We build - Part 3
Change the Way We build -  Part 3Change the Way We build -  Part 3
Change the Way We build - Part 3
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 

Similaire à IFMA Presentation: BIM Making the Facility Manager's Life Easier

BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
Eric Peabody
 
BIM Roundtable Webinar 1/15/09
BIM Roundtable Webinar 1/15/09BIM Roundtable Webinar 1/15/09
BIM Roundtable Webinar 1/15/09
kpreddy
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 

Similaire à IFMA Presentation: BIM Making the Facility Manager's Life Easier (20)

Experimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsExperimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
 
Reducing Risk with BIM
Reducing Risk with BIMReducing Risk with BIM
Reducing Risk with BIM
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk Equation
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Digital & BIM in Total Architecture
Digital & BIM in Total ArchitectureDigital & BIM in Total Architecture
Digital & BIM in Total Architecture
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Bim
BimBim
Bim
 
BIM Professional Portfolio LAM VU NGO HUNG
BIM Professional Portfolio   LAM VU NGO HUNGBIM Professional Portfolio   LAM VU NGO HUNG
BIM Professional Portfolio LAM VU NGO HUNG
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
Difference between revit and autocad-converted.pptx
Difference between revit and autocad-converted.pptxDifference between revit and autocad-converted.pptx
Difference between revit and autocad-converted.pptx
 
2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
 
BIM Roundtable Webinar 1/15/09
BIM Roundtable Webinar 1/15/09BIM Roundtable Webinar 1/15/09
BIM Roundtable Webinar 1/15/09
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 

Plus de The Design Partnership

Plus de The Design Partnership (9)

Collaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesCollaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the Senses
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Shenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryShenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition Jury
 
Advancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelAdvancing Healing Design to the Next Level
Advancing Healing Design to the Next Level
 
CSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old InfrastructureCSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old Infrastructure
 
Navisworks Clash Course
Navisworks Clash CourseNavisworks Clash Course
Navisworks Clash Course
 
High-Tech vs. Old Infrastruction
High-Tech vs. Old InfrastructionHigh-Tech vs. Old Infrastruction
High-Tech vs. Old Infrastruction
 
Labs 21 BIM & Sustainability
Labs 21 BIM & SustainabilityLabs 21 BIM & Sustainability
Labs 21 BIM & Sustainability
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
 

Dernier

Dernier (20)

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 

IFMA Presentation: BIM Making the Facility Manager's Life Easier

  • 1. BIM Making the Facility Manager’s Life Easier: Techniques to Reduce Risk on Your Next Project and Protect Your Investment Eric Peabody Suj Mishra eric@dpsf.com suj@dpsf.com 415 777-3737 415 777-3737
  • 2. Agenda Quick Overview What is BIM, how does it work Reduce Risk Use the Risk=Cost equation to benefit everyone Prove it! Experimental data on three identical projects Use BIM in FM today Free tools to implement BIM now The Design Partnership LLP  Architects + Planners
  • 3. Quick Overview of BIM The Design Partnership LLP  Architects + Planners
  • 4. Project Delivery Improvement Automatic Document Coordination 3D Systems Coordination Virtual Building Simulation Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 5. BIM is a 3D Database The Design Partnership LLP  Architects + Planners
  • 6. A Federated Model The Design Partnership LLP  Architects + Planners
  • 7. 3D Laser Survey The Design Partnership LLP  Architects + Planners
  • 8. Clash Detection & Coordination Structural Plan Where is the coordination error? Mechanical Plan The Design Partnership LLP  Architects + Planners
  • 9. The Design Partnership LLP  Architects + Planners
  • 10. Direct Fabrication The Design Partnership LLP  Architects + Planners Images courtesy of Marelich Mechanical
  • 11. Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 12. Prefabrication The Design Partnership LLP  Architects + Planners
  • 13. Just-in-time Delivery The Design Partnership LLP  Architects + Planners
  • 14. The Design Partnership LLP  Architects + Planners Image courtesy of Marelich Mechanical
  • 15. The Design Partnership LLP  Architects + Planners
  • 16. Image courtesy of Marelich Mechanical The Design Partnership LLP  Architects + Planners
  • 17. The Design Partnership LLP  Architects + Planners
  • 18. Reduce Risk The Design Partnership LLP  Architects + Planners
  • 19. The Big BIM/IPD/Lean Idea The Design Partnership LLP  Architects + Planners
  • 20. Increase in Architect’s Exposure  Unknown Consequences Of Sharing BIM Information  Design Only Information In BIM Model  Extensive Pre-coordination  Fabrication From Design Models  Increased Exposure to Risk The Design Partnership LLP  Architects + Planners
  • 21. Decrease in Contractor’s Risk  Reduced Coordination Errors  Reduced Unknown Conditions  More Efficient Workflow  Cooperation & Collaboration  Reduced Contingency  Increased Confidence &  Reduced Risk The Design Partnership LLP  Architects + Planners
  • 22. Decrease in Owner’s Risk  Reduced Bids Due To Reduced Contractor Risks  Reduced Risk Of – Change Orders From Unknown Conditions – Coordination Changes – Fighting Among AEC Entities  Reduced User Changes Due To Better Pre-visualization And Planning Design Partnership LLPRisk The Reduced  Architects + Planners
  • 23. Architect’s Exposure  However Architect’s Risk  Reduced Risk for All = Reduced Cost The Design Partnership LLP  Architects + Planners
  • 24. Prove it! The Design Partnership LLP  Architects + Planners
  • 26. Experimental Controls Experimental Variables BIM Use Area* Start** Architect Cath Lab 7 CAD 720 SF 2006 Cath Lab 9 2” 1,173 SF 2009 Standard Cath Lab Everything 1,060 SF 2010 10 *Results expressed per SF to normalize this variable **Cost values escalated to 2010 relative value to normalize this variable
  • 27. Cath Lab 7 CAD Only The Design Partnership LLP  Architects + Planners
  • 28. 7
  • 29. Cath Lab 7: Siemens Biplane Cath Lab Project Area: 720 Gross Square Feet Construction Start: 2006 Procedure Room: 600 Net Square Feet BIM Use: None
  • 30. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 31. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 32. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 33. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 34. The delay was caused…by the over-head structural and M/E/P/FP not being coordinated. The majority of the overhead had to be re-designed. DPR Construction The Design Partnership LLP  Architects + Planners
  • 35. Cath Lab 9 BIM to 2” The Design Partnership LLP  Architects + Planners
  • 36. 9
  • 37. Cath Lab 9: Siemens Biplane Hybrid OR Project Area: 1,173 Gross Square Feet Construction Start: 2009 Procedure Room: 821 Net Square Feet BIM Use: Model to 2”
  • 38. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 39. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 40. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 41. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 42. Cath Lab 10 BIM Everything The Design Partnership LLP  Architects + Planners
  • 43. 10
  • 44. Cath Lab 10: Siemens Biplane Pediatric Cath Lab Project Area: 1060 Gross Square Feet Construction Start: 2010 Procedure Room: 717 Net Square Feet BIM Use: Model Everything
  • 45. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 46. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 47. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 48. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 49. Results The Design Partnership LLP  Architects + Planners
  • 50. Construction Cost BIM Use % from CAD Cath Lab 7 CAD Cath Lab 9 2” Standard -15.0% Cath Lab Everything *All figures in 2010 Relative Value -4.1% 10 Change Order BIM Use % of Total Cost 7 CAD Cath Lab 12.4% Cath Lab 9 2” Standard 8.1% Cath Lab Everything <0.1% 10 *All figures in 2010 Relative Value The Design Partnership LLP  Architects + Planners
  • 51. Construction BIM Use Construction Days/SF % from Schedule Cath Lab 7 CAD 8.40 mo 0.23 D/SF CAD Cath Lab 9 2” Standard 8.50 mo 0.15 D/SF -34.8% Cath Lab Everything 8.45 mo 0.16 D/SF -30.4% 10 All Costs Survey All Construction Margin** Total Services* $ Cath Lab 7 18.5% 18.5% Cath Lab 9 1.6% 27.3% (15.0%) (22.0%) (23.3%) Cath Lab 10 1.6% 18.5% *All design professional fees, including non-BIM fees (4.1%) (18.6%) (17.9%) **Cath lab contribution margin of ~$8,000 per day The Design Partnership LLP  Architects + Planners
  • 52. Conclusions Save up to 23% on project costs Complete project 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 53. Federated Model REVIT 3D CADD REVIT NAVISWORKS ABS CADD/REVIT The Design Partnership LLP  Architects + Planners
  • 54. Use BIM in FM Today BIM model from construction phase Navisworks Freedom Smart Tags linked to (E) systems QR codes linked to (E) systems The Design Partnership LLP  Architects + Planners
  • 55. Free Tools Navisworks Freedom: Model Navigation QR reader: QR Droid or Adobe AIR QR Code Generator: Kaywa.com The Design Partnership LLP  Architects + Planners
  • 56. Thanks. Questions? Find the slides from this presentation on SlideShare. Search for us by name: TheDesignPartnership Or by our public profile: http://www.slideshare.net/TheDesignPartnership Eric Peabody Suj Mishra eric@dpsf.com suj@dpsf.com 415 777-3737 415 777-3737

Notes de l'éditeur

  1. Quarter million $ saved on Cath 9
  2. Go to Revit demo after this slide. Focus on 3D views, and explain that the drawings are views of a model, not drafted abstractions.
  3. Go to Revit demo after this slide. Focus on 3D views, and explain that the drawings are views of a model, not drafted abstractions.