BEST PRACTICES FOR CONDITION 
MONITORING AND MAINTENANCE OF BOILER 
FEED PUMP 
V.Gautham 
BE Power NPTI 
MBA SIMSREE(2014-16)
INTRODUCTION 
 Function of BFP – transport water from feed 
storage tank to boiler drum through H.P heater, 
F.R.S and economizer 
 Types of BFP – KHI and FK series 
 Need for maintenance
AIMS AND OBJECTIVES OF 
MAINTENANCE OF BFP 
 To maintain BFP at its maximum 
operating efficiency 
 To safeguard investment 
 To help management in taking 
decisions 
 Make best use of resources. 
 Maintain plant parameters
TECHNICAL DETAILS OF BFP 
 Pump type: FK 6D30 
 Flow rate: 398 cum/hr 
 Speed: 5075 rpm 
 Input Power: 2558 kw 
 Efficiency: 81 % 
 Min. RC flow: 100 tonnes/hr 
 No. of stages: 6
BFP EXTERNALS
BFP INTERNALS
Maintenance 
 The BFP is a critical auxiliary which has to 
work continuously. 
 Maintenance types : 
 Breakdown maintenance 
 Preventive 
 Reliability centered maintenance 
 Condition monitoring 
 Computer management maintenance 
system(CMMS)
BREAKDOWN MAINTENANCE 
 Breakdown maintenance involves the repair or 
replacement of equipment and components after 
they have failed. 
 Activities which are undertaken when the BFP 
stops working come under breakdown 
maintenance 
s.n Clearance between Clearance(in mm) 
01. 
Impeller wearing-Casing wear 
0.4 
ring/Diffuser wear ring. 
02 
Balance drum-Restriction bush. 
0.24 
03. 
Total axial float. 
8.0 
04. 
Thrust/Axial bearing clearance 
0.25 to 0.40 
05. 
Journal bearing clearance (Top 
0.15 to 0.18 
clearance) 
06. 
Interference of thrust collar & shaft 
0.09
Preventive maintenance 
 It includes cleaning, inspection, oiling and 
retightening 
 It is the work done primarily to rectify the effects of 
normal wear in pump. 
 The usual intervals of preventive maintenance are: 
 Daily 
 Monthly 
 Quarterly 
 Half yearly 
 Annually
Predictive maintenance 
 It includes the following - 
 Visual and sound monitoring 
 Contaminant or debris monitoring 
 Performance and behaviour monitoring 
 thermograph monitoring 
 Shock pulse monitoring. 
 Vibration monitoring.
Vibration monitoring
COMPUTERIZED MAINTAINANCE 
MANAGEMENT SYSTEM 
 It is a type of management software that performs 
functions in support of management and tracking of 
operation and maintenance activities. 
 Historical tracking of all work orders generated which 
become sortable by equipment, date ,person 
responding etc. 
 Tracking of scheduled and unscheduled maintenance 
activities. 
 Storing of maintenance procedures as well as all 
warranty information by component. 
 Storing of all technical documentation or procedures by 
component.
CMMS BENEFITS 
 Detection of impending problems before 
a failure occurs resulting in fewer 
failures. 
 Achieving a higher level of plant 
maintenance activities that enables a 
more efficient use of staff resources. 
 Maintaining optimal equipment 
performance that reduces downtime and 
results in longer equipment life.
Shaft alignment 
 Shaft Alignment – Shaft alignment is the 
process of matching the centerline of two 
shafts. There is a one driving and another 
one is driven shaft. 
 Misalignment -It is the deviation in the 
centerline and plane of two shafts. 
 Radial misalignment 
 Axial misalignment 
 Combined misalignment
Motor 
Pump 
Radial misalignment 
Motor Pump 
Axial or angular misalignment 
Motor 
Pump 
Combined misalignment
Procedure for cartridge 
replacement
BFP PERMISSIVES 
1. Deaerator level normal(2375mm). 
2. BFP suction valve open. 
3. Auxiliary oil pump on lube oil pressure 
more than 2.5 kg/cm2. 
4. Discharge valve closed, recirculation valve 
open. 
5. Working oil temperature less than 130˚C. 
6. Differential temperature across feed pump 
suction and discharge less than 12˚C.
Boiler feed pump Log Book
Troubleshooting 
Sr. 
no 
Symptom Possible cause Action 
1. Pump does not 
deliver rated 
quantity 
•Pump not upto rated 
speed 
•Restriction in delivery 
pipe work or incorrect 
•Blockage in impeller or 
casing 
•High fluid viscosity 
• Increase speed 
• Clear obstruction 
or rectify error in 
pipe work 
• Remove half 
casing and clear 
obstruction 
• Check the 
recommended 
viscosity 
2. Bearing 
overheating 
•Defect in lubricating oil 
system 
•Bearing warn out of 
misaligned 
•Misaligned of pump 
•Check lubricating oil 
system (pr.>2.5kg/cm) 
•Examine bearings 
•Check the alignment
Thank You

Contenu connexe

Tendances

Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plantTarek Erin
 
condensate system
condensate systemcondensate system
condensate systemvikrantdesh
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
Steam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptSteam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptBiswajit Mohanty
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING Nitin Patel
 
steam turbine govering system
steam turbine govering systemsteam turbine govering system
steam turbine govering systemmitravanu mishra
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 
STEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSSTEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSAkhil Krishnan G
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2Mohammad Basid
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleAli Rafiei
 

Tendances (20)

Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
condensate system
condensate systemcondensate system
condensate system
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Steam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptSteam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance ppt
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
steam turbine govering system
steam turbine govering systemsteam turbine govering system
steam turbine govering system
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
STEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGSSTEAM TURBINES AND ITS GOVERNINGS
STEAM TURBINES AND ITS GOVERNINGS
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 
Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -Sample
 

En vedette

Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemBoiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemVudugundla Kodandapani
 
Boiler feed and pump sizing c-b and grundfos july 2016(1)
Boiler feed and pump sizing   c-b and grundfos july 2016(1)Boiler feed and pump sizing   c-b and grundfos july 2016(1)
Boiler feed and pump sizing c-b and grundfos july 2016(1)lorenzo Monasca
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Boiler Water Circulation Pumps
Boiler Water Circulation PumpsBoiler Water Circulation Pumps
Boiler Water Circulation PumpsGerard B. Hawkins
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Pumps and piping
Pumps and pipingPumps and piping
Pumps and pipingHashim Khan
 
Maintenance of Pumps
Maintenance of PumpsMaintenance of Pumps
Maintenance of PumpsHammad Akber
 
Pump Maintenance and Troubleshooting
Pump Maintenance and TroubleshootingPump Maintenance and Troubleshooting
Pump Maintenance and TroubleshootingBrian Gongol
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines Amir Ayad
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam TurbineSumit Sharma
 
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Shah Jalal
 
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
THUM'S UP! : Wireless Troubleshooting of Intermittent UpsetsTHUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
THUM'S UP! : Wireless Troubleshooting of Intermittent UpsetsEmerson Exchange
 
Orthographic projections by Dr. Ashish
Orthographic projections by Dr. AshishOrthographic projections by Dr. Ashish
Orthographic projections by Dr. AshishAbhishek Srivastav
 

En vedette (20)

Boiler Feedwater Pumps
Boiler Feedwater PumpsBoiler Feedwater Pumps
Boiler Feedwater Pumps
 
Bfwp
BfwpBfwp
Bfwp
 
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemBoiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
 
Boiler feed and pump sizing c-b and grundfos july 2016(1)
Boiler feed and pump sizing   c-b and grundfos july 2016(1)Boiler feed and pump sizing   c-b and grundfos july 2016(1)
Boiler feed and pump sizing c-b and grundfos july 2016(1)
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Boiler Water Circulation Pumps
Boiler Water Circulation PumpsBoiler Water Circulation Pumps
Boiler Water Circulation Pumps
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Pumps and piping
Pumps and pipingPumps and piping
Pumps and piping
 
Maintenance of Pumps
Maintenance of PumpsMaintenance of Pumps
Maintenance of Pumps
 
Pump Maintenance and Troubleshooting
Pump Maintenance and TroubleshootingPump Maintenance and Troubleshooting
Pump Maintenance and Troubleshooting
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines
 
Basics of pump
Basics of pump Basics of pump
Basics of pump
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
 
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
 
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
THUM'S UP! : Wireless Troubleshooting of Intermittent UpsetsTHUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
 
Deaerator Control presentation
Deaerator Control presentationDeaerator Control presentation
Deaerator Control presentation
 
Orthographic projections by Dr. Ashish
Orthographic projections by Dr. AshishOrthographic projections by Dr. Ashish
Orthographic projections by Dr. Ashish
 
Basics of valves
Basics of valvesBasics of valves
Basics of valves
 

Similaire à Power Plant Boiler feed pump

Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxMaintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxsaubhagyabista
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintananceAnasMirza10
 
IRJET- Risks Prioritization using FMEA Method -A Case Study
IRJET-  	  Risks Prioritization using FMEA Method -A Case StudyIRJET-  	  Risks Prioritization using FMEA Method -A Case Study
IRJET- Risks Prioritization using FMEA Method -A Case StudyIRJET Journal
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxIsmailJulaihi
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxMohsinRaza177052
 
Training ppts on rotating equipments best practices
Training ppts on rotating equipments best practicesTraining ppts on rotating equipments best practices
Training ppts on rotating equipments best practicespgemp93manish
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfchintanraval24
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Bhavesh Shukla
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfssuser5599ce
 
Variable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcastVariable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcastSchneider Electric
 

Similaire à Power Plant Boiler feed pump (20)

Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxMaintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintanance
 
IRJET- Risks Prioritization using FMEA Method -A Case Study
IRJET-  	  Risks Prioritization using FMEA Method -A Case StudyIRJET-  	  Risks Prioritization using FMEA Method -A Case Study
IRJET- Risks Prioritization using FMEA Method -A Case Study
 
LECTURE 01.pptx
LECTURE 01.pptxLECTURE 01.pptx
LECTURE 01.pptx
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptx
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
Poster pdf
Poster pdfPoster pdf
Poster pdf
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptx
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
Training ppts on rotating equipments best practices
Training ppts on rotating equipments best practicesTraining ppts on rotating equipments best practices
Training ppts on rotating equipments best practices
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Lecture 1 - part 1.pptx
Lecture 1 - part 1.pptxLecture 1 - part 1.pptx
Lecture 1 - part 1.pptx
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdf
 
Variable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcastVariable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcast
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 

Dernier

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Dernier (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Power Plant Boiler feed pump

  • 1. BEST PRACTICES FOR CONDITION MONITORING AND MAINTENANCE OF BOILER FEED PUMP V.Gautham BE Power NPTI MBA SIMSREE(2014-16)
  • 2. INTRODUCTION  Function of BFP – transport water from feed storage tank to boiler drum through H.P heater, F.R.S and economizer  Types of BFP – KHI and FK series  Need for maintenance
  • 3. AIMS AND OBJECTIVES OF MAINTENANCE OF BFP  To maintain BFP at its maximum operating efficiency  To safeguard investment  To help management in taking decisions  Make best use of resources.  Maintain plant parameters
  • 4. TECHNICAL DETAILS OF BFP  Pump type: FK 6D30  Flow rate: 398 cum/hr  Speed: 5075 rpm  Input Power: 2558 kw  Efficiency: 81 %  Min. RC flow: 100 tonnes/hr  No. of stages: 6
  • 5.
  • 8. Maintenance  The BFP is a critical auxiliary which has to work continuously.  Maintenance types :  Breakdown maintenance  Preventive  Reliability centered maintenance  Condition monitoring  Computer management maintenance system(CMMS)
  • 9. BREAKDOWN MAINTENANCE  Breakdown maintenance involves the repair or replacement of equipment and components after they have failed.  Activities which are undertaken when the BFP stops working come under breakdown maintenance s.n Clearance between Clearance(in mm) 01. Impeller wearing-Casing wear 0.4 ring/Diffuser wear ring. 02 Balance drum-Restriction bush. 0.24 03. Total axial float. 8.0 04. Thrust/Axial bearing clearance 0.25 to 0.40 05. Journal bearing clearance (Top 0.15 to 0.18 clearance) 06. Interference of thrust collar & shaft 0.09
  • 10. Preventive maintenance  It includes cleaning, inspection, oiling and retightening  It is the work done primarily to rectify the effects of normal wear in pump.  The usual intervals of preventive maintenance are:  Daily  Monthly  Quarterly  Half yearly  Annually
  • 11. Predictive maintenance  It includes the following -  Visual and sound monitoring  Contaminant or debris monitoring  Performance and behaviour monitoring  thermograph monitoring  Shock pulse monitoring.  Vibration monitoring.
  • 13. COMPUTERIZED MAINTAINANCE MANAGEMENT SYSTEM  It is a type of management software that performs functions in support of management and tracking of operation and maintenance activities.  Historical tracking of all work orders generated which become sortable by equipment, date ,person responding etc.  Tracking of scheduled and unscheduled maintenance activities.  Storing of maintenance procedures as well as all warranty information by component.  Storing of all technical documentation or procedures by component.
  • 14. CMMS BENEFITS  Detection of impending problems before a failure occurs resulting in fewer failures.  Achieving a higher level of plant maintenance activities that enables a more efficient use of staff resources.  Maintaining optimal equipment performance that reduces downtime and results in longer equipment life.
  • 15. Shaft alignment  Shaft Alignment – Shaft alignment is the process of matching the centerline of two shafts. There is a one driving and another one is driven shaft.  Misalignment -It is the deviation in the centerline and plane of two shafts.  Radial misalignment  Axial misalignment  Combined misalignment
  • 16. Motor Pump Radial misalignment Motor Pump Axial or angular misalignment Motor Pump Combined misalignment
  • 17. Procedure for cartridge replacement
  • 18. BFP PERMISSIVES 1. Deaerator level normal(2375mm). 2. BFP suction valve open. 3. Auxiliary oil pump on lube oil pressure more than 2.5 kg/cm2. 4. Discharge valve closed, recirculation valve open. 5. Working oil temperature less than 130˚C. 6. Differential temperature across feed pump suction and discharge less than 12˚C.
  • 19. Boiler feed pump Log Book
  • 20.
  • 21. Troubleshooting Sr. no Symptom Possible cause Action 1. Pump does not deliver rated quantity •Pump not upto rated speed •Restriction in delivery pipe work or incorrect •Blockage in impeller or casing •High fluid viscosity • Increase speed • Clear obstruction or rectify error in pipe work • Remove half casing and clear obstruction • Check the recommended viscosity 2. Bearing overheating •Defect in lubricating oil system •Bearing warn out of misaligned •Misaligned of pump •Check lubricating oil system (pr.>2.5kg/cm) •Examine bearings •Check the alignment