SlideShare une entreprise Scribd logo
1  sur  20
Planning and Control in General
• What is planning and control?
• What is difference between planning and
control?
• How does the nature of demand affect planning
and control?
• What is involved in planning and control?
Concepts We need to Understand
• dependent demand and independent demand
• make-to-stock, make-to-order, resource-to-
order
• loading, sequencing, scheduling and monitoring
• pull and push systems
Planning and Control
– Reconcile Supply and Demand
Supply of
products
and services
Planning
and Control
Demand for
products and
services
Operation
resources
Required time,
quantity and
quality of products
and services
Customer
requirements
Planning is deciding
Control is
what activities should take place in
the operation and their quantities
when they should take place
what resources should be allocated
to them
understanding what is actually
happening in the the operation
deciding whether there is a
significant deviation from what
should be happening
(if there is deviation) changing
resources in order to affect the
operation’s activities
Planning and Control
Significance of planning or control
Timehorizon
Hours/daysDays/weeks/monthsMonths/years
Medium-term Planning and Control
Uses partially dissaggregated demand
forecasts
Determines resources and contingencies
Objectives set in both financial and
operations terms
Long-term Planning and Control
Uses aggregated demand forecasts
Determines resources in aggregated form
Objectives set in largely financial terms
Short-term Planning and Control
Uses totally dissaggregated forecasts or
actual demand
Makes interventions to resources to
correct deviations from plans
Ad hoc consideration of operations
objectives
PLANNING
CONTROL
Planning and control needs….
Information on Demand levels
Information on Resources
Dependent and Independent Demand
Dependent demand
e.g. input tyre store in car plant
Demand for tyres is
governed by the number of
cars planned to be made
Demand for tyres is
largely governed by
random factors
ACE
TYRES
Independent demand
e.g. tyre fitting service
Dependent and Independent Demand
-defining them
Demand = forecasts + known orders
• Dependent demand – the demand is mainly
coming from known orders.
• Independent demand – the demand is mainly
coming from forecasted figures.
P and D for the Different Types of Planning and Control
Purchase Make Deliver
D
P
Purchase Make Deliver
Purchase Make Deliver
D
P
Make to stock
Make to order
Resource
to order
P
D
Where D is demand time and P is total throughput time.
MAKE TO STOCK
Purchase
And … – ‘make-to-stock and assemble-to-order’
Planning and Control
Make Parts Assemble Deliver
D
P
Order
ASSEMBLE TO ORDER
Resource-to-order
Make-to-order
Make-to-stock
Dependent
Demand
Independent Demand
Each product or
service large
compared with
total capacity of
each operation
Each product or
service small
compared with
total capacity of
each operation
Planning and Control Activities
Sequencing
MonitoringScheduling
Loading
Are activities
going to plan?
When to do
things?
In what order
to do things?
How much
to do?
Loading
– the amount of work allocated in terms of time
Maximum time available
Normal time available Not worked
Planned time available
Planned running time Set-ups
Available time
Actual running time
Down
time
Sequencing
– the order in which the work will be tackled
Various sequencing rules are used in operations:
- Customer priority;
- Due date;
- LIFO - last in first out;
- FIFO - first in first out;
Longest operation time first;
- Shortest operation time first.
-
Scheduling
– the details on starts and finishes of jobs
Gantt Chart
• Created by American industrial engineer Henry
Gantt (1861-1919)
• In a table format
• Two dimensions-jobs (tasks) and time
• the horizontal axis is directly proportional to time
• Easy to draw and use for a day-to-day plan
JOB
Mon
6th
Tue
7th
Wed
8th
Thur
9th
Fri
10th
Mon
13th
Tue
14th
Table
Shelves
Kitchen
units
Bed
Time now
Scheduled
activity time Actual progress
Gantt Chart for Job Progress
JOB
Mon
6th
Tue
7th
Wed
8th
Thur
9th
Fri
10th
Mon
13th
Tue
14th
Wood
preparation
Assembly
Finishing
Paint
Time now
Scheduled
activity time
Actual progress
T
B
B T
S K
S S S
K
KTS
B T
Gantt Chart for Work Centers
Non- productive time
Pull and Push Control
CENTRAL OPS. PLANNING AND CONTROL SYSTEM
Work
centre
DEMANDWork
centre
Work
centre
Work
centre
Instruction on
what to make
and where to
send it
FORECAST
PULL CONTROL
Work
centre
Work
centre
Work
centre
Work
centre DEMAND
Request Request Request Request
Delivery Delivery Delivery Delivery
PUSH CONTROL
KNOWN
ORDERS
True or False
If the demand of a product is mainly from forecasts,
we call this type of demand independent demand.
Resource-to-order planning and control is used for
dealing with independent demand.
Time is the only important aspect in planning and
control activities
Summary
• The three dimensions of planning and control are:
timing, quantity (volumes) and quality
• The difference between dependent and independent
demand is the % of known orders or forecasts of the
total demand
• Types of planning and control are:
‘make-to-stock’, ‘make-to-order’, ‘resource-to-
order’, ‘make-to-stock and assemble- to-order’
• Planning and control activities are:
loading, sequencing, scheduling and monitoring

Contenu connexe

Tendances

Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 
The role of e business in supply chain management
The role of e business in supply chain managementThe role of e business in supply chain management
The role of e business in supply chain managementJohns Joseph
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)Abdulrahman El-Sayed
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect pptpulak126
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And ProductivityJoanmaines
 
Forecasting in Supply Chain
Forecasting in Supply ChainForecasting in Supply Chain
Forecasting in Supply ChainE P John
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planningsenthil.G
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...Babasab Patil
 
Demand forecasting in supply chain
Demand forecasting in supply chainDemand forecasting in supply chain
Demand forecasting in supply chainvishnuvsvn
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp ErpJoanmaines
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentAnand Jha
 

Tendances (20)

Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
The role of e business in supply chain management
The role of e business in supply chain managementThe role of e business in supply chain management
The role of e business in supply chain management
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Supply Chain Management and IT
Supply Chain Management and IT Supply Chain Management and IT
Supply Chain Management and IT
 
MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect ppt
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Forecasting in Supply Chain
Forecasting in Supply ChainForecasting in Supply Chain
Forecasting in Supply Chain
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Inventory Control & Management
Inventory Control & ManagementInventory Control & Management
Inventory Control & Management
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
 
Supply Chain Management, Basics
Supply Chain Management, BasicsSupply Chain Management, Basics
Supply Chain Management, Basics
 
Demand forecasting in supply chain
Demand forecasting in supply chainDemand forecasting in supply chain
Demand forecasting in supply chain
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Network design
Network designNetwork design
Network design
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp Erp
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain Manageent
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
 

En vedette

Alibaba Vision and Mission
Alibaba Vision and MissionAlibaba Vision and Mission
Alibaba Vision and MissionSook Yen Wong
 
Alibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewAlibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewSelf Employed
 
Alibaba One-Off Experiences Business Model
Alibaba One-Off Experiences Business ModelAlibaba One-Off Experiences Business Model
Alibaba One-Off Experiences Business ModelErwan Cipto Priyatmoko
 
The Alibaba Group Explained
The Alibaba Group ExplainedThe Alibaba Group Explained
The Alibaba Group ExplainedRanjan Roy
 
Heineken Case Study business Analysis
Heineken Case Study business AnalysisHeineken Case Study business Analysis
Heineken Case Study business Analysisjin88lin
 

En vedette (7)

case study of alibaba group
case study of alibaba groupcase study of alibaba group
case study of alibaba group
 
Alibaba Vision and Mission
Alibaba Vision and MissionAlibaba Vision and Mission
Alibaba Vision and Mission
 
Alibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewAlibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - Overview
 
Alibaba One-Off Experiences Business Model
Alibaba One-Off Experiences Business ModelAlibaba One-Off Experiences Business Model
Alibaba One-Off Experiences Business Model
 
The Alibaba Group Explained
The Alibaba Group ExplainedThe Alibaba Group Explained
The Alibaba Group Explained
 
Alibaba Global Strategy
Alibaba Global StrategyAlibaba Global Strategy
Alibaba Global Strategy
 
Heineken Case Study business Analysis
Heineken Case Study business AnalysisHeineken Case Study business Analysis
Heineken Case Study business Analysis
 

Similaire à Planing and control in general 1

Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3i4VC
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011honeysethi
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
Production management
Production managementProduction management
Production managementPurnesh Aloni
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptxvirshit
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.pptDarrajBrahim1
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesvideoaakash15
 
20141028 michael ryan ibf orlando - dp from the ground up
20141028 michael ryan   ibf orlando - dp from the ground up20141028 michael ryan   ibf orlando - dp from the ground up
20141028 michael ryan ibf orlando - dp from the ground upMichael Ryan
 
Orders and delivery dashboard
Orders and delivery dashboardOrders and delivery dashboard
Orders and delivery dashboardDharshniSuresh
 
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Lora Cecere
 
Week 10_Demand Forecasting.pdf
Week 10_Demand Forecasting.pdfWeek 10_Demand Forecasting.pdf
Week 10_Demand Forecasting.pdfssusercbc19c
 
APP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAPP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAkshatTiwari96
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptxArpanKumar79
 
Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersRootstock Software
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 

Similaire à Planing and control in general 1 (20)

Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Production management
Production managementProduction management
Production management
 
ATCO Engineering - Process Evaluation
ATCO Engineering - Process EvaluationATCO Engineering - Process Evaluation
ATCO Engineering - Process Evaluation
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
20141028 michael ryan ibf orlando - dp from the ground up
20141028 michael ryan   ibf orlando - dp from the ground up20141028 michael ryan   ibf orlando - dp from the ground up
20141028 michael ryan ibf orlando - dp from the ground up
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Orders and delivery dashboard
Orders and delivery dashboardOrders and delivery dashboard
Orders and delivery dashboard
 
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
 
Week 10_Demand Forecasting.pdf
Week 10_Demand Forecasting.pdfWeek 10_Demand Forecasting.pdf
Week 10_Demand Forecasting.pdf
 
APP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAPP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptx
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many Manufacturers
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 

Plus de Crina Feier

Introduction to the Field of Organizational Behavior Chapter 1
Introduction to the Field of Organizational Behavior Chapter 1Introduction to the Field of Organizational Behavior Chapter 1
Introduction to the Field of Organizational Behavior Chapter 1Crina Feier
 
Introduction to the Field of Organizational Behavior Chapter 2
Introduction to the Field of Organizational Behavior Chapter 2Introduction to the Field of Organizational Behavior Chapter 2
Introduction to the Field of Organizational Behavior Chapter 2Crina Feier
 
Audit and assurance
Audit and assuranceAudit and assurance
Audit and assuranceCrina Feier
 
Balanced score cards
Balanced score cardsBalanced score cards
Balanced score cardsCrina Feier
 
Performance management
Performance managementPerformance management
Performance managementCrina Feier
 
Management Notes
Management NotesManagement Notes
Management NotesCrina Feier
 
Planing and control in general
Planing and control in generalPlaning and control in general
Planing and control in generalCrina Feier
 
Knowledge Management
Knowledge ManagementKnowledge Management
Knowledge ManagementCrina Feier
 
Guidelines for mpb
Guidelines for mpbGuidelines for mpb
Guidelines for mpbCrina Feier
 
Tata steel quality movement
Tata steel   quality movementTata steel   quality movement
Tata steel quality movementCrina Feier
 
Chinese strategies
Chinese strategiesChinese strategies
Chinese strategiesCrina Feier
 
Useful definitions
Useful definitionsUseful definitions
Useful definitionsCrina Feier
 
Balanced score card guest house
Balanced score card   guest houseBalanced score card   guest house
Balanced score card guest houseCrina Feier
 

Plus de Crina Feier (20)

Lecture 2
Lecture 2Lecture 2
Lecture 2
 
Introduction to the Field of Organizational Behavior Chapter 1
Introduction to the Field of Organizational Behavior Chapter 1Introduction to the Field of Organizational Behavior Chapter 1
Introduction to the Field of Organizational Behavior Chapter 1
 
Introduction to the Field of Organizational Behavior Chapter 2
Introduction to the Field of Organizational Behavior Chapter 2Introduction to the Field of Organizational Behavior Chapter 2
Introduction to the Field of Organizational Behavior Chapter 2
 
Audit and assurance
Audit and assuranceAudit and assurance
Audit and assurance
 
Balanced score cards
Balanced score cardsBalanced score cards
Balanced score cards
 
Performance management
Performance managementPerformance management
Performance management
 
Management Notes
Management NotesManagement Notes
Management Notes
 
Planing and control in general
Planing and control in generalPlaning and control in general
Planing and control in general
 
English grammar
English grammarEnglish grammar
English grammar
 
Mukand tpm
Mukand  tpmMukand  tpm
Mukand tpm
 
Knowledge Management
Knowledge ManagementKnowledge Management
Knowledge Management
 
Guidelines for mpb
Guidelines for mpbGuidelines for mpb
Guidelines for mpb
 
Tata steel quality movement
Tata steel   quality movementTata steel   quality movement
Tata steel quality movement
 
Chinese strategies
Chinese strategiesChinese strategies
Chinese strategies
 
5 s scl
5 s scl5 s scl
5 s scl
 
Useful definitions
Useful definitionsUseful definitions
Useful definitions
 
Balanced score card guest house
Balanced score card   guest houseBalanced score card   guest house
Balanced score card guest house
 
Marketing
Marketing Marketing
Marketing
 
Innovex
InnovexInnovex
Innovex
 
Sigmaintro
SigmaintroSigmaintro
Sigmaintro
 

Dernier

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 

Dernier (20)

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 

Planing and control in general 1

  • 1. Planning and Control in General • What is planning and control? • What is difference between planning and control? • How does the nature of demand affect planning and control? • What is involved in planning and control?
  • 2. Concepts We need to Understand • dependent demand and independent demand • make-to-stock, make-to-order, resource-to- order • loading, sequencing, scheduling and monitoring • pull and push systems
  • 3. Planning and Control – Reconcile Supply and Demand Supply of products and services Planning and Control Demand for products and services Operation resources Required time, quantity and quality of products and services Customer requirements
  • 4. Planning is deciding Control is what activities should take place in the operation and their quantities when they should take place what resources should be allocated to them understanding what is actually happening in the the operation deciding whether there is a significant deviation from what should be happening (if there is deviation) changing resources in order to affect the operation’s activities Planning and Control
  • 5. Significance of planning or control Timehorizon Hours/daysDays/weeks/monthsMonths/years Medium-term Planning and Control Uses partially dissaggregated demand forecasts Determines resources and contingencies Objectives set in both financial and operations terms Long-term Planning and Control Uses aggregated demand forecasts Determines resources in aggregated form Objectives set in largely financial terms Short-term Planning and Control Uses totally dissaggregated forecasts or actual demand Makes interventions to resources to correct deviations from plans Ad hoc consideration of operations objectives PLANNING CONTROL
  • 6. Planning and control needs…. Information on Demand levels Information on Resources
  • 7. Dependent and Independent Demand Dependent demand e.g. input tyre store in car plant Demand for tyres is governed by the number of cars planned to be made Demand for tyres is largely governed by random factors ACE TYRES Independent demand e.g. tyre fitting service
  • 8. Dependent and Independent Demand -defining them Demand = forecasts + known orders • Dependent demand – the demand is mainly coming from known orders. • Independent demand – the demand is mainly coming from forecasted figures.
  • 9. P and D for the Different Types of Planning and Control Purchase Make Deliver D P Purchase Make Deliver Purchase Make Deliver D P Make to stock Make to order Resource to order P D Where D is demand time and P is total throughput time.
  • 10. MAKE TO STOCK Purchase And … – ‘make-to-stock and assemble-to-order’ Planning and Control Make Parts Assemble Deliver D P Order ASSEMBLE TO ORDER
  • 11. Resource-to-order Make-to-order Make-to-stock Dependent Demand Independent Demand Each product or service large compared with total capacity of each operation Each product or service small compared with total capacity of each operation
  • 12. Planning and Control Activities Sequencing MonitoringScheduling Loading Are activities going to plan? When to do things? In what order to do things? How much to do?
  • 13. Loading – the amount of work allocated in terms of time Maximum time available Normal time available Not worked Planned time available Planned running time Set-ups Available time Actual running time Down time
  • 14. Sequencing – the order in which the work will be tackled Various sequencing rules are used in operations: - Customer priority; - Due date; - LIFO - last in first out; - FIFO - first in first out; Longest operation time first; - Shortest operation time first. -
  • 15. Scheduling – the details on starts and finishes of jobs Gantt Chart • Created by American industrial engineer Henry Gantt (1861-1919) • In a table format • Two dimensions-jobs (tasks) and time • the horizontal axis is directly proportional to time • Easy to draw and use for a day-to-day plan
  • 18. Pull and Push Control CENTRAL OPS. PLANNING AND CONTROL SYSTEM Work centre DEMANDWork centre Work centre Work centre Instruction on what to make and where to send it FORECAST PULL CONTROL Work centre Work centre Work centre Work centre DEMAND Request Request Request Request Delivery Delivery Delivery Delivery PUSH CONTROL KNOWN ORDERS
  • 19. True or False If the demand of a product is mainly from forecasts, we call this type of demand independent demand. Resource-to-order planning and control is used for dealing with independent demand. Time is the only important aspect in planning and control activities
  • 20. Summary • The three dimensions of planning and control are: timing, quantity (volumes) and quality • The difference between dependent and independent demand is the % of known orders or forecasts of the total demand • Types of planning and control are: ‘make-to-stock’, ‘make-to-order’, ‘resource-to- order’, ‘make-to-stock and assemble- to-order’ • Planning and control activities are: loading, sequencing, scheduling and monitoring