Agenda

• Combining Lean and Six Sigma
• The Laws of Lean Six Sigma
• Deploying Lean Six Sigma




     Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Combining Lean and Six Sigma
•   The Lean Six
    Sigma Approach
    combines
    –   The DMAIC
        Methodology
        (from Six Sigma)
    –   Quality Tools
        (used in both Six
        Sigma and TPS)
    –   Lean Tools (from
        TPS)

           Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Lean and Six Sigma Tools
System                   Lean / Toyota                            Six Sigma
                          Production
                            System
Philosophy          •Elimination of                      •Reduction of
                    waste                                defects/variation

Improvement •PDCA                                        •DMAIC
Process/Cycle

Tools               VSM, 5S,                             Process Mapping,
                    Standardized Work,                   SIPOC, Hypothesis
                    Leveling, SMED,                      Testing, DOE,
                    TPM, One Piece                       Control Charts, etc.
                    Flow, Kanban, etc.

         Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
The Laws of Lean Six Sigma
                       Lean Six Sigma, George, 2002




•   Lean means speed; it applies to all processes.
•   Slow processes are expensive processes.
•   The Lean metric is process cycle efficiency
    (Value-added Time/Total Lead Time)
•   Batch sizes must be calculated using flow
    variables
•   95% of the lead times in most processes is
    wait time.
•   To improve speed, you need to identify and
    eliminate the biggest time traps using the
    Laws of Six Sigma
         Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
The Laws of Lean Six Sigma
                           Lean Six Sigma, George, 2002
•    Laws of Six Sigma
    – The Law of the Market:
       Customer CTQ (critical-to-
       quality) issues must be
       addressed first.
    – The Law of Flexibility: Process
       Velocity is directly proportional
       to flexibility.
    – The Law of Focus: 80% of the
       delay in any process is caused
       by 20% of the activities
    – The Law of Velocity: The
       average velocity of flow through
       any process is inversely
       proportional to both the number
       of “things” in the process and
       the average variation in supply
       and demand.
            Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Execution of Lean Six Sigma
1. Initiation – Top Management
   becomes engaged in supporting the
   initiative.
2. Resource and Project Selection
  •   Linked to Customer CTQ
  •   Focus on creating value (high NPV
      projects)
3. Implementation / Sustainability /
   Evolution

       Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan
•   Process
•   Organization
•   Measures
•   Rewards
•   Tools


      Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan
• Process

Org                                                               Results
                    VSM                  Projects
Goals                                                               ($)
 Select            Identify                                         Quality
Products /        Opportun-                  DMAIC                Productivity
 Value               ities                   Kaizen                Inventory
Streams           (Projects)                                      Lead-Time
                                                                     Sales
             Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan
 • Organization
                    Executive
                   Leadership
      Resources               Accountability

               Project
              Champions

             Resources             Accountability

 Master                                      Process
                     Black Belt
Black Belt                                   Owners
                      Team
                     Members
              Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan: Organization



                                MBB
                          Black Belts
                         Green Belts
                         Yellow Belts



  Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan
•       Measures
    –        Leading Indicators
         •      # of champions
                identified
         •      # of BB/GB identified
                and trained
         •      Size and value of
                project queue
    –        Financial
             Improvements linked
             to each initiative
         •      Quality
         •      Productivity
         •      Inventory
         •      Lead-Time
         •      Sales



                Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
Deployment Plan
•   Rewards
    – Bonuses tied to
      project performance
      (savings generated)
      for team
      leaders/participants.
    – Recognition –
      visible support from
      executives


         Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved

Contenu connexe

Tendances

Lean Management
Lean ManagementLean Management
Lean ManagementPeter Klym
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingQualsys Ltd
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides SlideTeam
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageAnand Subramaniam
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingOperational Excellence Consulting
 
Six Sigma Principles And Concepts PowerPoint Presentation Slides
Six Sigma Principles And Concepts PowerPoint Presentation SlidesSix Sigma Principles And Concepts PowerPoint Presentation Slides
Six Sigma Principles And Concepts PowerPoint Presentation SlidesSlideTeam
 
Lean 6 Sigma Training | By ex-Deloitte & McKinsey Consultants
Lean 6 Sigma Training | By ex-Deloitte & McKinsey ConsultantsLean 6 Sigma Training | By ex-Deloitte & McKinsey Consultants
Lean 6 Sigma Training | By ex-Deloitte & McKinsey ConsultantsAurelien Domont, MBA
 

Tendances (20)

Lean Management
Lean ManagementLean Management
Lean Management
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
Basics of Six Sigma
Basics of Six SigmaBasics of Six Sigma
Basics of Six Sigma
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners training
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Lean Six Sigma
Lean Six SigmaLean Six Sigma
Lean Six Sigma
 
Six Sigma Principles And Concepts PowerPoint Presentation Slides
Six Sigma Principles And Concepts PowerPoint Presentation SlidesSix Sigma Principles And Concepts PowerPoint Presentation Slides
Six Sigma Principles And Concepts PowerPoint Presentation Slides
 
Lean 6 Sigma Training | By ex-Deloitte & McKinsey Consultants
Lean 6 Sigma Training | By ex-Deloitte & McKinsey ConsultantsLean 6 Sigma Training | By ex-Deloitte & McKinsey Consultants
Lean 6 Sigma Training | By ex-Deloitte & McKinsey Consultants
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
Dmaic
DmaicDmaic
Dmaic
 

Similaire à Lean Six Sigma Implementation

Lean and the Extended Value Stream
Lean and the Extended Value StreamLean and the Extended Value Stream
Lean and the Extended Value StreamDarren Dolcemascolo
 
Business Improvement Overview
Business Improvement OverviewBusiness Improvement Overview
Business Improvement OverviewDr. Filiep Samyn
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management SkillsJessica Booth
 
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02youzitang
 
Dnv Improving Your Process Performances With Agile
Dnv   Improving Your Process Performances With AgileDnv   Improving Your Process Performances With Agile
Dnv Improving Your Process Performances With AgileGeorge Ang
 
Integrating agiledevsixsigmabp mandcm-presented
Integrating agiledevsixsigmabp mandcm-presentedIntegrating agiledevsixsigmabp mandcm-presented
Integrating agiledevsixsigmabp mandcm-presenteddrewz lin
 
Using Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk ImprovementsUsing Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk Improvementskirkholmes11
 
Lean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaLean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaDarren Dolcemascolo
 
PMI Auckland 09 May: Agile Overview
PMI Auckland 09 May: Agile OverviewPMI Auckland 09 May: Agile Overview
PMI Auckland 09 May: Agile OverviewCarolyn Sanders
 
Using Six Sigma to Drive Tangible Service Desk Improvement and Savings
Using Six Sigma to Drive Tangible Service Desk Improvement and SavingsUsing Six Sigma to Drive Tangible Service Desk Improvement and Savings
Using Six Sigma to Drive Tangible Service Desk Improvement and SavingsITSM Academy, Inc.
 
Key strategies for discrete manufacturers j caie arc japan 2008
Key strategies for discrete manufacturers j caie arc japan 2008Key strategies for discrete manufacturers j caie arc japan 2008
Key strategies for discrete manufacturers j caie arc japan 2008ARC Advisory Group
 
Laurent Tarin B P M Ilog
Laurent  Tarin    B P M  IlogLaurent  Tarin    B P M  Ilog
Laurent Tarin B P M IlogSOA Symposium
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practicesSugarCRM
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeArvind Rajan
 
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessGoverning Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessTechWell
 
Enterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy RogersEnterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy Rogerstrogers77
 
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1jonathanwiesman_1
 

Similaire à Lean Six Sigma Implementation (20)

Six sigma orntn
Six sigma orntnSix sigma orntn
Six sigma orntn
 
Lean and the Extended Value Stream
Lean and the Extended Value StreamLean and the Extended Value Stream
Lean and the Extended Value Stream
 
Business Improvement Overview
Business Improvement OverviewBusiness Improvement Overview
Business Improvement Overview
 
Lean in a Lean Economy
Lean in a Lean EconomyLean in a Lean Economy
Lean in a Lean Economy
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management Skills
 
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
Ppwithagileyannhamonqconbeijing 090423081417-phpapp02
 
Dnv Improving Your Process Performances With Agile
Dnv   Improving Your Process Performances With AgileDnv   Improving Your Process Performances With Agile
Dnv Improving Your Process Performances With Agile
 
Integrating agiledevsixsigmabp mandcm-presented
Integrating agiledevsixsigmabp mandcm-presentedIntegrating agiledevsixsigmabp mandcm-presented
Integrating agiledevsixsigmabp mandcm-presented
 
Using Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk ImprovementsUsing Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk Improvements
 
Lean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six SigmaLean Manufacturing and Lean Six Sigma
Lean Manufacturing and Lean Six Sigma
 
PMI Auckland 09 May: Agile Overview
PMI Auckland 09 May: Agile OverviewPMI Auckland 09 May: Agile Overview
PMI Auckland 09 May: Agile Overview
 
Using Six Sigma to Drive Tangible Service Desk Improvement and Savings
Using Six Sigma to Drive Tangible Service Desk Improvement and SavingsUsing Six Sigma to Drive Tangible Service Desk Improvement and Savings
Using Six Sigma to Drive Tangible Service Desk Improvement and Savings
 
Key strategies for discrete manufacturers j caie arc japan 2008
Key strategies for discrete manufacturers j caie arc japan 2008Key strategies for discrete manufacturers j caie arc japan 2008
Key strategies for discrete manufacturers j caie arc japan 2008
 
Laurent Tarin B P M Ilog
Laurent  Tarin    B P M  IlogLaurent  Tarin    B P M  Ilog
Laurent Tarin B P M Ilog
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practices
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
 
Neil Potter Presentation
Neil Potter Presentation Neil Potter Presentation
Neil Potter Presentation
 
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessGoverning Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
 
Enterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy RogersEnterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy Rogers
 
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
 

Dernier

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Dernier (20)

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Lean Six Sigma Implementation

  • 1. Lean Six Sigma Implementation Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 2. Agenda • Combining Lean and Six Sigma • The Laws of Lean Six Sigma • Deploying Lean Six Sigma Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 3. Combining Lean and Six Sigma • The Lean Six Sigma Approach combines – The DMAIC Methodology (from Six Sigma) – Quality Tools (used in both Six Sigma and TPS) – Lean Tools (from TPS) Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 4. Lean and Six Sigma Tools System Lean / Toyota Six Sigma Production System Philosophy •Elimination of •Reduction of waste defects/variation Improvement •PDCA •DMAIC Process/Cycle Tools VSM, 5S, Process Mapping, Standardized Work, SIPOC, Hypothesis Leveling, SMED, Testing, DOE, TPM, One Piece Control Charts, etc. Flow, Kanban, etc. Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 5. The Laws of Lean Six Sigma Lean Six Sigma, George, 2002 • Lean means speed; it applies to all processes. • Slow processes are expensive processes. • The Lean metric is process cycle efficiency (Value-added Time/Total Lead Time) • Batch sizes must be calculated using flow variables • 95% of the lead times in most processes is wait time. • To improve speed, you need to identify and eliminate the biggest time traps using the Laws of Six Sigma Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 6. The Laws of Lean Six Sigma Lean Six Sigma, George, 2002 • Laws of Six Sigma – The Law of the Market: Customer CTQ (critical-to- quality) issues must be addressed first. – The Law of Flexibility: Process Velocity is directly proportional to flexibility. – The Law of Focus: 80% of the delay in any process is caused by 20% of the activities – The Law of Velocity: The average velocity of flow through any process is inversely proportional to both the number of “things” in the process and the average variation in supply and demand. Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 7. Execution of Lean Six Sigma 1. Initiation – Top Management becomes engaged in supporting the initiative. 2. Resource and Project Selection • Linked to Customer CTQ • Focus on creating value (high NPV projects) 3. Implementation / Sustainability / Evolution Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 8. Deployment Plan • Process • Organization • Measures • Rewards • Tools Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 9. Deployment Plan • Process Org Results VSM Projects Goals ($) Select Identify Quality Products / Opportun- DMAIC Productivity Value ities Kaizen Inventory Streams (Projects) Lead-Time Sales Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 10. Deployment Plan • Organization Executive Leadership Resources Accountability Project Champions Resources Accountability Master Process Black Belt Black Belt Owners Team Members Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 11. Deployment Plan: Organization MBB Black Belts Green Belts Yellow Belts Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 12. Deployment Plan • Measures – Leading Indicators • # of champions identified • # of BB/GB identified and trained • Size and value of project queue – Financial Improvements linked to each initiative • Quality • Productivity • Inventory • Lead-Time • Sales Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved
  • 13. Deployment Plan • Rewards – Bonuses tied to project performance (savings generated) for team leaders/participants. – Recognition – visible support from executives Copyright © 2005-2008 EMS Consulting Group Inc. All Rights Reserved