SlideShare une entreprise Scribd logo
1  sur  4
Sudden three phase short circuit test
Table of Content:
1 Objective..........................................................................................................
2 Scope...............................................................................................................
3 Referenced documents....................................................................................
4 Terms and abbreviations..................................................................................
5 Sudden three-phase short-circuit test...............................................................
5.1 Preparations...................................................................................................
5.2 Conduction of test..........................................................................................
5.3 Evaluation of the test......................................................................................
6 Proceeding in case of deviations ......................................................................
7 Copyright............................................................................................................
1 Objective
The sudden three-phase short-circuit test is performed to determine the following
machine quantities:
- Direct-axis transient reactance Xd'
- Direct-axis subtransient reactance Xd"
- Direct-axis transient short-circuit time constant Td'
- Direct-axis subtransient short-circuit time constant Td"
- Armature short-circuit time constant Ta.
- Evidence of mechanical strength
2 Scope
This procedure applies to all types of synchronous machines during final inspections at
site or in the workshop.
3 Referenced documents
IEC 34-4, 40-41 Rotating electrical machines – Methods for determining
Synchronous machine quantities from tests
IEEE 115, 11.7 Test Procedures for synchronous machines
EN 60034-4 Rotating electrical machines - Methods for determining
Synchronous machine quantities from tests
4 Terms and abbreviations
none
5 Sudden three-phase short-circuit test
5.1 Preparations
Visual inspections:
- End winding supports
- Condition of foundation
- Are the foundation bolts tightened?
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 1 of 4
- Correct assembly and fixation of all rotor components
- Disconnect the line terminals from the terminal buses (may not be necessary in all
cases).
- Connect the power cable between the line terminals and the circuit breaker, which is
used to make the short-circuit and install measuring devices for recording the short-
circuit currents in wye-connection.
Note: Normally the plant circuit breaker will be used for this purpose. To install a
separate
short-circuit breaker in the plant requires high efforts and good coordination between the
user of the plant and the generator manufacturer, as well as considerable extra costs.
In the workshop a special short-circuit breaker with synchronized phases is used. The
short circuit itself can be made with a special bar across the terminal buses or a
disconnector installed in the current leads (e.g. braking disconnector). This is placed
after the circuit breaker and is inserted before switching in the circuit breaker. Consider
that it is designed to support the current forces and can carry the substained short circuit
current during the recording time.
-
For current transformation the following equipment may be alternatively used:
- Linearized current transformers
- Low inductance precision shunts
- Unlock protection relays as required.
- Remove the grounding cable of the neutral terminals and directly connect the common
terminal of the three-phase short-circuit wye to ground.
- Attach a voltmeter and potential transformer to the generator line terminals (if required)
to measure the armature voltage prior to the sudden short-circuit.
- Connect and set the precision instruments for measuring the terminal voltage and field
current.
Note: The following analog- or digital instruments or equivalent (at least 4 channels) may
be used for recording purposes:
- Digital storage oscilloscope (Hioki 8855)
- Memory Recorder (YEW AR 1100 A)
- Memory Recorder (YEW DL 708)
- Connect the output signals of the current transformer (CT) or equivalent to the
recorder, whereby the current signal of the CT is converted into a voltage signal required
for the digital storage oscilloscope using precision shunts.
- Calibrate and set the trigger of the recording instruments to the expected levels.
5.2 Conduction of test
- Operate the unit at rated speed in no-load condition with the manual control of the
excitation system. In case of static excitation set the ignition anlge of the gate trigger
pulse to achieve the required generator voltage. Neither a current regulator (for the field
current) nor a voltage regulator (for the generator voltage) may be switched on.
Note: If a prime mover is not available, this test can also be performed by retardation
method, initiating the sudden short-circuit, when the decelerating machine passes
through nominal speed.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 2 of 4
- Supply small field current and then initiate a trial run of the sudden short-circuit test.
Verify that recorders are triggered and all signals are recorded properly.
- Adjust the excitation to the desired value of the terminal voltage.
Note: The usual test voltage is approx. 0.5 Un. The test may be repeated at various open
circuit voltages as required by the contract. For voltages exceeding this limit value,
explicit agreement of the turbine manufacturer should be reached. Through the machine
set must withstand the short-circuit forces, there is a high risk of damages to the
foundation (especially in case of bulb-type generators). Therefore it is not recommended
to perform a 100% Un sudden short-circuit directly at all stator terminals. Consider that
machine life endurance may be reduced.
- Read off the terminal voltage, frequency and field current immediately before
performing the sudden short circuit test. If still free channels are available on the digital
storage oscilloscope, at least the phase-to-phase voltage of the generator should be
recorded by oscilloscope.
- Close the circuit breaker in order to initiate the sudden short-circuits. Recording
instruments will be triggered and the three armature currents, the field current and the
voltage going to zero should be recorded continuously.
- After approx. 10 sec. record the armature currents manually, then switch off the
excitation and open the circuit breaker.
- Check the recordings in order to ensure that the data was registrated correctly.
Performed by: GP-QS1
5.3 Evaluation of the test
- Mathematical evaluation acc. to IEC-standard.
Note: Since the sudden short-circuit test is mainly performed with reduced voltages, in
general only unsaturated values for the reactance’s can be determined. Saturated
values should be estimated from the calculation values.
- The evaluation of analog short-circuit current characteristics can only be done by hand.
- Digital storage data may be computer evaluated, using a special program for
separating the envelope of the current waveform into 2 exponential functions.
- If a 100% Un sudden short-circuit is performed at the generator terminals (only after
agreement with the customer), despite of the prohibitive aspects mentioned, thorough
visual inspection for cracks, permanent deformations and any other damages shall be
made after the test.
e.g.:
- End winding support
- Condition of winding (ties, spacers …)
- Condition of foundation
- Foundation bolts
- Assembly and fixation of rotor components
- Acc. to international standards, a repetition of the voltage test, preferably 80% of test
voltage, are recommended.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 3 of 4
6 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc. given in an
instruction is intended to serve for quality purposes only. In case of deviations, a non-
conformity report has to be written acc. to PNG Power Standard
7 Copyright
This Document is properly of PNG Power internal use only and must neither be copied.
Neither is it to be handed over nor in other way communicated to a third party.
Infringement will lead to prosecution.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 4 of 4

Contenu connexe

Tendances

Instalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_iInstalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_iwagner26
 
Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)JUAN AGUILAR
 
Root Locus Plot
Root Locus Plot Root Locus Plot
Root Locus Plot Hussain K
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sightDHAVALKUMAR JULASANA
 
Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02neomindx
 
Experiment no. 2
Experiment no. 2Experiment no. 2
Experiment no. 2Suhas Chate
 
Stabiltiy & R-H Ccriterion
Stabiltiy & R-H CcriterionStabiltiy & R-H Ccriterion
Stabiltiy & R-H CcriterionHussain K
 
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G. CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G. Hemersson
 
RETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADORETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADOMaycon Dias
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometerstadi1padma
 
Single phase full bridge inverter
Single phase full bridge inverterSingle phase full bridge inverter
Single phase full bridge inverterNisarg Amin
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan Reddy
 
Three phase voltage source inverter
Three phase voltage source inverterThree phase voltage source inverter
Three phase voltage source invertertamilnesaner
 
tutorial_pscad.pptx
tutorial_pscad.pptxtutorial_pscad.pptx
tutorial_pscad.pptxdfddfdf5
 
Dual and cyclo converter
Dual and cyclo converterDual and cyclo converter
Dual and cyclo converterRutika Abhang
 

Tendances (20)

Instalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_iInstalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_i
 
Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)
 
Root Locus Plot
Root Locus Plot Root Locus Plot
Root Locus Plot
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
EMI-tansducers
EMI-tansducersEMI-tansducers
EMI-tansducers
 
Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02
 
Experiment no. 2
Experiment no. 2Experiment no. 2
Experiment no. 2
 
Static relay
Static relayStatic relay
Static relay
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
Stabiltiy & R-H Ccriterion
Stabiltiy & R-H CcriterionStabiltiy & R-H Ccriterion
Stabiltiy & R-H Ccriterion
 
Triac and diac
Triac and diacTriac and diac
Triac and diac
 
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G. CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
 
RETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADORETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADO
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
 
Single phase full bridge inverter
Single phase full bridge inverterSingle phase full bridge inverter
Single phase full bridge inverter
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
 
Three phase voltage source inverter
Three phase voltage source inverterThree phase voltage source inverter
Three phase voltage source inverter
 
tutorial_pscad.pptx
tutorial_pscad.pptxtutorial_pscad.pptx
tutorial_pscad.pptx
 
Dual and cyclo converter
Dual and cyclo converterDual and cyclo converter
Dual and cyclo converter
 

En vedette

Deep bar n double cage rotors
Deep bar n double cage rotorsDeep bar n double cage rotors
Deep bar n double cage rotorsManish Sahu
 
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011Jesse Warden
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notesAcot Benard
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Corona presentation
Corona presentationCorona presentation
Corona presentationBriana Leigh
 
Electrical Heating 01 - 03
Electrical Heating 01 - 03Electrical Heating 01 - 03
Electrical Heating 01 - 03Vijay Raskar
 
Electrical power ecx3232 lab report
Electrical power ecx3232 lab reportElectrical power ecx3232 lab report
Electrical power ecx3232 lab reportSandun Perera
 
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007Viren Pandya
 
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topicsCorona effect, corona ring and any other topics
Corona effect, corona ring and any other topicsMithilesh Raj
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heatingpopet
 
Electrical Heating 01-03
Electrical Heating 01-03Electrical Heating 01-03
Electrical Heating 01-03Vijay Raskar
 
Series and parallel circuit
Series and parallel circuitSeries and parallel circuit
Series and parallel circuitNoman Rajput
 
Chapter 4 synchronous machine
Chapter 4 synchronous machineChapter 4 synchronous machine
Chapter 4 synchronous machinemkazree
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine labDHEERAJ DHAKAR
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformerPooja Dubey
 

En vedette (20)

Deep bar n double cage rotors
Deep bar n double cage rotorsDeep bar n double cage rotors
Deep bar n double cage rotors
 
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Corona presentation
Corona presentationCorona presentation
Corona presentation
 
Corona1
Corona1Corona1
Corona1
 
Short circuit
Short circuit   Short circuit
Short circuit
 
Electrical Heating 01 - 03
Electrical Heating 01 - 03Electrical Heating 01 - 03
Electrical Heating 01 - 03
 
Seminar
SeminarSeminar
Seminar
 
Heating ppt
Heating pptHeating ppt
Heating ppt
 
Electrical power ecx3232 lab report
Electrical power ecx3232 lab reportElectrical power ecx3232 lab report
Electrical power ecx3232 lab report
 
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007
 
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topicsCorona effect, corona ring and any other topics
Corona effect, corona ring and any other topics
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heating
 
Electrical Heating 01-03
Electrical Heating 01-03Electrical Heating 01-03
Electrical Heating 01-03
 
Series and parallel circuit
Series and parallel circuitSeries and parallel circuit
Series and parallel circuit
 
Chapter 4 synchronous machine
Chapter 4 synchronous machineChapter 4 synchronous machine
Chapter 4 synchronous machine
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformer
 

Similaire à Sudden three phase short-circuit test

Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constantDonald Stephen
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfeShikhon
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"Teja venkat
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comDien Ha The
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji ElectricCTY TNHH HẠO PHƯƠNG
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker OperationIRJET Journal
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Kyoritsu India
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Kyoritsu India
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxssuser27df19
 
The Intellectual Automated Substation
The Intellectual Automated SubstationThe Intellectual Automated Substation
The Intellectual Automated Substationijtsrd
 
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...EG TECHNOLOGIES
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Marlon Torres
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comDien Ha The
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Toàn Huỳnh
 

Similaire à Sudden three phase short-circuit test (20)

Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"
 
Abb lv breakers working with trip curves
Abb lv breakers working with trip curvesAbb lv breakers working with trip curves
Abb lv breakers working with trip curves
 
Hioki solution car_industry_ denkei
Hioki solution car_industry_ denkeiHioki solution car_industry_ denkei
Hioki solution car_industry_ denkei
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
 
Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
 
The Intellectual Automated Substation
The Intellectual Automated SubstationThe Intellectual Automated Substation
The Intellectual Automated Substation
 
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
 
lm555.pdf
lm555.pdflm555.pdf
lm555.pdf
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
 

Plus de Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr testDonald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setupDonald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta testDonald Stephen
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit testDonald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testingDonald Stephen
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance testDonald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windingsDonald Stephen
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodDonald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejectionDonald Stephen
 

Plus de Donald Stephen (20)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Load test
Load testLoad test
Load test
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit test
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
High potential test
High potential testHigh potential test
High potential test
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 
Crack monitor
Crack monitorCrack monitor
Crack monitor
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
 

Dernier

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 

Dernier (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Sudden three phase short-circuit test

  • 1. Sudden three phase short circuit test Table of Content: 1 Objective.......................................................................................................... 2 Scope............................................................................................................... 3 Referenced documents.................................................................................... 4 Terms and abbreviations.................................................................................. 5 Sudden three-phase short-circuit test............................................................... 5.1 Preparations................................................................................................... 5.2 Conduction of test.......................................................................................... 5.3 Evaluation of the test...................................................................................... 6 Proceeding in case of deviations ...................................................................... 7 Copyright............................................................................................................ 1 Objective The sudden three-phase short-circuit test is performed to determine the following machine quantities: - Direct-axis transient reactance Xd' - Direct-axis subtransient reactance Xd" - Direct-axis transient short-circuit time constant Td' - Direct-axis subtransient short-circuit time constant Td" - Armature short-circuit time constant Ta. - Evidence of mechanical strength 2 Scope This procedure applies to all types of synchronous machines during final inspections at site or in the workshop. 3 Referenced documents IEC 34-4, 40-41 Rotating electrical machines – Methods for determining Synchronous machine quantities from tests IEEE 115, 11.7 Test Procedures for synchronous machines EN 60034-4 Rotating electrical machines - Methods for determining Synchronous machine quantities from tests 4 Terms and abbreviations none 5 Sudden three-phase short-circuit test 5.1 Preparations Visual inspections: - End winding supports - Condition of foundation - Are the foundation bolts tightened? 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 1 of 4
  • 2. - Correct assembly and fixation of all rotor components - Disconnect the line terminals from the terminal buses (may not be necessary in all cases). - Connect the power cable between the line terminals and the circuit breaker, which is used to make the short-circuit and install measuring devices for recording the short- circuit currents in wye-connection. Note: Normally the plant circuit breaker will be used for this purpose. To install a separate short-circuit breaker in the plant requires high efforts and good coordination between the user of the plant and the generator manufacturer, as well as considerable extra costs. In the workshop a special short-circuit breaker with synchronized phases is used. The short circuit itself can be made with a special bar across the terminal buses or a disconnector installed in the current leads (e.g. braking disconnector). This is placed after the circuit breaker and is inserted before switching in the circuit breaker. Consider that it is designed to support the current forces and can carry the substained short circuit current during the recording time. - For current transformation the following equipment may be alternatively used: - Linearized current transformers - Low inductance precision shunts - Unlock protection relays as required. - Remove the grounding cable of the neutral terminals and directly connect the common terminal of the three-phase short-circuit wye to ground. - Attach a voltmeter and potential transformer to the generator line terminals (if required) to measure the armature voltage prior to the sudden short-circuit. - Connect and set the precision instruments for measuring the terminal voltage and field current. Note: The following analog- or digital instruments or equivalent (at least 4 channels) may be used for recording purposes: - Digital storage oscilloscope (Hioki 8855) - Memory Recorder (YEW AR 1100 A) - Memory Recorder (YEW DL 708) - Connect the output signals of the current transformer (CT) or equivalent to the recorder, whereby the current signal of the CT is converted into a voltage signal required for the digital storage oscilloscope using precision shunts. - Calibrate and set the trigger of the recording instruments to the expected levels. 5.2 Conduction of test - Operate the unit at rated speed in no-load condition with the manual control of the excitation system. In case of static excitation set the ignition anlge of the gate trigger pulse to achieve the required generator voltage. Neither a current regulator (for the field current) nor a voltage regulator (for the generator voltage) may be switched on. Note: If a prime mover is not available, this test can also be performed by retardation method, initiating the sudden short-circuit, when the decelerating machine passes through nominal speed. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 2 of 4
  • 3. - Supply small field current and then initiate a trial run of the sudden short-circuit test. Verify that recorders are triggered and all signals are recorded properly. - Adjust the excitation to the desired value of the terminal voltage. Note: The usual test voltage is approx. 0.5 Un. The test may be repeated at various open circuit voltages as required by the contract. For voltages exceeding this limit value, explicit agreement of the turbine manufacturer should be reached. Through the machine set must withstand the short-circuit forces, there is a high risk of damages to the foundation (especially in case of bulb-type generators). Therefore it is not recommended to perform a 100% Un sudden short-circuit directly at all stator terminals. Consider that machine life endurance may be reduced. - Read off the terminal voltage, frequency and field current immediately before performing the sudden short circuit test. If still free channels are available on the digital storage oscilloscope, at least the phase-to-phase voltage of the generator should be recorded by oscilloscope. - Close the circuit breaker in order to initiate the sudden short-circuits. Recording instruments will be triggered and the three armature currents, the field current and the voltage going to zero should be recorded continuously. - After approx. 10 sec. record the armature currents manually, then switch off the excitation and open the circuit breaker. - Check the recordings in order to ensure that the data was registrated correctly. Performed by: GP-QS1 5.3 Evaluation of the test - Mathematical evaluation acc. to IEC-standard. Note: Since the sudden short-circuit test is mainly performed with reduced voltages, in general only unsaturated values for the reactance’s can be determined. Saturated values should be estimated from the calculation values. - The evaluation of analog short-circuit current characteristics can only be done by hand. - Digital storage data may be computer evaluated, using a special program for separating the envelope of the current waveform into 2 exponential functions. - If a 100% Un sudden short-circuit is performed at the generator terminals (only after agreement with the customer), despite of the prohibitive aspects mentioned, thorough visual inspection for cracks, permanent deformations and any other damages shall be made after the test. e.g.: - End winding support - Condition of winding (ties, spacers …) - Condition of foundation - Foundation bolts - Assembly and fixation of rotor components - Acc. to international standards, a repetition of the voltage test, preferably 80% of test voltage, are recommended. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 3 of 4
  • 4. 6 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc. given in an instruction is intended to serve for quality purposes only. In case of deviations, a non- conformity report has to be written acc. to PNG Power Standard 7 Copyright This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 4 of 4