Soumettre la recherche
Mettre en ligne
Sudden three phase short-circuit test
•
Télécharger en tant que DOC, PDF
•
1 j'aime
•
3,762 vues
Donald Stephen
Suivre
Ingénierie
Business
Signaler
Partager
Signaler
Partager
1 sur 4
Télécharger maintenant
Recommandé
Estudos de Controle - Aula 5: Espaço de Estados
Estudos de Controle - Aula 5: Espaço de Estados
Lab. de Sistemas Embarcados Críticos - ICMC/USP
Voltage Source Inverter
Voltage Source Inverter
PreetamJadhav2
Automatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modelling
rajani51
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent test
Donald Stephen
power system analysis PPT
power system analysis PPT
Ziyaulhaq
Symmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
michaeljmack
inversor de frequencia
inversor de frequencia
Renato Amorim
zero cross detector.pptx
zero cross detector.pptx
Aman bharti
Recommandé
Estudos de Controle - Aula 5: Espaço de Estados
Estudos de Controle - Aula 5: Espaço de Estados
Lab. de Sistemas Embarcados Críticos - ICMC/USP
Voltage Source Inverter
Voltage Source Inverter
PreetamJadhav2
Automatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modelling
rajani51
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent test
Donald Stephen
power system analysis PPT
power system analysis PPT
Ziyaulhaq
Symmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
michaeljmack
inversor de frequencia
inversor de frequencia
Renato Amorim
zero cross detector.pptx
zero cross detector.pptx
Aman bharti
Instalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_i
wagner26
Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)
JUAN AGUILAR
Root Locus Plot
Root Locus Plot
Hussain K
Transformer testing on sight and off sight
Transformer testing on sight and off sight
DHAVALKUMAR JULASANA
EMI-tansducers
EMI-tansducers
Ðîgëñ Tàìlør
Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02
neomindx
Experiment no. 2
Experiment no. 2
Suhas Chate
Static relay
Static relay
jawaharramaya
Buchholz relay
Buchholz relay
malay ranjan
Stabiltiy & R-H Ccriterion
Stabiltiy & R-H Ccriterion
Hussain K
Triac and diac
Triac and diac
taranjeet10
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
Hemersson
RETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADO
Maycon Dias
ECNG 6503 #2
ECNG 6503 #2
Chandrabhan Sharma
DC potentiometers
DC potentiometers
tadi1padma
Single phase full bridge inverter
Single phase full bridge inverter
Nisarg Amin
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
Janardhan Reddy
Three phase voltage source inverter
Three phase voltage source inverter
tamilnesaner
tutorial_pscad.pptx
tutorial_pscad.pptx
dfddfdf5
Dual and cyclo converter
Dual and cyclo converter
Rutika Abhang
Deep bar n double cage rotors
Deep bar n double cage rotors
Manish Sahu
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Jesse Warden
Contenu connexe
Tendances
Instalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_i
wagner26
Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)
JUAN AGUILAR
Root Locus Plot
Root Locus Plot
Hussain K
Transformer testing on sight and off sight
Transformer testing on sight and off sight
DHAVALKUMAR JULASANA
EMI-tansducers
EMI-tansducers
Ðîgëñ Tàìlør
Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02
neomindx
Experiment no. 2
Experiment no. 2
Suhas Chate
Static relay
Static relay
jawaharramaya
Buchholz relay
Buchholz relay
malay ranjan
Stabiltiy & R-H Ccriterion
Stabiltiy & R-H Ccriterion
Hussain K
Triac and diac
Triac and diac
taranjeet10
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
Hemersson
RETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADO
Maycon Dias
ECNG 6503 #2
ECNG 6503 #2
Chandrabhan Sharma
DC potentiometers
DC potentiometers
tadi1padma
Single phase full bridge inverter
Single phase full bridge inverter
Nisarg Amin
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
Janardhan Reddy
Three phase voltage source inverter
Three phase voltage source inverter
tamilnesaner
tutorial_pscad.pptx
tutorial_pscad.pptx
dfddfdf5
Dual and cyclo converter
Dual and cyclo converter
Rutika Abhang
Tendances
(20)
Instalações elétricas industriais_slides_parte_i
Instalações elétricas industriais_slides_parte_i
Convertidores dc-dc (Colección apuntes UJA 96/97)
Convertidores dc-dc (Colección apuntes UJA 96/97)
Root Locus Plot
Root Locus Plot
Transformer testing on sight and off sight
Transformer testing on sight and off sight
EMI-tansducers
EMI-tansducers
Powerelectronicsnote 121011031400-phpapp02
Powerelectronicsnote 121011031400-phpapp02
Experiment no. 2
Experiment no. 2
Static relay
Static relay
Buchholz relay
Buchholz relay
Stabiltiy & R-H Ccriterion
Stabiltiy & R-H Ccriterion
Triac and diac
Triac and diac
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
CIRCUITOS ELECTRICOS ING. O . MORALES . G.
RETIFICADOR TRIFÁSICO CONTROLADO
RETIFICADOR TRIFÁSICO CONTROLADO
ECNG 6503 #2
ECNG 6503 #2
DC potentiometers
DC potentiometers
Single phase full bridge inverter
Single phase full bridge inverter
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
Three phase voltage source inverter
Three phase voltage source inverter
tutorial_pscad.pptx
tutorial_pscad.pptx
Dual and cyclo converter
Dual and cyclo converter
En vedette
Deep bar n double cage rotors
Deep bar n double cage rotors
Manish Sahu
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Jesse Warden
Ee423 fault analysis_notes
Ee423 fault analysis_notes
Acot Benard
Open circuit saturation test
Open circuit saturation test
Donald Stephen
Corona presentation
Corona presentation
Briana Leigh
Corona1
Corona1
Abhinay Potlabathini
Short circuit
Short circuit
Maria Romina Angustia
Electrical Heating 01 - 03
Electrical Heating 01 - 03
Vijay Raskar
Seminar
Seminar
aliyu aliyu
Heating ppt
Heating ppt
Prabhakar Naik
Electrical power ecx3232 lab report
Electrical power ecx3232 lab report
Sandun Perera
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007
Viren Pandya
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topics
Mithilesh Raj
Protection of alternator
Protection of alternator
Biswajit Pratihari
Electrical Heating
Electrical Heating
popet
Electrical Heating 01-03
Electrical Heating 01-03
Vijay Raskar
Series and parallel circuit
Series and parallel circuit
Noman Rajput
Chapter 4 synchronous machine
Chapter 4 synchronous machine
mkazree
Electrical machine lab
Electrical machine lab
DHEERAJ DHAKAR
Sc and oc test on transformer
Sc and oc test on transformer
Pooja Dubey
En vedette
(20)
Deep bar n double cage rotors
Deep bar n double cage rotors
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Ee423 fault analysis_notes
Ee423 fault analysis_notes
Open circuit saturation test
Open circuit saturation test
Corona presentation
Corona presentation
Corona1
Corona1
Short circuit
Short circuit
Electrical Heating 01 - 03
Electrical Heating 01 - 03
Seminar
Seminar
Heating ppt
Heating ppt
Electrical power ecx3232 lab report
Electrical power ecx3232 lab report
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topics
Protection of alternator
Protection of alternator
Electrical Heating
Electrical Heating
Electrical Heating 01-03
Electrical Heating 01-03
Series and parallel circuit
Series and parallel circuit
Chapter 4 synchronous machine
Chapter 4 synchronous machine
Electrical machine lab
Electrical machine lab
Sc and oc test on transformer
Sc and oc test on transformer
Similaire à Sudden three phase short-circuit test
Determination of the transient open circuit time constant
Determination of the transient open circuit time constant
Donald Stephen
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
eShikhon
project presentation on "THMC"
project presentation on "THMC"
Teja venkat
Abb lv breakers working with trip curves
Abb lv breakers working with trip curves
Luis Antonio González Mederos
Hioki solution car_industry_ denkei
Hioki solution car_industry_ denkei
NIHON DENKEI SINGAPORE
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
Irwing Sanchez
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Dien Ha The
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
CTY TNHH HẠO PHƯƠNG
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET Journal
Unit 6 power quality
Unit 6 power quality
hariyenireddy1
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Kyoritsu India
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Kyoritsu India
Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310
CTY TNHH HẠO PHƯƠNG
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
ssuser27df19
The Intellectual Automated Substation
The Intellectual Automated Substation
ijtsrd
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...
EG TECHNOLOGIES
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
Marlon Torres
lm555.pdf
lm555.pdf
Slides51
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
Dien Ha The
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
Toàn Huỳnh
Similaire à Sudden three phase short-circuit test
(20)
Determination of the transient open circuit time constant
Determination of the transient open circuit time constant
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
project presentation on "THMC"
project presentation on "THMC"
Abb lv breakers working with trip curves
Abb lv breakers working with trip curves
Hioki solution car_industry_ denkei
Hioki solution car_industry_ denkei
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
Unit 6 power quality
Unit 6 power quality
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
The Intellectual Automated Substation
The Intellectual Automated Substation
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
lm555.pdf
lm555.pdf
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
Plus de Donald Stephen
Tangent delta test report form
Tangent delta test report form
Donald Stephen
Stator insulation test setup
Stator insulation test setup
Donald Stephen
Stator core induction test
Stator core induction test
Donald Stephen
Stator core compr test
Stator core compr test
Donald Stephen
Rotor insul test setup
Rotor insul test setup
Donald Stephen
Noise measurement
Noise measurement
Donald Stephen
Measurement of winding resistances
Measurement of winding resistances
Donald Stephen
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Donald Stephen
Measurement of partial discharges
Measurement of partial discharges
Donald Stephen
Loss tangent delta test
Loss tangent delta test
Donald Stephen
Load test
Load test
Donald Stephen
Line to-line sustained short-circuit test
Line to-line sustained short-circuit test
Donald Stephen
Insulation resistance testing
Insulation resistance testing
Donald Stephen
Insulation resistance test
Insulation resistance test
Donald Stephen
Impedance measurement of field windings
Impedance measurement of field windings
Donald Stephen
High potential test
High potential test
Donald Stephen
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
Donald Stephen
Determination of inertia by load rejection
Determination of inertia by load rejection
Donald Stephen
Crack monitor
Crack monitor
Donald Stephen
Core deffect detector
Core deffect detector
Donald Stephen
Plus de Donald Stephen
(20)
Tangent delta test report form
Tangent delta test report form
Stator insulation test setup
Stator insulation test setup
Stator core induction test
Stator core induction test
Stator core compr test
Stator core compr test
Rotor insul test setup
Rotor insul test setup
Noise measurement
Noise measurement
Measurement of winding resistances
Measurement of winding resistances
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of partial discharges
Measurement of partial discharges
Loss tangent delta test
Loss tangent delta test
Load test
Load test
Line to-line sustained short-circuit test
Line to-line sustained short-circuit test
Insulation resistance testing
Insulation resistance testing
Insulation resistance test
Insulation resistance test
Impedance measurement of field windings
Impedance measurement of field windings
High potential test
High potential test
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
Determination of inertia by load rejection
Determination of inertia by load rejection
Crack monitor
Crack monitor
Core deffect detector
Core deffect detector
Dernier
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
BhangaleSonal
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
hamedmustafa094
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
meghakumariji156
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
drmkjayanthikannan
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
DineshKumar4165
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
Quintin Balsdon
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
NadaHaitham1
Employee leave management system project.
Employee leave management system project.
Kamal Acharya
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
DineshKumar4165
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
RAJNEESHKUMAR341697
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Morshed Ahmed Rahath
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
VinayVitekari
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
maisarahman1
Online food ordering system project report.pdf
Online food ordering system project report.pdf
Kamal Acharya
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Arindam Chakraborty, Ph.D., P.E. (CA, TX)
Dernier
(20)
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
Employee leave management system project.
Employee leave management system project.
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
Online food ordering system project report.pdf
Online food ordering system project report.pdf
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Sudden three phase short-circuit test
1.
Sudden three phase
short circuit test Table of Content: 1 Objective.......................................................................................................... 2 Scope............................................................................................................... 3 Referenced documents.................................................................................... 4 Terms and abbreviations.................................................................................. 5 Sudden three-phase short-circuit test............................................................... 5.1 Preparations................................................................................................... 5.2 Conduction of test.......................................................................................... 5.3 Evaluation of the test...................................................................................... 6 Proceeding in case of deviations ...................................................................... 7 Copyright............................................................................................................ 1 Objective The sudden three-phase short-circuit test is performed to determine the following machine quantities: - Direct-axis transient reactance Xd' - Direct-axis subtransient reactance Xd" - Direct-axis transient short-circuit time constant Td' - Direct-axis subtransient short-circuit time constant Td" - Armature short-circuit time constant Ta. - Evidence of mechanical strength 2 Scope This procedure applies to all types of synchronous machines during final inspections at site or in the workshop. 3 Referenced documents IEC 34-4, 40-41 Rotating electrical machines – Methods for determining Synchronous machine quantities from tests IEEE 115, 11.7 Test Procedures for synchronous machines EN 60034-4 Rotating electrical machines - Methods for determining Synchronous machine quantities from tests 4 Terms and abbreviations none 5 Sudden three-phase short-circuit test 5.1 Preparations Visual inspections: - End winding supports - Condition of foundation - Are the foundation bolts tightened? 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 1 of 4
2.
- Correct assembly
and fixation of all rotor components - Disconnect the line terminals from the terminal buses (may not be necessary in all cases). - Connect the power cable between the line terminals and the circuit breaker, which is used to make the short-circuit and install measuring devices for recording the short- circuit currents in wye-connection. Note: Normally the plant circuit breaker will be used for this purpose. To install a separate short-circuit breaker in the plant requires high efforts and good coordination between the user of the plant and the generator manufacturer, as well as considerable extra costs. In the workshop a special short-circuit breaker with synchronized phases is used. The short circuit itself can be made with a special bar across the terminal buses or a disconnector installed in the current leads (e.g. braking disconnector). This is placed after the circuit breaker and is inserted before switching in the circuit breaker. Consider that it is designed to support the current forces and can carry the substained short circuit current during the recording time. - For current transformation the following equipment may be alternatively used: - Linearized current transformers - Low inductance precision shunts - Unlock protection relays as required. - Remove the grounding cable of the neutral terminals and directly connect the common terminal of the three-phase short-circuit wye to ground. - Attach a voltmeter and potential transformer to the generator line terminals (if required) to measure the armature voltage prior to the sudden short-circuit. - Connect and set the precision instruments for measuring the terminal voltage and field current. Note: The following analog- or digital instruments or equivalent (at least 4 channels) may be used for recording purposes: - Digital storage oscilloscope (Hioki 8855) - Memory Recorder (YEW AR 1100 A) - Memory Recorder (YEW DL 708) - Connect the output signals of the current transformer (CT) or equivalent to the recorder, whereby the current signal of the CT is converted into a voltage signal required for the digital storage oscilloscope using precision shunts. - Calibrate and set the trigger of the recording instruments to the expected levels. 5.2 Conduction of test - Operate the unit at rated speed in no-load condition with the manual control of the excitation system. In case of static excitation set the ignition anlge of the gate trigger pulse to achieve the required generator voltage. Neither a current regulator (for the field current) nor a voltage regulator (for the generator voltage) may be switched on. Note: If a prime mover is not available, this test can also be performed by retardation method, initiating the sudden short-circuit, when the decelerating machine passes through nominal speed. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 2 of 4
3.
- Supply small
field current and then initiate a trial run of the sudden short-circuit test. Verify that recorders are triggered and all signals are recorded properly. - Adjust the excitation to the desired value of the terminal voltage. Note: The usual test voltage is approx. 0.5 Un. The test may be repeated at various open circuit voltages as required by the contract. For voltages exceeding this limit value, explicit agreement of the turbine manufacturer should be reached. Through the machine set must withstand the short-circuit forces, there is a high risk of damages to the foundation (especially in case of bulb-type generators). Therefore it is not recommended to perform a 100% Un sudden short-circuit directly at all stator terminals. Consider that machine life endurance may be reduced. - Read off the terminal voltage, frequency and field current immediately before performing the sudden short circuit test. If still free channels are available on the digital storage oscilloscope, at least the phase-to-phase voltage of the generator should be recorded by oscilloscope. - Close the circuit breaker in order to initiate the sudden short-circuits. Recording instruments will be triggered and the three armature currents, the field current and the voltage going to zero should be recorded continuously. - After approx. 10 sec. record the armature currents manually, then switch off the excitation and open the circuit breaker. - Check the recordings in order to ensure that the data was registrated correctly. Performed by: GP-QS1 5.3 Evaluation of the test - Mathematical evaluation acc. to IEC-standard. Note: Since the sudden short-circuit test is mainly performed with reduced voltages, in general only unsaturated values for the reactance’s can be determined. Saturated values should be estimated from the calculation values. - The evaluation of analog short-circuit current characteristics can only be done by hand. - Digital storage data may be computer evaluated, using a special program for separating the envelope of the current waveform into 2 exponential functions. - If a 100% Un sudden short-circuit is performed at the generator terminals (only after agreement with the customer), despite of the prohibitive aspects mentioned, thorough visual inspection for cracks, permanent deformations and any other damages shall be made after the test. e.g.: - End winding support - Condition of winding (ties, spacers …) - Condition of foundation - Foundation bolts - Assembly and fixation of rotor components - Acc. to international standards, a repetition of the voltage test, preferably 80% of test voltage, are recommended. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 3 of 4
4.
6 Proceeding in
case of deviations Any nominal value, minimum value, maximum value, tolerance etc. given in an instruction is intended to serve for quality purposes only. In case of deviations, a non- conformity report has to be written acc. to PNG Power Standard 7 Copyright This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 4 of 4