Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Control Tollgate Date: 25/09/08
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Control – Executive Summary ,[object Object],[object Object],[object Object],[object Object]
Project Charter Review ,[object Object],[object Object],Problem/Goal Statement Tollgate Review Schedule Business Impact Core Team ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Scheduled Revised   Complete Define: 04/30/08 -  04/29/08 Measure: 05/14/08 04/06/08   06/04/08 Analyze: 06/13/08 07/13/08  08/05/08 Improve:   07/18/08 08/13/08  09/05/08 Control: 08/23/08 09/13/08  09/29/08 ,[object Object],[object Object],[object Object],Problem Statement  Soldiers of 1/16 express dissatisfaction with the Unit Maintenance Activities M1 series tank quality prior to mission support. Currently, 90% of the tanks drawn require maintenance for mission readiness.  Approximately 10% of faults listed on the 5988-E ‘s completed by soldiers are tracked by UMA.  Lastly, tank bumper number accuracy during T-2 is currently at 10% which causes excess work in the last days of the mission support draw.
Measure Review Baseline Data Tools Used Process Capability Recommended Quick Wins/RIEs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Baseline   Quality #1:  To-date, 33% of tanks presented for draw are not ready for issue. Baseline Quality #2 : To-date, 10% of 5988-E faults annotated by soldiers during tank draw is updated by UMA clerks. Baseline Quality #3 : To-date, 67% of tank bumper numbers presented to 1/16 at T-2 by UMA is actually drawn for mission support. The current tank draw process is capable of issuing 2 tanks per hour with a 33% critical maintenance defect rate.
Analyze Review Impact of Root Causes:  Hypothesis Tests Tools Used Reducing List of Root Causes Prioritized Root Causes / Effects ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Improve Review “ To-Be” Process Map Implementation Plan Solution Selection Pilot Results Solution A = a 75 %  improvement in accuracy of bumper #’s (75% of 40%=30%) Solution B = a 50 %  improvement of maintenance quality (50% of 30%=15%) Solution C = a 50 %  improvement of vehicle tracking (50% of 30%=15%)  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],QAQC Maintenance Manager Dispatch Soldier Issues prescreened bumper number list to soldier Hand receipt Vehicle signed over to soldier Avg. Delay 30 min Soldier conducts PMCS and  updates  5988-E, turns it in to maintenance supervisor  Passes QAQC Receives signed QAQC sheet Vehicle dispatched to soldier YES NO NVA time is in dark blue,  Total delay time is reduced to .5 hours Retrieves info from RATSS system Notify UMA of the # of tanks needed Mechanics Maintenance manager checks bumper number list and 5988-E,  verifies faults and makes repairs if needed  Solutions Trackable Causes Accurate Bumper #’s 40% Increased quality  maintenance 30% Improved vehicle  tracking 30% Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Maintenance personnel PMCS training UMA Training manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
Process Control/Response Plan
Measurement System Analysis  ,[object Object],Type of Measurement Error Description Considerations to this Project Discrimination (resolution) The ability of the measurement system to divide measurements into “data categories” Work hours can be measured to .25 hours.  Tank draw times are measured to +- .25 hours.  Bias The difference between an observed average measurement result and a reference value No bias - Work hours and draw start-stop times consistent through the population.  Stability The change in bias over time No bias of work hours and draw data. Repeatability The extent variability is consistent Not an issue.  Labor and tank usage is based on course requirements, so it is historical and felt to be accurate enough for insight and analysis. Reproducibility Different appraisers produce consistent results Usage data deemed not reproducible, therefore was not considered in determining which were used during the tank draw Variation The difference between tanks Tanks are either Fully Mission Capable or Non Fully Mission Capable.
Standard Operating Procedures (SOPs) and Training Plans SOPs Requiring Revision Required Training SOPs Requiring Revision Responsible Status EXSOP Joe Massouda and MAJ Douglas Aydelott In process Required Training Responsible Status UMA employees (PMCS Training) Reed Lyons In Process 16 th  Cavalry Soldiers (PMCS Training) Various Troop Commanders In Process
Process Monitoring and Stabilization:  Visual Control Measures Takt time sheet to be used in vehicle issue times and monitor throughput
Process Monitoring and Stabilization:  Visual Control Measures Map board to be used in vehicle tracking and aid in bumper number accuracy
Transition to Process Owner:  RACI Chart R = Responsible  –   The person who performs the action/task. A = Accountable  – The person who is held accountable that the action/task is completed. C = Consulted  – The person(s) who is consulted before performing the action/task. I = Informed  – The person(s) who is informed after performing the action/task. Step Action/Task Responsible Accountable Consulted Informed 1 Map board updates Maintenance supervisor (UMA) Maintenance supervisor (UMA) Mechanics and soldiers 16 th  Cav Leadership and UMA program manager 2 Takt Time Sheet annotation Maintenance supervisor (UMA) Mechanics Maintenance supervisor (UMA) 16 th  Cav Leadership and UMA program manager 3 Bumper number list updates Maintenance supervisor (UMA) Mechanics and Maintenance supervisor (UMA) UMA program manager 16 th  Cav Leadership and UMA program manager 4 Maintenance training (UMA) UMA program manager UMA program manager UMA program manager 16 th  Cav Leadership 5 Maintenance training (soldiers) 16 th  Cav Leadership 16 th  Cav Leadership Unit Motor Officer Unit Motor Officer 16 th  Cav Leadership
[object Object],[object Object],[object Object],Transition to Process Owner:  Other Steps
Transition to Process Owner: Lessons Learned ,[object Object],[object Object],[object Object],[object Object],[object Object]
Project Replication Opportunities and Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Barriers/Issues/Project Action Log ,[object Object],[object Object],[object Object],[object Object],[object Object],Lean Six Sigma Project Action Log         Last Revised: 09/09/2008   No Description/ Recommendation Status  Open/Closed/Hold Due Date Revised Due Date Resp. Comments / Resolution 1 Leave of critical team member     14 May   4 May     2 Larger multi-colored Push Pins Closed  9 Sep.  n/a   SFC Henry Identified on 3 Sep.  3 Investigate possible IT tracker   Open   TBD     UMA program Manager   4           5          
Next Steps ,[object Object],[object Object],[object Object]
Project Contributors Team Member Project Contribution Andre Mackey, MAJ Champion Douglas Aydelott, MAJ Assistant Champion   Joe Massouda, Program Manager Process Owner Reed Lyons, Supervisor Subject Matter Expert (SME) Richard Pryor, Basic Issue Items  SME Don Henry, SFC Black Belt  (Project Leader) Nathan Sprague Master Black Belt These team members contributed to the success of this project!
Analyze Storyboard Define Project Charter T-6  IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR  vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines  collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Improve Potential solutions identified Pilot test/results Implementation Plan developed Control Update SOP’s Train, train, train Process owner takes over! Problem: Poor tank quality at issue Goal: Improve tank quality at issue,  Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Hiring of more maintenance personnel UMA Hiring manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
Sign Off ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CW4 David Lucy Resource Manager/Finance COL Leopoldo Quintas  Deployment Director  SFC Don H. Henry II  Black Belt Nathan Sprague Master Black Belt MAJ Andre L. Mackey  Sponsor / Process Owner
Control  Tollgate Checklist ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Has the team implemented the solution, and a control plan to insure the process is robust to change? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Review Stop
 

Contenu connexe

Tendances

Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause AnalysisDavid Hanson
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving ApproachJ. García - Verdugo
 
Process improvement
Process improvementProcess improvement
Process improvementaolrac
 
Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyboscollkid
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009ExerciseLeanLLC
 
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Tony Alvarez
 
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%GoLeanSixSigma.com
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Hedakrishnaheda
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive IndustryGestion Projet Auto
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 

Tendances (20)

Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
8D Training.PPT
8D Training.PPT8D Training.PPT
8D Training.PPT
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
Process improvement
Process improvementProcess improvement
Process improvement
 
Problem solving preview
Problem solving previewProblem solving preview
Problem solving preview
 
Green Belt Training
Green Belt TrainingGreen Belt Training
Green Belt Training
 
Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journey
 
Tollgate Presentation
Tollgate PresentationTollgate Presentation
Tollgate Presentation
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
 
Visual Management
Visual Management Visual Management
Visual Management
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009
 
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2
 
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%
PROJECT STORYBOARD: Reducing Cycle Time for Natural Disaster Response by 50%
 
Gemba walks
Gemba walksGemba walks
Gemba walks
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 

Similaire à Control Tollgate

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgatedonhhenry
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgatedonhhenry
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxIsmailJulaihi
 
planning maintenance system for engineers
planning maintenance system for engineersplanning maintenance system for engineers
planning maintenance system for engineersZiad Salem
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Stephen Crowell
 
Aircraft maintenance programme
Aircraft maintenance programmeAircraft maintenance programme
Aircraft maintenance programmeS P Singh
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sampleantonioharenas
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTRIrfan Rasheed Rana
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)Timothy Wooi
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics ReportingTSSParatransit
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10United States Marine Corps
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10United States Marine Corps
 
Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Rakesh Raja
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementsmumbahelp
 
USMC Shops PM Project-Dec 3, 2008
USMC Shops PM Project-Dec 3, 2008USMC Shops PM Project-Dec 3, 2008
USMC Shops PM Project-Dec 3, 2008tkjohns1
 

Similaire à Control Tollgate (20)

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgate
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgate
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptx
 
planning maintenance system for engineers
planning maintenance system for engineersplanning maintenance system for engineers
planning maintenance system for engineers
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014
 
Aircraft maintenance programme
Aircraft maintenance programmeAircraft maintenance programme
Aircraft maintenance programme
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10
 
Reliability Engineer
Reliability EngineerReliability Engineer
Reliability Engineer
 
Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)
 
Cmp presentation 3 21-16
Cmp presentation 3 21-16Cmp presentation 3 21-16
Cmp presentation 3 21-16
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
USMC Shops PM Project-Dec 3, 2008
USMC Shops PM Project-Dec 3, 2008USMC Shops PM Project-Dec 3, 2008
USMC Shops PM Project-Dec 3, 2008
 

Dernier

Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Dernier (20)

Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Control Tollgate

  • 1. Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Control Tollgate Date: 25/09/08
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 9.
  • 10. Standard Operating Procedures (SOPs) and Training Plans SOPs Requiring Revision Required Training SOPs Requiring Revision Responsible Status EXSOP Joe Massouda and MAJ Douglas Aydelott In process Required Training Responsible Status UMA employees (PMCS Training) Reed Lyons In Process 16 th Cavalry Soldiers (PMCS Training) Various Troop Commanders In Process
  • 11. Process Monitoring and Stabilization: Visual Control Measures Takt time sheet to be used in vehicle issue times and monitor throughput
  • 12. Process Monitoring and Stabilization: Visual Control Measures Map board to be used in vehicle tracking and aid in bumper number accuracy
  • 13. Transition to Process Owner: RACI Chart R = Responsible – The person who performs the action/task. A = Accountable – The person who is held accountable that the action/task is completed. C = Consulted – The person(s) who is consulted before performing the action/task. I = Informed – The person(s) who is informed after performing the action/task. Step Action/Task Responsible Accountable Consulted Informed 1 Map board updates Maintenance supervisor (UMA) Maintenance supervisor (UMA) Mechanics and soldiers 16 th Cav Leadership and UMA program manager 2 Takt Time Sheet annotation Maintenance supervisor (UMA) Mechanics Maintenance supervisor (UMA) 16 th Cav Leadership and UMA program manager 3 Bumper number list updates Maintenance supervisor (UMA) Mechanics and Maintenance supervisor (UMA) UMA program manager 16 th Cav Leadership and UMA program manager 4 Maintenance training (UMA) UMA program manager UMA program manager UMA program manager 16 th Cav Leadership 5 Maintenance training (soldiers) 16 th Cav Leadership 16 th Cav Leadership Unit Motor Officer Unit Motor Officer 16 th Cav Leadership
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Project Contributors Team Member Project Contribution Andre Mackey, MAJ Champion Douglas Aydelott, MAJ Assistant Champion Joe Massouda, Program Manager Process Owner Reed Lyons, Supervisor Subject Matter Expert (SME) Richard Pryor, Basic Issue Items SME Don Henry, SFC Black Belt (Project Leader) Nathan Sprague Master Black Belt These team members contributed to the success of this project!
  • 20. Analyze Storyboard Define Project Charter T-6 IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Improve Potential solutions identified Pilot test/results Implementation Plan developed Control Update SOP’s Train, train, train Process owner takes over! Problem: Poor tank quality at issue Goal: Improve tank quality at issue, Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Hiring of more maintenance personnel UMA Hiring manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
  • 21.
  • 22.
  • 23.  

Notes de l'éditeur

  1. Expectations from the Measure Phase A detailed process map has been developed by the team and reflects key customer requirements and process variables. Key input, process and output metrics have been identified for data collection (potential Critical X’s) The relationship between process inputs and customer requirements has been investigated to provide a direction for the Analysis Phase. Special cause variation is reduced/removed providing an accurate picture of the process. A measurement system is in place and it’s error is understood. Baseline capability has been established and a path forward has been identified. A detailed project plan for the next phase exists, is realistic and reflects a more accurate financial impact statement. Who Should Attend Green Belt or Black Belt Required Project Leader Required Project Sponsor Required Process Owner Required (if not = Project Sponsor) Project Team Nice to have; Required for M, A, I, and C Stakeholders Required/Strongly Recommended Deployment Director Recommended Senior Management As possible or at DD request Master Black Belt Strongly Recommended (if available to attend)