THE ARCHITECTURAL PROCESS       A1.     INITIAL DISCUSSION

A1.   Initial discussion        For a new project, we normally meet with clients for an initial no-obligation discussion. This allows both parties to get a
A2.   Sustainable Design        measure of each other while discussing the project. The meeting can be either at our office or in the Clientʼs current
A3.   Site Analysis             home/work environment or at the potential site.
A4.   Pre-design Studies
A5.   Preliminary Design        We will take the Client through our general design philosophies and illustrate how these have been applied to previous
                                projects. We also like to see any images of architectural work that you admire from any source. The information below is
B1.   Detailed Design           intended to give an indicative outline of the process involved in procuring a building (for example a house for a private
                                client). We tailor our services to suit clientsʼ needs, so at an initial meeting we would discuss the specific services required
C1.   Contract Documentation    by the Clientʼs programme and an estimate of the fees that we would charge for each stage of the process.
C2.   Tendering & Negotiation
                                The Architectural Process is complex and part of our job is to advise the client when they should use other specialist
D1.   Site Supervision          consultants. Taking advice from specialists early in a project can often save money and time in the longer term. For the
D2.   Final Certificate         majority of new build and refurbishment projects, the Client will be legally obliged to contract a Technical Architect
                                (Arquitecte Técnic/Aparejador) and Site Safety Coordinator (Coordinador de Seguritat i Salut/Coordinador de Seguridad y
E1.   Additional Services       Salud), as well as an architect. Larger, more complex projects may require the services of other consultants, such as
                                Project Managers.
F1.   Fees
F2.   Fee Stages                Depending on the complexity of the project, we can provide some initial feasibility information about building costs,
                                programme and site suitability in this first meeting. This is explained in more detail in the Pre-Design Studies (A4).

                                We will explain precisely the responsibilities of the Architect at each stage, according to the services required by
                                the Client.




                                                                                                                                                         1 // 13
                                                                                                                                                         1 13
THE ARCHITECTURAL PROCESS       A2.     SUSTAINABLE DESIGN

A1.   Initial discussion        Construction is an industrial process that consumes vast quantities of energy and other non-renewable resources. It also
A2.   Sustainable Design        generates approximately 50% by volume of the waste products generated in Europe, and keeping buildings warm, cool and
A3.   Site Analysis             lit currently consumes about 50% of our energy requirements.
A4.   Pre-design Studies
A5.   Preliminary Design        Following the Initial Discussion, we will indicate the most appropriate technologies available for the project, depending on
                                local site conditions and intended use of the building. Local climate and energy options must be taken into account at this
B1.   Detailed Design           early stage, and we will opt for Low Impact Design (LID) within the constraints of the programme, site conditions and
                                budget.
C1.   Contract Documentation
C2.   Tendering & Negotiation   Our design will take into account the following criteria:

D1.   Site Supervision          •     Location within the site
D2.   Final Certificate         •     Integration with immediate surroundings
                                •     Specific response to the clientʼs requirements
E1.   Additional Services       •     Orientation and distribution of internal spaces
                                •     Use of recycled and renewable materials
F1.   Fees                      •     Optimization of natural resources
F2.   Fee Stages                •     Use of technology to reduce consumption
                                •     Use of technology to reduce emissions
                                •     Treatment of residues
                                •     Use, maintenance and effective life of the building

                                Solar energy should be used to generate heat and electricity. Geothermal energy can be used for heating and cooling.
                                Rainwater should be used for keeping vegetation green. Grey water can be used twice. Natural ventilation, which has
                                maintained Mediterranean buildings cool for centuries, should be used instead of air-conditioning. Combined with highly
                                insulated and high inertia building construction, solar energy can provide domestic hot water throughout the year, and
                                provide up to 80% of heating requirements.

                                Wherever possible, we specify renewable, low impact or recycled materials (bamboo, cork, stainless steel, polyethylene)
                                as substitutes for non-renewable or environmentally unfriendly products (tropical hardwoods, polystyrene, aluminium,
                                PVC), without compromising performance or increasing costs.

                                An intelligently designed, environmentally friendly building will also generate mid-term cost savings for its users and
                                owners, as well as long-term benefits for the economy and ecosystem. It is also increasingly a high priority for end-users.
                                There are also grants and low interest loans available for the use of renewable energy sources, which we can apply for on
                                the Clientʼs behalf.

                                Sustainable building is no longer an option, but a moral and economic obligation.




                                                                                                                                                     2 // 13
                                                                                                                                                     2 13
THE ARCHITECTURAL PROCESS       A3.     SITE ANALYSIS

A1.   Initial discussion        This stage involves deciphering opportunities and constraints within the proposed site. We can also provide advice
A2.   Sustainable Design        regarding the selection of a suitable site based on the Clientʼs needs if required. Appropriate site selection may reduce the
A3.   Site Analysis             cost and increase the potential of the project.
A4.   Pre-design Studies
A5.   Preliminary Design        An analysis of local authority regulations, consent requirements, orientation, views, levels, heritage implications, legal
                                requirements, relationship with neighbouring sites and available utilities and service routes all help give everyone some
B1.   Detailed Design           certainty with which to make decisions on the direction in which project should go. A Planning Report (Informe Urbanìstic /
                                Informe Urbanístico) is usually requested from the local authorities at this stage, detailing the permitted uses, site
C1.   Contract Documentation    occupation, height restrictions, conservation and environmental issues governing the development of the site. Projects in
C2.   Tendering & Negotiation   rural areas (sol no-urbanitzable / suelo no-urbanizable) may require extensive consultation and negotiation with various
                                local administrations. We will provide the Client with an estimate of the probable duration of these procedures.
D1.   Site Supervision
D2.   Final Certificate         A survey of levels and boundaries is required in all but the most simple of site situations. We can facilitate the engagement
                                of a land surveyor to provide this information by briefing them on what is required. We can survey any existing buildings on
E1.   Additional Services       the site by measuring, drawing and taking photos, although for more complex situations (non-residential or listed buildings),
                                we would recommend the engagement of a specialist in photometry.
F1.   Fees
F2.   Fee Stages                We will also assist in the appointment of a geotechnical engineer to analyse soil conditions, bearing capacity and help with
                                the interpretation of the results.

                                Our involvement to this stage is usually charged at an hourly rate, to be agreed with the Client in advance. Should the
                                Client decide to proceed with the project on the basis of the Site Analysis, then the fees for this stage are calculated
                                according to the Fee Stages Table F2, and would be included in the overall fee proposal.

                                A successful interpretation of the site will provide economic, environmental and aesthetic benefits.




                                                                                                                                                      3 // 13
                                                                                                                                                      3 13
THE ARCHITECTURAL PROCESS       A4.       PRE-DESIGN STUDIES                                               (Estudis Previs / Estudios Previos)

A1.   Initial discussion        We can make a valuable contribution to the realization of the Clientʼs objectives before any design work begins by helping
A2.   Sustainable Design        prepare a comprehensive architectural brief. The relationship between the Client and architect is usually formalised at this
A3.   Site Analysis             stage with a Letter of Appointment (Full dʼEncàrrec / Hoja de Encargo).
A4.   Pre-design Studies
A5.   Preliminary Design        The success of the project greatly benefits from a well-defined brief. A brief is a description of the desired objectives and it
                                can include such things as the requirements and functions of the building, the activities and spaces to be accommodated,
B1.   Detailed Design           desired materials and finishes and the Clientʼs budgetary constraints.

C1.   Contract Documentation    It is also essential to consider the proposed building in qualitative terms. We are trained to translate the Clientʼs hopes and
C2.   Tendering & Negotiation   aspirations into built form, but these are often more difficult to convey than the more prosaic requirements such as number
                                of bedrooms required. We want to hear about the Clientʼs likes and dislikes in all aspects of design, architecture, art,
D1.   Site Supervision          fashion, and way of life, using images from books, magazines or internet. Our task at this stage is to look and listen.
D2.   Final Certificate
                                We work hard to make our designs particular to their site and specific to their owners. Clients often believe that by
E1.   Additional Services       displaying their own preferences and ideas they will restrict the creativity of their designer. This fear is unwarranted for a
                                number of reasons:
F1.   Fees
F2.   Fee Stages                      •   there is usually broad scope for creativity and originality around any requirements.
                                      •   an honest discussion of issues between architect and clients will usually lead to richer designs.
                                      •   the more input we have from our clients, the greater the chance that we can find individual personal aspects that
                                          can tie the design to its owners.

                                We are creative and energetic when pursuing design options, but we must also be clear and decisive when it is necessary
                                to meet deadlines.

                                As part of the brief development process, we can advise you on the feasibility of the project in terms of budget planning,
                                site analysis, programme requirements and any other professional services that may be required. We can advise on soil
                                conditions, availability of services, local building regulations, heritage implications, consent issues, site orientation and
                                views.

                                We can also give advice on likely costs for different phases of the building project such as site development costs,
                                construction costs, furniture and fitting out, landscaping and consultants fees.

                                We will also discuss the programme for the project. This will take into account the nature of the project, the current state of
                                the building market, site availability, the Clientʼs time requirements and our office workload.

                                We will aim to give the Client what they require, but not necessarily what they expect.




                                                                                                                                                         4 // 13
                                                                                                                                                         4 13
THE ARCHITECTURAL PROCESS       A5.     PRELIMINARY DESIGN                                                        (Avantprojecte / Anteproyecto)

A1.   Initial discussion        Together with the Client, we will incorporate the major items that will affect the design and develop the initial ideas for the
A2.   Sustainable Design        project.
A3.   Site Analysis
A4.   Pre-design Studies        These include prosaic, philosophical and aesthetic issues. It is important for us to understand how you wish to
A5.   Preliminary Design        live/work/eat/sleep/meditate/play in the building. However, it is worth noting that most people's tastes are based on their
                                experiences, so keeping an open mind may produce unexpected but suggestive results. Of course, we will try to do the
B1.   Detailed Design           same.

C1.   Contract Documentation    During this stage, we will develop some key conceptual ideas that will drive the design. These develop in tandem with
C2.   Tendering & Negotiation   working through issues of the general form of the building and its relationship with the site and surrounding environment.
                                We will begin by proposing spatial relationships and diagrams, defining these as scaled layouts as decisions are made.
D1.   Site Supervision          When we feel that we have reached a viable solution, we will begin to model the design in three dimensions using both real
D2.   Final Certificate         and virtual models. This provides a feedback loop where ideas are tested on the model and the results provide stimulus for
                                further design ideas.
E1.   Additional Services
                                Approximately 80% of the decisions that influence a building's appearance and energy efficiency are made by the architect
F1.   Fees                      and client during the preliminary design phase; the remaining 20% are made by engineers at the later phases of design.
F2.   Fee Stages                Orientation, volumetric composition, location and protection of glazing will determine both the energy consumption and the
                                overall feel of the building. Selecting the right design at the concept stage will improve energy performance, and will greatly
                                reduce the need for expensive engineering solutions later on in the design process.

                                We use Building Information Modelling (BIM) throughout the design process, from inception to completion, and our clients
                                and collaborators are therefore able to both visualise and quantify the evolution of the design. BIM is an object-oriented
                                building development tool that utilizes 6D-modelling concepts, information technology and software interoperability to
                                design, construct and operate a building project, as well as communicate its details. 6D modelling involves not only design
                                in the 3 primary spatial dimensions, but also in a 4th (sustainability), a 5th (time) and a 6th (cost.

                                At the conclusion of this stage, the Client will have the basic graphic information that describes the preliminary design with
                                all current decisions/ideas shown. Cost estimates will be prepared from our database according to the type, size and
                                location of the building. Strategic decisions made at this stage will influence the construction, maintenance and
                                environmental costs of the project. We will also provide a Gantt chart that schedules all major activities and milestones
                                throughout larger projects.

                                The design process works from the general to the particular, so it is important that the client is completely comfortable with
                                the design at the end of each stage, and that we understand any reservations that the Client may have before we proceed
                                to the next step.

                                Modifications to the brief should be kept to a minimum after this point, as the next (Detailed Design) stage will
                                form the basis of the planning and building regulations submission.


                                                                                                                                                        5 // 13
                                                                                                                                                        5 13
THE ARCHITECTURAL PROCESS       B1.     DETAILED DESIGN                                           (Projecte Bàsic / Proyecto Básico)

A1.   Initial discussion        The project is refined at this point and final decisions made to enable the preparation of the Contract Documentation (see
A2.   Sustainable Design        C1).
A3.   Site Analysis
A4.   Pre-design Studies        We will make recommendations for the design of detail and the use of materials that reinforce the vision previously
A5.   Preliminary Design        developed during Preliminary Design stage. Outline compliance with the building and planning regulations are implicit in
                                the project at this stage.
B1.   Detailed Design
                                For a residential project, we provide general layouts the house, proposals for bathrooms and kitchens, and decisions made
C1.   Contract Documentation    on types of fixtures, fittings and cabinetry throughout the house. For commercial projects, space-planning studies will be
C2.   Tendering & Negotiation   undertaken to optimise the use of the available floor area and to define working relationships between different areas of the
                                building. We will also develop sufficient detail in our computer model for the Client to understand the nature of the
D1.   Site Supervision          proposal, adding materials and depth, and the buildingʼs relationship with its surroundings will be defined.
D2.   Final Certificate
                                We can apply for conditional Building Consent on the Clientʼs behalf at this stage, once all issues affecting the Consent
E1.   Additional Services       have been resolved. If, however, the project involves particularly complex Consent issues then we may recommend that a
                                specialist consultant be engaged to make the application together with our supporting documents. For the rehabilitation,
F1.   Fees                      conversion or extension of listed buildings or rural properties, we will inform the Clients of any restrictions or conditions
F2.   Fee Stages                specific to the project, and guide the Client through the submission process. If the project is for commercial premises
                                (offices, shops, hotels, restaurants etc.), then a specialist consultant should be engaged at this point to manage the
                                commercial licence, as compliance with building regulations do not always coincide with specific trading or occupancy
                                regulations.

                                It is important that everybody completely understands and is at ease with the design before the Detailed Design
                                submission. If there have been any major changes during this stage then we will amend the budget accordingly.

                                By this stage, the BIM ((building information model) will contain not only the geometrical information required to construct
                                and service the building, but also information regarding elemental and global costs, energy performance, sustainability,
                                illumination and shading.

                                At the conclusion of the Detailed Design, the building is sufficiently defined to give a clear understanding of the scope of
                                work, approximate costs, and the architectural look and feel of the building. Preliminary Architects Institute approval is
                                usually applied for at this stage and for residential projects, conditional building regulations approval may be applied for.

                                Modifications to the project after this stage can mean a great deal of work altering many drawings and may
                                compromise other earlier design decisions, as well as generating additional costs and causing delay to the
                                project.




                                                                                                                                                       6 // 13
                                                                                                                                                       6 13
THE ARCHITECTURAL PROCESS       C1.     CONTRACT DOCUMENTATION                                     (Projecte Executiu / Proyecto Ejecutivo)

A1.   Initial discussion        This stage generates the most work for the Architect and our consultants. All structural and environmental calculations
A2.   Sustainable Design        required for the construction of the building are undertaken during this phase. Beams and slabs are calculated,
A3.   Site Analysis             reinforcement is specified and quantified. The thermal performance of the building is defined, and the electrical and heating
A4.   Pre-design Studies        requirements are detailed. An exhaustive description of the building work is put together that will form the contract
A5.   Preliminary Design        between the Client and the Contractor.

B1.   Detailed Design           This includes general arrangement drawings, detail drawings, schedules, specifications and Bills of Quantities. The project
                                documentation is compiled in a PDF document for electronic certification by the Architects Institute. The Local Council will
C1.   Contract Documentation    inspect this set of documents before they issue their final approvals, and these documents will be used by the Contractors
C2.   Tendering & Negotiation   for the preparation of their competitive tender documents. Once work on site begins, these documents will provide the
                                information required to construct the building.
D1.   Site Supervision
D2.   Final Certificate         During this stage, we will coordinate the work of any other consultants that are involved in the project and incorporate their
                                information into the documents. If the project requires specific energy certification, then an external consultant will audit the
E1.   Additional Services       project at this stage.

F1.   Fees                      It is important to document thoroughly to ensure a high quality of work and to maintain control over design outcomes during
F2.   Fee Stages                construction. There is a huge difference between being economical and cheap. The viability of a project is not always
                                apparent at pre-Tender stage. It is unlikely that a cheap building will be economical in the long run. It will be expensive to
                                keep at a comfortable temperature, and expensive to maintain. In both economic and energetic terms, the cost of a building
                                must be judged throughout it's useful life, not just in terms of how much the builder thinks it may cost to build. An efficient
                                durable building is more economic than a cheap building, will cheaper to run and maintain, and as a consequence will also
                                do less harm to the environment. A cheap building that lasts 15 years will cost more in financial and energetic terms than
                                an economic building that lasts 40, and it will be more difficult to sell after 10. We will advise the Client on the durability of
                                the materials and solutions adopted at this stage, and on the relative maintenance and running costs associated with these
                                decisions.

                                A Health and Safety project is also drawn up at this stage, either by the architect or a designated consultant, depending on
                                the size and complexity of the project. This is a statutory requirement, and must accompany the contract documentation
                                submission before any approvals will be given.

                                Final Architects Institute approval for the project is applied for at this stage, and the project submitted for building
                                regulations approval.

                                Significant modifications to the Contract Documentation after submission for approvals at this stage may have
                                considerable cost and time implications.




                                                                                                                                                          7 // 13
                                                                                                                                                          7 13
THE ARCHITECTURAL PROCESS       C2.      TENDERING & NEGOTIATION

A1.   Initial discussion        There are different methods of building procurement.
A2.   Sustainable Design
A3.   Site Analysis             Typically, projects are tendered to selected contractors in order to gain a competitive fixed price. Other methods are
A4.   Pre-design Studies        available depending upon preferred timeframe, budget, desired quality and current economic climate.
A5.   Preliminary Design
                                If a selective tender process is used then an identical CD of the contract documents will be provided to each of the
B1.   Detailed Design           Contractors from which they calculate their price. We usually recommend the selection of a minimum of four tenderers, and
                                they should be selected according to the following criteria:
C1.   Contract Documentation
C2.   Tendering & Negotiation   •     ability to meet project programme
                                •     ability to appropriately staff and equip the project
D1.   Site Supervision          •     experience in type of work
D2.   Final Certificate         •     reputation for quality work
                                •     reputation for cooperation
E1.   Additional Services       •     financial stability
                                •     references received from previous Clients and Architects
F1.   Fees
F2.   Fee Stages                If a selected tender process is used then it is essential that most of this information is obtained and assessed before the
                                builders are invited to tender, because it is usually understood that an invitation to tender denotes a willingness to accept a
                                builder subject to a satisfactory price. The tender period is usually three weeks, during which we answer questions and
                                provide clarifications of the contract documents.

                                Once tenders are opened, we review them for compliance with the Contract Documentation, analyse the comparative
                                costs, clarify any exclusions and make recommendations. Once a contractor has been appointed, the local council will
                                issue the definitive construction licence. The contractor will then prepare their Health and Safety proposals for approval by
                                the designated site health and safety coordinator, which may be the architect or a designated consultant.

                                Any final modifications to the project should be agreed with the Contractor and incorporated in the Contract
                                Documentation before signature. In our experience, any modifications to the scope of the works after signature
                                can cause serious delays and may have serious cost implications.




                                                                                                                                                          8 // 13
                                                                                                                                                          8 13
THE ARCHITECTURAL PROCESS       D1.       SITE SUPERVISION                                           (Direcció dʼObra / Dirección de Obra)

A1.   Initial discussion        This is the construction stage of the project. The building will be built under a contract between the Client and Contractor.
A2.   Sustainable Design        In normal circumstances, we would only take part in a project where we are engaged to administer the contract. Having
A3.   Site Analysis             been responsible for the design and documentation, we have an intimate understanding of what is required by the contract
A4.   Pre-design Studies        and are therefore in the best position to administer it.
A5.   Preliminary Design
                                As architects, we have three quite distinct roles during contract administration. They are:
B1.   Detailed Design
                                1. to act as the Clientʼs professional advisor
C1.   Contract Documentation    2. to act as the Clientʼs agent
C2.   Tendering & Negotiation   3. to administer the contract

D1.   Site Supervision          In the first two of these roles, the architect is entitled to promote the Clientʼs interests. In the third, the architect must act
D2.   Final Certificate         impartially between the Client and the Contractor, which must be clearly understood by all parties at the outset of the
                                construction process. If the architect has been appointed site safety coordinator, then the architect will approve the
E1.   Additional Services       contractorʼs site safety proposals, and supervise their implementation.

F1.   Fees                      During construction, it is the Contractor's ultimate responsibility to ensure that the work is executed in accordance with the
F2.   Fee Stages                contract documents and the requirements of the site safety project. We visit the site at regular intervals to provide an
                                executive level of observation on the Clientʼs behalf. The Arquitecte Tècnic/Aparejador is responsible for on-site quality
                                control and if appointed, for site safety coordination.

                                The architectʼs responsibilities during this stage include:

                                •     Prepare contract documents for signing by the Client and Contractor.
                                •     Notify selected contractor and unsuccessful tenderers on behalf of the Client.
                                •     Provide periodic site visits to observe progress and compliance with the contract documents.
                                •     Convene project coordination and/or site meetings.
                                •     Review and monitor Contractor's programme.
                                •     Review and approve fabrication drawings.
                                •     Review samples and prototypes.
                                •     Liaise with and coordinate any other consultants.
                                •     Provide additional information or clarification to the builder to enable him/her to carry out the building.
                                •     Issue variations and all instructions to contractual parties.
                                •     Maintain records on costs including all variations.
                                •     Give notices of any justified extensions of contract duration.
                                •     Certify claims by the builder for payment and variations to the contract are correct.
                                •     Issue certificates for payment.

                                We also ensure that things that slide slide, things that shine donʼt buzz, and that water stays in the right place.


                                                                                                                                                          9 // 13
                                                                                                                                                          9 13
THE ARCHITECTURAL PROCESS       D2.      FINAL CERTIFICATE                                                (Liquidació / Liquidación)

A1.   Initial discussion        With the completion of the construction works, we undertake the calculation of the final statement of costs and supervise
A2.   Sustainable Design        the reception of the building by the client in accordance with the Contract.
A3.   Site Analysis
A4.   Pre-design Studies        The architectʼs responsibilities during this stage include:
A5.   Preliminary Design
                                •     Make partial and practical completion (Acta de Recepció / Recepción) inspections and issue certificates.
B1.   Detailed Design           •     Notification of faults during the Defects Liability Period.
                                •     Issue the Final Certificate (Final de Obra) and authorise release of retentions.
C1.   Contract Documentation    •     Prepare As-Built drawings incorporating any modifications to the original project.
C2.   Tendering & Negotiation   •     Maintenance and Building Use manuals (Llibre del Edifici / Libro del del Edificio) if required.
                                •     Supervision of the legalisation of Mechanical and Electrical Services.
D1.   Site Supervision          •     Coordination of the legalization of non-residential projects.
D2.   Final Certificate         •     First occupier certificate for residential projects.

E1.   Additional Services       The Maintenance and Building Use should be read and understood by all building owners. Cyclical maintenance within the
                                specified periods will avoid increased energy consumption, blocked drains, leaking roofs and creaking timber. A well-
F1.   Fees                      designed and properly maintained building will not depreciate in value.
F2.   Fee Stages
                                We strongly recommend that the Client retain a percentage of the Contract Sum, to be released to the Contractor
                                after an agreed Defects Liability Period.




                                                                                                                                                   10 // 13
                                                                                                                                                   10 13
THE ARCHITECTURAL PROCESS       E1.     ADDITIONAL SERVICES                                       (Serveis Adicionals / Servicios Adicionales)

A1.   Initial discussion        Relocation and Building procurement
A2.   Sustainable Design
A3.   Site Analysis             Clients requiring relocation sites or relocation to existing buildings can contract our services. We check on the development
A4.   Pre-design Studies        potential of the site or building according to local regulations. In the case of existing buildings, a structural and condition
A5.   Preliminary Design        survey would also be undertaken in order to establish its fitness for the intended use.

B1.   Detailed Design           Project Management

C1.   Contract Documentation    We also undertake the Project Management of small and medium sized projects, providing the Client with specific scope,
C2.   Tendering & Negotiation   time, and cost control. We can also coordinate consultants and subcontractors where a general contractor is unnecessary
                                or undesirable, and manage statutory consent submissions on behalf of the Client.
D1.   Site Supervision
D2.   Final Certificate         Town Planning and Urbanism

E1.   Additional Services       Planning and development studies may be undertaken for larger scale projects (Estudis de Detalle), and submissions
                                made for the occupation and refurbishment of rural properties.
F1.   Fees
F2.   Fee Stages                Interior Design

                                Our own projects include all fixed furniture, fittings and general illumination. Should the Client require a comprehensive
                                Interior Design package, we can coordinate the selection and procurement process and provide the design services
                                required for their successful implementation.

                                Landscape Design

                                We can provide a comprehensive Landscape Design service in collaboration with our specialized consultants, ranging from
                                the selection of appropriate planting and finishes, to more complex civil engineering solutions.

                                Marketing

                                We design and work exclusively in three dimensions, and our computer-generated models may be used to create high
                                quality renders and animation sequences for marketing and fund-raising purposes.

                                Site Safety

                                For most projects, we can prepare the Site Safety project (Estudi de Seguritat i Salut), and may either coordinate
                                implementation and compliance (Coordinació de Seguretat I Salut), or we can recommend a suitable professional to
                                undertake these legal responsibilities.




                                                                                                                                                      11 // 13
                                                                                                                                                      11 13
THE ARCHITECTURAL PROCESS       F1.     FEES                                                               (Honoraris / Honorarios)

A1.   Initial discussion        It is important that clients are aware of the costs of architectural services early in the relationship. Our charges will be
A2.   Sustainable Design        specific to the complexity of the job and the extent of our involvement.
A3.   Site Analysis
A4.   Pre-design Studies        Our fees may be based upon time charges, lump-sum fees, percentage fees or a combination of these. All of these are IVA
A5.   Preliminary Design        exclusive. We use a standard COAC agreement for architectural services as a contract between Client and architect. We
                                are happy to talk about fees and services and will give quotes once the scope of work is known. Our fees include structural
B1.   Detailed Design           design and the specification of basic electrical, thermal and liquid services, unless the Client wishes to appoint specific
                                consultants.
C1.   Contract Documentation
C2.   Tendering & Negotiation   Time Charges:

D1.   Site Supervision          We generally apply hourly charges for small amounts of work or if the scope of work has not yet been decided.
D2.   Final Certificate
                                Percentage Fees (Full Service):
E1.   Additional Services
                                A percentage fee is the traditional method of charging for architectural services. The percentage charged varies upon the
F1.   Fees                      value of the work (for example, as the value of the job increases there is a smaller percentage required to cover the hours
F2.   Fee Stages                worked) and the complexity of the work (for example, owner-occupied residential projects tend to be more complex than
                                warehouses, and therefore take longer to design and document). This percentage is applied to the basic cost (PEM,
                                excluding the builderʼs profit and VAT) of all elements designed, specified and certified by ourselves or by consultants
                                coordinated by us. We invoice based upon cost estimates of this work until a Contract Sum is fixed. Modifications to the
                                project after stage B will be charged by agreement with the Client.

                                Lump Sum Fees:

                                We can charge a fixed fee and this is calculated specifically for individual projects.

                                Partial Services:

                                We would consider our appointment for a partial service comprising phases A & B, although it is usually in the Clientʼs
                                interest to contract the same architect for all phases of the architectural process.

                                Additional Services:

                                The fees that we may charge for additional services are calculated using the same criteria as our architectural service. We
                                may include these services in our architectural fees, depending on the size and complexity of the project.




                                                                                                                                                    12 // 13
                                                                                                                                                    12 13
THE ARCHITECTURAL PROCESS       F2.       FEE STAGES

A1.   Initial discussion        To give some idea of the relative costs of the different work stages, we have broken down a typical project into the
A2.   Sustainable Design        percentage of the total fees charged for each phase:
A3.   Site Analysis
A4.   Pre-design Studies
                                 A1       Initial Discussion                                                     0%
A5.   Preliminary Design
                                 A2       Sustainability                                                         0%
B1.   Detailed Design            A3       Site Analysis                                                          2%
                                 A4       Pre-Design Studies                                                     3%
C1.   Contract Documentation     A5       Preliminary Design                                                    10%
C2.   Tendering & Negotiation                                                       Total Phase A      15%
                                 B1       Detailed Design                                                       15%
D1.   Site Supervision                                                              Total Phase B      15%
D2.   Final Certificate          C1       Contract Documentation                                                35%
                                 C2       Tendering and Negotiation                                              5%
E1.   Additional Services
                                                                                    Total Phase C      40%
F1.   Fees                       D1       Site Supervision                                                       25%
F2.   Fee Stages                 D2       Final Certificate                                                       5%
                                                                                    Total Phase D      30%

                                                                                        Total Fees     100%

                                Disbursements:

                                We may also charge for some expense items such as travel and printing of drawings. The Client would agree charges for
                                expenses before they are incurred.

                                Exclusions:

                                The following items are not usually included in our standard percentage fees:

                                      •   site and existing building surveys
                                      •   geotechnical survey
                                      •   environmental impact reports
                                      •   site health and safety project and coordination
                                      •   legalization of commercial premises
                                      •   grant applications

                                We will advise the Client on the selection of the relevant specialists for each of these items.


                                                                                                                                             13 // 13
                                                                                                                                             13 13

Contenu connexe

Tendances

Greg lynn contemporary process -II M.Arch
Greg lynn contemporary process -II  M.Arch Greg lynn contemporary process -II  M.Arch
Greg lynn contemporary process -II M.Arch Kethees Waran
 
How to Develop Architectural concepts
How to Develop Architectural conceptsHow to Develop Architectural concepts
How to Develop Architectural conceptsRishii2i
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 Drawing
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 DrawingArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 Drawing
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 DrawingGalala University
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 Concept
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 ConceptArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 Concept
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 ConceptGalala University
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessGalala University
 
Housing typologies report
Housing typologies reportHousing typologies report
Housing typologies reportakicinder
 
Architectural design-process
Architectural design-processArchitectural design-process
Architectural design-processHakim Danish
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations ameed inam
 
Planning concepts
Planning conceptsPlanning concepts
Planning conceptsctlachu
 
L-5 LANDSCAPE site analysis.pdf
L-5 LANDSCAPE site analysis.pdfL-5 LANDSCAPE site analysis.pdf
L-5 LANDSCAPE site analysis.pdfshrutikapur5
 
Architectural Professional Practice - Design
Architectural Professional Practice - DesignArchitectural Professional Practice - Design
Architectural Professional Practice - DesignGalala University
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project managerJackson Sampson
 
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN Kethees Waran
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureArundathi Pinky
 

Tendances (20)

Greg lynn contemporary process -II M.Arch
Greg lynn contemporary process -II  M.Arch Greg lynn contemporary process -II  M.Arch
Greg lynn contemporary process -II M.Arch
 
How to Develop Architectural concepts
How to Develop Architectural conceptsHow to Develop Architectural concepts
How to Develop Architectural concepts
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 Drawing
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 DrawingArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 Drawing
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 7 Drawing
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 Concept
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 ConceptArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 Concept
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 5 Concept
 
Ud ppt
Ud pptUd ppt
Ud ppt
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
 
Housing typologies report
Housing typologies reportHousing typologies report
Housing typologies report
 
Architectural design-process
Architectural design-processArchitectural design-process
Architectural design-process
 
Hassan fathy
Hassan fathyHassan fathy
Hassan fathy
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations
 
Planning concepts
Planning conceptsPlanning concepts
Planning concepts
 
L-5 LANDSCAPE site analysis.pdf
L-5 LANDSCAPE site analysis.pdfL-5 LANDSCAPE site analysis.pdf
L-5 LANDSCAPE site analysis.pdf
 
Zoning
ZoningZoning
Zoning
 
Architectural Professional Practice - Design
Architectural Professional Practice - DesignArchitectural Professional Practice - Design
Architectural Professional Practice - Design
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN
CONTEMPORARY PROCESS ON ARCHITECTURAL DESIGN
 
Theory of design
Theory of designTheory of design
Theory of design
 
Le Corbusier
Le CorbusierLe Corbusier
Le Corbusier
 
Site planing
Site planingSite planing
Site planing
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 

En vedette

Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1xennechau
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an ArchitectClara Lee
 
Architectural Design Process
Architectural Design ProcessArchitectural Design Process
Architectural Design ProcessKhaled Almusa
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
The Role Of An Architect
The Role Of An ArchitectThe Role Of An Architect
The Role Of An Architectllangit
 

En vedette (8)

PILINH RIG OPERATOR
PILINH RIG OPERATORPILINH RIG OPERATOR
PILINH RIG OPERATOR
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
The Role of the Architect
The Role of the ArchitectThe Role of the Architect
The Role of the Architect
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
Architectural Design Process
Architectural Design ProcessArchitectural Design Process
Architectural Design Process
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
The Role Of An Architect
The Role Of An ArchitectThe Role Of An Architect
The Role Of An Architect
 

Similaire à The Architectural Process

Green Building and Technology Unit 2
Green Building and Technology Unit 2Green Building and Technology Unit 2
Green Building and Technology Unit 2Chaitanya Nagare
 
COST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxCOST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxabedamtie
 
Iaetsd green building
Iaetsd green buildingIaetsd green building
Iaetsd green buildingIaetsd Iaetsd
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
Managing cost and making housing cost- Effective
Managing cost and making housing cost- EffectiveManaging cost and making housing cost- Effective
Managing cost and making housing cost- EffectiveJIT KUMAR GUPTA
 
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET Journal
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability EngineerAngela Lopez
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability Farah Abdullah
 
Managing Cost and Making Housing Cost - Copy.docx
Managing Cost and Making Housing Cost - Copy.docxManaging Cost and Making Housing Cost - Copy.docx
Managing Cost and Making Housing Cost - Copy.docxJIT KUMAR GUPTA
 
Managing Cost and Making Housing Cost - Copy - Copy.docx
Managing Cost and Making Housing Cost - Copy - Copy.docxManaging Cost and Making Housing Cost - Copy - Copy.docx
Managing Cost and Making Housing Cost - Copy - Copy.docxJIT KUMAR GUPTA
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdfahsansaeed78
 
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facadeCLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facadeCLICKNL
 

Similaire à The Architectural Process (20)

Green Building and Technology Unit 2
Green Building and Technology Unit 2Green Building and Technology Unit 2
Green Building and Technology Unit 2
 
COST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxCOST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptx
 
Iaetsd green building
Iaetsd green buildingIaetsd green building
Iaetsd green building
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
Managing cost and making housing cost- Effective
Managing cost and making housing cost- EffectiveManaging cost and making housing cost- Effective
Managing cost and making housing cost- Effective
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability
 
Managing Cost and Making Housing Cost - Copy.docx
Managing Cost and Making Housing Cost - Copy.docxManaging Cost and Making Housing Cost - Copy.docx
Managing Cost and Making Housing Cost - Copy.docx
 
Managing Cost and Making Housing Cost - Copy - Copy.docx
Managing Cost and Making Housing Cost - Copy - Copy.docxManaging Cost and Making Housing Cost - Copy - Copy.docx
Managing Cost and Making Housing Cost - Copy - Copy.docx
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
Ici individual
Ici individualIci individual
Ici individual
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Presentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable buildingPresentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable building
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
 
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facadeCLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
 
John CV
John CVJohn CV
John CV
 
Matrix207
Matrix207Matrix207
Matrix207
 

Dernier

Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...Amil baba
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...nagunakhan
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 

Dernier (20)

Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 

The Architectural Process

  • 1. THE ARCHITECTURAL PROCESS estudiSP ⎋ shaun piillgrem ⎋ shaun p grem ✎ pttge madoz 6 2 1 ✎ p ge madoz 6 2 1 ✈ barrcellona 0 800 2 ✈ ba c e ona 0 800 2 ✆ +34 658 8 65 12 0 ✆ +34 658 8 65 12 0 ▶ ▶ ▶ ▶ ▶ ▶ ▶ ▶ 1
  • 2. THE ARCHITECTURAL PROCESS A1. INITIAL DISCUSSION A1. Initial discussion For a new project, we normally meet with clients for an initial no-obligation discussion. This allows both parties to get a A2. Sustainable Design measure of each other while discussing the project. The meeting can be either at our office or in the Clientʼs current A3. Site Analysis home/work environment or at the potential site. A4. Pre-design Studies A5. Preliminary Design We will take the Client through our general design philosophies and illustrate how these have been applied to previous projects. We also like to see any images of architectural work that you admire from any source. The information below is B1. Detailed Design intended to give an indicative outline of the process involved in procuring a building (for example a house for a private client). We tailor our services to suit clientsʼ needs, so at an initial meeting we would discuss the specific services required C1. Contract Documentation by the Clientʼs programme and an estimate of the fees that we would charge for each stage of the process. C2. Tendering & Negotiation The Architectural Process is complex and part of our job is to advise the client when they should use other specialist D1. Site Supervision consultants. Taking advice from specialists early in a project can often save money and time in the longer term. For the D2. Final Certificate majority of new build and refurbishment projects, the Client will be legally obliged to contract a Technical Architect (Arquitecte Técnic/Aparejador) and Site Safety Coordinator (Coordinador de Seguritat i Salut/Coordinador de Seguridad y E1. Additional Services Salud), as well as an architect. Larger, more complex projects may require the services of other consultants, such as Project Managers. F1. Fees F2. Fee Stages Depending on the complexity of the project, we can provide some initial feasibility information about building costs, programme and site suitability in this first meeting. This is explained in more detail in the Pre-Design Studies (A4). We will explain precisely the responsibilities of the Architect at each stage, according to the services required by the Client. 1 // 13 1 13
  • 3. THE ARCHITECTURAL PROCESS A2. SUSTAINABLE DESIGN A1. Initial discussion Construction is an industrial process that consumes vast quantities of energy and other non-renewable resources. It also A2. Sustainable Design generates approximately 50% by volume of the waste products generated in Europe, and keeping buildings warm, cool and A3. Site Analysis lit currently consumes about 50% of our energy requirements. A4. Pre-design Studies A5. Preliminary Design Following the Initial Discussion, we will indicate the most appropriate technologies available for the project, depending on local site conditions and intended use of the building. Local climate and energy options must be taken into account at this B1. Detailed Design early stage, and we will opt for Low Impact Design (LID) within the constraints of the programme, site conditions and budget. C1. Contract Documentation C2. Tendering & Negotiation Our design will take into account the following criteria: D1. Site Supervision • Location within the site D2. Final Certificate • Integration with immediate surroundings • Specific response to the clientʼs requirements E1. Additional Services • Orientation and distribution of internal spaces • Use of recycled and renewable materials F1. Fees • Optimization of natural resources F2. Fee Stages • Use of technology to reduce consumption • Use of technology to reduce emissions • Treatment of residues • Use, maintenance and effective life of the building Solar energy should be used to generate heat and electricity. Geothermal energy can be used for heating and cooling. Rainwater should be used for keeping vegetation green. Grey water can be used twice. Natural ventilation, which has maintained Mediterranean buildings cool for centuries, should be used instead of air-conditioning. Combined with highly insulated and high inertia building construction, solar energy can provide domestic hot water throughout the year, and provide up to 80% of heating requirements. Wherever possible, we specify renewable, low impact or recycled materials (bamboo, cork, stainless steel, polyethylene) as substitutes for non-renewable or environmentally unfriendly products (tropical hardwoods, polystyrene, aluminium, PVC), without compromising performance or increasing costs. An intelligently designed, environmentally friendly building will also generate mid-term cost savings for its users and owners, as well as long-term benefits for the economy and ecosystem. It is also increasingly a high priority for end-users. There are also grants and low interest loans available for the use of renewable energy sources, which we can apply for on the Clientʼs behalf. Sustainable building is no longer an option, but a moral and economic obligation. 2 // 13 2 13
  • 4. THE ARCHITECTURAL PROCESS A3. SITE ANALYSIS A1. Initial discussion This stage involves deciphering opportunities and constraints within the proposed site. We can also provide advice A2. Sustainable Design regarding the selection of a suitable site based on the Clientʼs needs if required. Appropriate site selection may reduce the A3. Site Analysis cost and increase the potential of the project. A4. Pre-design Studies A5. Preliminary Design An analysis of local authority regulations, consent requirements, orientation, views, levels, heritage implications, legal requirements, relationship with neighbouring sites and available utilities and service routes all help give everyone some B1. Detailed Design certainty with which to make decisions on the direction in which project should go. A Planning Report (Informe Urbanìstic / Informe Urbanístico) is usually requested from the local authorities at this stage, detailing the permitted uses, site C1. Contract Documentation occupation, height restrictions, conservation and environmental issues governing the development of the site. Projects in C2. Tendering & Negotiation rural areas (sol no-urbanitzable / suelo no-urbanizable) may require extensive consultation and negotiation with various local administrations. We will provide the Client with an estimate of the probable duration of these procedures. D1. Site Supervision D2. Final Certificate A survey of levels and boundaries is required in all but the most simple of site situations. We can facilitate the engagement of a land surveyor to provide this information by briefing them on what is required. We can survey any existing buildings on E1. Additional Services the site by measuring, drawing and taking photos, although for more complex situations (non-residential or listed buildings), we would recommend the engagement of a specialist in photometry. F1. Fees F2. Fee Stages We will also assist in the appointment of a geotechnical engineer to analyse soil conditions, bearing capacity and help with the interpretation of the results. Our involvement to this stage is usually charged at an hourly rate, to be agreed with the Client in advance. Should the Client decide to proceed with the project on the basis of the Site Analysis, then the fees for this stage are calculated according to the Fee Stages Table F2, and would be included in the overall fee proposal. A successful interpretation of the site will provide economic, environmental and aesthetic benefits. 3 // 13 3 13
  • 5. THE ARCHITECTURAL PROCESS A4. PRE-DESIGN STUDIES (Estudis Previs / Estudios Previos) A1. Initial discussion We can make a valuable contribution to the realization of the Clientʼs objectives before any design work begins by helping A2. Sustainable Design prepare a comprehensive architectural brief. The relationship between the Client and architect is usually formalised at this A3. Site Analysis stage with a Letter of Appointment (Full dʼEncàrrec / Hoja de Encargo). A4. Pre-design Studies A5. Preliminary Design The success of the project greatly benefits from a well-defined brief. A brief is a description of the desired objectives and it can include such things as the requirements and functions of the building, the activities and spaces to be accommodated, B1. Detailed Design desired materials and finishes and the Clientʼs budgetary constraints. C1. Contract Documentation It is also essential to consider the proposed building in qualitative terms. We are trained to translate the Clientʼs hopes and C2. Tendering & Negotiation aspirations into built form, but these are often more difficult to convey than the more prosaic requirements such as number of bedrooms required. We want to hear about the Clientʼs likes and dislikes in all aspects of design, architecture, art, D1. Site Supervision fashion, and way of life, using images from books, magazines or internet. Our task at this stage is to look and listen. D2. Final Certificate We work hard to make our designs particular to their site and specific to their owners. Clients often believe that by E1. Additional Services displaying their own preferences and ideas they will restrict the creativity of their designer. This fear is unwarranted for a number of reasons: F1. Fees F2. Fee Stages • there is usually broad scope for creativity and originality around any requirements. • an honest discussion of issues between architect and clients will usually lead to richer designs. • the more input we have from our clients, the greater the chance that we can find individual personal aspects that can tie the design to its owners. We are creative and energetic when pursuing design options, but we must also be clear and decisive when it is necessary to meet deadlines. As part of the brief development process, we can advise you on the feasibility of the project in terms of budget planning, site analysis, programme requirements and any other professional services that may be required. We can advise on soil conditions, availability of services, local building regulations, heritage implications, consent issues, site orientation and views. We can also give advice on likely costs for different phases of the building project such as site development costs, construction costs, furniture and fitting out, landscaping and consultants fees. We will also discuss the programme for the project. This will take into account the nature of the project, the current state of the building market, site availability, the Clientʼs time requirements and our office workload. We will aim to give the Client what they require, but not necessarily what they expect. 4 // 13 4 13
  • 6. THE ARCHITECTURAL PROCESS A5. PRELIMINARY DESIGN (Avantprojecte / Anteproyecto) A1. Initial discussion Together with the Client, we will incorporate the major items that will affect the design and develop the initial ideas for the A2. Sustainable Design project. A3. Site Analysis A4. Pre-design Studies These include prosaic, philosophical and aesthetic issues. It is important for us to understand how you wish to A5. Preliminary Design live/work/eat/sleep/meditate/play in the building. However, it is worth noting that most people's tastes are based on their experiences, so keeping an open mind may produce unexpected but suggestive results. Of course, we will try to do the B1. Detailed Design same. C1. Contract Documentation During this stage, we will develop some key conceptual ideas that will drive the design. These develop in tandem with C2. Tendering & Negotiation working through issues of the general form of the building and its relationship with the site and surrounding environment. We will begin by proposing spatial relationships and diagrams, defining these as scaled layouts as decisions are made. D1. Site Supervision When we feel that we have reached a viable solution, we will begin to model the design in three dimensions using both real D2. Final Certificate and virtual models. This provides a feedback loop where ideas are tested on the model and the results provide stimulus for further design ideas. E1. Additional Services Approximately 80% of the decisions that influence a building's appearance and energy efficiency are made by the architect F1. Fees and client during the preliminary design phase; the remaining 20% are made by engineers at the later phases of design. F2. Fee Stages Orientation, volumetric composition, location and protection of glazing will determine both the energy consumption and the overall feel of the building. Selecting the right design at the concept stage will improve energy performance, and will greatly reduce the need for expensive engineering solutions later on in the design process. We use Building Information Modelling (BIM) throughout the design process, from inception to completion, and our clients and collaborators are therefore able to both visualise and quantify the evolution of the design. BIM is an object-oriented building development tool that utilizes 6D-modelling concepts, information technology and software interoperability to design, construct and operate a building project, as well as communicate its details. 6D modelling involves not only design in the 3 primary spatial dimensions, but also in a 4th (sustainability), a 5th (time) and a 6th (cost. At the conclusion of this stage, the Client will have the basic graphic information that describes the preliminary design with all current decisions/ideas shown. Cost estimates will be prepared from our database according to the type, size and location of the building. Strategic decisions made at this stage will influence the construction, maintenance and environmental costs of the project. We will also provide a Gantt chart that schedules all major activities and milestones throughout larger projects. The design process works from the general to the particular, so it is important that the client is completely comfortable with the design at the end of each stage, and that we understand any reservations that the Client may have before we proceed to the next step. Modifications to the brief should be kept to a minimum after this point, as the next (Detailed Design) stage will form the basis of the planning and building regulations submission. 5 // 13 5 13
  • 7. THE ARCHITECTURAL PROCESS B1. DETAILED DESIGN (Projecte Bàsic / Proyecto Básico) A1. Initial discussion The project is refined at this point and final decisions made to enable the preparation of the Contract Documentation (see A2. Sustainable Design C1). A3. Site Analysis A4. Pre-design Studies We will make recommendations for the design of detail and the use of materials that reinforce the vision previously A5. Preliminary Design developed during Preliminary Design stage. Outline compliance with the building and planning regulations are implicit in the project at this stage. B1. Detailed Design For a residential project, we provide general layouts the house, proposals for bathrooms and kitchens, and decisions made C1. Contract Documentation on types of fixtures, fittings and cabinetry throughout the house. For commercial projects, space-planning studies will be C2. Tendering & Negotiation undertaken to optimise the use of the available floor area and to define working relationships between different areas of the building. We will also develop sufficient detail in our computer model for the Client to understand the nature of the D1. Site Supervision proposal, adding materials and depth, and the buildingʼs relationship with its surroundings will be defined. D2. Final Certificate We can apply for conditional Building Consent on the Clientʼs behalf at this stage, once all issues affecting the Consent E1. Additional Services have been resolved. If, however, the project involves particularly complex Consent issues then we may recommend that a specialist consultant be engaged to make the application together with our supporting documents. For the rehabilitation, F1. Fees conversion or extension of listed buildings or rural properties, we will inform the Clients of any restrictions or conditions F2. Fee Stages specific to the project, and guide the Client through the submission process. If the project is for commercial premises (offices, shops, hotels, restaurants etc.), then a specialist consultant should be engaged at this point to manage the commercial licence, as compliance with building regulations do not always coincide with specific trading or occupancy regulations. It is important that everybody completely understands and is at ease with the design before the Detailed Design submission. If there have been any major changes during this stage then we will amend the budget accordingly. By this stage, the BIM ((building information model) will contain not only the geometrical information required to construct and service the building, but also information regarding elemental and global costs, energy performance, sustainability, illumination and shading. At the conclusion of the Detailed Design, the building is sufficiently defined to give a clear understanding of the scope of work, approximate costs, and the architectural look and feel of the building. Preliminary Architects Institute approval is usually applied for at this stage and for residential projects, conditional building regulations approval may be applied for. Modifications to the project after this stage can mean a great deal of work altering many drawings and may compromise other earlier design decisions, as well as generating additional costs and causing delay to the project. 6 // 13 6 13
  • 8. THE ARCHITECTURAL PROCESS C1. CONTRACT DOCUMENTATION (Projecte Executiu / Proyecto Ejecutivo) A1. Initial discussion This stage generates the most work for the Architect and our consultants. All structural and environmental calculations A2. Sustainable Design required for the construction of the building are undertaken during this phase. Beams and slabs are calculated, A3. Site Analysis reinforcement is specified and quantified. The thermal performance of the building is defined, and the electrical and heating A4. Pre-design Studies requirements are detailed. An exhaustive description of the building work is put together that will form the contract A5. Preliminary Design between the Client and the Contractor. B1. Detailed Design This includes general arrangement drawings, detail drawings, schedules, specifications and Bills of Quantities. The project documentation is compiled in a PDF document for electronic certification by the Architects Institute. The Local Council will C1. Contract Documentation inspect this set of documents before they issue their final approvals, and these documents will be used by the Contractors C2. Tendering & Negotiation for the preparation of their competitive tender documents. Once work on site begins, these documents will provide the information required to construct the building. D1. Site Supervision D2. Final Certificate During this stage, we will coordinate the work of any other consultants that are involved in the project and incorporate their information into the documents. If the project requires specific energy certification, then an external consultant will audit the E1. Additional Services project at this stage. F1. Fees It is important to document thoroughly to ensure a high quality of work and to maintain control over design outcomes during F2. Fee Stages construction. There is a huge difference between being economical and cheap. The viability of a project is not always apparent at pre-Tender stage. It is unlikely that a cheap building will be economical in the long run. It will be expensive to keep at a comfortable temperature, and expensive to maintain. In both economic and energetic terms, the cost of a building must be judged throughout it's useful life, not just in terms of how much the builder thinks it may cost to build. An efficient durable building is more economic than a cheap building, will cheaper to run and maintain, and as a consequence will also do less harm to the environment. A cheap building that lasts 15 years will cost more in financial and energetic terms than an economic building that lasts 40, and it will be more difficult to sell after 10. We will advise the Client on the durability of the materials and solutions adopted at this stage, and on the relative maintenance and running costs associated with these decisions. A Health and Safety project is also drawn up at this stage, either by the architect or a designated consultant, depending on the size and complexity of the project. This is a statutory requirement, and must accompany the contract documentation submission before any approvals will be given. Final Architects Institute approval for the project is applied for at this stage, and the project submitted for building regulations approval. Significant modifications to the Contract Documentation after submission for approvals at this stage may have considerable cost and time implications. 7 // 13 7 13
  • 9. THE ARCHITECTURAL PROCESS C2. TENDERING & NEGOTIATION A1. Initial discussion There are different methods of building procurement. A2. Sustainable Design A3. Site Analysis Typically, projects are tendered to selected contractors in order to gain a competitive fixed price. Other methods are A4. Pre-design Studies available depending upon preferred timeframe, budget, desired quality and current economic climate. A5. Preliminary Design If a selective tender process is used then an identical CD of the contract documents will be provided to each of the B1. Detailed Design Contractors from which they calculate their price. We usually recommend the selection of a minimum of four tenderers, and they should be selected according to the following criteria: C1. Contract Documentation C2. Tendering & Negotiation • ability to meet project programme • ability to appropriately staff and equip the project D1. Site Supervision • experience in type of work D2. Final Certificate • reputation for quality work • reputation for cooperation E1. Additional Services • financial stability • references received from previous Clients and Architects F1. Fees F2. Fee Stages If a selected tender process is used then it is essential that most of this information is obtained and assessed before the builders are invited to tender, because it is usually understood that an invitation to tender denotes a willingness to accept a builder subject to a satisfactory price. The tender period is usually three weeks, during which we answer questions and provide clarifications of the contract documents. Once tenders are opened, we review them for compliance with the Contract Documentation, analyse the comparative costs, clarify any exclusions and make recommendations. Once a contractor has been appointed, the local council will issue the definitive construction licence. The contractor will then prepare their Health and Safety proposals for approval by the designated site health and safety coordinator, which may be the architect or a designated consultant. Any final modifications to the project should be agreed with the Contractor and incorporated in the Contract Documentation before signature. In our experience, any modifications to the scope of the works after signature can cause serious delays and may have serious cost implications. 8 // 13 8 13
  • 10. THE ARCHITECTURAL PROCESS D1. SITE SUPERVISION (Direcció dʼObra / Dirección de Obra) A1. Initial discussion This is the construction stage of the project. The building will be built under a contract between the Client and Contractor. A2. Sustainable Design In normal circumstances, we would only take part in a project where we are engaged to administer the contract. Having A3. Site Analysis been responsible for the design and documentation, we have an intimate understanding of what is required by the contract A4. Pre-design Studies and are therefore in the best position to administer it. A5. Preliminary Design As architects, we have three quite distinct roles during contract administration. They are: B1. Detailed Design 1. to act as the Clientʼs professional advisor C1. Contract Documentation 2. to act as the Clientʼs agent C2. Tendering & Negotiation 3. to administer the contract D1. Site Supervision In the first two of these roles, the architect is entitled to promote the Clientʼs interests. In the third, the architect must act D2. Final Certificate impartially between the Client and the Contractor, which must be clearly understood by all parties at the outset of the construction process. If the architect has been appointed site safety coordinator, then the architect will approve the E1. Additional Services contractorʼs site safety proposals, and supervise their implementation. F1. Fees During construction, it is the Contractor's ultimate responsibility to ensure that the work is executed in accordance with the F2. Fee Stages contract documents and the requirements of the site safety project. We visit the site at regular intervals to provide an executive level of observation on the Clientʼs behalf. The Arquitecte Tècnic/Aparejador is responsible for on-site quality control and if appointed, for site safety coordination. The architectʼs responsibilities during this stage include: • Prepare contract documents for signing by the Client and Contractor. • Notify selected contractor and unsuccessful tenderers on behalf of the Client. • Provide periodic site visits to observe progress and compliance with the contract documents. • Convene project coordination and/or site meetings. • Review and monitor Contractor's programme. • Review and approve fabrication drawings. • Review samples and prototypes. • Liaise with and coordinate any other consultants. • Provide additional information or clarification to the builder to enable him/her to carry out the building. • Issue variations and all instructions to contractual parties. • Maintain records on costs including all variations. • Give notices of any justified extensions of contract duration. • Certify claims by the builder for payment and variations to the contract are correct. • Issue certificates for payment. We also ensure that things that slide slide, things that shine donʼt buzz, and that water stays in the right place. 9 // 13 9 13
  • 11. THE ARCHITECTURAL PROCESS D2. FINAL CERTIFICATE (Liquidació / Liquidación) A1. Initial discussion With the completion of the construction works, we undertake the calculation of the final statement of costs and supervise A2. Sustainable Design the reception of the building by the client in accordance with the Contract. A3. Site Analysis A4. Pre-design Studies The architectʼs responsibilities during this stage include: A5. Preliminary Design • Make partial and practical completion (Acta de Recepció / Recepción) inspections and issue certificates. B1. Detailed Design • Notification of faults during the Defects Liability Period. • Issue the Final Certificate (Final de Obra) and authorise release of retentions. C1. Contract Documentation • Prepare As-Built drawings incorporating any modifications to the original project. C2. Tendering & Negotiation • Maintenance and Building Use manuals (Llibre del Edifici / Libro del del Edificio) if required. • Supervision of the legalisation of Mechanical and Electrical Services. D1. Site Supervision • Coordination of the legalization of non-residential projects. D2. Final Certificate • First occupier certificate for residential projects. E1. Additional Services The Maintenance and Building Use should be read and understood by all building owners. Cyclical maintenance within the specified periods will avoid increased energy consumption, blocked drains, leaking roofs and creaking timber. A well- F1. Fees designed and properly maintained building will not depreciate in value. F2. Fee Stages We strongly recommend that the Client retain a percentage of the Contract Sum, to be released to the Contractor after an agreed Defects Liability Period. 10 // 13 10 13
  • 12. THE ARCHITECTURAL PROCESS E1. ADDITIONAL SERVICES (Serveis Adicionals / Servicios Adicionales) A1. Initial discussion Relocation and Building procurement A2. Sustainable Design A3. Site Analysis Clients requiring relocation sites or relocation to existing buildings can contract our services. We check on the development A4. Pre-design Studies potential of the site or building according to local regulations. In the case of existing buildings, a structural and condition A5. Preliminary Design survey would also be undertaken in order to establish its fitness for the intended use. B1. Detailed Design Project Management C1. Contract Documentation We also undertake the Project Management of small and medium sized projects, providing the Client with specific scope, C2. Tendering & Negotiation time, and cost control. We can also coordinate consultants and subcontractors where a general contractor is unnecessary or undesirable, and manage statutory consent submissions on behalf of the Client. D1. Site Supervision D2. Final Certificate Town Planning and Urbanism E1. Additional Services Planning and development studies may be undertaken for larger scale projects (Estudis de Detalle), and submissions made for the occupation and refurbishment of rural properties. F1. Fees F2. Fee Stages Interior Design Our own projects include all fixed furniture, fittings and general illumination. Should the Client require a comprehensive Interior Design package, we can coordinate the selection and procurement process and provide the design services required for their successful implementation. Landscape Design We can provide a comprehensive Landscape Design service in collaboration with our specialized consultants, ranging from the selection of appropriate planting and finishes, to more complex civil engineering solutions. Marketing We design and work exclusively in three dimensions, and our computer-generated models may be used to create high quality renders and animation sequences for marketing and fund-raising purposes. Site Safety For most projects, we can prepare the Site Safety project (Estudi de Seguritat i Salut), and may either coordinate implementation and compliance (Coordinació de Seguretat I Salut), or we can recommend a suitable professional to undertake these legal responsibilities. 11 // 13 11 13
  • 13. THE ARCHITECTURAL PROCESS F1. FEES (Honoraris / Honorarios) A1. Initial discussion It is important that clients are aware of the costs of architectural services early in the relationship. Our charges will be A2. Sustainable Design specific to the complexity of the job and the extent of our involvement. A3. Site Analysis A4. Pre-design Studies Our fees may be based upon time charges, lump-sum fees, percentage fees or a combination of these. All of these are IVA A5. Preliminary Design exclusive. We use a standard COAC agreement for architectural services as a contract between Client and architect. We are happy to talk about fees and services and will give quotes once the scope of work is known. Our fees include structural B1. Detailed Design design and the specification of basic electrical, thermal and liquid services, unless the Client wishes to appoint specific consultants. C1. Contract Documentation C2. Tendering & Negotiation Time Charges: D1. Site Supervision We generally apply hourly charges for small amounts of work or if the scope of work has not yet been decided. D2. Final Certificate Percentage Fees (Full Service): E1. Additional Services A percentage fee is the traditional method of charging for architectural services. The percentage charged varies upon the F1. Fees value of the work (for example, as the value of the job increases there is a smaller percentage required to cover the hours F2. Fee Stages worked) and the complexity of the work (for example, owner-occupied residential projects tend to be more complex than warehouses, and therefore take longer to design and document). This percentage is applied to the basic cost (PEM, excluding the builderʼs profit and VAT) of all elements designed, specified and certified by ourselves or by consultants coordinated by us. We invoice based upon cost estimates of this work until a Contract Sum is fixed. Modifications to the project after stage B will be charged by agreement with the Client. Lump Sum Fees: We can charge a fixed fee and this is calculated specifically for individual projects. Partial Services: We would consider our appointment for a partial service comprising phases A & B, although it is usually in the Clientʼs interest to contract the same architect for all phases of the architectural process. Additional Services: The fees that we may charge for additional services are calculated using the same criteria as our architectural service. We may include these services in our architectural fees, depending on the size and complexity of the project. 12 // 13 12 13
  • 14. THE ARCHITECTURAL PROCESS F2. FEE STAGES A1. Initial discussion To give some idea of the relative costs of the different work stages, we have broken down a typical project into the A2. Sustainable Design percentage of the total fees charged for each phase: A3. Site Analysis A4. Pre-design Studies A1 Initial Discussion 0% A5. Preliminary Design A2 Sustainability 0% B1. Detailed Design A3 Site Analysis 2% A4 Pre-Design Studies 3% C1. Contract Documentation A5 Preliminary Design 10% C2. Tendering & Negotiation Total Phase A 15% B1 Detailed Design 15% D1. Site Supervision Total Phase B 15% D2. Final Certificate C1 Contract Documentation 35% C2 Tendering and Negotiation 5% E1. Additional Services Total Phase C 40% F1. Fees D1 Site Supervision 25% F2. Fee Stages D2 Final Certificate 5% Total Phase D 30% Total Fees 100% Disbursements: We may also charge for some expense items such as travel and printing of drawings. The Client would agree charges for expenses before they are incurred. Exclusions: The following items are not usually included in our standard percentage fees: • site and existing building surveys • geotechnical survey • environmental impact reports • site health and safety project and coordination • legalization of commercial premises • grant applications We will advise the Client on the selection of the relevant specialists for each of these items. 13 // 13 13 13