MARINE AND OFFSHORE
CONSTRUCTION EQUIPMENT
FABIL .T
MT15CTM003
VISVESVARAYA NATIONAL INSTITUTE OF TECHNOLOGY,NAGPUR
INTRODUCTION
• OCEANS PRESENT UNIQUE ENVIRONMENTAL CONDITIONS THAT DOMINATES
METHODS, EQUIPMENT AND PROCEDURES
• MOST MARINE CONSTRUCTIONS AT SUBSTANTIAL DISTANCE FROM SHORE,
THUS UNIQUE METHODS AND EQUIPMENT'S HAS TO BE USED
• CONSTRUCTION OPERATION : 2000 M
• EXPLORATORY OIL DRILLING : 6000 M
• EQUIPMENT ARE DESIGNED TO WORK IN AND UNDER SEA AND DRAWN HEAVILY
ON NAVEL ARCHITECTURE
• INCLUDE BARGES, SHIPS AND CONSTRUCTION, DRILLING ,DREDGING
EQUIPMENT.
• MAIN CONSTRUCTION ACTIVITIES
OFFSHORE WIND FARM,
OIL PLATFORM
BRIDGE PIERS
HARBOR
BASIC MOTIONS IN A SEAWAY
• A TYPICAL FLOATING STRUCTURE HAS 6 DEGREE OF FREEDOM AND 6 BASIC
RESPONSE TO WAVE
• ROLL, PITCH, HEAVE,
SURGE ,SWAY AND YAW
• VESSELS OR EQUIPMENTS RESPONDS TO COMPLEX SET OF ALL THE ABOVE
MOTIONS
• MOTION ARE AFFECTED BY WAVES AND TIDES
BARGES
• LARGE FLAT BOTTOMED TOWED OR SELF PROPELLED BOAT USED FOR HEAVY
GOODS AND BULK CARGO TRANSPORT
• LONG FOR MINIMAL SURGE AND PITCH RESPONSE TO WAVE, WIDE FOR MINIMAL
ROLL
DEEP FOR ADEQUATE BENDING STRENGTH AGAINST HOG AND SAG
• IN CONSTRUCTION THEY ARE USED TO CARRY ROCK REMOVED BY CLAMSHELL
OR DRAGLINES
AND UPON WHICH EQUIPMENT LIKE TRACKED CRANE OR LOADER ARE OPERATED
• TYPICAL BARGE RUN 80 TO 160 M LENGTH ,WIDTH 1/3 OF LENGTH ,DEPTH
1/15 OF LENGTH
CRANE BARGES
• BARGE EQUIPPED WITH SHEER LEG CRANE OR FULLY ROTATING CRANE
• SHEER LEGS ARE RIGID A-FRAME SUPPORT AND MANEUVERED BY DECK ENGINE
,TUGS
• WHICH CAN LIFT AN LUFF BUT NOT SWING
• MAXIMUM CAPACITY 7000 T
• LESS COSTLY COMPARED TO ROTATING
DERRICK BARGES
• FULLY REVOLVING
• WORKHORSE OF OFFSHORE CONSTRUCTION
• CAPACITY 500- 1500 T
• THE ADVANTAGE IS OPERATION IN ALL DIRECTIONS –SWING
• DESIGNED UPON NAVEL AND STRUCTURAL ARCHITECTURE
SEMISUBMERSIBLE BARGES
• STANDARD BARGE SERVING CARGO TRANSPORT OR AS SUPPORT TO CRANE
,OTHER OPERATIONAL EQUIPMENT
• LARGE BASE PONTOON (FLAT BOTTOM HOLLOW METAL CHAMBER)
• FULLY SUBMERGED DURING OPERATION
• PROVIDE MORE STABILITY AGAINST WAVES
• 4 TO 8 COLUMN THAT EXTEND THROUGH WATER SUPPORT DECK
JACK UP CONSTRUCTION BARGE
• USE FULL FOR WORKING IN TURBULENT SEA, COASTAL WATER
• FITTED WITH 4 TO 8 LARGE JACKS AND LEGS ; TUBULAR OR FABRICATED STEEL
• BARGE IS TOWED TO WORK POSITION AND JACK UP FREE FROM WAVE
• OPERATE ONLY IN RELATIVELY SHALLOW WATER 30-60 M , 150 EXTREME ,
SINCE LEGS ARE LOWERED TO SEA FLOOR
LAUNCH BARGES
• USED FOR TRANSPORT AND LAUNCHING OF JACKETS
• TO DELIVER SUBSEA TEMPLATES WHICH BECOME WORKING PLATFORM OR THE
STRUCTURE ITSELF
• VERY LARGE AND STRONGLY BUILT
• HEAVY RUNNER BEAMS/LAUNCH BEAMS OVER WHICH JACKET WILL SLIDE
CATAMARAN BARGES
• FOR HEAVY LIFTING IN HARBORS AND ESPECIALLY USED FOR SUBMERGED
PREFABRICATED TUNNEL
• TWO LONG BARGES SPREAD APART AND JOINED OVER THE TOP BY GANTRIES
• GANTRIES MAY BE TWIN GANTRY TRUSSES TO ENABLE LIFTING
DREDGE
• FOR DREDGING – CLEAR BED OF HARBOR , RIVER , OTHER AREA OF WATER
BY SCOOPING OUT MUD
• DIFFERENT TYPES BASED UPON EXTENT , QUALITY, TYPE OF SOIL REMOVED ,
DISPOSAL REQUIREMENT AND DEPTH
CLAMSHELL DREDGE - BUCKET ON VERTICAL LINE ENABLES TO USE CLOSE TO
EXISTING STRUCTURE.
DRAGLINE DREDGE - SUITABLE FOR DIGGING TRENCHES IN SHALLOW WATER ,
SOFT AND MODERATE HARD SOIL
LADDER OR CONTINUOUS FLIGHT BUCKET – DIG DEEPLY >40 M IN HARD
MATERIAL.
HYDRAULIC SUCTION DREDGE – SUCK UP MATERIAL THROUGH A PIPE THEN
DISCHARGE IN TO PONTOON OR REQUIRED DISTANCE
CUTTER HEAD DREDGE – IN DENSE AND HARD MATERIAL , CUTTER HEAD
MOUNTED AT THE END OF SUCTION LINE
TRAILER SUCTION HOPPER – SELF PROPELLED VESSEL WITH JET TO BREAK UP SAND
AND SUCK
RIPPER TEETH TO CUT HARD MATERIAL.
ANCHOR HANDLING BOATS
• TO PICK AND MOVE ANCHOR EVEN IN ROUGH SEA
• SHORT HIGH MANEUVERABLE VESSELS
• HYDRAULIC ASSIST EQUIPMENT IS AVAILABLE
DRILLING VESSELS
• SEMISUBMERSIBLE AND BARGE TYPE
• USED MAINLY FOR EXPLORATORY DRILLING
• HEAVY LIFT EQUIPMENT FOR DRILL STRING
• HAS CENTRAL MOON POOL( OPEN WELL ) WHICH PROVIDE DIRECT
AND PARTIALLY PROTECTED ACCESS TO SEA BELOW
• ABILITY TO WORK AT GREAT DEPTHS
• SETTING SUBSEA TEMPLATES,
PIPE LINE REPAIR AND SEA FLOOR MODIFICATION
• USUALLY EQUIPPED WITH LARGE HOIST OF 500 T CAPACITY
FLOATING CONCRETE PLANT
• MOUNTED ON LARGE , HEAVY DUTY BARGE, EQUIPPED WITH MOORING LINES
TO HOLD THE BARGE IN POSITION
• HAVE ; LARGE BIN FOR CA AND FA
SILO FOR CEMENT
SILO FOR FLY ASH AND BLAST FURNACE SLAG
WATER TANK
BATCHING PLANT
CONCRETE MIXER – NORMALLY TURBINE MIXER
CONCRETE PUMP
ROV
• REMOTELY OPERATED UNDERWATER VEHICLES
• HIGHLY MANEUVERABLE , OPERATED BY CREW ABOARD A VESSEL
• COMMON IN DEEP WATER HYDROCARBON INDUSTRY
• LEAST EQUIPPED WITH VIDEO CAMERA AND LIGHT
• USED FOR INSPECTION,WELDING
THANK YOU
The waves tell of ocean spaces,
Of hearts that are wild and brave.

Contenu connexe

Tendances

underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanDavid H Moloney
 
Eccentric connections 1
Eccentric connections 1Eccentric connections 1
Eccentric connections 1sky hawk
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSSuyash Awasthi
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTvikas verma
 
Tremie concreting
Tremie concretingTremie concreting
Tremie concretingpriyank 59
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss Sudhir Gayake
 
seepage through earthen dam
seepage through earthen damseepage through earthen dam
seepage through earthen damNathanimahar
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGEAnkit Gautam
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control WorksGAURAV. H .TANDON
 
Rmc plant
Rmc plantRmc plant
Rmc plantKp Ahm
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Construction methods and equipments
Construction methods and equipmentsConstruction methods and equipments
Construction methods and equipmentsR VIJAYAKUMAR
 

Tendances (20)

Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution Plan
 
Eccentric connections 1
Eccentric connections 1Eccentric connections 1
Eccentric connections 1
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
Trenching machine
Trenching machineTrenching machine
Trenching machine
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Tower crane
Tower craneTower crane
Tower crane
 
Construction process
Construction processConstruction process
Construction process
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
Deck slab bridge
Deck slab bridgeDeck slab bridge
Deck slab bridge
 
Tremie concreting
Tremie concretingTremie concreting
Tremie concreting
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss
 
seepage through earthen dam
seepage through earthen damseepage through earthen dam
seepage through earthen dam
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Rmc plant
Rmc plantRmc plant
Rmc plant
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Construction methods and equipments
Construction methods and equipmentsConstruction methods and equipments
Construction methods and equipments
 

En vedette

Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projectsFernando Remolina, PMP
 
Broussard Brothers, Inc. BB-90
Broussard Brothers, Inc. BB-90Broussard Brothers, Inc. BB-90
Broussard Brothers, Inc. BB-90Chuck Landry
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introductionBruce nguyen
 
Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Innovation Norway
 
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...João Henrique Volpini Mattos
 

En vedette (6)

Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
 
Mercurius Shipping Group: Crane Barge
Mercurius Shipping Group: Crane BargeMercurius Shipping Group: Crane Barge
Mercurius Shipping Group: Crane Barge
 
Broussard Brothers, Inc. BB-90
Broussard Brothers, Inc. BB-90Broussard Brothers, Inc. BB-90
Broussard Brothers, Inc. BB-90
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
 
Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard
 
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...
SUC Brasil 2012 : Engineering Study for Barge Lifting Weight on Crane Barge O...
 

Similaire à Marine and offshore construction equipments

Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujaratadhyaru19
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion RAJ BAIRWA
 
Ports, Harbours & Docks.pptx
Ports, Harbours & Docks.pptxPorts, Harbours & Docks.pptx
Ports, Harbours & Docks.pptxAnujyadav514462
 
Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916PALANIVEL SUBBIAH
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction madhura92
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfShrutiLotliker
 
Design Aspects of Gates of Dam
Design Aspects of Gates of DamDesign Aspects of Gates of Dam
Design Aspects of Gates of DamTushar Dholakia
 
Fish aggrigrating devices(fad)
Fish aggrigrating devices(fad)Fish aggrigrating devices(fad)
Fish aggrigrating devices(fad)Ashish sahu
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreShankaregowda Mandya
 
Harbour 160808044336 (1)
Harbour 160808044336 (1)Harbour 160808044336 (1)
Harbour 160808044336 (1)ArunKumar7403
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit vDr.Anil Deshpande
 
Dams and Reserviors
Dams and ReserviorsDams and Reserviors
Dams and ReserviorsTarun kumar
 
harbour-160808044336.ppt
harbour-160808044336.pptharbour-160808044336.ppt
harbour-160808044336.pptRishi Nath
 
Offshore mining
Offshore miningOffshore mining
Offshore miningAbhiRam152
 

Similaire à Marine and offshore construction equipments (20)

Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujarat
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion
 
Ports, Harbours & Docks.pptx
Ports, Harbours & Docks.pptxPorts, Harbours & Docks.pptx
Ports, Harbours & Docks.pptx
 
Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdf
 
Design Aspects of Gates of Dam
Design Aspects of Gates of DamDesign Aspects of Gates of Dam
Design Aspects of Gates of Dam
 
Fish aggrigrating devices(fad)
Fish aggrigrating devices(fad)Fish aggrigrating devices(fad)
Fish aggrigrating devices(fad)
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT Mysore
 
CAISSON PPT.pptx
CAISSON PPT.pptxCAISSON PPT.pptx
CAISSON PPT.pptx
 
Harbour
HarbourHarbour
Harbour
 
Harbour 160808044336 (1)
Harbour 160808044336 (1)Harbour 160808044336 (1)
Harbour 160808044336 (1)
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit v
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Cac loai gian khoan
Cac loai gian khoanCac loai gian khoan
Cac loai gian khoan
 
Dams and Reserviors
Dams and ReserviorsDams and Reserviors
Dams and Reserviors
 
harbour-160808044336.ppt
harbour-160808044336.pptharbour-160808044336.ppt
harbour-160808044336.ppt
 
Offshore_Technology.pptx
Offshore_Technology.pptxOffshore_Technology.pptx
Offshore_Technology.pptx
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Offshore mining
Offshore miningOffshore mining
Offshore mining
 

Dernier

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 

Dernier (20)

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 

Marine and offshore construction equipments

  • 1. MARINE AND OFFSHORE CONSTRUCTION EQUIPMENT FABIL .T MT15CTM003 VISVESVARAYA NATIONAL INSTITUTE OF TECHNOLOGY,NAGPUR
  • 2. INTRODUCTION • OCEANS PRESENT UNIQUE ENVIRONMENTAL CONDITIONS THAT DOMINATES METHODS, EQUIPMENT AND PROCEDURES • MOST MARINE CONSTRUCTIONS AT SUBSTANTIAL DISTANCE FROM SHORE, THUS UNIQUE METHODS AND EQUIPMENT'S HAS TO BE USED • CONSTRUCTION OPERATION : 2000 M • EXPLORATORY OIL DRILLING : 6000 M • EQUIPMENT ARE DESIGNED TO WORK IN AND UNDER SEA AND DRAWN HEAVILY ON NAVEL ARCHITECTURE • INCLUDE BARGES, SHIPS AND CONSTRUCTION, DRILLING ,DREDGING EQUIPMENT.
  • 3. • MAIN CONSTRUCTION ACTIVITIES OFFSHORE WIND FARM, OIL PLATFORM BRIDGE PIERS HARBOR
  • 4. BASIC MOTIONS IN A SEAWAY • A TYPICAL FLOATING STRUCTURE HAS 6 DEGREE OF FREEDOM AND 6 BASIC RESPONSE TO WAVE • ROLL, PITCH, HEAVE, SURGE ,SWAY AND YAW
  • 5. • VESSELS OR EQUIPMENTS RESPONDS TO COMPLEX SET OF ALL THE ABOVE MOTIONS • MOTION ARE AFFECTED BY WAVES AND TIDES
  • 6. BARGES • LARGE FLAT BOTTOMED TOWED OR SELF PROPELLED BOAT USED FOR HEAVY GOODS AND BULK CARGO TRANSPORT • LONG FOR MINIMAL SURGE AND PITCH RESPONSE TO WAVE, WIDE FOR MINIMAL ROLL DEEP FOR ADEQUATE BENDING STRENGTH AGAINST HOG AND SAG • IN CONSTRUCTION THEY ARE USED TO CARRY ROCK REMOVED BY CLAMSHELL OR DRAGLINES AND UPON WHICH EQUIPMENT LIKE TRACKED CRANE OR LOADER ARE OPERATED • TYPICAL BARGE RUN 80 TO 160 M LENGTH ,WIDTH 1/3 OF LENGTH ,DEPTH 1/15 OF LENGTH
  • 7.
  • 8.
  • 9.
  • 10. CRANE BARGES • BARGE EQUIPPED WITH SHEER LEG CRANE OR FULLY ROTATING CRANE • SHEER LEGS ARE RIGID A-FRAME SUPPORT AND MANEUVERED BY DECK ENGINE ,TUGS • WHICH CAN LIFT AN LUFF BUT NOT SWING • MAXIMUM CAPACITY 7000 T • LESS COSTLY COMPARED TO ROTATING
  • 11.
  • 12.
  • 13. DERRICK BARGES • FULLY REVOLVING • WORKHORSE OF OFFSHORE CONSTRUCTION • CAPACITY 500- 1500 T • THE ADVANTAGE IS OPERATION IN ALL DIRECTIONS –SWING • DESIGNED UPON NAVEL AND STRUCTURAL ARCHITECTURE
  • 14.
  • 15. SEMISUBMERSIBLE BARGES • STANDARD BARGE SERVING CARGO TRANSPORT OR AS SUPPORT TO CRANE ,OTHER OPERATIONAL EQUIPMENT • LARGE BASE PONTOON (FLAT BOTTOM HOLLOW METAL CHAMBER) • FULLY SUBMERGED DURING OPERATION • PROVIDE MORE STABILITY AGAINST WAVES • 4 TO 8 COLUMN THAT EXTEND THROUGH WATER SUPPORT DECK
  • 16.
  • 17.
  • 18.
  • 19. JACK UP CONSTRUCTION BARGE • USE FULL FOR WORKING IN TURBULENT SEA, COASTAL WATER • FITTED WITH 4 TO 8 LARGE JACKS AND LEGS ; TUBULAR OR FABRICATED STEEL • BARGE IS TOWED TO WORK POSITION AND JACK UP FREE FROM WAVE • OPERATE ONLY IN RELATIVELY SHALLOW WATER 30-60 M , 150 EXTREME , SINCE LEGS ARE LOWERED TO SEA FLOOR
  • 20.
  • 21.
  • 22. LAUNCH BARGES • USED FOR TRANSPORT AND LAUNCHING OF JACKETS • TO DELIVER SUBSEA TEMPLATES WHICH BECOME WORKING PLATFORM OR THE STRUCTURE ITSELF • VERY LARGE AND STRONGLY BUILT • HEAVY RUNNER BEAMS/LAUNCH BEAMS OVER WHICH JACKET WILL SLIDE
  • 23.
  • 24.
  • 25. CATAMARAN BARGES • FOR HEAVY LIFTING IN HARBORS AND ESPECIALLY USED FOR SUBMERGED PREFABRICATED TUNNEL • TWO LONG BARGES SPREAD APART AND JOINED OVER THE TOP BY GANTRIES • GANTRIES MAY BE TWIN GANTRY TRUSSES TO ENABLE LIFTING
  • 26.
  • 27. DREDGE • FOR DREDGING – CLEAR BED OF HARBOR , RIVER , OTHER AREA OF WATER BY SCOOPING OUT MUD • DIFFERENT TYPES BASED UPON EXTENT , QUALITY, TYPE OF SOIL REMOVED , DISPOSAL REQUIREMENT AND DEPTH CLAMSHELL DREDGE - BUCKET ON VERTICAL LINE ENABLES TO USE CLOSE TO EXISTING STRUCTURE. DRAGLINE DREDGE - SUITABLE FOR DIGGING TRENCHES IN SHALLOW WATER , SOFT AND MODERATE HARD SOIL LADDER OR CONTINUOUS FLIGHT BUCKET – DIG DEEPLY >40 M IN HARD MATERIAL.
  • 28. HYDRAULIC SUCTION DREDGE – SUCK UP MATERIAL THROUGH A PIPE THEN DISCHARGE IN TO PONTOON OR REQUIRED DISTANCE CUTTER HEAD DREDGE – IN DENSE AND HARD MATERIAL , CUTTER HEAD MOUNTED AT THE END OF SUCTION LINE TRAILER SUCTION HOPPER – SELF PROPELLED VESSEL WITH JET TO BREAK UP SAND AND SUCK RIPPER TEETH TO CUT HARD MATERIAL.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. ANCHOR HANDLING BOATS • TO PICK AND MOVE ANCHOR EVEN IN ROUGH SEA • SHORT HIGH MANEUVERABLE VESSELS • HYDRAULIC ASSIST EQUIPMENT IS AVAILABLE
  • 35. DRILLING VESSELS • SEMISUBMERSIBLE AND BARGE TYPE • USED MAINLY FOR EXPLORATORY DRILLING • HEAVY LIFT EQUIPMENT FOR DRILL STRING • HAS CENTRAL MOON POOL( OPEN WELL ) WHICH PROVIDE DIRECT AND PARTIALLY PROTECTED ACCESS TO SEA BELOW • ABILITY TO WORK AT GREAT DEPTHS • SETTING SUBSEA TEMPLATES, PIPE LINE REPAIR AND SEA FLOOR MODIFICATION • USUALLY EQUIPPED WITH LARGE HOIST OF 500 T CAPACITY
  • 36.
  • 37. FLOATING CONCRETE PLANT • MOUNTED ON LARGE , HEAVY DUTY BARGE, EQUIPPED WITH MOORING LINES TO HOLD THE BARGE IN POSITION • HAVE ; LARGE BIN FOR CA AND FA SILO FOR CEMENT SILO FOR FLY ASH AND BLAST FURNACE SLAG WATER TANK BATCHING PLANT CONCRETE MIXER – NORMALLY TURBINE MIXER CONCRETE PUMP
  • 38.
  • 39. ROV • REMOTELY OPERATED UNDERWATER VEHICLES • HIGHLY MANEUVERABLE , OPERATED BY CREW ABOARD A VESSEL • COMMON IN DEEP WATER HYDROCARBON INDUSTRY • LEAST EQUIPPED WITH VIDEO CAMERA AND LIGHT • USED FOR INSPECTION,WELDING
  • 40.
  • 41. THANK YOU The waves tell of ocean spaces, Of hearts that are wild and brave.