Hydropower can be a powerful engine for economic growth, especially when linked with industries that seek low-carbon energy supply. Traditional and new power-intensive industries, such as metal, manufacturing, consumer goods, and internet data centres, are particularly likely to demand low-carbon energy. How to successfully link generation with these industries’ demand for power? This session will present recent case studies and will discuss their regional impacts.
Case study: Sarawak Corridor of Renewable Energy, Mr Chang Ngee Hui, Economic Advisor, State Planning Unit
Unleash Your Potential - Namagunga Girls Coding Club
IHA 2013 World Congress: Bringing markets to the resource case study: Sarawak Corridor of Renewable Energy
1. Bringing Markets to the Resource:
The Case of SCORE
Chang Ngee Hui
Economic Adviser
State Planning Unit
Sarawak
IHA World Congress, Menara Sarawak Energy
20 May 2013 (Monday)
2. Sarawak’s Problem: Big and Lonely
• Geographically isolated, though strategically located
(now)
• Small economy, in need of a critical mass in economic
activity to take off
• Large geographic space, relative to population size, with
costly infrastructure requirements to develop into the
interior
• Agriculture, in need of higher value-added activities to
improve livelihood
3. Connecting to the Global Supply Chain
• Problems
– Identifying specific products which Sarawak can produce
– Identifying markets for local products
– Promoting local products
– Cost competitiveness re transport and logistics
• Solution: Think in reverse
– Attract market to Sarawak with a real attraction
– Projects will link Sarawak back to the markets and the global
supply chain
– Projects will form a basis for triggering off local activities
– Construction, services, skills
– SMEs, value chains, supply chains
5. Local Industrialisation
• For the first time, Sarawak is using its energy resources to
develop industries a home
• Why industries – to generate higher income; agriculture
has the lowest productivity growth
• Local communities unused to industrialisation – cultural
shock
• They want change for the better, and change starts with
economics
• After heavy industries, we need to focus on higher value-
added industrial activities
6. Current Work
• Many interested investors because of availability of non-
fossil fuel, more competitive
• Building a totally new infrastructure to cater to heavy
industries
– Power generation and transmission
– Port
– Communications
– Manpower training
7. Social and Environmental Impact
Assessment (SEIA) Study
SEIA Study
SEIA for Dam Contemporary
Ethnography
Cultural
Heritage and
Archaeology
Development
of
Resettlement
Action Plan
SEIA for
Resettlement
Economic
Study
8. Consultations. Nearly 40
formal consultations and nearly 80
informal consultations with the
directly affected communities had
been conducted during the course of
the SEIA Study. Major ones are:
1 7 October 2009 Meeting with Affected Communities to introduce Study
2 1 December 2009 Meeting to brief on resettlement and roles of government departments and agencies
3 13 January 2010 Selection of Proposed Resettlement Site for Long Wat
4 24 March 2010 Selection of Proposed Resettlement Sites for Plieran Group
5 25 March 2010 Selection of Proposed Resettlement Site for Long Malim
6 30 April 2010 First Murum Penan Development Meeting (MPDC)
7 12 June 2010 Meeting Shin Yang and Pelieran Group
8 7 July 2010 Briefing on Preliminary Feasibility Findings of Preferred Resettlement Sites
20 August 2010 Briefing to SPA on SEIA for Murum Resettlement
9 28 September 2010 Meeting with Long Malim to discuss voluntary resettlement site
10 29 September 2010 Meeting with Plieran Group to discuss voluntary resettlement site
11 30 September 2010 Meeting with Long Wat to discuss voluntary resettlement site
12 29 October 2010 Meeting with Long Malim to confirm decision to move to Tegulang
DO Belaga Abdul Halim
moderating during the
question and answer session,
1 December 2009
9. Consultations/2
13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer
14 15 December 2010 General meeting of MPDC at Long Singu
14 February 2011 Briefing of Murum SEIA to CM on resettlement site
15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size
16 30 June 2011 MPDC meeting at Sungei Asap
17 1-2 July 2011 Metalun longhouse site selection exercise
18 3 July 2011 Tegulang longhouse site selection exercise
19 15 August 2011 Pegging of Tegulang longhouse sites
20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal
21 27 September 2011 Pegging of Metalun longhouse sites
22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan
rituals and customs during resettlement process
The affected communities
were being briefed on the
design of the longhouse, 22
September 2011
10. Consultations/2
13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer
14 15 December 2010 General meeting of MPDC at Long Singu
14 February 2011 Briefing of Murum SEIA to CM on resettlement site
15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size
16 30 June 2011 MPDC meeting at Sungei Asap
17 1-2 July 2011 Metalun longhouse site selection exercise
18 3 July 2011 Tegulang longhouse site selection exercise
19 15 August 2011 Pegging of Tegulang longhouse sites
20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal
21 27 September 2011 Pegging of Metalun longhouse sites
22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan
rituals and customs during resettlement process
The affected communities
were being briefed on the
design of the longhouse, 22
September 2011