Bringing Markets to the Resource:
The Case of SCORE
Chang Ngee Hui
Economic Adviser
State Planning Unit
Sarawak
IHA World Congress, Menara Sarawak Energy
20 May 2013 (Monday)
Sarawak’s Problem: Big and Lonely
• Geographically isolated, though strategically located
(now)
• Small economy, in need of a critical mass in economic
activity to take off
• Large geographic space, relative to population size, with
costly infrastructure requirements to develop into the
interior
• Agriculture, in need of higher value-added activities to
improve livelihood
Connecting to the Global Supply Chain
• Problems
– Identifying specific products which Sarawak can produce
– Identifying markets for local products
– Promoting local products
– Cost competitiveness re transport and logistics
• Solution: Think in reverse
– Attract market to Sarawak with a real attraction
– Projects will link Sarawak back to the markets and the global
supply chain
– Projects will form a basis for triggering off local activities
– Construction, services, skills
– SMEs, value chains, supply chains
Sarawak as Energy Producer
• Oil and gas
• Hydro
• Coal
Local Industrialisation
• For the first time, Sarawak is using its energy resources to
develop industries a home
• Why industries – to generate higher income; agriculture
has the lowest productivity growth
• Local communities unused to industrialisation – cultural
shock
• They want change for the better, and change starts with
economics
• After heavy industries, we need to focus on higher value-
added industrial activities
Current Work
• Many interested investors because of availability of non-
fossil fuel, more competitive
• Building a totally new infrastructure to cater to heavy
industries
– Power generation and transmission
– Port
– Communications
– Manpower training
Social and Environmental Impact
Assessment (SEIA) Study
SEIA Study
SEIA for Dam Contemporary
Ethnography
Cultural
Heritage and
Archaeology
Development
of
Resettlement
Action Plan
SEIA for
Resettlement
Economic
Study
Consultations. Nearly 40
formal consultations and nearly 80
informal consultations with the
directly affected communities had
been conducted during the course of
the SEIA Study. Major ones are:
1 7 October 2009 Meeting with Affected Communities to introduce Study
2 1 December 2009 Meeting to brief on resettlement and roles of government departments and agencies
3 13 January 2010 Selection of Proposed Resettlement Site for Long Wat
4 24 March 2010 Selection of Proposed Resettlement Sites for Plieran Group
5 25 March 2010 Selection of Proposed Resettlement Site for Long Malim
6 30 April 2010 First Murum Penan Development Meeting (MPDC)
7 12 June 2010 Meeting Shin Yang and Pelieran Group
8 7 July 2010 Briefing on Preliminary Feasibility Findings of Preferred Resettlement Sites
20 August 2010 Briefing to SPA on SEIA for Murum Resettlement
9 28 September 2010 Meeting with Long Malim to discuss voluntary resettlement site
10 29 September 2010 Meeting with Plieran Group to discuss voluntary resettlement site
11 30 September 2010 Meeting with Long Wat to discuss voluntary resettlement site
12 29 October 2010 Meeting with Long Malim to confirm decision to move to Tegulang
DO Belaga Abdul Halim
moderating during the
question and answer session,
1 December 2009
Consultations/2
13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer
14 15 December 2010 General meeting of MPDC at Long Singu
14 February 2011 Briefing of Murum SEIA to CM on resettlement site
15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size
16 30 June 2011 MPDC meeting at Sungei Asap
17 1-2 July 2011 Metalun longhouse site selection exercise
18 3 July 2011 Tegulang longhouse site selection exercise
19 15 August 2011 Pegging of Tegulang longhouse sites
20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal
21 27 September 2011 Pegging of Metalun longhouse sites
22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan
rituals and customs during resettlement process
The affected communities
were being briefed on the
design of the longhouse, 22
September 2011
Consultations/2
13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer
14 15 December 2010 General meeting of MPDC at Long Singu
14 February 2011 Briefing of Murum SEIA to CM on resettlement site
15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size
16 30 June 2011 MPDC meeting at Sungei Asap
17 1-2 July 2011 Metalun longhouse site selection exercise
18 3 July 2011 Tegulang longhouse site selection exercise
19 15 August 2011 Pegging of Tegulang longhouse sites
20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal
21 27 September 2011 Pegging of Metalun longhouse sites
22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan
rituals and customs during resettlement process
The affected communities
were being briefed on the
design of the longhouse, 22
September 2011

Contenu connexe

Similaire à IHA 2013 World Congress: Bringing markets to the resource case study: Sarawak Corridor of Renewable Energy

Seoul internationalurbandevelopmentcollaboration 20140517
Seoul internationalurbandevelopmentcollaboration 20140517Seoul internationalurbandevelopmentcollaboration 20140517
Seoul internationalurbandevelopmentcollaboration 20140517
simrc
 
Think Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation studyThink Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation study
Toowoomba Region
 
Think tank 1 - West Toowoomba land use investigation study
Think tank 1 - West Toowoomba land use investigation studyThink tank 1 - West Toowoomba land use investigation study
Think tank 1 - West Toowoomba land use investigation study
Toowoomba Region
 
Water for All in Angola
Water for All in AngolaWater for All in Angola
Water for All in Angola
Rui de Sousa
 
Better livable town
Better livable town Better livable town
Better livable town
rachaelcheong
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
Crosstown TO
 
10 10 11 2_3_q all staff
10 10 11 2_3_q all staff10 10 11 2_3_q all staff
10 10 11 2_3_q all staff
UNICEF Supply
 

Similaire à IHA 2013 World Congress: Bringing markets to the resource case study: Sarawak Corridor of Renewable Energy (20)

Seoul internationalurbandevelopmentcollaboration 20140517
Seoul internationalurbandevelopmentcollaboration 20140517Seoul internationalurbandevelopmentcollaboration 20140517
Seoul internationalurbandevelopmentcollaboration 20140517
 
Agenda: Kick-off Meeting 21-22 September 2023 Evora, Portugal.pdf
Agenda: Kick-off Meeting 21-22 September 2023 Evora, Portugal.pdfAgenda: Kick-off Meeting 21-22 September 2023 Evora, Portugal.pdf
Agenda: Kick-off Meeting 21-22 September 2023 Evora, Portugal.pdf
 
oct & bulb
oct & bulboct & bulb
oct & bulb
 
Portfolio.4.15
Portfolio.4.15Portfolio.4.15
Portfolio.4.15
 
Think Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation studyThink Tank 1 - West Toowoomba land use investigation study
Think Tank 1 - West Toowoomba land use investigation study
 
Think tank 1 - West Toowoomba land use investigation study
Think tank 1 - West Toowoomba land use investigation studyThink tank 1 - West Toowoomba land use investigation study
Think tank 1 - West Toowoomba land use investigation study
 
Cv marinda le roux sept 2015
Cv marinda le roux sept 2015Cv marinda le roux sept 2015
Cv marinda le roux sept 2015
 
Neighbourhood Planning: The National Picture
Neighbourhood Planning: The National PictureNeighbourhood Planning: The National Picture
Neighbourhood Planning: The National Picture
 
Active18 agm-2013 public
Active18 agm-2013 publicActive18 agm-2013 public
Active18 agm-2013 public
 
Water for All in Angola
Water for All in AngolaWater for All in Angola
Water for All in Angola
 
Culture strategy presentation ola feb 2017
Culture strategy presentation ola feb 2017Culture strategy presentation ola feb 2017
Culture strategy presentation ola feb 2017
 
Presentation to georgian group
Presentation to georgian groupPresentation to georgian group
Presentation to georgian group
 
World FinTech Forum
World FinTech ForumWorld FinTech Forum
World FinTech Forum
 
Neighbourhood Planning: The National Picture November 2015
Neighbourhood Planning: The National Picture November 2015Neighbourhood Planning: The National Picture November 2015
Neighbourhood Planning: The National Picture November 2015
 
Better livable town
Better livable town Better livable town
Better livable town
 
Module service delivery niz 04.12.2014 rev2
Module service delivery niz 04.12.2014 rev2Module service delivery niz 04.12.2014 rev2
Module service delivery niz 04.12.2014 rev2
 
Module service delivery niz 04.12.2014 rev2
Module service delivery niz 04.12.2014 rev2Module service delivery niz 04.12.2014 rev2
Module service delivery niz 04.12.2014 rev2
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
10 10 11 2_3_q all staff
10 10 11 2_3_q all staff10 10 11 2_3_q all staff
10 10 11 2_3_q all staff
 
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSASITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
SITE ANALYSIS FOR TAMAN TASIK TITIWANGSA
 

Plus de International Hydropower Association

IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
International Hydropower Association
 

Plus de International Hydropower Association (20)

IHA 2013 World Congress: Canadian Hydropower Association: Hydropower - Canada...
IHA 2013 World Congress: Canadian Hydropower Association: Hydropower - Canada...IHA 2013 World Congress: Canadian Hydropower Association: Hydropower - Canada...
IHA 2013 World Congress: Canadian Hydropower Association: Hydropower - Canada...
 
IHA 2013 World Congress: Instituto Acende Brasil: Current initiatives and wha...
IHA 2013 World Congress: Instituto Acende Brasil: Current initiatives and wha...IHA 2013 World Congress: Instituto Acende Brasil: Current initiatives and wha...
IHA 2013 World Congress: Instituto Acende Brasil: Current initiatives and wha...
 
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
IHA 2013 World Congress: Nepal Hydropower Association: Hydropower Development...
 
IHA 2013 World Congress: Sarawak Energy: Incorporating Sustainability into Bu...
IHA 2013 World Congress: Sarawak Energy: Incorporating Sustainability into Bu...IHA 2013 World Congress: Sarawak Energy: Incorporating Sustainability into Bu...
IHA 2013 World Congress: Sarawak Energy: Incorporating Sustainability into Bu...
 
IHA 2013 World Congress: E.ON: Incorporating Sustainability into Business Pra...
IHA 2013 World Congress: E.ON: Incorporating Sustainability into Business Pra...IHA 2013 World Congress: E.ON: Incorporating Sustainability into Business Pra...
IHA 2013 World Congress: E.ON: Incorporating Sustainability into Business Pra...
 
IHA 2013 World Congress: GDF Suez: Climate change: Four dimensions for hydrop...
IHA 2013 World Congress: GDF Suez: Climate change: Four dimensions for hydrop...IHA 2013 World Congress: GDF Suez: Climate change: Four dimensions for hydrop...
IHA 2013 World Congress: GDF Suez: Climate change: Four dimensions for hydrop...
 
IHA 2013 World Congress: Dr Byman Hamududu: Climate change: Four dimensions ...
 IHA 2013 World Congress: Dr Byman Hamududu: Climate change: Four dimensions ... IHA 2013 World Congress: Dr Byman Hamududu: Climate change: Four dimensions ...
IHA 2013 World Congress: Dr Byman Hamududu: Climate change: Four dimensions ...
 
IHA 2013 World Congress: IPCC: Climate change: Four dimensions for hydropower
IHA 2013 World Congress: IPCC: Climate change: Four dimensions for hydropowerIHA 2013 World Congress: IPCC: Climate change: Four dimensions for hydropower
IHA 2013 World Congress: IPCC: Climate change: Four dimensions for hydropower
 
IHA 2013 World Congress: IGA: Renewable systems: sharing experience
IHA 2013 World Congress: IGA: Renewable systems: sharing experienceIHA 2013 World Congress: IGA: Renewable systems: sharing experience
IHA 2013 World Congress: IGA: Renewable systems: sharing experience
 
IHA 2013 World Congress: Judith Plummer: Who’s investing in hydropower?
IHA 2013 World Congress: Judith Plummer: Who’s investing in hydropower?IHA 2013 World Congress: Judith Plummer: Who’s investing in hydropower?
IHA 2013 World Congress: Judith Plummer: Who’s investing in hydropower?
 
IHA 2013 World Congress: Judith Plummer: Special Lecture on the Impacts of De...
IHA 2013 World Congress: Judith Plummer: Special Lecture on the Impacts of De...IHA 2013 World Congress: Judith Plummer: Special Lecture on the Impacts of De...
IHA 2013 World Congress: Judith Plummer: Special Lecture on the Impacts of De...
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
 
IHA 2013 World Congress: ADB presentation: Case Study of Song Bung 4 Hydropow...
IHA 2013 World Congress: ADB presentation: Case Study of Song Bung 4 Hydropow...IHA 2013 World Congress: ADB presentation: Case Study of Song Bung 4 Hydropow...
IHA 2013 World Congress: ADB presentation: Case Study of Song Bung 4 Hydropow...
 
Gil Maranhão Neto, GDF SUEZ
Gil Maranhão Neto, GDF SUEZGil Maranhão Neto, GDF SUEZ
Gil Maranhão Neto, GDF SUEZ
 
Rikard Liden, World Bank
Rikard Liden, World BankRikard Liden, World Bank
Rikard Liden, World Bank
 
Ricardo Krauskopf Neto, Itaipu
Ricardo Krauskopf Neto, ItaipuRicardo Krauskopf Neto, Itaipu
Ricardo Krauskopf Neto, Itaipu
 
Cameron Ironside, IHA
Cameron Ironside, IHACameron Ironside, IHA
Cameron Ironside, IHA
 
Valdineuza do Nascimento Borges, CPPT Cuniã
Valdineuza do Nascimento Borges, CPPT CuniãValdineuza do Nascimento Borges, CPPT Cuniã
Valdineuza do Nascimento Borges, CPPT Cuniã
 
Sergio Leao, Acreditar
Sergio Leao, Acreditar Sergio Leao, Acreditar
Sergio Leao, Acreditar
 
Hon. Omar Tejada
Hon. Omar TejadaHon. Omar Tejada
Hon. Omar Tejada
 

Dernier

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Dernier (20)

Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

IHA 2013 World Congress: Bringing markets to the resource case study: Sarawak Corridor of Renewable Energy

  • 1. Bringing Markets to the Resource: The Case of SCORE Chang Ngee Hui Economic Adviser State Planning Unit Sarawak IHA World Congress, Menara Sarawak Energy 20 May 2013 (Monday)
  • 2. Sarawak’s Problem: Big and Lonely • Geographically isolated, though strategically located (now) • Small economy, in need of a critical mass in economic activity to take off • Large geographic space, relative to population size, with costly infrastructure requirements to develop into the interior • Agriculture, in need of higher value-added activities to improve livelihood
  • 3. Connecting to the Global Supply Chain • Problems – Identifying specific products which Sarawak can produce – Identifying markets for local products – Promoting local products – Cost competitiveness re transport and logistics • Solution: Think in reverse – Attract market to Sarawak with a real attraction – Projects will link Sarawak back to the markets and the global supply chain – Projects will form a basis for triggering off local activities – Construction, services, skills – SMEs, value chains, supply chains
  • 4. Sarawak as Energy Producer • Oil and gas • Hydro • Coal
  • 5. Local Industrialisation • For the first time, Sarawak is using its energy resources to develop industries a home • Why industries – to generate higher income; agriculture has the lowest productivity growth • Local communities unused to industrialisation – cultural shock • They want change for the better, and change starts with economics • After heavy industries, we need to focus on higher value- added industrial activities
  • 6. Current Work • Many interested investors because of availability of non- fossil fuel, more competitive • Building a totally new infrastructure to cater to heavy industries – Power generation and transmission – Port – Communications – Manpower training
  • 7. Social and Environmental Impact Assessment (SEIA) Study SEIA Study SEIA for Dam Contemporary Ethnography Cultural Heritage and Archaeology Development of Resettlement Action Plan SEIA for Resettlement Economic Study
  • 8. Consultations. Nearly 40 formal consultations and nearly 80 informal consultations with the directly affected communities had been conducted during the course of the SEIA Study. Major ones are: 1 7 October 2009 Meeting with Affected Communities to introduce Study 2 1 December 2009 Meeting to brief on resettlement and roles of government departments and agencies 3 13 January 2010 Selection of Proposed Resettlement Site for Long Wat 4 24 March 2010 Selection of Proposed Resettlement Sites for Plieran Group 5 25 March 2010 Selection of Proposed Resettlement Site for Long Malim 6 30 April 2010 First Murum Penan Development Meeting (MPDC) 7 12 June 2010 Meeting Shin Yang and Pelieran Group 8 7 July 2010 Briefing on Preliminary Feasibility Findings of Preferred Resettlement Sites 20 August 2010 Briefing to SPA on SEIA for Murum Resettlement 9 28 September 2010 Meeting with Long Malim to discuss voluntary resettlement site 10 29 September 2010 Meeting with Plieran Group to discuss voluntary resettlement site 11 30 September 2010 Meeting with Long Wat to discuss voluntary resettlement site 12 29 October 2010 Meeting with Long Malim to confirm decision to move to Tegulang DO Belaga Abdul Halim moderating during the question and answer session, 1 December 2009
  • 9. Consultations/2 13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer 14 15 December 2010 General meeting of MPDC at Long Singu 14 February 2011 Briefing of Murum SEIA to CM on resettlement site 15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size 16 30 June 2011 MPDC meeting at Sungei Asap 17 1-2 July 2011 Metalun longhouse site selection exercise 18 3 July 2011 Tegulang longhouse site selection exercise 19 15 August 2011 Pegging of Tegulang longhouse sites 20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal 21 27 September 2011 Pegging of Metalun longhouse sites 22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan rituals and customs during resettlement process The affected communities were being briefed on the design of the longhouse, 22 September 2011
  • 10. Consultations/2 13 30 Nov-1 Dec 2010 Murum site visit with Robert Barclay, Independent Reviewer 14 15 December 2010 General meeting of MPDC at Long Singu 14 February 2011 Briefing of Murum SEIA to CM on resettlement site 15 29 March 2011 Briefing to MPDC on confirmed resettlement site and land size 16 30 June 2011 MPDC meeting at Sungei Asap 17 1-2 July 2011 Metalun longhouse site selection exercise 18 3 July 2011 Tegulang longhouse site selection exercise 19 15 August 2011 Pegging of Tegulang longhouse sites 20 17 August 2011 Site visit to present government’s longhouse sites counter-proposal 21 27 September 2011 Pegging of Metalun longhouse sites 22 29 September 2011 Meeting Briefing on Status of SEIA Study and Details of proposed longhouse design and enquiries on Penan rituals and customs during resettlement process The affected communities were being briefed on the design of the longhouse, 22 September 2011