ABSTRACT
This paper presents an analytical model to estimate the cost of reinforced concrete buildings
in Qatar. A conceptual estimate is defined in this paper as the estimate based on parameter cost ࣌
that relates building cost to building area and cost capacity factor X is an exponential model that
used to estimate the cost of new building with desired area base on a known different building cost
and area. Parameter cost ࣌ and cost capacity factor X values are derived based on buildings
historical data. A set of values of parameter cost value ࣌ and the cost capacity factor X for the state
of Qatar is developed as a result of this research paper to be used to predict and estimate the projects
costs and the required resources. Numerical results are presented to illustrate the model capability of
estimating the building cost.
Keywords: Estimation, Parameter cost, Cost capacity factor, Cost Estimate, Building, historical
Data.
INTRODUCTION
Qatar is an Arab state with Doha as its capital; it is the capital of natural gas in the world.
Qatar successful bid to host the FIFA World Cup in 2022 created a land of opportunity for
construction. Qatar is planning to invest more than 200 billion USD$ in construction projects before
the starting of the World Cup. These big projects are outside the scope of this paper; this paper will
cover the analysis of small to medium budget projects. Too many companies are trying to get a
share of the booming construction but they have to make the correct building cost estimation.
Estimating is the process of predicting project cost and the required resources. A conceptual estimate
is defined in this paper as the estimate based on parameter cost ࣌ that relates building cost to
building area and cost capacity factor X is an exponential model that used to estimate the cost of new
building with desired area base on a known different building cost and area. Developing a set of
values of parameter cost ࣌ and cost capacity factor X to be used in the state of Qatar to predict and
estimate the projects costs and the required resources is the objective of this paper. The methodology
of developing parameter cost ࣌ and cost capacity factor X consist of collecting historical data of
actual buildings from consultants offices, contracting companies and government agencies, selected
INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND
TECHNOLOGY (IJCIET)
ISSN 0976 – 6308 (Print)
ISSN 0976 – 6316(Online)
Volume 4, Issue 4, July-August (2013), pp. 284-288
© IAEME: www.iaeme.com/ijciet.asp
Journal Impact Factor (2013): 5.3277 (Calculated by GISI)
www.jifactor.com
IJCIET
© IAEME
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308
(Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME
285
historical data are shown in Table 1. Developing parameter cost ߪ and cost capacity factor X from
the historical data through mathematical formulation. Finally, validation check of parameter cost ߪ
and cost capacity factor X is done by comparing the estimated cost with the actual cost of the
building, (1, 2, 3 and 4).
Table 1 Building Historical Data
Year Project # Building Cost
Q.R.
1$ = 3.65 Q.R.
Building Area
m2
2002 1 ૚. ૜ૠ૞ · ૚૙૟ 659
2 ૚. ૢ૜ · ૚૙૟ 902
3 ૚. ૚૟૜ · ૚૙ૠ 6112
2006 4 ૢ. ૢ૜ · ૚૙૞ 409
5 ૛. ૚૛૞ · ૚૙૟ 1012
6 ૡ. ૝ૠ · ૚૙૟ 5640
2009 7 ૚. ૞૝૜ · ૚૙૟ 816
8 ૚. ૠ૞ૡ · ૚૙૟ 951
9 ૝. ૞૟૝ · ૚૙૟ 2680
2012 10 ૞. ૟ · ૚૙૞ 354
11 ૚. ૚ૡ૟ · ૚૙૟ 766
12 ૢ. ૞૙ · ૚૙૟ 4543
Parameter Cost and Cost Capacity Factor
Parameter cost value relates the building cost to the building area:
ߪ ൌ
஼
஺
(1)
Where
ߪ ൌ Parameter Cost
‫ܥ‬ ൌ Building Cost
‫=ܣ‬ Building Area
Cost capacity factor is an exponential model that used to estimate the cost of new building with
desired area base on a known different building cost with different area:
‫ܥ‬ே ൌ ‫ܥ‬௄ ቀ
஺ಿ
஺಼
ቁ
௑
(2)
Where
‫ܥ‬ே ൌEstimated cost of the new building
‫ܥ‬௄ ൌ Known cost of the building
‫ܣ‬ே = Area of the new building
‫ܣ‬௄ ൌ Area of the known building
ܺ ൌ Cost capacity Factor
Modifying equation 2 we have:
ܺ ൌ
୪୬
಴ಿ
಴಼
୪୬
ಲಿ
ಲ಼
(3)
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308
(Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME
286
RESULT AND DISCUSSION
Calculated values of the average parameter cost value ࣌ࡹ for the total building cost value
from 2002 to 2012, Table 1, Fig. 1.
Table 1 Average parameter cost value ࣌ࡹ
Year 2002 2006 2009 2012
࣌ࡹ ሺࡽ. ࡾ. ሻ 1981 1978 1809 1686
Table1 and Fig 1 show clearly that there is a drop in the cost parameter value ࣌ࡹ base on the
historical data even though the prices of material, labor charges, accommodation and everything
relates to the contracting business. There was a drop of 0.1 % between 2002 and 2006, drop of 9.0 %
between 2006 and 2009, and a drop 7% between 2009 and 2012. Drop percentages show that there is
a slim drop between 2002 and 2006, a much bigger drop between 2006 and 2009 and a somewhat
lower drop but still high between 2009 and 2012. The reason behind these drop percentages is the
increase in the number of the contracting companies to the point that they are willing to work for
zero profit to survive. The fact of the matter is that the fierce competition of the contracting
companies due to their large numbers did lead indeed to big reduction in the profits sought by the
companies. The reduction of building cost with zero profit does not necessarily mean a good chance
for the building owner because the contractor in most cases will try to make up for his losses by
lowering the building quality. The small drop percentage of 0.1 % for the years 2002 to 2006 shows
the beginning of the increase of the contracting companies in the market. The high drop percentage
of 9 % for the years 2006 to 2009 shows a huge increase in the number of the contracting companies.
For the years 2009 to 2012 the drop percentage of 7 % indicate that some companies got out of the
race, that helps the construction business to go in the right direction.
2000 2002 2004 2006 2008 2010 2012 2014
1650
1700
1750
1800
1850
1900
1950
2000
2050
Average Parameter Cost Value
Fig. 1 Years of Historical Data
AverageParameterCostValue࣌ࡹQ.R.
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308
(Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME
287
The cost capacity factor X values was determined using equation 3 and the historical data for
the years 2002 to 2012, Table 2.
Table 2 Cost capacity factor X
Year 2002 2006 2009 2012
ࢄ 0.379 0.602 0.853 0.856
To validate the cost capacity factor X values. The cost capacity factor for the years 2002 to
2012 X will be used to calculate the total cost of some buildings based on the historical data for the
years 2006 to 2012. The calculated values of the building total cost will be compared with actual
building total cost, Table 3.
Table 3 Estimated Total building Cost Based on Cost capacity factor X
Building Data
‫ܣ‬ே = Area of the new building
‫ܣ‬௄ ൌ Area of the known building
‫ܥ‬௄ ൌ Known cost of the building
Cost
capacity
factor
X
Building Total Cost
Q.R. ൬
۳‫܌܍ܜ܉ܕܑܜܛ‬
‫ܔ܉ܝܜ܋ۯ‬
൰ ૚૙૙
Year ࡭ࡺ ࡭ࡷ ࡯ࡷ Estimated Actual
2002 902 902 1.93 x 106
0.379 1.98 x 106
1.93 x 106
97.5
2006 905 905 1.764 x 106
0.602 1.887 x 106
1.764 x 106
93.5
2009 816 816 1.5 x 106
0.853 1.8 x 106
1.5 x 106
83.33
2012 766 766 1.186 x 106
0.856 1.238 x 106
1.186 x 106
95.8
The tabulated values of estimated and actual cost of buildings in table 3 show that the estimated cost
of the buildings based on cost capacity factor X is close to the actual cost. Therefore the cost
capacity factor X could be used to estimate the cost of new buildings in Qatar, Fig. 2.
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308
(Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME
288
Fig. 2 Estimated and Actual Buildings Costs
CONCLUSIONS
A set of values of parameter cost value ࣌ࡹ and the cost capacity factor X for the state of
Qatar is developed as a result of this research paper to be used to predict and estimate the projects
costs and the required resources. The number of contracting companies must be limited; otherwise
the fierce competition of the contracting companies due to their large numbers will lead indeed to big
reduction in the profits sought by the companies. The reduction of building cost with zero profit does
not necessarily mean a good chance for the building owner because the contractor in most cases will
try to make up for his losses by lowering the building quality.
REFERENCES
1. El Asmar, M. , Hana, A. and Whited, G. (2011). “New Approach to Developing Conceptual
Cost Estimates for Highway Projects”, Journal of construction Engineering and Management,
ASCE, pp.942-949.
2. Jadid, M. and Idrees, M. (2007). “Cost estimation of structural skeleton using an interactive
automation algorithm: A conceptual approach ” Journal of Automation in Construction,
ELSEVIER, pp.797-805.
3. Park, H. (2006). “Conceptual Framework of Construction Productivity Estimation”, Journal of
Engineering , KSCE, pp.311-317.
4. Mahamid, I. (2013). “Conceptual Cost of Estimate of Roads Construction Projects in Saudi
Arabia ”, Jordan Journal of Civil Engineering , pp.285-294.
5. Mohammed S. Al-Ansari, “Flexural Safety Cost of Optimized Reinforced Concrete Beams”,
International Journal of Civil Engineering & Technology (IJCIET), Volume 4, Issue 2, 2013,
pp. 15 - 35, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316.
6. Mohammed S. Al-Ansari, “Flexural Safety Cost of Optimized Reinforced Concrete Slabs”,
International Journal of Advanced Research in Engineering & Technology (IJARET),
Volume 3, Issue 2, 2012, pp. 289 - 310, ISSN Print: 0976-6480, ISSN Online: 0976-6499.

Contenu connexe

Similaire à Conceptual Cost Estimates for Buildings in Qatar

IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET Journal
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...IAEME Publication
 
Performance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsPerformance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsiaemedu
 
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...IRJET Journal
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring oneSAT Publishing House
 
Effect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projctEffect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projcteSAT Journals
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
 
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONE
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONEENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONE
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONEIRJET Journal
 
The Effect of Building Direction and Natural Airing on Yearly Power Utilization
The Effect of Building Direction and Natural Airing on Yearly Power UtilizationThe Effect of Building Direction and Natural Airing on Yearly Power Utilization
The Effect of Building Direction and Natural Airing on Yearly Power UtilizationYogeshIJTSRD
 
Construction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperConstruction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperPeter Cholakis
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...IRJET Journal
 
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...IRJET Journal
 
IRJET- Development of EDC Software for Economic Analysis of Pavements
IRJET- Development of EDC Software for Economic Analysis of PavementsIRJET- Development of EDC Software for Economic Analysis of Pavements
IRJET- Development of EDC Software for Economic Analysis of PavementsIRJET Journal
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression techniquePemmasani Srinivas
 
Modeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsModeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsGafel Kareem
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 

Similaire à Conceptual Cost Estimates for Buildings in Qatar (20)

IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
 
Performance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsPerformance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projects
 
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type F...
 
CCP_SEC2_ Cost Estimating
CCP_SEC2_ Cost EstimatingCCP_SEC2_ Cost Estimating
CCP_SEC2_ Cost Estimating
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring on
 
Effect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projctEffect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projct
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
 
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONE
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONEENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONE
ENERGY EFFICIENT BUILDING FOR INDIAN CLIMATIC ZONE
 
The Effect of Building Direction and Natural Airing on Yearly Power Utilization
The Effect of Building Direction and Natural Airing on Yearly Power UtilizationThe Effect of Building Direction and Natural Airing on Yearly Power Utilization
The Effect of Building Direction and Natural Airing on Yearly Power Utilization
 
20320140507006
2032014050700620320140507006
20320140507006
 
20320140507006 2-3
20320140507006 2-320320140507006 2-3
20320140507006 2-3
 
Construction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperConstruction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paper
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...
“Planning, Designing and Analysis of Net-Zero Residential Building with BIM I...
 
IRJET- Development of EDC Software for Economic Analysis of Pavements
IRJET- Development of EDC Software for Economic Analysis of PavementsIRJET- Development of EDC Software for Economic Analysis of Pavements
IRJET- Development of EDC Software for Economic Analysis of Pavements
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression technique
 
Modeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsModeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projects
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 

Plus de IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Plus de IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Dernier

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Dernier (20)

Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 

Conceptual Cost Estimates for Buildings in Qatar

  • 1. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME 284 CONCEPTUAL COST ESTIMATES FOR BUILDINGS IN QATAR Mohammed S. Al-Ansari Civil Engineering Department, Qatar University, P.O. Box 2713, Doha Qatar ABSTRACT This paper presents an analytical model to estimate the cost of reinforced concrete buildings in Qatar. A conceptual estimate is defined in this paper as the estimate based on parameter cost ࣌ that relates building cost to building area and cost capacity factor X is an exponential model that used to estimate the cost of new building with desired area base on a known different building cost and area. Parameter cost ࣌ and cost capacity factor X values are derived based on buildings historical data. A set of values of parameter cost value ࣌ and the cost capacity factor X for the state of Qatar is developed as a result of this research paper to be used to predict and estimate the projects costs and the required resources. Numerical results are presented to illustrate the model capability of estimating the building cost. Keywords: Estimation, Parameter cost, Cost capacity factor, Cost Estimate, Building, historical Data. INTRODUCTION Qatar is an Arab state with Doha as its capital; it is the capital of natural gas in the world. Qatar successful bid to host the FIFA World Cup in 2022 created a land of opportunity for construction. Qatar is planning to invest more than 200 billion USD$ in construction projects before the starting of the World Cup. These big projects are outside the scope of this paper; this paper will cover the analysis of small to medium budget projects. Too many companies are trying to get a share of the booming construction but they have to make the correct building cost estimation. Estimating is the process of predicting project cost and the required resources. A conceptual estimate is defined in this paper as the estimate based on parameter cost ࣌ that relates building cost to building area and cost capacity factor X is an exponential model that used to estimate the cost of new building with desired area base on a known different building cost and area. Developing a set of values of parameter cost ࣌ and cost capacity factor X to be used in the state of Qatar to predict and estimate the projects costs and the required resources is the objective of this paper. The methodology of developing parameter cost ࣌ and cost capacity factor X consist of collecting historical data of actual buildings from consultants offices, contracting companies and government agencies, selected INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET) ISSN 0976 – 6308 (Print) ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), pp. 284-288 © IAEME: www.iaeme.com/ijciet.asp Journal Impact Factor (2013): 5.3277 (Calculated by GISI) www.jifactor.com IJCIET © IAEME
  • 2. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME 285 historical data are shown in Table 1. Developing parameter cost ߪ and cost capacity factor X from the historical data through mathematical formulation. Finally, validation check of parameter cost ߪ and cost capacity factor X is done by comparing the estimated cost with the actual cost of the building, (1, 2, 3 and 4). Table 1 Building Historical Data Year Project # Building Cost Q.R. 1$ = 3.65 Q.R. Building Area m2 2002 1 ૚. ૜ૠ૞ · ૚૙૟ 659 2 ૚. ૢ૜ · ૚૙૟ 902 3 ૚. ૚૟૜ · ૚૙ૠ 6112 2006 4 ૢ. ૢ૜ · ૚૙૞ 409 5 ૛. ૚૛૞ · ૚૙૟ 1012 6 ૡ. ૝ૠ · ૚૙૟ 5640 2009 7 ૚. ૞૝૜ · ૚૙૟ 816 8 ૚. ૠ૞ૡ · ૚૙૟ 951 9 ૝. ૞૟૝ · ૚૙૟ 2680 2012 10 ૞. ૟ · ૚૙૞ 354 11 ૚. ૚ૡ૟ · ૚૙૟ 766 12 ૢ. ૞૙ · ૚૙૟ 4543 Parameter Cost and Cost Capacity Factor Parameter cost value relates the building cost to the building area: ߪ ൌ ஼ ஺ (1) Where ߪ ൌ Parameter Cost ‫ܥ‬ ൌ Building Cost ‫=ܣ‬ Building Area Cost capacity factor is an exponential model that used to estimate the cost of new building with desired area base on a known different building cost with different area: ‫ܥ‬ே ൌ ‫ܥ‬௄ ቀ ஺ಿ ஺಼ ቁ ௑ (2) Where ‫ܥ‬ே ൌEstimated cost of the new building ‫ܥ‬௄ ൌ Known cost of the building ‫ܣ‬ே = Area of the new building ‫ܣ‬௄ ൌ Area of the known building ܺ ൌ Cost capacity Factor Modifying equation 2 we have: ܺ ൌ ୪୬ ಴ಿ ಴಼ ୪୬ ಲಿ ಲ಼ (3)
  • 3. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME 286 RESULT AND DISCUSSION Calculated values of the average parameter cost value ࣌ࡹ for the total building cost value from 2002 to 2012, Table 1, Fig. 1. Table 1 Average parameter cost value ࣌ࡹ Year 2002 2006 2009 2012 ࣌ࡹ ሺࡽ. ࡾ. ሻ 1981 1978 1809 1686 Table1 and Fig 1 show clearly that there is a drop in the cost parameter value ࣌ࡹ base on the historical data even though the prices of material, labor charges, accommodation and everything relates to the contracting business. There was a drop of 0.1 % between 2002 and 2006, drop of 9.0 % between 2006 and 2009, and a drop 7% between 2009 and 2012. Drop percentages show that there is a slim drop between 2002 and 2006, a much bigger drop between 2006 and 2009 and a somewhat lower drop but still high between 2009 and 2012. The reason behind these drop percentages is the increase in the number of the contracting companies to the point that they are willing to work for zero profit to survive. The fact of the matter is that the fierce competition of the contracting companies due to their large numbers did lead indeed to big reduction in the profits sought by the companies. The reduction of building cost with zero profit does not necessarily mean a good chance for the building owner because the contractor in most cases will try to make up for his losses by lowering the building quality. The small drop percentage of 0.1 % for the years 2002 to 2006 shows the beginning of the increase of the contracting companies in the market. The high drop percentage of 9 % for the years 2006 to 2009 shows a huge increase in the number of the contracting companies. For the years 2009 to 2012 the drop percentage of 7 % indicate that some companies got out of the race, that helps the construction business to go in the right direction. 2000 2002 2004 2006 2008 2010 2012 2014 1650 1700 1750 1800 1850 1900 1950 2000 2050 Average Parameter Cost Value Fig. 1 Years of Historical Data AverageParameterCostValue࣌ࡹQ.R.
  • 4. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME 287 The cost capacity factor X values was determined using equation 3 and the historical data for the years 2002 to 2012, Table 2. Table 2 Cost capacity factor X Year 2002 2006 2009 2012 ࢄ 0.379 0.602 0.853 0.856 To validate the cost capacity factor X values. The cost capacity factor for the years 2002 to 2012 X will be used to calculate the total cost of some buildings based on the historical data for the years 2006 to 2012. The calculated values of the building total cost will be compared with actual building total cost, Table 3. Table 3 Estimated Total building Cost Based on Cost capacity factor X Building Data ‫ܣ‬ே = Area of the new building ‫ܣ‬௄ ൌ Area of the known building ‫ܥ‬௄ ൌ Known cost of the building Cost capacity factor X Building Total Cost Q.R. ൬ ۳‫܌܍ܜ܉ܕܑܜܛ‬ ‫ܔ܉ܝܜ܋ۯ‬ ൰ ૚૙૙ Year ࡭ࡺ ࡭ࡷ ࡯ࡷ Estimated Actual 2002 902 902 1.93 x 106 0.379 1.98 x 106 1.93 x 106 97.5 2006 905 905 1.764 x 106 0.602 1.887 x 106 1.764 x 106 93.5 2009 816 816 1.5 x 106 0.853 1.8 x 106 1.5 x 106 83.33 2012 766 766 1.186 x 106 0.856 1.238 x 106 1.186 x 106 95.8 The tabulated values of estimated and actual cost of buildings in table 3 show that the estimated cost of the buildings based on cost capacity factor X is close to the actual cost. Therefore the cost capacity factor X could be used to estimate the cost of new buildings in Qatar, Fig. 2.
  • 5. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 4, Issue 4, July-August (2013), © IAEME 288 Fig. 2 Estimated and Actual Buildings Costs CONCLUSIONS A set of values of parameter cost value ࣌ࡹ and the cost capacity factor X for the state of Qatar is developed as a result of this research paper to be used to predict and estimate the projects costs and the required resources. The number of contracting companies must be limited; otherwise the fierce competition of the contracting companies due to their large numbers will lead indeed to big reduction in the profits sought by the companies. The reduction of building cost with zero profit does not necessarily mean a good chance for the building owner because the contractor in most cases will try to make up for his losses by lowering the building quality. REFERENCES 1. El Asmar, M. , Hana, A. and Whited, G. (2011). “New Approach to Developing Conceptual Cost Estimates for Highway Projects”, Journal of construction Engineering and Management, ASCE, pp.942-949. 2. Jadid, M. and Idrees, M. (2007). “Cost estimation of structural skeleton using an interactive automation algorithm: A conceptual approach ” Journal of Automation in Construction, ELSEVIER, pp.797-805. 3. Park, H. (2006). “Conceptual Framework of Construction Productivity Estimation”, Journal of Engineering , KSCE, pp.311-317. 4. Mahamid, I. (2013). “Conceptual Cost of Estimate of Roads Construction Projects in Saudi Arabia ”, Jordan Journal of Civil Engineering , pp.285-294. 5. Mohammed S. Al-Ansari, “Flexural Safety Cost of Optimized Reinforced Concrete Beams”, International Journal of Civil Engineering & Technology (IJCIET), Volume 4, Issue 2, 2013, pp. 15 - 35, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316. 6. Mohammed S. Al-Ansari, “Flexural Safety Cost of Optimized Reinforced Concrete Slabs”, International Journal of Advanced Research in Engineering & Technology (IJARET), Volume 3, Issue 2, 2012, pp. 289 - 310, ISSN Print: 0976-6480, ISSN Online: 0976-6499.