International Business Solutions


                     Project management
                                                -an initial briefing

At the end of this chapter you should be able to:

    Describe the driving forces behind the development of project
    management

    Define what is meant by the term 'project management'

    Identify the characteristics of a project

    Discuss the relationship between the four project constraints

    Discuss the importance of the project life cycle

    Identify the common stakeholders to a project
Introduction

Everyone at some time in their life will be involved in a project of one kind
or another. in fact, the reality is that most of us have been involved in
many projects for some considerable time, and will face many more in the
future.




Projects come in all sizes and each project brings with it a differing
degree of complexity requiring a specific set of team and management
skills that will underpin the project's success.
Introduction

The evolution of projects has increased exponentially to the point where
the discipline, methods and tools behind projects (and their management)
have reached huge heights of application, sophistication and popularity.
What is the drive for this development and interest. Is it due to:

    advances in technology?

    increasing influence of market pressures?

    global competition and the need to remain competitive?

    the need to deliver products or services that meet certain benchmarks,
    quality assurance or best practice standards?

    greater emphasis on business producing cost-effective solutions?

    the constant cycle of change that business operates within?

The reason should be obvious – change must be managed if the
project is to succeed.
Demystifying project management - 1

Modern competition is rapidly becoming focused on three critical issues:


    the timing of decision making

    the costs driving the decisions

    the impact that change will have on these decisions


To deal with these pressures, project management has grown in importance
and stature as a toll for successfully dealing with time, cost and change
-driven decisions.
Demystifying project management - 2

So what is project management? Let's start with a simple explanation. Think
abut any project (big or small) you are involved with and answer the following
questions:


What type of information do you need to complete the project?
What type of decisions will this information produce throughout the project?
What actions will these decisions result in?
(Answers??)

  the work required to be completed (let's call these project 'tasks');

  who would be doing that work (let's call these project 'resources');

  the cost of the work being performed (let's call this project 'costs');

  how well the work had to be completed (let's call this project 'specification').
Project management – a balancing act




    Resources       Tasks
The tasks – more than just the work
                                        required

All projects involve delivering something (often referred to as 'outcome',
'asset', 'deliverable' or 'solution') to someone (often referred to as the
'client').


To achieve this 'something', a range of work will need to be first identified
and then performed. But (and it is a big but) consider the additional task
information you need before you 'go live' on the project given in the next
slide.
Additional task information


    Will all this work be performed simultaneously or will some follow earlier
    completed work?

    How long will each component of work take (commonly referred to as
    duration)?

    How accurate will these duration estimates be?

    What impact will this work duration have on the project's planning,
    execution, management and completion activities?

    Will all the required work be correctly identified and scheduled?

    What risk factors might impact on the start or finish of the scheduled work?

    Does the completed work comply with the required specification or
    standard?
The resources – more than just the
                                           workers
A considerable amount of resource information is required concerning the
work needed to complete the project. Consider the following for starters:

    Exactly what resources are required?

    Are these resources available to be assigned to the project tasks?

    Have these resources got the required skills, authority and power (if
    people), the right technical features (if materials)?

    Do any of the human resources need training in particular skills?

    How much do these resources cost?

    Are there any substitute resources?

    Will risk be a factor in assigning and tracking the performance of these
    resources?

    What impact will these resources have on the project's planning,
    execution, management and completion activities?
What exactly is a project?
To some people, projects are a little like a puzzle – too many pieces and not
enough clues. A project can be defined in terms of a number of criteria
which collectively distinguish it from an everyday activity performed by an
individual or organisation.

                                  Client or              Logical task
                                  stakeholders                                            Temporary
                                                         dependencies
       Agreed
       budget
                          Shared
                          available and          Initiated and                Agreed start
                          committed              managed to                   and finish dates
                          resources              succeed

     Agreed
     specification
                                                                 An agreed and
                     Discrete organisational                     measurable objective,
                     resource (and management                    deliverable or outcome
                     structure)
Essential project characteristics - 1

        Criteria                                        Explanation
An agreed and             Projects 'create' and 'hand over' a tangible result that addresses a
measurable objective,     problem or perhaps an opportunity.
deliverable or outcome
An agreed budget          In most projects, the budget is a finite resource. While contingent
                          funding (in case the estimates fall short of true costs) should be
                          available, the greater majority of projects will be constrained by limited
                          funding.
Discrete organisational   While many organisations operate by habitual practice and follow what
resource (and             has worked before, the creation and management of a project should
management) structure     be based on an appropriate organisational structure suited to the
                          particular project.
Client or stakeholders    All projects are owned by their ultimate client (the party the final
                          deliverable is handed over to) and all the other parties to the project
                          (staff, contractors, professional advisers, management, suppliers).
Temporary                 Projects are not enduring. That is, they do not go on for ever (though
                          many have been known to drift off target and get lost)The very nature
                          of the project (deliverable) dictated that it must end.
Essential project characteristics - 2
        Criteria                                        Explanation
Shared, available and     Projects require a pool of resources to achieve agreed deliverables.
committed resources       These could include any of the following: people, materials,
                          equipment, facilities, tools, information, systems, policies, procedures,
                          techniques, finances and knowledge, among others. These resources
                          are often deployed on other projects and/or their normal work duties,
                          which brings another degree of complexity and management to the
                          project.
Agreed start and finish   Projects (should) have target start and finish dates that define (and
dates                     constrain) the project window. That is, the project has a finite life span.
An agreed specification   The work performed on a project will not be completed 'on a whim'. It
                          will comply with a standard, a performance measure or a benchmark
                          of some kind that explicitly defines and clarifies the exact nature of the
                          work to be performed.
Logical task              All the required work will probably not be performed at the same time.
dependencies              Some work will precede other work, some might occur concurrently,
                          while other work will follow earlier work. Again this sequence must be
                          planned and managed if the project is to succeed.
Initiated and managed to Given the potential complexity in managing task and resource
succeed                  decisions, a dedicated set of management and project competencies
                         is required if the project is to succeed.
What exactly is management?

All managers perform four accepted functions given in the table below


            Function                              Explanation
 Planning                 These activities can include defining goals, designing
                          strategies and developing plans to achieve the goals
 Organising               These activities can include determining what tasks have to
                          be performed, who will do them, what decisions need to be
                          made and who reports to whom
 Leading                  These activities can include motivating subordinates,
                          directing others, resoling conflicts, delegating and using the
                          most effective communication channels
 Controlling              These activities can include monitoring all the activities to
                          ensure they are being accomplished as planned while also
                          taking into account any significant deviations that might
                          need correcting
What then is project management?



    Bringing two words project and management together, what progress have
    we made?

    Project management refers to management of activities that lead to the
    successful completion and outcomes of a project.

    The project requires the application of management principles in planning,
    organising, controlling and leading the resources of the organisation to
    realise a one-off specific goal.

    The management process brings together and optimises the necessary
    resources to complete successfully the project as scheduled (and agreed)
What then is project management?

Management projects differs somewhat from conventional management
assignments with the key difference being that a project is a limited concept
that is usually more narrowly focused than traditional management goals.

Other ways to define project management are:

    The process of identifying, planning, scheduling and controlling the true
    requirements of the project and ensuring the agreed trade-offs

    The management of change

    Scheduling solutions to problems or opportunities

    The science of disciplined logic
True project constraints

  Common project constraints - 1

  Constraint                                   Key points
Time            Each project will probably have a prescribed window from the initial idea
                 stage through to the completion stage during which all stages and
                 project work must be successfully completed
                If there is no latitude or freedom in this time window, the project is said

                 to be overdetermined (in this constraint)
                The amount of time available will determine the project's schedule of

                 work
                Projects can be completed ahead of time/schedule, on time/schedule or

                 behind time/schedule
                The amount of time available for the project can have a direct and often

                 immediate effect on the project's other constraints
Cost            Each project should have a budgeted and approved cost to fund the
                 required work to the required standard during the required time allowed
                Some projects are underfunded, some excessively funded, while others

                 are adequately financed
                Remember too that the finance available will impact on the other three

                 project constraint
True project constraints

  Common project constraints - 2

   Constraint                                   Key points
Specification    Each project should specify the exact standard of work required for all
                  the work scheduled to be performed
                 The specification should not contain any loose terms, ambiguity or

                  missing requirements
                 The specification should state the standard of the end products

                  whenever possible in quantitative terms, including tolerances,
                  performance finish, reliability and maintainability
                 As with the two earlier constraints, the specification can also impact on

                  time, cost and resource constraints
                 Specifications sometimes change once the project is under way,

                  causing delays and increases in costs
Resources        Finally, each project requires that an appropriate range of resources be
                  assigned to complete the scheduled work
                 Some human resources might require additional training

                 Resources are often over-allocated, causing scheduling conflicts, delays

                  and cost over-runs
Fine-tuning the project outcome
These four constraints form the parameters of the project. That is, collectively
they determine the project's optimal outcome as depicted below,


                                      Time



                                     Optimal
                     Cost            Project            Resource
                                     outcome




                                  Specification
Constraint interdependences - 1
 Nothing happens in a project that isn't related to one or more of these four
 constraints as shown below,
   Constraint              If increased                             If decreased
Specification    Additional finance could be          Money could be saved through the
                  required to fund the new features     down-graded specification.
                  and/or the resources required.       Resource assignments could be

                 Better skilled resources may be       changed to allow less skilled
                  required.                             resources to complete the tasks.
                 More time may be needed to           Time may be saved by taking less

                  complete th project.                  functionality from the project, though in
                                                        some cases the less skilled resources
                                                        might add time to the project
Time             Resources could be reassigned        Increased resources will be required to
                  to other projects.                    compress the work timeline.
                 Scheduled tasks could be             More costs will be incurred to fund the

                  delayed.                              compressed schedule.
                 Costs could increase due to          The specification may come under

                  prolonged work activities.            review as the project team looks for
                 More time could prove the             ways to save time.
                  catalyst in fine-tuning the
                  specification.
Constraint interdependences - 2

    Constraint              If increased                            If decreased
Budget            Higher skilled resources could       One immediate way to save money
                   be deployed.                          is to shed resources.
                  More resources could be              Another way is to downgrade the

                   assigned which could shorten          specification.
                   completion times.                    With less money, the timeline might

                  Additional funding could allow        shorten if less work is now required,
                   for the upgrading of the original     or it may lengthen if the resources
                   specification.                        now require additional time to
                                                         complete all the work with fewer
                                                         resources.
Resources         With more resources, more            If resources are removed, the time
                   money might be required.              required to complete the project will
                  Completion times could be             probably increase.
                   shortened.                           Money might appear to be saved,

                  With the greater number (and          though the additional completion
                   diversity) of resources,              time may well erode any savings.
                   opportunities might also exist to    The agreed specification may not be

                   upgrade the specifications.           completed to the same high level
                                                         with fewer resources available.
Constraint interdependences - 3

Think back to the beginning of this section. The claim was made that
nothing happens in a project that falls outside these four constraints.


While some would refute this claim, many others support the notion of
interdependent constraints as they create and manage their projects.


Failure to identify and 'massage' these constraints accordingly can lead
to any of the following problems:

    Project 'drift', where the project loses direction and commitment.

    'scope creep', where the deliverable agreed at the start of the project
    suddenly changes to another requirement.

    'premature termination' resulting in the project (successful or
    otherwise)being shut down.
The phases of a project –
                                        its life cycle



    To expand our knowledge of the essentials of project management
    further, we identify the four stages that signal the project's evolution.


    Irrespective of what the project is, each project progresses through a
    series of stages from beginning to end.


    The 'staged' project evolution is know as the project life cycle.


    In the following four slides a variety of non-project life cycles is discussed
    first.
Industry life cycles
                            The marketing life cycle
In a marketing context, products and services follow a set evolution from
their initial research and development stage to their later decline and
potential disappearance from the market. These stages are identified below.
Stage No.              Stage                               Explanation
1           Research and development Marketing research is conducted to uncover customer
                                     needs. Products and services are then designed
                                     around those needs.
2           Introduction               The product or service is released n the market for
                                       sale.
3           Growth                     As sales increase, prices fall, features improve and
                                       competition increases.
4           Maturity                   Sales begin to level out as the market reaches
                                       saturation point
5           Deterioration              Sales begin to fall as newer products and services
                                       erode the sales and customer base.
6           Decline                    Sales have fallen to the point where the product or
                                       service may be withdrawn from the market.
Industry life cycles
                              The economic life cycle
In economic terms, the business cycles, which are changing patterns of
economic growth over time, pass through known stages. The table below
depicts this cycle as consisting of three stages.

Stage No.     Stage                                Explanation
1           Prosperity   This stage is characterised by low unemployment, high total income
                         and high purchasing power. There would also be signs of economic
                         growth, optimistic consumers and a stimulated economy.
2           Recession    During recession, increased unemployment, falling total income,
                         together with reduced purchasing power, would be evident.
                         Increasing price awareness, increased savings and conservative
                         spending patterns would be apparent.
3           Recovery     The recovery stage would see unemployment beginning to drop,
                         consumer confidence returning and previously postponed
                         purchases being now bought.
Industry life cycles
              The construction engineering life cycle

    Naturally construction and engineering projects also pass through
    project phases, as shown below,


Stage No.        Stage                          Explanation
1           Initiation     The client and construction company agree on the
                           project's outcome. Risk assessment, feasibility studies
                           and financial modelling will occur.
2           Design         Detailed designs and costing are finished.
3           Implementation Construction commences.
4           Handover       The deliverable is completed and handed to the client.
Industry life cycles
                    New product development life cycle
    Even new product development projects can be investigated through the life
    cycle analogy, as illustrated below,
Stage No.      Stage                       Explanation
1              Idea generation             An idea is generated – from a range of sources
                                           including the client, research, market conditions or
                                           competitive behaviour.
2              Product definition          The idea is refined to the point where it can be
                                           precisely defined, which will include initial costings
                                           and designs.
3              Product engineering         Following reviews, the idea is developed into a
                                           'working model' for further testing and evaluation.
4              Pilot start-up              Market-based research and sampling will occur to
                                           ensure the product or service will be adopted by the
                                           market. Pre-production setup will also take place.
5              Manufacture                 Fullscale manufacturing occurs in readiness for a full
                                           market release and sales.
6              Marketing                   In line with the product launch, fullscale marketing
                                           activities commence.
The project management life cycle


There are a number of stages in project management – its life cycle – with
each stage integral to the overall success of the project.


The obvious question would be: How many stages are there and what are
their names?


This is an area where few project management authors agree.


Some believe that a project evolves through the 12 stages displayed on
the next table.
A 12-stage project management
                                                    life cycle
Stage No.            Stage                                       Explanation
1           Definition              An idea is generated that forms the basis of the project deliverable.
2           Feasibility             The idea is fully researched to identify the costs, benefits, risks and
                                    other impacts generated or have to be resolved.
3           Initial specification   Tentative specification ('scope of works') is prepared identifying the
                                    resources required.
4           Estimation              The project costs are determined.
5           Proposal                A formal, thoroughly researched and documented proposal is put
                                    forward for consideration (sometimes called 'business case').
6           Planning                Work packaged to be performed on the project detailed and
                                    scheduled.
7           Design                  Designs finalised prior to implementation (the production stage).
8           Implementation          Work is commenced on the projec.t
9           Installation            On some projects, the deliverable may need to be installed in the
                                    client's premises.
10          Commissioning           The formal stage where deliverable is 'handed over' to client.
11          Run-up                  Initial full scale operation (testing) of deliverable under normal
                                    working conditions.
12          Review                  A complete project audit from stage 1 to stage 12.
A 4-stage project management
                                        life cycle

With so much discrepancy over the number of stages in a project's life
cycle, it is proposed to reduce it to only four stages.


Why only four?


Simple, with four stages all the project work can be captured and more
importantly each stage can be managed.


This ensures that the project is completed as scheduled.


The four stages are summarized on the next slide.
A 4-stage project management
                                       life cycle


                    Concept     Schedule      Progress      Outcome




                                             Time



As the project evolves, each stage has its own particular characteristics
representing a mix of the four project constraints cited earlier:

    Time

    Cost

    Specification

    Resources
The four stages to a project in
                                         more detail
Stage No.    Stage                                   Explanation
1           Concept     Thin of this as the 'idea' stage where the project is conceived.
                        Preliminary goals are discussed, problems raised, potential benefits
                        identified, alternative approaches researched and provisional costings
                        determined.
2           Schedule    Following the decision to proceed (in the concept stage), all the work
                        required by the project is scheduled. Objectives are finalised,
                        resources are assigned, quality is signed off n, final costings are
                        approved, the timing agreed and all other administrative matters are
                        determined.
3           Progress    The project has commenced during this stage and the emphasis is
                        moved to tracking actual progress using the schedule developed in the
                        previous stage as the comparison point of reference. All work is
                        monitored, controlled and corrected where necessary with schedules
                        being reviewed, revised and updated as required.
4           Outcome     Finally, the project has been completed with the deliverable handed
                        over to the client. Resources are disposed of or reassigned, the
                        project is evaluated, reports are written and presented, and the
                        administration arm of the project is closed.
The project life-cycle inputs

    Key concept inputs           Key schedule inputs          Key progress inputs        Key outcome inputs
 Project selection           Project variables           Ongoing progress          Document client
 Problem or opportunity       reviewed and redefined       review and control         acceptance
  trigger                     Breaking down the           Progress, status and      Document project

 Alternative solution         project into activities      forecast reports           outcome
  discussed                   Schedule developed,         Manage change             Conduct project

 Consistent with              revised and baselined        requests                   evaluation and audit
  organisational              Estimating contingency      Managing contracts        Contract closeout

  capability                   factors                     Dealing with team         Team and stakeholder

 Project benefits            Identify critical path       issues                     de-brief
  identified                  Source and assign           Corrective and/or         Communicate lessons

 Critical success factors     resources                    reinforcement action       learned
  identified                  Quality measures in         Managing escalation       Resources reassigned

 Risks identified             place                        issues                    Retentions, certificates

 Expectation agreed          Procurement                 Managing meetings          and warranties
 Project sponsors             specifications finalised    Controlling and           Archiving and recording

  located                     Contracts formulated         reporting progress        Celebrate team's

 Essential stakeholders      Control measures            Explicit decision to       success
  confirmed                    identified                   commit more time,         Decision to close out

 Explicit decision to        Explicit decision to         resources and money in
  commit more time,            commit more time,            proceeding to next
  resources and money          resources and money in       stage
  in proceeding to the         proceeding to next stage
● next stage
The benefits of using project
                                       life cycles
The project lifecycle :

 provides an overriding narrative of the total project;
 limits and orders the project's progress through clearly defined stages (some

  might call these decisions gates);
 provides points of reference against which stakeholders can assess progress;

 enables an overview of the total project to be maintained and in perspective;

 allows for all project tasks to be correctly identified and partitioned under the

  appropriate stage of work;
 fosters the sequential management of the project schedule through all stages;

 promotes a sense of urgency throughout the schedule;

 clearly identifies the stage where different resources will need to be procured;

 works towards integrating all the project activities along a continuum;

 provides tangible evidence of the planning process;

 acts as a guide for all project activity;

 assists in detailing responsibility among project stakeholders;

 divides the project into manageable portions.
The physical output of the project
                                               life cycle
    Benefits aside, each stage of the life cycle also has a number of specific
    outputs that are unique (in most cases). A preview of these is provided in
    the Table below.
    Concept outputs        Schedule outputs        Progress outputs        Outcome outputs
 Client brief          Stage, task and        Performance            Handover
 Business case          milestone detail –      standards              Acceptance testing

 Feasibility study      including duration,    Inspection and         Project audit

 Risk assessment        sequencing and          monitoring/testing     Completion checklist

 Scope                  resources               plan                   Feedback and

  documentation         Revised timelines      Purchase orders         evaluation
 Stakeholder            (PERT/Gantt)           Performance reports    Approvals

  analysis              Revised cashflows      Change of scope

 Budget forecasts       and budgets             requests
 Procedures and        Resource matrix        Progress claims

  policies              Baseline project       Corrective action

 Meeting minutes        schedule               Contracts

 Approvals             Approvals              Revised schedules

                                                Approvals
The stakeholders to the project

Stakeholders are the parties with a vested interest – positive or negative
in the success (or otherwise) of the project.
Not every stakeholder must actively support and promote the project's
success.
While this would be appreciated by other stakeholders, reality and case
studies suggest that each project has its mix of champions, workers and
protagonists.
One of the key roles that the project manager performs is to:
Identify all stakeholders




Determine their needs and expectations




Influence and manage those expectations




Project stakeholders on any project are found internal and external to the
project and come under different names, e.g. owners, suppliers, etc
Project stakeholders
          Key stakeholder                                     Key roles performed
Sponsor – initiates the project            Determines project's relevance to organisation
And supports the team's most senior        Champions project from a position of seniority

members                                    Acts as an inspirational figurehead

                                           Helps to finialise top level goals

                                           Works to minimise operational constraints


Project steering team – a group of         Aligns projects to corporate objectives
project sponsors who monitor the status    Provides clear strategic direction where required

of all active projects                     Prioritises active projects where conflicts exist


Project manager – leads the project        Provides and manages the project schedule
team and delivers the project goal         Motivates, develops and rewards the team

                                           Communicates project information

                                           Monitors and reviews progress


Team member – performs specific            Provides technical skill and application
actions required in the project            Responsible for project task performance

                                           Takes directions from project manager


Client – person owning the project         Provides direction for project manager
                                           Influences how outcomes will be achieved

                                           May initiate project changes


Supplier – delivers the goods and          Delivers supplies to the project as required
services by the project                    Compliance with contractual conditions

                                           Provision of logistical support
The stakeholders to the project



More than merely identifying each stakeholder, each stakeholder's needs
(stated or unstated) and particular interests must be identified prior to the
start of the project.


This enables information and decisions to be relevant and directed towards
the appropriate stakeholder – particularly in times of delays, cost over-runs,
variations and other escalating issues.
The stakeholders to the project

You should research the following:
Understand each stakeholder – What interests in the project do they
have? How involved will they be? What information do they need? How will
they make decisions?
Understand the environment in which they operate - Who are their
allies and enemies? What influence do they have? What are the 'right'
channels of communication? What protocols should be observed? How
much authority and power do they have?
Understand their information needs – Different stakeholders will
require different types, amounts and timing of information. Some might want
'progress' information on the project up to a point in time. Others might
require 'status' information or forecast completion data.
The stakeholders to the project

You should also research the following:
Understand how this information will be presented – That is,
what is the preferred communication channel of each stakeholder?

    Formal project reports (commonly referred to as 'progress', 'status' and
    'forecast' reports

    Project meetings

    Email

    In person

    Newsletters

    Social gatherings

    Fax

    Phone
Summary

    The study of project management borrows heavily from a number of
    associated disciplines, including science, management, engineering,
    business, human resource management, marketing and finance.

    Modern-day project management provides the necessary tools, methods,

    processes, structure and guidelines in creating and managing projects.

    Managing projects is different from everyday management activities due to
    the discrete characteristics of projects.

    Recall that projects are time, budget, specification and resource constrained,
    involve diverse stakeholders and require a number of connected tasks to be
    completed.

    Project management enables a 'measured' trade-off between task and
    resource decisions to be executed.

    It provides the framework or life cycle for completing the project goal and
    objectives as agreed by all stakeholders

Contenu connexe

Tendances

Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planningYasirHamour
 
project cost management
project cost managementproject cost management
project cost managementjay mitkari
 
Challenges Of Project Management
Challenges Of Project ManagementChallenges Of Project Management
Challenges Of Project Managementashutoshsachan
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/FailurePeter Salmon
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager ProofHub
 
Project team management
Project team managementProject team management
Project team managementsirjana Tiwari
 
Facility Management Cost optimization
Facility Management Cost optimizationFacility Management Cost optimization
Facility Management Cost optimizationEugen Ion
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project ManagementNoorHameed6
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection MethodsManikandan M
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Resource Planning
Resource PlanningResource Planning
Resource PlanningWajahat Ali
 
Project management
Project managementProject management
Project managementTom Thand
 

Tendances (20)

Resource allocation
Resource allocationResource allocation
Resource allocation
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
project cost management
project cost managementproject cost management
project cost management
 
Challenges Of Project Management
Challenges Of Project ManagementChallenges Of Project Management
Challenges Of Project Management
 
Project management
Project management Project management
Project management
 
Project management
Project managementProject management
Project management
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Project team management
Project team managementProject team management
Project team management
 
Facility Management Cost optimization
Facility Management Cost optimizationFacility Management Cost optimization
Facility Management Cost optimization
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
labour management
labour managementlabour management
labour management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
Roles of project managers in oe
Roles of project managers in oeRoles of project managers in oe
Roles of project managers in oe
 
Project management
Project managementProject management
Project management
 

En vedette

Exposicion Juridica
Exposicion JuridicaExposicion Juridica
Exposicion Juridicaamigonianos
 
Citrex 0610 I En Revised Spa 1 Citrex Mic Mbc
Citrex 0610 I En Revised Spa 1 Citrex Mic MbcCitrex 0610 I En Revised Spa 1 Citrex Mic Mbc
Citrex 0610 I En Revised Spa 1 Citrex Mic MbcCITREX
 
How To Navigate Lastwednesday
How To Navigate LastwednesdayHow To Navigate Lastwednesday
How To Navigate LastwednesdayMCDFS
 
Chapters 3 and 4 Ben and Me
Chapters 3 and 4 Ben and MeChapters 3 and 4 Ben and Me
Chapters 3 and 4 Ben and MeAnna Donskoy
 
Philosophies Of Education Save
Philosophies Of Education SavePhilosophies Of Education Save
Philosophies Of Education Savebasilio duller
 
Catalogo divani Ditre Italia 2010
Catalogo divani Ditre Italia 2010 Catalogo divani Ditre Italia 2010
Catalogo divani Ditre Italia 2010 Ditre Italia divani
 
Next Generation Media Quarterly October 2011
Next Generation Media Quarterly October 2011Next Generation Media Quarterly October 2011
Next Generation Media Quarterly October 2011dentsu
 
DB-IR-ranking
DB-IR-rankingDB-IR-ranking
DB-IR-rankingFELIX75
 
Digital eng
Digital engDigital eng
Digital engbeerguy
 
Billetaria 13 abril2013_media_esp
Billetaria 13 abril2013_media_espBilletaria 13 abril2013_media_esp
Billetaria 13 abril2013_media_espatomonafxa
 
Tecnica de Ermiro de Lima
Tecnica de Ermiro de LimaTecnica de Ermiro de Lima
Tecnica de Ermiro de LimaFrancy Vivas
 

En vedette (20)

Exposicion Juridica
Exposicion JuridicaExposicion Juridica
Exposicion Juridica
 
Citrex 0610 I En Revised Spa 1 Citrex Mic Mbc
Citrex 0610 I En Revised Spa 1 Citrex Mic MbcCitrex 0610 I En Revised Spa 1 Citrex Mic Mbc
Citrex 0610 I En Revised Spa 1 Citrex Mic Mbc
 
How To Navigate Lastwednesday
How To Navigate LastwednesdayHow To Navigate Lastwednesday
How To Navigate Lastwednesday
 
animations
animationsanimations
animations
 
Unit 15b How to gear
Unit 15b How to gearUnit 15b How to gear
Unit 15b How to gear
 
The elephant
The elephantThe elephant
The elephant
 
New vestnik 01-02-year_2013
New vestnik 01-02-year_2013New vestnik 01-02-year_2013
New vestnik 01-02-year_2013
 
Chapters 3 and 4 Ben and Me
Chapters 3 and 4 Ben and MeChapters 3 and 4 Ben and Me
Chapters 3 and 4 Ben and Me
 
Philosophies Of Education Save
Philosophies Of Education SavePhilosophies Of Education Save
Philosophies Of Education Save
 
Catalogo divani Ditre Italia 2010
Catalogo divani Ditre Italia 2010 Catalogo divani Ditre Italia 2010
Catalogo divani Ditre Italia 2010
 
Next Generation Media Quarterly October 2011
Next Generation Media Quarterly October 2011Next Generation Media Quarterly October 2011
Next Generation Media Quarterly October 2011
 
DB-IR-ranking
DB-IR-rankingDB-IR-ranking
DB-IR-ranking
 
Pakistani cow
Pakistani cowPakistani cow
Pakistani cow
 
Ditre Italia Leather kit
Ditre Italia Leather kitDitre Italia Leather kit
Ditre Italia Leather kit
 
Digital eng
Digital engDigital eng
Digital eng
 
Cpd 102 ab fall10session1
Cpd 102 ab fall10session1Cpd 102 ab fall10session1
Cpd 102 ab fall10session1
 
Billetaria 13 abril2013_media_esp
Billetaria 13 abril2013_media_espBilletaria 13 abril2013_media_esp
Billetaria 13 abril2013_media_esp
 
Photocubism
PhotocubismPhotocubism
Photocubism
 
Tecnica de Ermiro de Lima
Tecnica de Ermiro de LimaTecnica de Ermiro de Lima
Tecnica de Ermiro de Lima
 
New vestnik 03-year_2013
New vestnik 03-year_2013New vestnik 03-year_2013
New vestnik 03-year_2013
 

Similaire à Project Management1

Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project ManagementMostafa Ewees
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009Manish Chaurasia
 
Project management chapter 1 notes
Project management chapter 1 notesProject management chapter 1 notes
Project management chapter 1 notesDreams Design
 
PPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxPPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxSabrinaScott22
 
MIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfMIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfEsteban340583
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1Abeera Malik
 
Project management is the discipline of planning
Project management is the discipline of planningProject management is the discipline of planning
Project management is the discipline of planningPhilip Menezes
 
Project management glossary_of_terms
Project management glossary_of_termsProject management glossary_of_terms
Project management glossary_of_termsnagham ali hasan
 
Project management
Project managementProject management
Project managementArnab Ghosh
 
Project Management
Project ManagementProject Management
Project Managementirfan ali
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxgilpinleeanna
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estatehando2845
 
Project management professional
Project management professionalProject management professional
Project management professionalReema
 
Effective Project Management
Effective Project ManagementEffective Project Management
Effective Project ManagementBinary Semantics
 

Similaire à Project Management1 (20)

Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project Management
 
Project management
Project management Project management
Project management
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009
 
Project management chapter 1 notes
Project management chapter 1 notesProject management chapter 1 notes
Project management chapter 1 notes
 
PPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxPPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptx
 
Project management
Project managementProject management
Project management
 
2. project scope management
2. project scope management2. project scope management
2. project scope management
 
MIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfMIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdf
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1
 
Project management is the discipline of planning
Project management is the discipline of planningProject management is the discipline of planning
Project management is the discipline of planning
 
Project management glossary_of_terms
Project management glossary_of_termsProject management glossary_of_terms
Project management glossary_of_terms
 
Project management
Project managementProject management
Project management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docx
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estate
 
Project management professional
Project management professionalProject management professional
Project management professional
 
Effective Project Management
Effective Project ManagementEffective Project Management
Effective Project Management
 

Dernier

Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 

Dernier (20)

Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 

Project Management1

  • 1. International Business Solutions Project management -an initial briefing At the end of this chapter you should be able to:  Describe the driving forces behind the development of project management  Define what is meant by the term 'project management'  Identify the characteristics of a project  Discuss the relationship between the four project constraints  Discuss the importance of the project life cycle  Identify the common stakeholders to a project
  • 2. Introduction Everyone at some time in their life will be involved in a project of one kind or another. in fact, the reality is that most of us have been involved in many projects for some considerable time, and will face many more in the future. Projects come in all sizes and each project brings with it a differing degree of complexity requiring a specific set of team and management skills that will underpin the project's success.
  • 3. Introduction The evolution of projects has increased exponentially to the point where the discipline, methods and tools behind projects (and their management) have reached huge heights of application, sophistication and popularity. What is the drive for this development and interest. Is it due to:  advances in technology?  increasing influence of market pressures?  global competition and the need to remain competitive?  the need to deliver products or services that meet certain benchmarks, quality assurance or best practice standards?  greater emphasis on business producing cost-effective solutions?  the constant cycle of change that business operates within? The reason should be obvious – change must be managed if the project is to succeed.
  • 4. Demystifying project management - 1 Modern competition is rapidly becoming focused on three critical issues:  the timing of decision making  the costs driving the decisions  the impact that change will have on these decisions To deal with these pressures, project management has grown in importance and stature as a toll for successfully dealing with time, cost and change -driven decisions.
  • 5. Demystifying project management - 2 So what is project management? Let's start with a simple explanation. Think abut any project (big or small) you are involved with and answer the following questions: What type of information do you need to complete the project? What type of decisions will this information produce throughout the project? What actions will these decisions result in? (Answers??)  the work required to be completed (let's call these project 'tasks');  who would be doing that work (let's call these project 'resources');  the cost of the work being performed (let's call this project 'costs');  how well the work had to be completed (let's call this project 'specification').
  • 6. Project management – a balancing act Resources Tasks
  • 7. The tasks – more than just the work required All projects involve delivering something (often referred to as 'outcome', 'asset', 'deliverable' or 'solution') to someone (often referred to as the 'client'). To achieve this 'something', a range of work will need to be first identified and then performed. But (and it is a big but) consider the additional task information you need before you 'go live' on the project given in the next slide.
  • 8. Additional task information  Will all this work be performed simultaneously or will some follow earlier completed work?  How long will each component of work take (commonly referred to as duration)?  How accurate will these duration estimates be?  What impact will this work duration have on the project's planning, execution, management and completion activities?  Will all the required work be correctly identified and scheduled?  What risk factors might impact on the start or finish of the scheduled work?  Does the completed work comply with the required specification or standard?
  • 9. The resources – more than just the workers A considerable amount of resource information is required concerning the work needed to complete the project. Consider the following for starters:  Exactly what resources are required?  Are these resources available to be assigned to the project tasks?  Have these resources got the required skills, authority and power (if people), the right technical features (if materials)?  Do any of the human resources need training in particular skills?  How much do these resources cost?  Are there any substitute resources?  Will risk be a factor in assigning and tracking the performance of these resources?  What impact will these resources have on the project's planning, execution, management and completion activities?
  • 10. What exactly is a project? To some people, projects are a little like a puzzle – too many pieces and not enough clues. A project can be defined in terms of a number of criteria which collectively distinguish it from an everyday activity performed by an individual or organisation. Client or Logical task stakeholders Temporary dependencies Agreed budget Shared available and Initiated and Agreed start committed managed to and finish dates resources succeed Agreed specification An agreed and Discrete organisational measurable objective, resource (and management deliverable or outcome structure)
  • 11. Essential project characteristics - 1 Criteria Explanation An agreed and Projects 'create' and 'hand over' a tangible result that addresses a measurable objective, problem or perhaps an opportunity. deliverable or outcome An agreed budget In most projects, the budget is a finite resource. While contingent funding (in case the estimates fall short of true costs) should be available, the greater majority of projects will be constrained by limited funding. Discrete organisational While many organisations operate by habitual practice and follow what resource (and has worked before, the creation and management of a project should management) structure be based on an appropriate organisational structure suited to the particular project. Client or stakeholders All projects are owned by their ultimate client (the party the final deliverable is handed over to) and all the other parties to the project (staff, contractors, professional advisers, management, suppliers). Temporary Projects are not enduring. That is, they do not go on for ever (though many have been known to drift off target and get lost)The very nature of the project (deliverable) dictated that it must end.
  • 12. Essential project characteristics - 2 Criteria Explanation Shared, available and Projects require a pool of resources to achieve agreed deliverables. committed resources These could include any of the following: people, materials, equipment, facilities, tools, information, systems, policies, procedures, techniques, finances and knowledge, among others. These resources are often deployed on other projects and/or their normal work duties, which brings another degree of complexity and management to the project. Agreed start and finish Projects (should) have target start and finish dates that define (and dates constrain) the project window. That is, the project has a finite life span. An agreed specification The work performed on a project will not be completed 'on a whim'. It will comply with a standard, a performance measure or a benchmark of some kind that explicitly defines and clarifies the exact nature of the work to be performed. Logical task All the required work will probably not be performed at the same time. dependencies Some work will precede other work, some might occur concurrently, while other work will follow earlier work. Again this sequence must be planned and managed if the project is to succeed. Initiated and managed to Given the potential complexity in managing task and resource succeed decisions, a dedicated set of management and project competencies is required if the project is to succeed.
  • 13. What exactly is management? All managers perform four accepted functions given in the table below Function Explanation Planning These activities can include defining goals, designing strategies and developing plans to achieve the goals Organising These activities can include determining what tasks have to be performed, who will do them, what decisions need to be made and who reports to whom Leading These activities can include motivating subordinates, directing others, resoling conflicts, delegating and using the most effective communication channels Controlling These activities can include monitoring all the activities to ensure they are being accomplished as planned while also taking into account any significant deviations that might need correcting
  • 14. What then is project management?  Bringing two words project and management together, what progress have we made?  Project management refers to management of activities that lead to the successful completion and outcomes of a project.  The project requires the application of management principles in planning, organising, controlling and leading the resources of the organisation to realise a one-off specific goal.  The management process brings together and optimises the necessary resources to complete successfully the project as scheduled (and agreed)
  • 15. What then is project management? Management projects differs somewhat from conventional management assignments with the key difference being that a project is a limited concept that is usually more narrowly focused than traditional management goals. Other ways to define project management are:  The process of identifying, planning, scheduling and controlling the true requirements of the project and ensuring the agreed trade-offs  The management of change  Scheduling solutions to problems or opportunities  The science of disciplined logic
  • 16. True project constraints Common project constraints - 1 Constraint Key points Time  Each project will probably have a prescribed window from the initial idea stage through to the completion stage during which all stages and project work must be successfully completed  If there is no latitude or freedom in this time window, the project is said to be overdetermined (in this constraint)  The amount of time available will determine the project's schedule of work  Projects can be completed ahead of time/schedule, on time/schedule or behind time/schedule  The amount of time available for the project can have a direct and often immediate effect on the project's other constraints Cost  Each project should have a budgeted and approved cost to fund the required work to the required standard during the required time allowed  Some projects are underfunded, some excessively funded, while others are adequately financed  Remember too that the finance available will impact on the other three project constraint
  • 17. True project constraints Common project constraints - 2 Constraint Key points Specification  Each project should specify the exact standard of work required for all the work scheduled to be performed  The specification should not contain any loose terms, ambiguity or missing requirements  The specification should state the standard of the end products whenever possible in quantitative terms, including tolerances, performance finish, reliability and maintainability  As with the two earlier constraints, the specification can also impact on time, cost and resource constraints  Specifications sometimes change once the project is under way, causing delays and increases in costs Resources  Finally, each project requires that an appropriate range of resources be assigned to complete the scheduled work  Some human resources might require additional training  Resources are often over-allocated, causing scheduling conflicts, delays and cost over-runs
  • 18. Fine-tuning the project outcome These four constraints form the parameters of the project. That is, collectively they determine the project's optimal outcome as depicted below, Time Optimal Cost Project Resource outcome Specification
  • 19. Constraint interdependences - 1 Nothing happens in a project that isn't related to one or more of these four constraints as shown below, Constraint If increased If decreased Specification  Additional finance could be  Money could be saved through the required to fund the new features down-graded specification. and/or the resources required.  Resource assignments could be  Better skilled resources may be changed to allow less skilled required. resources to complete the tasks.  More time may be needed to  Time may be saved by taking less complete th project. functionality from the project, though in some cases the less skilled resources might add time to the project Time  Resources could be reassigned  Increased resources will be required to to other projects. compress the work timeline.  Scheduled tasks could be  More costs will be incurred to fund the delayed. compressed schedule.  Costs could increase due to  The specification may come under prolonged work activities. review as the project team looks for  More time could prove the ways to save time. catalyst in fine-tuning the specification.
  • 20. Constraint interdependences - 2 Constraint If increased If decreased Budget  Higher skilled resources could  One immediate way to save money be deployed. is to shed resources.  More resources could be  Another way is to downgrade the assigned which could shorten specification. completion times.  With less money, the timeline might  Additional funding could allow shorten if less work is now required, for the upgrading of the original or it may lengthen if the resources specification. now require additional time to complete all the work with fewer resources. Resources  With more resources, more  If resources are removed, the time money might be required. required to complete the project will  Completion times could be probably increase. shortened.  Money might appear to be saved,  With the greater number (and though the additional completion diversity) of resources, time may well erode any savings. opportunities might also exist to  The agreed specification may not be upgrade the specifications. completed to the same high level with fewer resources available.
  • 21. Constraint interdependences - 3 Think back to the beginning of this section. The claim was made that nothing happens in a project that falls outside these four constraints. While some would refute this claim, many others support the notion of interdependent constraints as they create and manage their projects. Failure to identify and 'massage' these constraints accordingly can lead to any of the following problems:  Project 'drift', where the project loses direction and commitment.  'scope creep', where the deliverable agreed at the start of the project suddenly changes to another requirement.  'premature termination' resulting in the project (successful or otherwise)being shut down.
  • 22. The phases of a project – its life cycle  To expand our knowledge of the essentials of project management further, we identify the four stages that signal the project's evolution.  Irrespective of what the project is, each project progresses through a series of stages from beginning to end.  The 'staged' project evolution is know as the project life cycle.  In the following four slides a variety of non-project life cycles is discussed first.
  • 23. Industry life cycles The marketing life cycle In a marketing context, products and services follow a set evolution from their initial research and development stage to their later decline and potential disappearance from the market. These stages are identified below. Stage No. Stage Explanation 1 Research and development Marketing research is conducted to uncover customer needs. Products and services are then designed around those needs. 2 Introduction The product or service is released n the market for sale. 3 Growth As sales increase, prices fall, features improve and competition increases. 4 Maturity Sales begin to level out as the market reaches saturation point 5 Deterioration Sales begin to fall as newer products and services erode the sales and customer base. 6 Decline Sales have fallen to the point where the product or service may be withdrawn from the market.
  • 24. Industry life cycles The economic life cycle In economic terms, the business cycles, which are changing patterns of economic growth over time, pass through known stages. The table below depicts this cycle as consisting of three stages. Stage No. Stage Explanation 1 Prosperity This stage is characterised by low unemployment, high total income and high purchasing power. There would also be signs of economic growth, optimistic consumers and a stimulated economy. 2 Recession During recession, increased unemployment, falling total income, together with reduced purchasing power, would be evident. Increasing price awareness, increased savings and conservative spending patterns would be apparent. 3 Recovery The recovery stage would see unemployment beginning to drop, consumer confidence returning and previously postponed purchases being now bought.
  • 25. Industry life cycles The construction engineering life cycle Naturally construction and engineering projects also pass through project phases, as shown below, Stage No. Stage Explanation 1 Initiation The client and construction company agree on the project's outcome. Risk assessment, feasibility studies and financial modelling will occur. 2 Design Detailed designs and costing are finished. 3 Implementation Construction commences. 4 Handover The deliverable is completed and handed to the client.
  • 26. Industry life cycles New product development life cycle Even new product development projects can be investigated through the life cycle analogy, as illustrated below, Stage No. Stage Explanation 1 Idea generation An idea is generated – from a range of sources including the client, research, market conditions or competitive behaviour. 2 Product definition The idea is refined to the point where it can be precisely defined, which will include initial costings and designs. 3 Product engineering Following reviews, the idea is developed into a 'working model' for further testing and evaluation. 4 Pilot start-up Market-based research and sampling will occur to ensure the product or service will be adopted by the market. Pre-production setup will also take place. 5 Manufacture Fullscale manufacturing occurs in readiness for a full market release and sales. 6 Marketing In line with the product launch, fullscale marketing activities commence.
  • 27. The project management life cycle There are a number of stages in project management – its life cycle – with each stage integral to the overall success of the project. The obvious question would be: How many stages are there and what are their names? This is an area where few project management authors agree. Some believe that a project evolves through the 12 stages displayed on the next table.
  • 28. A 12-stage project management life cycle Stage No. Stage Explanation 1 Definition An idea is generated that forms the basis of the project deliverable. 2 Feasibility The idea is fully researched to identify the costs, benefits, risks and other impacts generated or have to be resolved. 3 Initial specification Tentative specification ('scope of works') is prepared identifying the resources required. 4 Estimation The project costs are determined. 5 Proposal A formal, thoroughly researched and documented proposal is put forward for consideration (sometimes called 'business case'). 6 Planning Work packaged to be performed on the project detailed and scheduled. 7 Design Designs finalised prior to implementation (the production stage). 8 Implementation Work is commenced on the projec.t 9 Installation On some projects, the deliverable may need to be installed in the client's premises. 10 Commissioning The formal stage where deliverable is 'handed over' to client. 11 Run-up Initial full scale operation (testing) of deliverable under normal working conditions. 12 Review A complete project audit from stage 1 to stage 12.
  • 29. A 4-stage project management life cycle With so much discrepancy over the number of stages in a project's life cycle, it is proposed to reduce it to only four stages. Why only four? Simple, with four stages all the project work can be captured and more importantly each stage can be managed. This ensures that the project is completed as scheduled. The four stages are summarized on the next slide.
  • 30. A 4-stage project management life cycle Concept Schedule Progress Outcome Time As the project evolves, each stage has its own particular characteristics representing a mix of the four project constraints cited earlier:  Time  Cost  Specification  Resources
  • 31. The four stages to a project in more detail Stage No. Stage Explanation 1 Concept Thin of this as the 'idea' stage where the project is conceived. Preliminary goals are discussed, problems raised, potential benefits identified, alternative approaches researched and provisional costings determined. 2 Schedule Following the decision to proceed (in the concept stage), all the work required by the project is scheduled. Objectives are finalised, resources are assigned, quality is signed off n, final costings are approved, the timing agreed and all other administrative matters are determined. 3 Progress The project has commenced during this stage and the emphasis is moved to tracking actual progress using the schedule developed in the previous stage as the comparison point of reference. All work is monitored, controlled and corrected where necessary with schedules being reviewed, revised and updated as required. 4 Outcome Finally, the project has been completed with the deliverable handed over to the client. Resources are disposed of or reassigned, the project is evaluated, reports are written and presented, and the administration arm of the project is closed.
  • 32. The project life-cycle inputs Key concept inputs Key schedule inputs Key progress inputs Key outcome inputs  Project selection  Project variables  Ongoing progress  Document client  Problem or opportunity reviewed and redefined review and control acceptance trigger  Breaking down the  Progress, status and  Document project  Alternative solution project into activities forecast reports outcome discussed  Schedule developed,  Manage change  Conduct project  Consistent with revised and baselined requests evaluation and audit organisational  Estimating contingency  Managing contracts  Contract closeout capability factors  Dealing with team  Team and stakeholder  Project benefits  Identify critical path issues de-brief identified  Source and assign  Corrective and/or  Communicate lessons  Critical success factors resources reinforcement action learned identified  Quality measures in  Managing escalation  Resources reassigned  Risks identified place issues  Retentions, certificates  Expectation agreed  Procurement  Managing meetings and warranties  Project sponsors specifications finalised  Controlling and  Archiving and recording located  Contracts formulated reporting progress  Celebrate team's  Essential stakeholders  Control measures  Explicit decision to success confirmed identified commit more time,  Decision to close out  Explicit decision to  Explicit decision to resources and money in commit more time, commit more time, proceeding to next resources and money resources and money in stage in proceeding to the proceeding to next stage ● next stage
  • 33. The benefits of using project life cycles The project lifecycle :  provides an overriding narrative of the total project;  limits and orders the project's progress through clearly defined stages (some might call these decisions gates);  provides points of reference against which stakeholders can assess progress;  enables an overview of the total project to be maintained and in perspective;  allows for all project tasks to be correctly identified and partitioned under the appropriate stage of work;  fosters the sequential management of the project schedule through all stages;  promotes a sense of urgency throughout the schedule;  clearly identifies the stage where different resources will need to be procured;  works towards integrating all the project activities along a continuum;  provides tangible evidence of the planning process;  acts as a guide for all project activity;  assists in detailing responsibility among project stakeholders;  divides the project into manageable portions.
  • 34. The physical output of the project life cycle Benefits aside, each stage of the life cycle also has a number of specific outputs that are unique (in most cases). A preview of these is provided in the Table below. Concept outputs Schedule outputs Progress outputs Outcome outputs  Client brief  Stage, task and  Performance  Handover  Business case milestone detail – standards  Acceptance testing  Feasibility study including duration,  Inspection and  Project audit  Risk assessment sequencing and monitoring/testing  Completion checklist  Scope resources plan  Feedback and documentation  Revised timelines  Purchase orders evaluation  Stakeholder (PERT/Gantt)  Performance reports  Approvals analysis  Revised cashflows  Change of scope  Budget forecasts and budgets requests  Procedures and  Resource matrix  Progress claims policies  Baseline project  Corrective action  Meeting minutes schedule  Contracts  Approvals  Approvals  Revised schedules  Approvals
  • 35. The stakeholders to the project Stakeholders are the parties with a vested interest – positive or negative in the success (or otherwise) of the project. Not every stakeholder must actively support and promote the project's success. While this would be appreciated by other stakeholders, reality and case studies suggest that each project has its mix of champions, workers and protagonists. One of the key roles that the project manager performs is to: Identify all stakeholders  Determine their needs and expectations  Influence and manage those expectations  Project stakeholders on any project are found internal and external to the project and come under different names, e.g. owners, suppliers, etc
  • 36. Project stakeholders Key stakeholder Key roles performed Sponsor – initiates the project  Determines project's relevance to organisation And supports the team's most senior  Champions project from a position of seniority members  Acts as an inspirational figurehead  Helps to finialise top level goals  Works to minimise operational constraints Project steering team – a group of  Aligns projects to corporate objectives project sponsors who monitor the status  Provides clear strategic direction where required of all active projects  Prioritises active projects where conflicts exist Project manager – leads the project  Provides and manages the project schedule team and delivers the project goal  Motivates, develops and rewards the team  Communicates project information  Monitors and reviews progress Team member – performs specific  Provides technical skill and application actions required in the project  Responsible for project task performance  Takes directions from project manager Client – person owning the project  Provides direction for project manager  Influences how outcomes will be achieved  May initiate project changes Supplier – delivers the goods and  Delivers supplies to the project as required services by the project  Compliance with contractual conditions  Provision of logistical support
  • 37. The stakeholders to the project More than merely identifying each stakeholder, each stakeholder's needs (stated or unstated) and particular interests must be identified prior to the start of the project. This enables information and decisions to be relevant and directed towards the appropriate stakeholder – particularly in times of delays, cost over-runs, variations and other escalating issues.
  • 38. The stakeholders to the project You should research the following: Understand each stakeholder – What interests in the project do they have? How involved will they be? What information do they need? How will they make decisions? Understand the environment in which they operate - Who are their allies and enemies? What influence do they have? What are the 'right' channels of communication? What protocols should be observed? How much authority and power do they have? Understand their information needs – Different stakeholders will require different types, amounts and timing of information. Some might want 'progress' information on the project up to a point in time. Others might require 'status' information or forecast completion data.
  • 39. The stakeholders to the project You should also research the following: Understand how this information will be presented – That is, what is the preferred communication channel of each stakeholder?  Formal project reports (commonly referred to as 'progress', 'status' and 'forecast' reports  Project meetings  Email  In person  Newsletters  Social gatherings  Fax  Phone
  • 40. Summary  The study of project management borrows heavily from a number of associated disciplines, including science, management, engineering, business, human resource management, marketing and finance.  Modern-day project management provides the necessary tools, methods,  processes, structure and guidelines in creating and managing projects.  Managing projects is different from everyday management activities due to the discrete characteristics of projects.  Recall that projects are time, budget, specification and resource constrained, involve diverse stakeholders and require a number of connected tasks to be completed.  Project management enables a 'measured' trade-off between task and resource decisions to be executed.  It provides the framework or life cycle for completing the project goal and objectives as agreed by all stakeholders