SlideShare une entreprise Scribd logo
1  sur  21
Télécharger pour lire hors ligne
International Journal of Engineering Research and Development 
e-ISSN: 2278-067X, p-ISSN: 2278-800X, www.ijerd.com 
Volume 10, Issue 10 (October 2014), PP.44-64 
Contingency Analysis in Deregulated Power System Using 
Facts Device (TCSC) 
1P. Ramanaiah, J. Srinivasa Rao2 
1M.Tech Scholar,Department Of EEE,QIS College of Engineering and Technology,Ongole, A.P, India. 
2Faculty, Department Of EEE,QIS College ofEngineering andTechnology, Ongole, A.P, India. 
Abstract:- Contingency Analysis is one of the basic power system studies. It is the protection of the system 
operation under the loss of one or more of the major system components. To calculate the violations 
Contingency Analysis is the most preferable choice. Power system engineers use contingency analysis to 
foretell the result of any component failure. Contingency analysis is a computer application that uses a 
simulated model of the power system to judge the results and to calculate any overloads and to take necessary 
actions to keep the power system secure and reliable. To reduce the power flows in heavily loaded lines 
Flexible AC Transmission System devices are the most alternativeequipment. It results the low system loss, 
increasing the stability of the network and increased load ability. This paper shows a 24-Bus power system 
which gives the information about the contingencies and violations. 
Keywords:- Contingency Analysis, LODFs, PTDFs, FACTS devices, Single Contingency, Multiple 
Contingency. 
I. INTRODUCTION 
In Deregulated power system security is the most difficult work because of the great rivalry in power 
market and open approach network. The security estimation is the most challenging task as it gives the 
knowledge about the system state in the event of contingency. In the stage of designing and operation of a 
power system the main thing in all controlling areas is to provide the protection. It occurs due to any outage of 
any equipment leads to transient instability of the system and can be checked without waiting by the usage of 
protective devices put in place. 
Outage of second line can cause the small change in the power flow on the line which is used by LODF. 
LODFs are only used to decide the change in the MW flow consider similarities to the pre-contingency flow. 
LODFs are approximately not influence the flows but they depend on the accepted network topology[6]. 
Power Transfer Distribution Factors show the linearized influence on transfer of power. 
Flexible Alternative Current Transmission System (FACTS) devices are used to something in an effective way 
as one of such technology which can make something smaller the transmission congestion and control to more 
suitable use of the existing grid infrastructure. Many different issues connected with the usage of FACTS 
devices are their modeling, approximate size, optimal location, settings and cost. 
Thyristor Controlled Switching Compensator (TCSC) is connected in series with transmission lines and which 
provide not interrupted and changeable control of line impedance with much faster response compared to 
conventional control devices. To determine the suitable location for FACTS devices a loss sensitivity method is 
used [5]. 
II. CONTINGENCY ANALYSIS 
Contingency Analysis can results the classification of the power system into two states those are secure 
and insecure states.When number of contingencies is more contingency analysis took more time consuming 
process. Contingencies are known as possible causing harmful disturbances that exist in the control state of a 
power system.Contingencies referring to interrupts like generator, transformer and transmission lines outages 
will cause quick and big changes in both the outline and the state of the system [3] [12]. The contingency list is 
choosing by the help of contingency ranking.Contingencies may result in extreme violations of the operating 
compulsions. 
The main objective of contingency analysis is to find out the line overloads or voltage violations under 
such contingencies and to start complete measures thatare make necessary to mitigate these violations.Voltage 
violations are caused by single or multiple contingencies andthose are called as voltage contingencies.AC Load 
flow method is more accurate compared to DC Load flow method [1]. In contingency analysis coming to the 
outages single outage case is studied in 60 seconds and for thousand outages it would took 16 minutes. 
Contingency Analysis is studied in two types of tools those are off-line analysis and on-line analysis [12]. In 
44
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
contingency analysis two types of contingencies are there those are Generator contingency and Line 
contingency. These are occurs due to two types of violations. 
 Low Voltage Violations. 
 Line MVA Limit Violations [2]. 
Low voltage violations are occurs due to the insufficient reactive power. These are occurs at the buses. Low 
voltage means voltage falls below 0.95 p.u at the bus. High voltage means voltage rises above 1.05 p.u at the 
bus. In case of Line MVA limit violations occurs in the system when the line MVA rating go beyond its actual 
rating. In general the lines are designed for able to withstand 125% of its MVA limit. 
III. PRIMARY CONTINGENCY (N-1) ANALYSIS 
A single contingency condition is or N-1 is the loss of any power system part that has only one of the 
transmission equipment or powerplant tripped but notincludes the bus bar and radial line. In general the state of 
the system is determined on the basisof ability to meet the expected demand under all levels of contingencies.In 
power system loss of one or more system parts that happen first that is called as primary contingency. It may be 
a planned event or unplanned event [4]. In primary contingency analysis (N-1) the term N is given as the 
totalnumber of components in the power system. In this state the system is in secure state. 
IV. MULTIPLE CONTINGENCY (N-1-1) ANALYSIS 
After primary contingency the secondary contingency will occur and it is unplanned event.A ordered 
series of events consisting of the initial loss of a transmission component or single generator (primary 
contingency), followed by the system changes, followed by another loss of a transmission component or single 
generator (secondary contingency) [4]. 
As per NERC Transmission Planning Standards the electric system performance needs the some 
contingency states those are, caused by the event in the loss of single element, caused by event in the loss of 
two or more elements, great incidents resulting in two or more elements take away from service [10].N-1- 
1means that two components have failed, it is normally comparative bad than having only one fail. 
 To explain a secure base case condition need to stop and changes are necessary. 
 To make clear of a secure primary contingency base case need to examine and modifications are 
45 
required. 
 Automatically explain the couple of secondary (N-1-1) contingencies. 
 Inclusive power systems changes of N-1-1 contingencies are automatically analyze and summary reports 
are created for documentation. 
Overview of N-1-1 Analysis process: 
Figure 1 – Multiple Contingency Analysis process
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
In the corrective action mode the system changes between the first and second primary contingencies 
are performed. In corrective action mode each couple of secondary (N-1-1) contingencies a group of system 
changes is decided. In case of single contingency solution and also for primary and multiple contingency 
solutions the corrective action analysis is run[10] [11]. 
V. STATIC MODELLING OF FACTS DEVICES 
FACTS as Flexible Alternating Current Transmission Systems incorporating power electronic-based and other 
static controllers to improve the quality of controllability and increase power transfer capability. FACTS 
devices are can be broadly divided as shunt, series, combined series-series and combined series-shunt. Some 
benefits of FACTS devices are 
 Increase the loading of lines to their thermal capabilities. 
 Reduce the power flows inheavily loaded lines. 
 Improve the stability, reliability, quality of supply, availability and load ability of the power system. 
 Reduce the reactive power flows and loop flows. 
 Limits the short circuit currents and overloads. 
The main device used here is Thyristor Controlled Series Capacitor (TCSC) for becoming better of 
46 
transfer capability. 
Thyristor Controlled Series Compensator: 
TCSCs are connected in series with the lines. By inserting the series capacitance the voltage profile is 
improved in the line. The net reactance is to make smaller and control to increase in power transfer ability. A 
basic set up of a TCSC is shown in figure 2 [8] [9]. 
Figure 2: Basic TCSC scheme 
The impedance of this circuit is that for a parallel LC circuit and is given by: 
XTCSC (α) = 
XcXt α 
Xl α −Xc 
Where 
Xl α =XL 
π 
π−2α−sin α 
α is the firing angle, 
XL is the Inductor reactance and Xlis the Inductor effective reactance at firing angle α and is very small thus: 
XL ≤ Xl(α) ≤ ∞ 
Figure 3: TCSC Model 
Let the complex voltages at bus mand bus NbE denoted as Vm∠δmand Vn∠δn, respectively. The complex 
power flowing from bus mto bus ncan be expressed as 
Smn 
* =Pmn – jQmn= Vm 
*Imn 
*[(Vm – Vn) Ymn + Vm (jBsh)] 
=Vm 
2 [Gmn+ j (Bmn+Bsh)] – Vm 
= Vm 
*Vn (Gmn+ jBmn) 
Where 
Gmn + jBmn =1/(RL +jXL –jXsh)
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
Equating the real and imaginary parts of the above equations the expressions for real and reactive power flows 
can be written as 
2Gmn−VmVnGmncos (δm − δn)− VmVnBmn sin(δm − δn) 
2(Bmn+Bsh)−VmVnGmnsin (δm-δn)+VmVnBmncos (δm-δn) 
2Gmn–VmVnGmncos (δm − δn)+VmVnBijsin (δm − δn) 
2(Bmn+Bsh)+VmVnGmnsin (δm-δn)+VmVnBmncos (δm-δn) 
47 
Pmn=Vm 
Qmn=−Vm 
Similarly, the real and reactive power flows from bus m to bus n can be expressed as 
Pmn=Vm 
Qmn=−Vm 
The active and reactive power loss in the line can be calculated as 
PL = Pmn+ Pnm 
2Gmn + Vn 
= Vm 
2Gmn – 2VmVnGmncos (δm−δn) 
QL = Qmn+ Qnm 
=−Vm 
2(Bmn+Bsh)–Vn 
2(Bmn+Bsh)+ 2VmVnBmncos(δm − δn) 
TCSC have two modes of operation in the direction of the circuit resonance depending on the value of firing 
angle. Those two modes are Inductive mode and capacitive mode. 
Main purposes of the TCSC are to minimize the total power loss, generation cost and reactive power generation 
limits. 
VI. POWER TRANSFER DISTRIBUTION FACTOR (PTDF) 
The Power Transfer Distribution Factor (PTDF) display is used to calculate the incremental distribution factors 
connected with power transfers between two regions. If single contingency or multiple contingency occurs in 
the power system the power is get rid of to the very near lines. To abstain from that position the overloaded 
lines must have to be lightening from the overload. 
The Power Transfer Distribution Factor is given by 
PTDFmn, ab= 
퐗퐦퐚−퐗퐧퐚−퐗퐦퐛+퐗퐧퐛 
퐗퐦퐧 
Where 
퐗퐦퐧 Transmission line reactance connecting zone m and zone n 
퐗퐦퐚 Entry in the mth row ath column of the bus reactance matrix X 
퐏퐓퐃퐅퐦퐧,퐚퐛Is the part of a whole of transmission from bus a to b that flows over a transmission line connecting 
bus m to bus n. 
The Power Transfer Distribution Factor (PTDF) is formulated by two types they are 
 ACPTDF Computation 
 DCPTDF Computation 
VII. LINE OUTAGE DISTRIBUTION FACTOR (LODF) 
Line outage distribution factors are linear guess of the change in flow on very near lines when 
transmission lines are lost and are normally used for checking overloads on the lines following the fault.Line 
Outage Distribution Factors (LODFs) are a sensitivity measure of how does the change in a line’s position 
pretend the flows on other lines in the system. On a brisk line, the LODF reckon decide the percentage of the 
present line flow that will be show up on other transmission lines after the outage of the line [6][7].
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
VIII. SIMULATION RESULTS AND DISCUSSIONS 
48 
 For Primary contingency (N-1) Analysis: 
Figure 4: Base case for 24 bus system 
Figure 5: N-1 Line contingency on 24 bus system
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
S.NO line details Violations Max Branch % 
1 L_0000011-0000022C1 9 222.7 
2 L_0000011-0000033C1 6 109.4 
3 L_0000011-0000055C1 11 182.4 
4 L_0000022-0000044C1 10 205.6 
5 L_0000022-0000066C1 6 107.3 
6 L_0000033-0000099C1 5 107.2 
7 L_0000033-00002424C1 6 127.4 
8 L_0000044-0000099C1 3 
9 L_0000055-00001010C1 5 101.7 
10 L_0000066-00001010C1 3 
11 L_0000077-0000088C1 8 136 
12 L_0000088-0000099C1 5 100.6 
13 L_0000088-00001010C1 5 106.1 
14 L_0000099-00001111C1 5 134.2 
15 L_0000099-00001212C1 5 
16 L_00001010-00001111C1 4 
17 L_00001010-00001212C1 5 101.1 
18 L_00001111-00001313C1 5 118.8 
19 L_00001111-00001414C1 5 106.6 
20 L_00001212-00001313C1 4 
21 L_00001212-00002323C1 4 
22 L_00001313-00002323C1 5 101.1 
23 L_00001414-00001616C1 5 120.2 
24 L_00001515-00001616C1 5 100.4 
25 L_00001515-00002121C1 6 110.5 
26 L_00001515-00002121C2 6 122.8 
27 L_00001616-00001717C1 8 180.3 
28 L_00001616-00001919C1 5 103.1 
29 L_00001717-00001818C1 6 137.6 
30 L_00001717-00002222C1 6 160.4 
31 L_00001818-00002121C1 5 100.9 
32 L_00001818-00002121C2 5 100.9 
33 L_00001919-00002020C1 5 100.4 
34 L_00001919-00002020C2 5 100.4 
35 L_00002020-00002323C1 5 101.5 
36 L_00002020-00002323C2 5 101.5 
37 L_00002121-00002222C1 6 160 
38 L_00002424-00001515C1 7 127.4 
49 
A. Result and Discussion for 24 bus system: 
TABLE 1Contingency Analysis of 24 bus system 
TABLE 2 Results of Contingency Analysis 
Total no of 
contingencies 
38 Start time 14 jun 14,03:33:08 
pm 
No of 
processed 
38 end time 14 jun 14,03:33:08 
pm 
No of 
unsolvable 
0 Total run 
time 
0.36 sec 
No of 
violations 
219 Avg time 
per ctg 
0.009 sec
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 3 LODF of 24 Bus System 
S.NO FROM LINE TO LINE % LODF MW From MW To 
1 1 2 -2.3 242.4 -241.9 
2 1 3 -11.4 71.5 -68.4 
3 1 5 13.8 154.7 -147.2 
4 2 4 -12.9 155.9 -144.1 
5 2 6 10.6 86 -81.4 
6 3 9 -5.3 38.4 -37.8 
7 3 24 -6.2 -55 55.1 
8 4 9 -12.9 -11.9 13.5 
9 5 10 13.8 51.2 -50.4 
10 6 10 10.6 26.4 -26.1 
11 7 8 0 25 -22.7 
12 8 9 -16.5 -27.8 28.3 
13 8 10 16.5 -34.5 35.4 
14 9 11 5.7 -31.7 31.8 
15 9 12 -40.4 -32.2 32.4 
16 10 11 -59.1 -9 9.1 
17 10 12 0 0 0 
18 11 13 -41 -17.6 18 
19 11 14 -12.5 -23.4 23.4 
20 12 13 40.3 -14.3 14.5 
21 12 23 19.3 -18.1 18.2 
22 13 23 -0.7 -12.5 12.5 
23 14 16 -12.5 -123.4 124.4 
24 15 16 -1.9 28.4 -28.4 
25 15 21 -2.2 -62 62.2 
26 15 21 -2.2 -62 62.2 
27 24 15 -6.2 -55.1 55.5 
28 16 17 4.3 -197.6 198.9 
29 16 19 -18.6 151.7 -150.9 
30 17 18 3.7 -121.1 121.3 
31 17 22 0.6 -77.8 78.6 
32 18 21 1.9 -38.2 38.2 
33 18 21 1.9 -38.2 38.2 
34 19 20 -9.3 25.5 -25.4 
35 19 20 -9.3 25.5 -25.4 
36 20 23 -9.3 -24.6 24.7 
37 20 23 -9.3 -24.6 24.7 
38 21 22 -0.6 -80.9 81.4 
TABLE 4 PTDF of 24 Bus System 
S.NO FROM LINE TO LINE % PTDF From % PTDF To 
1 1 5 -13.79 13.79 
2 1 2 2.34 -2.34 
3 1 3 11.45 -11.45 
4 2 4 12.95 -12.95 
5 2 6 -10.61 10.61 
6 3 24 6.17 -6.17 
7 3 9 5.28 -5.28 
8 4 9 12.95 -12.95 
9 5 10 -13.79 13.79 
10 6 10 -10.61 10.61 
11 8 10 -16.49 16.49 
12 8 9 16.49 -16.49 
13 9 12 40.39 -40.39 
14 9 11 -5.67 5.67 
15 10 11 59.11 -59.11 
16 11 14 12.46 -12.46 
17 11 13 40.99 -40.99 
18 12 23 -19.3 19.3 
19 12 13 -40.32 40.32 
20 14 16 12.46 -12.46 
21 15 21 2.16 -2.16 
22 15 21 2.16 -2.16 
23 16 19 18.63 -18.63 
24 16 17 -4.32 4.32 
25 17 18 -3.73 3.73 
26 19 20 9.31 -9.31 
27 19 20 9.31 -9.31 
28 20 23 9.31 -9.31 
29 20 23 9.31 -9.31 
30 24 15 6.17 -6.17 
50
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
B. Graph between Max Branch % MVA Limit, %LODF and %PTDF. 
The Table 1 show the contingency analysis when 10 to 12 line is open. The Overloaded Line is as 
shown in fig 5,the number of violations are 219 are shown in table 2. The LODF and PTDF calculations for 24 
bus system are shown in tables 3 and 4. 
After optimal location of FACTS device (TCSC) is placed on most positive sensitive line i.e. 6 to10, the 
preventive and corrective actions taken to solve the violations are given below. 
IX. AFTER REMIDIAL ACTION TAKEN ON 24 BUS SYSTEM 
Figure 6: N-1 Line violations solved after placing the FACTS device on line 6 to 10. 
51
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
C. Result and Discussion for violations solved after placing FACTS device on 24 bus system: 
TABLE 5 Contingency Analysis of 24 bus system 
S.NO Label Violations Max Branch % 
1 L_0000011-0000022C1 7 223.5 
2 L_0000011-0000033C1 5 
3 L_0000011-0000055C1 10 182.5 
4 L_0000022-0000044C1 10 154.2 
5 L_0000022-0000066C1 5 102.6 
6 L_0000033-0000099C1 4 
7 L_0000033-00002424C1 5 
8 L_0000044-0000099C1 2 
9 L_0000055-00001010C1 4 
10 L_0000066-00001010C1 3 
11 L_0000077-0000088C1 8 102.1 
12 L_0000088-0000099C1 4 
13 L_0000088-00001010C1 4 
14 L_0000099-00001111C1 5 100.7 
15 L_0000099-00001212C1 5 
16 L_00001010-00001111C1 4 
17 L_00001010-00001212C1 4 
18 L_00001111-00001313C1 4 
19 L_00001111-00001414C1 4 
20 L_00001212-00001313C1 4 
21 L_00001212-00002323C1 4 
22 L_00001313-00002323C1 4 
23 L_00001414-00001616C1 4 
24 L_00001515-00001616C1 4 
25 L_00001515-00002121C1 5 110.6 
26 L_00001515-00002121C2 5 122.9 
27 L_00001616-00001717C1 8 180.3 
28 L_00001616-00001919C1 4 
29 L_00001717-00001818C1 6 137.6 
30 L_00001717-00002222C1 5 160.4 
31 L_00001818-00002121C1 4 
32 L_00001818-00002121C2 4 
33 L_00001919-00002020C1 4 
34 L_00001919-00002020C2 4 
35 L_00002020-00002323C1 4 
36 L_00002020-00002323C2 4 
37 L_00002121-00002222C1 5 160 
38 L_00002424-00001515C1 6 
TABLE 6 Result of Contingency Analysis Violations solved after placing FACTS device on 24 bus system. 
52 
Total no of 
contingencies 
38 Start time 14 jun 14,03:33:08 
pm 
No of processed 38 end time 14 jun 14,03:33:08 
pm 
No of unsolvable 0 Total run 
time 
0.23 sec 
No of violations 189 Avg time per 
ctg 
0.007sec
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 7 LODF of 24 Bus systems after placing FACTS device in line 6-10. 
S.NO FROM LINE TO LINE % LODF MW From MW To 
1 1 2 -2.1 243 -242.4 
2 1 3 -11.5 71.4 -68.3 
3 1 5 13.6 154.2 -146.8 
4 2 4 -13 155.8 -143.9 
5 2 6 11 86.7 -82.1 
6 3 9 -5.3 38.3 -37.8 
7 3 24 -6.2 -55.1 55.2 
8 4 9 -13 -12.1 13.7 
9 5 10 13.6 50.8 -50 
10 6 10 11 27.2 -26.8 
11 7 8 0 25 -22.7 
12 8 9 -16.4 -27.8 28.2 
13 8 10 16.4 -34.5 35.5 
14 9 11 5.6 -31.8 31.9 
15 9 12 -40.4 -32.3 32.4 
16 10 11 -59 -8.7 8.9 
17 10 12 0 0 0 
18 11 13 -41 -17.5 18 
19 11 14 -12.4 -23.3 23.4 
20 12 13 40.3 -14.4 14.5 
21 12 23 19.3 -18.1 18.2 
22 13 23 -0.7 -12.5 12.5 
23 14 16 -12.4 -123.4 124.3 
24 15 16 -1.9 28.4 -28.4 
25 15 21 -2.2 -62 62.3 
26 15 21 -2.2 -62 62.3 
27 24 15 -6.2 -55.2 55.6 
28 16 17 4.3 -197.5 198.8 
29 16 19 -18.6 151.6 -150.9 
30 17 18 3.7 -121 121.3 
31 17 22 0.6 -77.8 78.6 
32 18 21 1.9 -38.1 38.2 
33 18 21 1.9 -38.1 38.2 
34 19 20 -9.3 25.5 -25.4 
35 19 20 -9.3 25.5 -25.4 
36 20 23 -9.3 -24.6 24.7 
37 20 23 -9.3 -24.6 24.7 
38 21 22 -0.6 -80.9 81.4 
TABLE 8 PTDF of 24 bus system after placing FACTS device in line 6-10. 
S.NO FROM LINE TO LINE % PTDF From % PTDF To 
1 1 5 -13.6 13.6 
2 1 2 2.08 -2.08 
3 1 3 11.52 -11.52 
4 2 4 13.03 -13.03 
5 2 6 -10.95 10.95 
6 3 24 6.2 -6.2 
7 3 9 5.32 -5.32 
8 4 9 13.03 -13.03 
9 5 10 -13.6 13.6 
10 6 10 -10.95 10.95 
11 8 10 -16.45 16.45 
12 8 9 16.45 -16.45 
13 9 12 40.41 -40.41 
14 9 11 -5.62 5.62 
15 10 11 59 -59 
16 11 14 12.43 -12.43 
17 11 13 40.96 -40.96 
18 12 23 -19.29 19.29 
19 12 13 -40.29 40.29 
20 14 16 12.43 -12.43 
21 15 21 2.17 -2.17 
22 15 21 2.17 -2.17 
23 16 19 18.63 -18.63 
24 16 17 -4.34 4.34 
25 17 18 -3.75 3.75 
26 19 20 9.32 -9.32 
27 19 20 9.32 -9.32 
28 20 23 9.32 -9.32 
29 20 23 9.32 -9.32 
30 24 15 6.2 -6.2 
53
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
D. Graph between Max Branch %MVA Limit, % LODF and % PTDF. 
The table 5 shows the Contingency Analysis of 24 bus system when 10-12 line is open after placing 
the FACTS device on the line 6-10i.e. (Compensating the line reactance 70% to its natural value). The 
overloaded line is 9-12 is comes into normal condition which is shown in figure 6. The number of violations are 
reduced to 219 to 189 are shown in table 6.The LODF, PTDF calculations for 24 bus system as shown in tables 
7 and 8. The graph between Max Branch % MVA Limit, %LODF and %PTDF are shown in D. Some of the 
lines are carrying more power than its limit. Action should be taken to solve these MVA violations. 
After reducing the reactance of 6-10 line is 0.03334 to 0.023338 (70% compensation) and MVA limit 
of 9-12 line is changed to 75% to 100% then the lines have come back to within its operational limits. 
 For Multiple Contingency (N-1-1) Analysis: 
Figure 7: N-1-1 Line contingency on 24 bus system 
54
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
38 Start time 24 jun 14,1:51:28 
No of processed 38 end time 24 jun 14,1:51:28 
0 Total run 
time 
No of violations 177 Avg time per 
ctg 
55 
E. Result and Discussion for 24 Bus system: 
TABLE 9 N-1-1 Contingency Analysis of 24 bus system 
Total no of 
contingencies 
pm 
pm 
No of 
unsolvable 
0.43 sec 
0.011 sec 
TABLE 10 Results of Multiple Contingency Analyses. 
S.NO Label Violations Max Branch % 
1 L_0000011-0000022C1 10 233 
2 L_0000011-0000033C1 5 160.4 
3 L_0000011-0000055C1 12 160.4 
4 L_0000022-0000044C1 10 191.7 
5 L_0000022-0000066C1 6 160.4 
6 L_0000033-0000099C1 3 160.4 
7 L_0000033-00002424C1 5 160.4 
8 L_0000044-0000099C1 3 160.4 
9 L_0000055-00001010C1 4 160.4 
10 L_0000066-00001010C1 4 160.4 
11 L_0000077-0000088C1 9 160.4 
12 L_0000088-0000099C1 3 160.4 
13 L_0000088-00001010C1 3 160.4 
14 L_0000099-00001111C1 5 160.4 
15 L_0000099-00001212C1 4 160.4 
16 L_00001010-00001111C1 6 160.4 
17 L_00001010-00001212C1 7 160.4 
18 L_00001111-00001313C1 4 160.4 
19 L_00001111-00001414C1 3 160.4 
20 L_00001212-00001313C1 4 160.4 
21 L_00001212-00002323C1 3 160.4 
22 L_00001313-00002323C1 3 160.4 
23 L_00001414-00001616C1 4 160.4 
24 L_00001515-00001616C1 3 160.4 
25 L_00001515-00002121C1 3 160.4 
26 L_00001515-00002121C2 5 160.4 
27 L_00001616-00001717C1 5 323.1 
28 L_00001616-00001919C1 4 160.4 
29 L_00001717-00001818C1 5 323.1 
30 L_00001717-00002222C1 3 160.4 
31 L_00001818-00002121C1 4 160.4 
32 L_00001818-00002121C2 4 160.4 
33 L_00001919-00002020C1 3 160.4 
34 L_00001919-00002020C2 3 160.4 
35 L_00002020-00002323C1 3 160.4 
36 L_00002020-00002323C2 3 160.4 
37 L_00002121-00002222C1 3 103.6 
38 L_00002424-00001515C1 6 160.4
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 11 LODF of 24 Bus System. 
 N-1-1 Contingency with 15-21(1) Line open. 
S.NO From Line To Line % LODF MW From MW To 
1 1 2 -1.5 242.7 -242.1 
2 1 3 2.8 73.4 -70.1 
3 1 5 -1.3 153.8 -147 
4 2 4 -0.4 157 -145 
5 2 6 -1 85.1 -81 
6 3 9 -5.8 37.4 -36.9 
7 3 24 8.7 -52.3 52.4 
8 4 9 -0.4 -11 12.6 
9 5 10 -1.3 51 -50 
10 6 10 -1 26 -25.5 
11 7 8 0 25 -23 
12 8 9 0.4 -25.1 25.5 
13 8 10 -0.4 -36.9 37.7 
14 9 11 -3.3 -31.2 31.2 
15 9 12 -2.6 -30.1 30.2 
16 10 11 -1.7 -6.6 6.7 
17 10 12 -1.1 -5.6 5.6 
18 11 13 -0.3 -15.1 15.5 
19 11 14 -4.7 -22.8 22.9 
20 12 13 -1.4 -16.7 17 
21 12 23 -2.3 -19.2 19.4 
22 13 23 -1.7 -12.5 12.5 
23 14 16 -4.7 -122.9 123.8 
24 15 16 -14.6 25.7 -25.7 
25 15 21 0 0 0 
26 15 21 -76.7 -118.5 119.4 
27 24 15 8.7 -52.4 52.8 
28 16 17 -23.3 -201 202.3 
29 16 19 4 152.9 -152.1 
30 17 18 -23.3 -202.3 203 
31 17 22 0 0 0 
32 18 21 -11.6 -79 79.2 
33 18 21 -11.6 -79 79.2 
34 19 20 2 26.1 -26 
35 19 20 2 26.1 -26 
36 20 23 2 -24 24.1 
37 20 23 2 -24 24.1 
38 21 22 0 -157.9 160 
56
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 12 LODF of 24 Bus System. 
57 
 N-1-1 Contingency with 17-22 Line open. 
S.NO From Line To Line % LODF MW From MW To 
1 1 2 0.8 242.7 -242.1 
2 1 3 -1.6 73.4 -70.1 
3 1 5 0.8 153.8 -147 
4 2 4 0.2 157 -145 
5 2 6 0.6 85.1 -81 
6 3 9 3.3 37.4 -36.9 
7 3 24 -4.8 -52.3 52.4 
8 4 9 0.2 -11 12.6 
9 5 10 0.8 51 -50 
10 6 10 0.6 26 -25.5 
11 7 8 0 25 -23 
12 8 9 -0.2 -25.1 25.5 
13 8 10 0.2 -36.9 37.7 
14 9 11 1.8 -31.2 31.2 
15 9 12 1.5 -30.1 30.2 
16 10 11 1 -6.6 6.7 
17 10 12 0.6 -5.6 5.6 
18 11 13 0.2 -15.1 15.5 
19 11 14 2.6 -22.8 22.9 
20 12 13 0.8 -16.7 17 
21 12 23 1.3 -19.2 19.4 
22 13 23 1 -12.5 12.5 
23 14 16 2.6 -122.9 123.8 
24 15 16 8.2 25.7 -25.7 
25 15 21 0 0 0 
26 15 21 -13 -118.5 119.4 
27 24 15 -4.8 -52.4 52.8 
28 16 17 13 -201 202.3 
29 16 19 -2.2 152.9 -152.1 
30 17 18 -87 -202.3 203 
31 17 22 0 0 0 
32 18 21 -43.5 -79 79.2 
33 18 21 -43.5 -79 79.2 
34 19 20 -1.1 26.1 -26 
35 19 20 -1.1 26.1 -26 
36 20 23 -1.1 -24 24.1 
37 20 23 -1.1 -24 24.1 
38 21 22 -100 -157.9 160
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 13 PTDF of 24 Bus System. 
 N-1-1 Contingency with 15-21(1) Line open. 
S.NO From Line To Line % PTDF From % PTDF To 
1 1 3 -2.81 2.81 
2 3 24 -8.65 8.65 
3 3 9 5.84 -5.84 
4 9 12 2.62 -2.62 
5 9 11 3.26 -3.26 
6 11 14 4.67 -4.67 
7 12 23 2.25 -2.25 
8 14 16 4.67 -4.67 
9 15 21 76.75 -76.75 
10 15 16 14.6 -14.6 
11 16 19 -3.98 3.98 
12 16 17 23.25 -23.25 
13 17 18 23.25 -23.25 
14 18 21 11.63 -11.63 
15 18 21 11.63 -11.63 
16 24 15 -8.65 8.65 
TABLE 14 PTDF of 24 Bus System. 
S.NO From Line To Line % PTDF From % PTDF To 
1 3 24 4.83 -4.83 
2 3 9 -3.26 3.26 
3 11 14 -2.61 2.61 
4 14 16 -2.61 2.61 
5 15 21 12.99 -12.99 
6 15 16 -8.16 8.16 
7 16 19 2.22 -2.22 
8 16 17 -12.99 12.99 
9 17 18 87.01 -87.01 
10 18 21 43.5 -43.5 
11 18 21 43.5 -43.5 
12 21 22 100 -100 
58 
 N-1-1 Contingency with 17-22 Line open. 
F.Graph Between Max Branch % MVA Limit, % LODF and % PTDF for the line 15-21(1).
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
G. Graph between Max Branch % MVA Limit, % LODF and % PTDF for the line 17-22. 
For the Contingency Analysis of a 24 bus power system, the table 9 represents Multiple Contingency 
Analysis of a24 bus system. When the lines 15-21(1) and 17-22 were opened before placing the FACTS device 
in the most positive sensitivity line 6-10. The overloaded lines were 15-21(2) and 21-22 is shown in figure 
7.The total number of violations in the Multiple Contingency Analysis were 177 which is shown in table 10. 
The LODF and PTDF values calculated for both lines 15-21(1) and 17-22 were shown in tables 11, 12, 13 and 
14. The graphs were drawn between the values of Max Branch % MVA Limit, % LODF and % PTDF is shown 
in F and G. 
X. AFTER REMEDIAL ACTION TAKEN ON 24 BUS SYSTEM 
Figure 8. Multiple Contingency (N-1-1) Line violations solved after placing the 
FACTS device on line 6-10. 
59
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
H. Result and Discussion for violations solved after placing FACTS device on 24 bus system: 
TABLE 15 N-1-1 Contingency Analysis of 24 Bus System. 
S.NO Label Violations Max Branch % MVA Limit 
1 L_0000011-0000022C1 8 228.4 
2 L_0000011-0000033C1 5 108.9 
3 L_0000011-0000055C1 9 152.8 
4 L_0000022-0000044C1 8 192.2 
5 L_0000022-0000066C1 5 100.3 
6 L_0000033-0000099C1 2 
7 L_0000033-00002424C1 4 109.2 
8 L_0000044-0000099C1 2 
9 L_0000055-00001010C1 3 
10 L_0000066-00001010C1 2 
11 L_0000077-0000088C1 7 108.3 
12 L_0000088-0000099C1 2 
13 L_0000088-00001010C1 2 
14 L_0000099-00001111C1 4 122.5 
15 L_0000099-00001212C1 3 
16 L_00001010-00001111C1 3 
17 L_00001010-00001212C1 4 100.6 
18 L_00001111-00001313C1 3 
19 L_00001111-00001414C1 2 
20 L_00001212-00001313C1 3 
21 L_00001212-00002323C1 2 
22 L_00001313-00002323C1 2 
23 L_00001414-00001616C1 4 111.2 
24 L_00001515-00001616C1 2 
25 L_00001515-00002121C1 2 
26 L_00001515-00002121C2 5 139.8 
27 L_00001616-00001717C1 4 258.5 
28 L_00001616-00001919C1 3 113.1 
29 L_00001717-00001818C1 4 258.5 
30 L_00001717-00002222C1 2 
31 L_00001818-00002121C1 4 151 
32 L_00001818-00002121C2 4 151 
33 L_00001919-00002020C1 2 
34 L_00001919-00002020C2 2 
35 L_00002020-00002323C1 2 
36 L_00002020-00002323C2 2 
37 L_00002121-00002222C1 4 117.5 
38 L_00002424-00001515C1 5 109.2 
TABLE 16 Result of N-1-1 Contingency Analysis Violations solved after placing 
FACTS device on 24 bus system. 
60 
Total no of 
contingencies 
38 Start time 25 jun 14,1:51:28 
pm 
No of processed 38 end time 25 jun 14,1:51:28 
pm 
No of 
unsolvable 
0 Total run 
time 
0.33 sec 
No of violations 136 Avg time 
per ctg 
0.009 sec
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 17 LODF of 24 Bus system after placing FACTS device in line 6-10. 
61 
 N-1-1 Contingency with 15-21(1) line open. 
S.NO From Line To Line % LODF MW From MW To 
1 1 2 -1.2 235.9 -235.4 
2 1 3 2.7 75.7 -72.2 
3 1 5 -1.6 158.5 -151.5 
4 2 4 -0.5 159.4 -147.1 
5 2 6 -0.6 76 -72.1 
6 3 9 -5.9 38.4 -37.8 
7 3 24 8.6 -51.2 51.3 
8 4 9 -0.5 -8.9 10.5 
9 5 10 -1.6 55.5 -54.3 
10 6 10 -0.6 17.1 -16.9 
11 7 8 0 25 -23.1 
12 8 9 0.4 -25.4 25.9 
13 8 10 -0.4 -36.5 37.3 
14 9 11 -3.3 -29.8 29.9 
15 9 12 -2.7 -28.7 28.8 
16 10 11 -1.6 -8.6 8.7 
17 10 12 -1 -7.5 7.5 
18 11 13 -0.3 -15.1 15.5 
19 11 14 -4.7 -23.5 23.5 
20 12 13 -1.4 -16.9 17.2 
21 12 23 -2.2 -19.5 19.7 
22 13 23 -1.7 -12.7 12.7 
23 14 16 -4.7 -123.5 124.4 
24 15 16 -14.6 26.1 -26.1 
25 15 21 0 0 0 
26 15 21 -76.8 -117.8 118.7 
27 24 15 8.6 -51.3 51.7 
28 16 17 -23.2 -201.7 203 
29 16 19 4 153.4 -152.6 
30 17 18 -23.2 -203 203.7 
31 17 22 0 0 0 
32 18 21 -11.6 -79.4 79.6 
33 18 21 -11.6 -79.4 79.6 
34 19 20 2 26.3 -26.3 
35 19 20 2 26.3 -26.3 
36 20 23 2 -23.7 23.8 
37 20 23 2 -23.7 23.8 
38 21 22 0 -157.9 160
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 18 LODF of 24 Bus system after placing FACTS device on line 6-10. 
S.NO From Line To Line % LODF MW From MW To 
1 1 2 0.7 235.9 -235.4 
2 1 3 -1.5 75.7 -72.2 
3 1 5 0.9 158.5 -151.5 
4 2 4 0.3 159.4 -147.1 
5 2 6 0.4 76 -72.1 
6 3 9 3.3 38.4 -37.8 
7 3 24 -4.8 -51.2 51.3 
8 4 9 0.3 -8.9 10.5 
9 5 10 0.9 55.5 -54.3 
10 6 10 0.4 17.1 -16.9 
11 7 8 0 25 -23.1 
12 8 9 -0.2 -25.4 25.9 
13 8 10 0.2 -36.5 37.3 
14 9 11 1.9 -29.8 29.9 
15 9 12 1.5 -28.7 28.8 
16 10 11 0.9 -8.6 8.7 
17 10 12 0.6 -7.5 7.5 
18 11 13 0.2 -15.1 15.5 
19 11 14 2.6 -23.5 23.5 
20 12 13 0.8 -16.9 17.2 
21 12 23 1.3 -19.5 19.7 
22 13 23 1 -12.7 12.7 
23 14 16 2.6 -123.5 124.4 
24 15 16 8.2 26.1 -26.1 
25 15 21 0 0 0 
26 15 21 -13 -117.8 118.7 
27 24 15 -4.8 -51.3 51.7 
28 16 17 13 -201.7 203 
29 16 19 -2.2 153.4 -152.6 
30 17 18 -87 -203 203.7 
31 17 22 0 0 0 
32 18 21 -43.5 -79.4 79.6 
33 18 21 -43.5 -79.4 79.6 
34 19 20 -1.1 26.3 -26.3 
35 19 20 -1.1 26.3 -26.3 
36 20 23 -1.1 -23.7 23.8 
37 20 23 -1.1 -23.7 23.8 
38 21 22 -100 -157.9 160 
62 
 N-1-1 Contingency with 17-22 line open. 
TABLE 19 PTDF of 24 Bus system after placing FACTS device on line 6-10. 
 N-1-1 Contingency with 15-21(1) line open. 
S.NO From Line To Line % PTDF From% PTDF To 
1 1 3 -2.72 2.72 
2 3 24 -8.61 8.61 
3 3 9 5.89 -5.89 
4 9 12 2.68 -2.68 
5 9 11 3.32 -3.32 
6 11 14 4.65 -4.65 
7 12 23 2.24 -2.24 
8 14 16 4.65 -4.65 
9 15 21 76.77 -76.77 
10 15 16 14.62 -14.62 
11 16 19 -3.96 3.96 
12 16 17 23.23 -23.23 
13 17 18 23.23 -23.23 
14 18 21 11.61 -11.61 
15 18 21 11.61 -11.61 
16 24 15 -8.61 8.61
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
TABLE 20 PTDF of 24 Bus system after placing FACTS device on line 6-10. 
S.NO From Line To Line % PTDF From % PTDF To 
1 3 24 4.81 -4.81 
2 3 9 -3.29 3.29 
3 11 14 -2.6 2.6 
4 14 16 -2.6 2.6 
5 15 21 12.98 -12.98 
6 15 16 -8.17 8.17 
7 16 19 2.21 -2.21 
8 16 17 -12.98 12.98 
9 17 18 87.02 -87.02 
10 18 21 43.51 -43.51 
11 18 21 43.51 -43.51 
12 21 22 100 -100 
13 24 15 4.81 -4.81 
63 
 N-1-1 Contingency with 17-22 line open. 
I. Graph Between Max Branch %MVA Limit, %LODF and %PTDF for the line 15-21(1). 
J. Graph Between Max Branch % MVA Limit, %LODF and %PTDF for the line 17-22. 
The table 15 shows the Multiple Contingency (N-1-1) Analysis of a 24 bus power system when the 
lines 15-21(1) and 17-22 were opened after placing the FACTS device on the most positive sensitive line 6-10. 
The overloaded lines 15-21(2), 17-22 were comes into normal condition which is shown in figure 8. 
The number of violations is reduced to 177 to 136 which is shown in table 16. The LODF, PTDF 
calculations for 24 bus power system is shown in tables 17, 18, 19 and 20.The graphs between the Max Branch 
%MVA Limit, % LODF, %PTDF are shown in figures I and J. 
Some of the lines are carrying more power than its limit. Actions should be taken to solve these MVA 
violations. After reducing the reactance of 6-10 line is 0.033340 to 0.023338 (70% compensation) and MVA 
limits are changes in the lines 15-21(1) as 100% to 175% and 17-22 line as 100% to 150% then the lines are 
comeback to within its operational limits.
Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 
XI. CONCLUSION 
Contingency analysis is used to foretell the result of outages caused line outage in a power 
transmission system. FACTS devices like TCSC by limit the flows in the network will help to bring down the 
flows in solidly loaded lines. The limit violations in the power system are effectivelytakenaway after using the 
corrective actions.The security limits give an account from maximum violations of the element of test system 
and sensitivity analysis of both line outage distribution factor and power transfer distribution factor. 
Contingency Analysis helps particularly in the busy power system operators.In power world simulator the 
contingency analysis is not difficult to run the power system as compared to the other contingency analysis and 
it is more trustworthy. 
REFERENCES 
[1]. Chary, D. M., “Contingency Analysis in Power Systems, Transfer CapabilityComputation and 
Enhancement Using Facts Devices in Deregulated Power System.”Ph.D. diss., Jawaharlal Nehru 
Technological University, 2011. 
[2]. K. Radha Rani, J. Amarnath, and S. Kamakshaiah, “Contingency Analysis under Deregulated Power 
Systems”, ICGST-ACSE Journal, Volume 11, Issue 2, November 2011. 
[3]. Wood, A. J. Wallenberg, B. F., “Power Generation, Operation and Control”. 2nd ed.,New York/USA: 
64 
John Wiley& Sons, 1996, pp. 410-432. 
[4]. N-1-1 Contingency Analysis using Power World Simulator by Scott R. Dahman, P.E March 24, 2010, 
October 25, 2012 (revised). 
[5]. P.Preedavichit and S.C.Srivatsava, “Optimal Reactive Power Dispatch considering FACTS devices,” 
Electric Power Syst. Res., vol.46, pp. 251-257, Sep.1998. 
[6]. Teoman Guler, George Gross and Minghai Liu, “Generalized Line Outage Distribution Factors”, IEEE 
Trans. Power System, vol.22,no.2, pp.879-881, May 2007. 
[7]. Power World Corporation Simulator Version 16 user’s guide December 22, 2011. 
[8]. Garng. M. Huang and Yishan Li, “Impact of Thyristor Controlled Series Capacitor on Bulk Power 
System Reliability”, IEEE Trans. Power Systems, Vol.2, November 2002, pp. 975-980. 
[9]. Masachika Ishimaru, Ryuichi Yokoyama, Goro Shirai, Kwang Y. Lee, “Allocation and Design of 
Robust TCSC Controllers Based on Power System Stability Index”, IEEE Trans. Power Systems, 
Vol.1, November 2002, pp. 573-578. 
[10]. NERC, Transmission Planning Standards, www.NERC.com. 
[11]. PSS®E Program Manual, Version 32, Siemens PTI, June 2009. 
[12]. Contingency Analysis Baseline.doc, Final Release, IECSA Volume 2, D38. 
.

Contenu connexe

Tendances

Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...IJAPEJOURNAL
 
V fuzzy logic applications to electrical systems
V fuzzy logic applications to electrical systemsV fuzzy logic applications to electrical systems
V fuzzy logic applications to electrical systemskypameenendranathred
 
An Under frequency Load Shedding Scheme for
An Under frequency Load Shedding Scheme forAn Under frequency Load Shedding Scheme for
An Under frequency Load Shedding Scheme forAjay Singh
 
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...idescitation
 
Power System Dynamics & Stability Overview & Electromagnetic Transients
Power System Dynamics & Stability Overview  &  Electromagnetic TransientsPower System Dynamics & Stability Overview  &  Electromagnetic Transients
Power System Dynamics & Stability Overview & Electromagnetic TransientsPower System Operation
 
Under frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyUnder frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyIAEME Publication
 
Future approach to mitigate Inter-Area Oscillations in GCC Combined System
Future approach to mitigate Inter-Area Oscillations in GCC Combined SystemFuture approach to mitigate Inter-Area Oscillations in GCC Combined System
Future approach to mitigate Inter-Area Oscillations in GCC Combined SystemPower System Operation
 
Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...eSAT Journals
 
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...ijeei-iaes
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factorViren Pandya
 
Power System Analysis Unit - V
Power System Analysis Unit - VPower System Analysis Unit - V
Power System Analysis Unit - Varunatshare
 
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...IRJET Journal
 
Transient stability analysis and enhancement of ieee 9 bus system
Transient stability analysis and enhancement of ieee  9 bus system Transient stability analysis and enhancement of ieee  9 bus system
Transient stability analysis and enhancement of ieee 9 bus system ecij
 
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithm
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithmVoltage Stability Indices: Taxonomy, Formulation and Calculation algorithm
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithmcimran15
 
The Need for Enhanced Power System Modelling Techniques and Simulation Tools
The Need for Enhanced Power System Modelling Techniques and Simulation ToolsThe Need for Enhanced Power System Modelling Techniques and Simulation Tools
The Need for Enhanced Power System Modelling Techniques and Simulation ToolsPower System Operation
 
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...IRJET Journal
 
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...Design and Analysis of Power System Stabilizer and Unified Power Flow Control...
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...IRJET Journal
 

Tendances (20)

Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
Compensation of Single-Phase and Three-Phase Voltage Sag and Swell Using Dyna...
 
Al4201250256
Al4201250256Al4201250256
Al4201250256
 
V fuzzy logic applications to electrical systems
V fuzzy logic applications to electrical systemsV fuzzy logic applications to electrical systems
V fuzzy logic applications to electrical systems
 
An Under frequency Load Shedding Scheme for
An Under frequency Load Shedding Scheme forAn Under frequency Load Shedding Scheme for
An Under frequency Load Shedding Scheme for
 
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
 
Power System Dynamics & Stability Overview & Electromagnetic Transients
Power System Dynamics & Stability Overview  &  Electromagnetic TransientsPower System Dynamics & Stability Overview  &  Electromagnetic Transients
Power System Dynamics & Stability Overview & Electromagnetic Transients
 
Under frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyUnder frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case study
 
Future approach to mitigate Inter-Area Oscillations in GCC Combined System
Future approach to mitigate Inter-Area Oscillations in GCC Combined SystemFuture approach to mitigate Inter-Area Oscillations in GCC Combined System
Future approach to mitigate Inter-Area Oscillations in GCC Combined System
 
Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...
 
[IJET-V1I5P10] Author: K.Dhivya, S.Nirmalrajan
[IJET-V1I5P10] Author: K.Dhivya, S.Nirmalrajan [IJET-V1I5P10] Author: K.Dhivya, S.Nirmalrajan
[IJET-V1I5P10] Author: K.Dhivya, S.Nirmalrajan
 
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...
Comparison of Dynamic Stability Response of A SMIB with PI and Fuzzy Controll...
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factor
 
Power System Analysis Unit - V
Power System Analysis Unit - VPower System Analysis Unit - V
Power System Analysis Unit - V
 
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
 
Transient stability analysis and enhancement of ieee 9 bus system
Transient stability analysis and enhancement of ieee  9 bus system Transient stability analysis and enhancement of ieee  9 bus system
Transient stability analysis and enhancement of ieee 9 bus system
 
Under voltage load shedding
Under voltage load sheddingUnder voltage load shedding
Under voltage load shedding
 
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithm
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithmVoltage Stability Indices: Taxonomy, Formulation and Calculation algorithm
Voltage Stability Indices: Taxonomy, Formulation and Calculation algorithm
 
The Need for Enhanced Power System Modelling Techniques and Simulation Tools
The Need for Enhanced Power System Modelling Techniques and Simulation ToolsThe Need for Enhanced Power System Modelling Techniques and Simulation Tools
The Need for Enhanced Power System Modelling Techniques and Simulation Tools
 
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...
IRJET- Fuzzy Control Scheme for Damping of Oscillations in Multi Machine Powe...
 
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...Design and Analysis of Power System Stabilizer and Unified Power Flow Control...
Design and Analysis of Power System Stabilizer and Unified Power Flow Control...
 

En vedette

交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」
交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」
交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」R.O.C.Executive Yuan
 
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹp
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹpCăn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹp
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹpnguyennguyenanh
 
Մադամ Տյուսոյի թանգարան
Մադամ Տյուսոյի թանգարանՄադամ Տյուսոյի թանգարան
Մադամ Տյուսոյի թանգարանMilenaMarkosyan
 
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...nguyennguyenanh
 
API-510 Certificate
API-510 CertificateAPI-510 Certificate
API-510 CertificateMayur Mehta
 
Klm lighting led candle bulb
Klm lighting led candle bulbKlm lighting led candle bulb
Klm lighting led candle bulbkate Klm
 
5 marketing strategy and marketing performance does strategy affect performa...
5 marketing strategy and marketing performance  does strategy affect performa...5 marketing strategy and marketing performance  does strategy affect performa...
5 marketing strategy and marketing performance does strategy affect performa...INFOGAIN PUBLICATION
 
Bmd7 opdracht4 cvk1986
Bmd7 opdracht4 cvk1986Bmd7 opdracht4 cvk1986
Bmd7 opdracht4 cvk1986cvk1986
 

En vedette (11)

Website Analysis
Website AnalysisWebsite Analysis
Website Analysis
 
交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」
交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」
交通部:「亞東關係協會與公益財團法人交流協會臺日觀光事業發展加強合作備忘錄」
 
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹp
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹpCăn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹp
Căn hộ TOPAZ CITY chỉ từ 956 triệu căn- nhanh tay đặt chỗ để sở hữu vị trí đẹp
 
الرسوم الخطية
الرسوم الخطيةالرسوم الخطية
الرسوم الخطية
 
Մադամ Տյուսոյի թանգարան
Մադամ Տյուսոյի թանգարանՄադամ Տյուսոյի թանգարան
Մադամ Տյուսոյի թանգարան
 
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...
Căn hộ Topaz city HOT nhất khu vực- chỉ 956 triệu căn- thiết kế đẹp- tiện ích...
 
API-510 Certificate
API-510 CertificateAPI-510 Certificate
API-510 Certificate
 
Hasil dan pembahasan
Hasil dan pembahasanHasil dan pembahasan
Hasil dan pembahasan
 
Klm lighting led candle bulb
Klm lighting led candle bulbKlm lighting led candle bulb
Klm lighting led candle bulb
 
5 marketing strategy and marketing performance does strategy affect performa...
5 marketing strategy and marketing performance  does strategy affect performa...5 marketing strategy and marketing performance  does strategy affect performa...
5 marketing strategy and marketing performance does strategy affect performa...
 
Bmd7 opdracht4 cvk1986
Bmd7 opdracht4 cvk1986Bmd7 opdracht4 cvk1986
Bmd7 opdracht4 cvk1986
 

Similaire à International Journal of Engineering Research and Development

Continuation Power Flow Method based Assessment of Static Voltage Stability c...
Continuation Power Flow Method based Assessment of Static Voltage Stability c...Continuation Power Flow Method based Assessment of Static Voltage Stability c...
Continuation Power Flow Method based Assessment of Static Voltage Stability c...IJERA Editor
 
IRJET- Location Identification for FACTs Device
IRJET- Location Identification for FACTs DeviceIRJET- Location Identification for FACTs Device
IRJET- Location Identification for FACTs DeviceIRJET Journal
 
Matlab Simulink in Three-Phase Fault Analysis on Transmission line
Matlab Simulink in Three-Phase Fault Analysis on Transmission lineMatlab Simulink in Three-Phase Fault Analysis on Transmission line
Matlab Simulink in Three-Phase Fault Analysis on Transmission linepamu17
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...IRJET Journal
 
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsPredicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsDr. Amarjeet Singh
 
Enhancement of power system security by tcsc under single line outages
Enhancement of power system security by tcsc under single line outagesEnhancement of power system security by tcsc under single line outages
Enhancement of power system security by tcsc under single line outagesIAEME Publication
 
Under voltage load shedding for contingency analysis to optimize power loss ...
Under voltage load shedding for contingency analysis to  optimize power loss ...Under voltage load shedding for contingency analysis to  optimize power loss ...
Under voltage load shedding for contingency analysis to optimize power loss ...elelijjournal
 
An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...journalBEEI
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Sensitivity based optimal location of tcsc for improvement of power system se...
Sensitivity based optimal location of tcsc for improvement of power system se...Sensitivity based optimal location of tcsc for improvement of power system se...
Sensitivity based optimal location of tcsc for improvement of power system se...eSAT Publishing House
 
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET Journal
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...IJAPEJOURNAL
 
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfAzizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfSultanAlSaiari1
 
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUE
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUEENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUE
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUEIAEME Publication
 
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQC
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQCIRJET- A Comparison of Power Quality Improvement based on Controls of UPQC
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQCIRJET Journal
 
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...iosrjce
 

Similaire à International Journal of Engineering Research and Development (20)

Continuation Power Flow Method based Assessment of Static Voltage Stability c...
Continuation Power Flow Method based Assessment of Static Voltage Stability c...Continuation Power Flow Method based Assessment of Static Voltage Stability c...
Continuation Power Flow Method based Assessment of Static Voltage Stability c...
 
IRJET- Location Identification for FACTs Device
IRJET- Location Identification for FACTs DeviceIRJET- Location Identification for FACTs Device
IRJET- Location Identification for FACTs Device
 
Matlab Simulink in Three-Phase Fault Analysis on Transmission line
Matlab Simulink in Three-Phase Fault Analysis on Transmission lineMatlab Simulink in Three-Phase Fault Analysis on Transmission line
Matlab Simulink in Three-Phase Fault Analysis on Transmission line
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
 
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsPredicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
 
Enhancement of power system security by tcsc under single line outages
Enhancement of power system security by tcsc under single line outagesEnhancement of power system security by tcsc under single line outages
Enhancement of power system security by tcsc under single line outages
 
Under voltage load shedding for contingency analysis to optimize power loss ...
Under voltage load shedding for contingency analysis to  optimize power loss ...Under voltage load shedding for contingency analysis to  optimize power loss ...
Under voltage load shedding for contingency analysis to optimize power loss ...
 
Power system security and smart grid
Power system security  and  smart gridPower system security  and  smart grid
Power system security and smart grid
 
An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Sensitivity based optimal location of tcsc for improvement of power system se...
Sensitivity based optimal location of tcsc for improvement of power system se...Sensitivity based optimal location of tcsc for improvement of power system se...
Sensitivity based optimal location of tcsc for improvement of power system se...
 
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...
Investigation and Comparison of the Effect of Facts Devices, Capacitors and L...
 
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdfAzizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
Azizan_2020_IOP_Conf._Ser.__Mater._Sci._Eng._767_012004.pdf
 
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUE
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUEENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUE
ENHANCEMENT OF POWER SYSTEM SECURITY USING PSO-NR OPTIMIZATION TECHNIQUE
 
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQC
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQCIRJET- A Comparison of Power Quality Improvement based on Controls of UPQC
IRJET- A Comparison of Power Quality Improvement based on Controls of UPQC
 
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...
“An Assessment of Voltage Stability based on Line Voltage Stability Indices a...
 
L010618188
L010618188L010618188
L010618188
 

Plus de IJERD Editor

A Novel Method for Prevention of Bandwidth Distributed Denial of Service Attacks
A Novel Method for Prevention of Bandwidth Distributed Denial of Service AttacksA Novel Method for Prevention of Bandwidth Distributed Denial of Service Attacks
A Novel Method for Prevention of Bandwidth Distributed Denial of Service AttacksIJERD Editor
 
MEMS MICROPHONE INTERFACE
MEMS MICROPHONE INTERFACEMEMS MICROPHONE INTERFACE
MEMS MICROPHONE INTERFACEIJERD Editor
 
Influence of tensile behaviour of slab on the structural Behaviour of shear c...
Influence of tensile behaviour of slab on the structural Behaviour of shear c...Influence of tensile behaviour of slab on the structural Behaviour of shear c...
Influence of tensile behaviour of slab on the structural Behaviour of shear c...IJERD Editor
 
Gold prospecting using Remote Sensing ‘A case study of Sudan’
Gold prospecting using Remote Sensing ‘A case study of Sudan’Gold prospecting using Remote Sensing ‘A case study of Sudan’
Gold prospecting using Remote Sensing ‘A case study of Sudan’IJERD Editor
 
Reducing Corrosion Rate by Welding Design
Reducing Corrosion Rate by Welding DesignReducing Corrosion Rate by Welding Design
Reducing Corrosion Rate by Welding DesignIJERD Editor
 
Router 1X3 – RTL Design and Verification
Router 1X3 – RTL Design and VerificationRouter 1X3 – RTL Design and Verification
Router 1X3 – RTL Design and VerificationIJERD Editor
 
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...IJERD Editor
 
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVR
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVRMitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVR
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVRIJERD Editor
 
Study on the Fused Deposition Modelling In Additive Manufacturing
Study on the Fused Deposition Modelling In Additive ManufacturingStudy on the Fused Deposition Modelling In Additive Manufacturing
Study on the Fused Deposition Modelling In Additive ManufacturingIJERD Editor
 
Spyware triggering system by particular string value
Spyware triggering system by particular string valueSpyware triggering system by particular string value
Spyware triggering system by particular string valueIJERD Editor
 
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...IJERD Editor
 
Secure Image Transmission for Cloud Storage System Using Hybrid Scheme
Secure Image Transmission for Cloud Storage System Using Hybrid SchemeSecure Image Transmission for Cloud Storage System Using Hybrid Scheme
Secure Image Transmission for Cloud Storage System Using Hybrid SchemeIJERD Editor
 
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...IJERD Editor
 
Gesture Gaming on the World Wide Web Using an Ordinary Web Camera
Gesture Gaming on the World Wide Web Using an Ordinary Web CameraGesture Gaming on the World Wide Web Using an Ordinary Web Camera
Gesture Gaming on the World Wide Web Using an Ordinary Web CameraIJERD Editor
 
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...IJERD Editor
 
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...IJERD Editor
 
Moon-bounce: A Boon for VHF Dxing
Moon-bounce: A Boon for VHF DxingMoon-bounce: A Boon for VHF Dxing
Moon-bounce: A Boon for VHF DxingIJERD Editor
 
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...IJERD Editor
 
Importance of Measurements in Smart Grid
Importance of Measurements in Smart GridImportance of Measurements in Smart Grid
Importance of Measurements in Smart GridIJERD Editor
 
Study of Macro level Properties of SCC using GGBS and Lime stone powder
Study of Macro level Properties of SCC using GGBS and Lime stone powderStudy of Macro level Properties of SCC using GGBS and Lime stone powder
Study of Macro level Properties of SCC using GGBS and Lime stone powderIJERD Editor
 

Plus de IJERD Editor (20)

A Novel Method for Prevention of Bandwidth Distributed Denial of Service Attacks
A Novel Method for Prevention of Bandwidth Distributed Denial of Service AttacksA Novel Method for Prevention of Bandwidth Distributed Denial of Service Attacks
A Novel Method for Prevention of Bandwidth Distributed Denial of Service Attacks
 
MEMS MICROPHONE INTERFACE
MEMS MICROPHONE INTERFACEMEMS MICROPHONE INTERFACE
MEMS MICROPHONE INTERFACE
 
Influence of tensile behaviour of slab on the structural Behaviour of shear c...
Influence of tensile behaviour of slab on the structural Behaviour of shear c...Influence of tensile behaviour of slab on the structural Behaviour of shear c...
Influence of tensile behaviour of slab on the structural Behaviour of shear c...
 
Gold prospecting using Remote Sensing ‘A case study of Sudan’
Gold prospecting using Remote Sensing ‘A case study of Sudan’Gold prospecting using Remote Sensing ‘A case study of Sudan’
Gold prospecting using Remote Sensing ‘A case study of Sudan’
 
Reducing Corrosion Rate by Welding Design
Reducing Corrosion Rate by Welding DesignReducing Corrosion Rate by Welding Design
Reducing Corrosion Rate by Welding Design
 
Router 1X3 – RTL Design and Verification
Router 1X3 – RTL Design and VerificationRouter 1X3 – RTL Design and Verification
Router 1X3 – RTL Design and Verification
 
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...
Active Power Exchange in Distributed Power-Flow Controller (DPFC) At Third Ha...
 
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVR
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVRMitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVR
Mitigation of Voltage Sag/Swell with Fuzzy Control Reduced Rating DVR
 
Study on the Fused Deposition Modelling In Additive Manufacturing
Study on the Fused Deposition Modelling In Additive ManufacturingStudy on the Fused Deposition Modelling In Additive Manufacturing
Study on the Fused Deposition Modelling In Additive Manufacturing
 
Spyware triggering system by particular string value
Spyware triggering system by particular string valueSpyware triggering system by particular string value
Spyware triggering system by particular string value
 
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...
A Blind Steganalysis on JPEG Gray Level Image Based on Statistical Features a...
 
Secure Image Transmission for Cloud Storage System Using Hybrid Scheme
Secure Image Transmission for Cloud Storage System Using Hybrid SchemeSecure Image Transmission for Cloud Storage System Using Hybrid Scheme
Secure Image Transmission for Cloud Storage System Using Hybrid Scheme
 
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...
Application of Buckley-Leverett Equation in Modeling the Radius of Invasion i...
 
Gesture Gaming on the World Wide Web Using an Ordinary Web Camera
Gesture Gaming on the World Wide Web Using an Ordinary Web CameraGesture Gaming on the World Wide Web Using an Ordinary Web Camera
Gesture Gaming on the World Wide Web Using an Ordinary Web Camera
 
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...
Hardware Analysis of Resonant Frequency Converter Using Isolated Circuits And...
 
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...
Simulated Analysis of Resonant Frequency Converter Using Different Tank Circu...
 
Moon-bounce: A Boon for VHF Dxing
Moon-bounce: A Boon for VHF DxingMoon-bounce: A Boon for VHF Dxing
Moon-bounce: A Boon for VHF Dxing
 
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...
“MS-Extractor: An Innovative Approach to Extract Microsatellites on „Y‟ Chrom...
 
Importance of Measurements in Smart Grid
Importance of Measurements in Smart GridImportance of Measurements in Smart Grid
Importance of Measurements in Smart Grid
 
Study of Macro level Properties of SCC using GGBS and Lime stone powder
Study of Macro level Properties of SCC using GGBS and Lime stone powderStudy of Macro level Properties of SCC using GGBS and Lime stone powder
Study of Macro level Properties of SCC using GGBS and Lime stone powder
 

Dernier

Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 

Dernier (20)

Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

International Journal of Engineering Research and Development

  • 1. International Journal of Engineering Research and Development e-ISSN: 2278-067X, p-ISSN: 2278-800X, www.ijerd.com Volume 10, Issue 10 (October 2014), PP.44-64 Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 1P. Ramanaiah, J. Srinivasa Rao2 1M.Tech Scholar,Department Of EEE,QIS College of Engineering and Technology,Ongole, A.P, India. 2Faculty, Department Of EEE,QIS College ofEngineering andTechnology, Ongole, A.P, India. Abstract:- Contingency Analysis is one of the basic power system studies. It is the protection of the system operation under the loss of one or more of the major system components. To calculate the violations Contingency Analysis is the most preferable choice. Power system engineers use contingency analysis to foretell the result of any component failure. Contingency analysis is a computer application that uses a simulated model of the power system to judge the results and to calculate any overloads and to take necessary actions to keep the power system secure and reliable. To reduce the power flows in heavily loaded lines Flexible AC Transmission System devices are the most alternativeequipment. It results the low system loss, increasing the stability of the network and increased load ability. This paper shows a 24-Bus power system which gives the information about the contingencies and violations. Keywords:- Contingency Analysis, LODFs, PTDFs, FACTS devices, Single Contingency, Multiple Contingency. I. INTRODUCTION In Deregulated power system security is the most difficult work because of the great rivalry in power market and open approach network. The security estimation is the most challenging task as it gives the knowledge about the system state in the event of contingency. In the stage of designing and operation of a power system the main thing in all controlling areas is to provide the protection. It occurs due to any outage of any equipment leads to transient instability of the system and can be checked without waiting by the usage of protective devices put in place. Outage of second line can cause the small change in the power flow on the line which is used by LODF. LODFs are only used to decide the change in the MW flow consider similarities to the pre-contingency flow. LODFs are approximately not influence the flows but they depend on the accepted network topology[6]. Power Transfer Distribution Factors show the linearized influence on transfer of power. Flexible Alternative Current Transmission System (FACTS) devices are used to something in an effective way as one of such technology which can make something smaller the transmission congestion and control to more suitable use of the existing grid infrastructure. Many different issues connected with the usage of FACTS devices are their modeling, approximate size, optimal location, settings and cost. Thyristor Controlled Switching Compensator (TCSC) is connected in series with transmission lines and which provide not interrupted and changeable control of line impedance with much faster response compared to conventional control devices. To determine the suitable location for FACTS devices a loss sensitivity method is used [5]. II. CONTINGENCY ANALYSIS Contingency Analysis can results the classification of the power system into two states those are secure and insecure states.When number of contingencies is more contingency analysis took more time consuming process. Contingencies are known as possible causing harmful disturbances that exist in the control state of a power system.Contingencies referring to interrupts like generator, transformer and transmission lines outages will cause quick and big changes in both the outline and the state of the system [3] [12]. The contingency list is choosing by the help of contingency ranking.Contingencies may result in extreme violations of the operating compulsions. The main objective of contingency analysis is to find out the line overloads or voltage violations under such contingencies and to start complete measures thatare make necessary to mitigate these violations.Voltage violations are caused by single or multiple contingencies andthose are called as voltage contingencies.AC Load flow method is more accurate compared to DC Load flow method [1]. In contingency analysis coming to the outages single outage case is studied in 60 seconds and for thousand outages it would took 16 minutes. Contingency Analysis is studied in two types of tools those are off-line analysis and on-line analysis [12]. In 44
  • 2. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) contingency analysis two types of contingencies are there those are Generator contingency and Line contingency. These are occurs due to two types of violations.  Low Voltage Violations.  Line MVA Limit Violations [2]. Low voltage violations are occurs due to the insufficient reactive power. These are occurs at the buses. Low voltage means voltage falls below 0.95 p.u at the bus. High voltage means voltage rises above 1.05 p.u at the bus. In case of Line MVA limit violations occurs in the system when the line MVA rating go beyond its actual rating. In general the lines are designed for able to withstand 125% of its MVA limit. III. PRIMARY CONTINGENCY (N-1) ANALYSIS A single contingency condition is or N-1 is the loss of any power system part that has only one of the transmission equipment or powerplant tripped but notincludes the bus bar and radial line. In general the state of the system is determined on the basisof ability to meet the expected demand under all levels of contingencies.In power system loss of one or more system parts that happen first that is called as primary contingency. It may be a planned event or unplanned event [4]. In primary contingency analysis (N-1) the term N is given as the totalnumber of components in the power system. In this state the system is in secure state. IV. MULTIPLE CONTINGENCY (N-1-1) ANALYSIS After primary contingency the secondary contingency will occur and it is unplanned event.A ordered series of events consisting of the initial loss of a transmission component or single generator (primary contingency), followed by the system changes, followed by another loss of a transmission component or single generator (secondary contingency) [4]. As per NERC Transmission Planning Standards the electric system performance needs the some contingency states those are, caused by the event in the loss of single element, caused by event in the loss of two or more elements, great incidents resulting in two or more elements take away from service [10].N-1- 1means that two components have failed, it is normally comparative bad than having only one fail.  To explain a secure base case condition need to stop and changes are necessary.  To make clear of a secure primary contingency base case need to examine and modifications are 45 required.  Automatically explain the couple of secondary (N-1-1) contingencies.  Inclusive power systems changes of N-1-1 contingencies are automatically analyze and summary reports are created for documentation. Overview of N-1-1 Analysis process: Figure 1 – Multiple Contingency Analysis process
  • 3. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) In the corrective action mode the system changes between the first and second primary contingencies are performed. In corrective action mode each couple of secondary (N-1-1) contingencies a group of system changes is decided. In case of single contingency solution and also for primary and multiple contingency solutions the corrective action analysis is run[10] [11]. V. STATIC MODELLING OF FACTS DEVICES FACTS as Flexible Alternating Current Transmission Systems incorporating power electronic-based and other static controllers to improve the quality of controllability and increase power transfer capability. FACTS devices are can be broadly divided as shunt, series, combined series-series and combined series-shunt. Some benefits of FACTS devices are  Increase the loading of lines to their thermal capabilities.  Reduce the power flows inheavily loaded lines.  Improve the stability, reliability, quality of supply, availability and load ability of the power system.  Reduce the reactive power flows and loop flows.  Limits the short circuit currents and overloads. The main device used here is Thyristor Controlled Series Capacitor (TCSC) for becoming better of 46 transfer capability. Thyristor Controlled Series Compensator: TCSCs are connected in series with the lines. By inserting the series capacitance the voltage profile is improved in the line. The net reactance is to make smaller and control to increase in power transfer ability. A basic set up of a TCSC is shown in figure 2 [8] [9]. Figure 2: Basic TCSC scheme The impedance of this circuit is that for a parallel LC circuit and is given by: XTCSC (α) = XcXt α Xl α −Xc Where Xl α =XL π π−2α−sin α α is the firing angle, XL is the Inductor reactance and Xlis the Inductor effective reactance at firing angle α and is very small thus: XL ≤ Xl(α) ≤ ∞ Figure 3: TCSC Model Let the complex voltages at bus mand bus NbE denoted as Vm∠δmand Vn∠δn, respectively. The complex power flowing from bus mto bus ncan be expressed as Smn * =Pmn – jQmn= Vm *Imn *[(Vm – Vn) Ymn + Vm (jBsh)] =Vm 2 [Gmn+ j (Bmn+Bsh)] – Vm = Vm *Vn (Gmn+ jBmn) Where Gmn + jBmn =1/(RL +jXL –jXsh)
  • 4. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) Equating the real and imaginary parts of the above equations the expressions for real and reactive power flows can be written as 2Gmn−VmVnGmncos (δm − δn)− VmVnBmn sin(δm − δn) 2(Bmn+Bsh)−VmVnGmnsin (δm-δn)+VmVnBmncos (δm-δn) 2Gmn–VmVnGmncos (δm − δn)+VmVnBijsin (δm − δn) 2(Bmn+Bsh)+VmVnGmnsin (δm-δn)+VmVnBmncos (δm-δn) 47 Pmn=Vm Qmn=−Vm Similarly, the real and reactive power flows from bus m to bus n can be expressed as Pmn=Vm Qmn=−Vm The active and reactive power loss in the line can be calculated as PL = Pmn+ Pnm 2Gmn + Vn = Vm 2Gmn – 2VmVnGmncos (δm−δn) QL = Qmn+ Qnm =−Vm 2(Bmn+Bsh)–Vn 2(Bmn+Bsh)+ 2VmVnBmncos(δm − δn) TCSC have two modes of operation in the direction of the circuit resonance depending on the value of firing angle. Those two modes are Inductive mode and capacitive mode. Main purposes of the TCSC are to minimize the total power loss, generation cost and reactive power generation limits. VI. POWER TRANSFER DISTRIBUTION FACTOR (PTDF) The Power Transfer Distribution Factor (PTDF) display is used to calculate the incremental distribution factors connected with power transfers between two regions. If single contingency or multiple contingency occurs in the power system the power is get rid of to the very near lines. To abstain from that position the overloaded lines must have to be lightening from the overload. The Power Transfer Distribution Factor is given by PTDFmn, ab= 퐗퐦퐚−퐗퐧퐚−퐗퐦퐛+퐗퐧퐛 퐗퐦퐧 Where 퐗퐦퐧 Transmission line reactance connecting zone m and zone n 퐗퐦퐚 Entry in the mth row ath column of the bus reactance matrix X 퐏퐓퐃퐅퐦퐧,퐚퐛Is the part of a whole of transmission from bus a to b that flows over a transmission line connecting bus m to bus n. The Power Transfer Distribution Factor (PTDF) is formulated by two types they are  ACPTDF Computation  DCPTDF Computation VII. LINE OUTAGE DISTRIBUTION FACTOR (LODF) Line outage distribution factors are linear guess of the change in flow on very near lines when transmission lines are lost and are normally used for checking overloads on the lines following the fault.Line Outage Distribution Factors (LODFs) are a sensitivity measure of how does the change in a line’s position pretend the flows on other lines in the system. On a brisk line, the LODF reckon decide the percentage of the present line flow that will be show up on other transmission lines after the outage of the line [6][7].
  • 5. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) VIII. SIMULATION RESULTS AND DISCUSSIONS 48  For Primary contingency (N-1) Analysis: Figure 4: Base case for 24 bus system Figure 5: N-1 Line contingency on 24 bus system
  • 6. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) S.NO line details Violations Max Branch % 1 L_0000011-0000022C1 9 222.7 2 L_0000011-0000033C1 6 109.4 3 L_0000011-0000055C1 11 182.4 4 L_0000022-0000044C1 10 205.6 5 L_0000022-0000066C1 6 107.3 6 L_0000033-0000099C1 5 107.2 7 L_0000033-00002424C1 6 127.4 8 L_0000044-0000099C1 3 9 L_0000055-00001010C1 5 101.7 10 L_0000066-00001010C1 3 11 L_0000077-0000088C1 8 136 12 L_0000088-0000099C1 5 100.6 13 L_0000088-00001010C1 5 106.1 14 L_0000099-00001111C1 5 134.2 15 L_0000099-00001212C1 5 16 L_00001010-00001111C1 4 17 L_00001010-00001212C1 5 101.1 18 L_00001111-00001313C1 5 118.8 19 L_00001111-00001414C1 5 106.6 20 L_00001212-00001313C1 4 21 L_00001212-00002323C1 4 22 L_00001313-00002323C1 5 101.1 23 L_00001414-00001616C1 5 120.2 24 L_00001515-00001616C1 5 100.4 25 L_00001515-00002121C1 6 110.5 26 L_00001515-00002121C2 6 122.8 27 L_00001616-00001717C1 8 180.3 28 L_00001616-00001919C1 5 103.1 29 L_00001717-00001818C1 6 137.6 30 L_00001717-00002222C1 6 160.4 31 L_00001818-00002121C1 5 100.9 32 L_00001818-00002121C2 5 100.9 33 L_00001919-00002020C1 5 100.4 34 L_00001919-00002020C2 5 100.4 35 L_00002020-00002323C1 5 101.5 36 L_00002020-00002323C2 5 101.5 37 L_00002121-00002222C1 6 160 38 L_00002424-00001515C1 7 127.4 49 A. Result and Discussion for 24 bus system: TABLE 1Contingency Analysis of 24 bus system TABLE 2 Results of Contingency Analysis Total no of contingencies 38 Start time 14 jun 14,03:33:08 pm No of processed 38 end time 14 jun 14,03:33:08 pm No of unsolvable 0 Total run time 0.36 sec No of violations 219 Avg time per ctg 0.009 sec
  • 7. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 3 LODF of 24 Bus System S.NO FROM LINE TO LINE % LODF MW From MW To 1 1 2 -2.3 242.4 -241.9 2 1 3 -11.4 71.5 -68.4 3 1 5 13.8 154.7 -147.2 4 2 4 -12.9 155.9 -144.1 5 2 6 10.6 86 -81.4 6 3 9 -5.3 38.4 -37.8 7 3 24 -6.2 -55 55.1 8 4 9 -12.9 -11.9 13.5 9 5 10 13.8 51.2 -50.4 10 6 10 10.6 26.4 -26.1 11 7 8 0 25 -22.7 12 8 9 -16.5 -27.8 28.3 13 8 10 16.5 -34.5 35.4 14 9 11 5.7 -31.7 31.8 15 9 12 -40.4 -32.2 32.4 16 10 11 -59.1 -9 9.1 17 10 12 0 0 0 18 11 13 -41 -17.6 18 19 11 14 -12.5 -23.4 23.4 20 12 13 40.3 -14.3 14.5 21 12 23 19.3 -18.1 18.2 22 13 23 -0.7 -12.5 12.5 23 14 16 -12.5 -123.4 124.4 24 15 16 -1.9 28.4 -28.4 25 15 21 -2.2 -62 62.2 26 15 21 -2.2 -62 62.2 27 24 15 -6.2 -55.1 55.5 28 16 17 4.3 -197.6 198.9 29 16 19 -18.6 151.7 -150.9 30 17 18 3.7 -121.1 121.3 31 17 22 0.6 -77.8 78.6 32 18 21 1.9 -38.2 38.2 33 18 21 1.9 -38.2 38.2 34 19 20 -9.3 25.5 -25.4 35 19 20 -9.3 25.5 -25.4 36 20 23 -9.3 -24.6 24.7 37 20 23 -9.3 -24.6 24.7 38 21 22 -0.6 -80.9 81.4 TABLE 4 PTDF of 24 Bus System S.NO FROM LINE TO LINE % PTDF From % PTDF To 1 1 5 -13.79 13.79 2 1 2 2.34 -2.34 3 1 3 11.45 -11.45 4 2 4 12.95 -12.95 5 2 6 -10.61 10.61 6 3 24 6.17 -6.17 7 3 9 5.28 -5.28 8 4 9 12.95 -12.95 9 5 10 -13.79 13.79 10 6 10 -10.61 10.61 11 8 10 -16.49 16.49 12 8 9 16.49 -16.49 13 9 12 40.39 -40.39 14 9 11 -5.67 5.67 15 10 11 59.11 -59.11 16 11 14 12.46 -12.46 17 11 13 40.99 -40.99 18 12 23 -19.3 19.3 19 12 13 -40.32 40.32 20 14 16 12.46 -12.46 21 15 21 2.16 -2.16 22 15 21 2.16 -2.16 23 16 19 18.63 -18.63 24 16 17 -4.32 4.32 25 17 18 -3.73 3.73 26 19 20 9.31 -9.31 27 19 20 9.31 -9.31 28 20 23 9.31 -9.31 29 20 23 9.31 -9.31 30 24 15 6.17 -6.17 50
  • 8. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) B. Graph between Max Branch % MVA Limit, %LODF and %PTDF. The Table 1 show the contingency analysis when 10 to 12 line is open. The Overloaded Line is as shown in fig 5,the number of violations are 219 are shown in table 2. The LODF and PTDF calculations for 24 bus system are shown in tables 3 and 4. After optimal location of FACTS device (TCSC) is placed on most positive sensitive line i.e. 6 to10, the preventive and corrective actions taken to solve the violations are given below. IX. AFTER REMIDIAL ACTION TAKEN ON 24 BUS SYSTEM Figure 6: N-1 Line violations solved after placing the FACTS device on line 6 to 10. 51
  • 9. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) C. Result and Discussion for violations solved after placing FACTS device on 24 bus system: TABLE 5 Contingency Analysis of 24 bus system S.NO Label Violations Max Branch % 1 L_0000011-0000022C1 7 223.5 2 L_0000011-0000033C1 5 3 L_0000011-0000055C1 10 182.5 4 L_0000022-0000044C1 10 154.2 5 L_0000022-0000066C1 5 102.6 6 L_0000033-0000099C1 4 7 L_0000033-00002424C1 5 8 L_0000044-0000099C1 2 9 L_0000055-00001010C1 4 10 L_0000066-00001010C1 3 11 L_0000077-0000088C1 8 102.1 12 L_0000088-0000099C1 4 13 L_0000088-00001010C1 4 14 L_0000099-00001111C1 5 100.7 15 L_0000099-00001212C1 5 16 L_00001010-00001111C1 4 17 L_00001010-00001212C1 4 18 L_00001111-00001313C1 4 19 L_00001111-00001414C1 4 20 L_00001212-00001313C1 4 21 L_00001212-00002323C1 4 22 L_00001313-00002323C1 4 23 L_00001414-00001616C1 4 24 L_00001515-00001616C1 4 25 L_00001515-00002121C1 5 110.6 26 L_00001515-00002121C2 5 122.9 27 L_00001616-00001717C1 8 180.3 28 L_00001616-00001919C1 4 29 L_00001717-00001818C1 6 137.6 30 L_00001717-00002222C1 5 160.4 31 L_00001818-00002121C1 4 32 L_00001818-00002121C2 4 33 L_00001919-00002020C1 4 34 L_00001919-00002020C2 4 35 L_00002020-00002323C1 4 36 L_00002020-00002323C2 4 37 L_00002121-00002222C1 5 160 38 L_00002424-00001515C1 6 TABLE 6 Result of Contingency Analysis Violations solved after placing FACTS device on 24 bus system. 52 Total no of contingencies 38 Start time 14 jun 14,03:33:08 pm No of processed 38 end time 14 jun 14,03:33:08 pm No of unsolvable 0 Total run time 0.23 sec No of violations 189 Avg time per ctg 0.007sec
  • 10. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 7 LODF of 24 Bus systems after placing FACTS device in line 6-10. S.NO FROM LINE TO LINE % LODF MW From MW To 1 1 2 -2.1 243 -242.4 2 1 3 -11.5 71.4 -68.3 3 1 5 13.6 154.2 -146.8 4 2 4 -13 155.8 -143.9 5 2 6 11 86.7 -82.1 6 3 9 -5.3 38.3 -37.8 7 3 24 -6.2 -55.1 55.2 8 4 9 -13 -12.1 13.7 9 5 10 13.6 50.8 -50 10 6 10 11 27.2 -26.8 11 7 8 0 25 -22.7 12 8 9 -16.4 -27.8 28.2 13 8 10 16.4 -34.5 35.5 14 9 11 5.6 -31.8 31.9 15 9 12 -40.4 -32.3 32.4 16 10 11 -59 -8.7 8.9 17 10 12 0 0 0 18 11 13 -41 -17.5 18 19 11 14 -12.4 -23.3 23.4 20 12 13 40.3 -14.4 14.5 21 12 23 19.3 -18.1 18.2 22 13 23 -0.7 -12.5 12.5 23 14 16 -12.4 -123.4 124.3 24 15 16 -1.9 28.4 -28.4 25 15 21 -2.2 -62 62.3 26 15 21 -2.2 -62 62.3 27 24 15 -6.2 -55.2 55.6 28 16 17 4.3 -197.5 198.8 29 16 19 -18.6 151.6 -150.9 30 17 18 3.7 -121 121.3 31 17 22 0.6 -77.8 78.6 32 18 21 1.9 -38.1 38.2 33 18 21 1.9 -38.1 38.2 34 19 20 -9.3 25.5 -25.4 35 19 20 -9.3 25.5 -25.4 36 20 23 -9.3 -24.6 24.7 37 20 23 -9.3 -24.6 24.7 38 21 22 -0.6 -80.9 81.4 TABLE 8 PTDF of 24 bus system after placing FACTS device in line 6-10. S.NO FROM LINE TO LINE % PTDF From % PTDF To 1 1 5 -13.6 13.6 2 1 2 2.08 -2.08 3 1 3 11.52 -11.52 4 2 4 13.03 -13.03 5 2 6 -10.95 10.95 6 3 24 6.2 -6.2 7 3 9 5.32 -5.32 8 4 9 13.03 -13.03 9 5 10 -13.6 13.6 10 6 10 -10.95 10.95 11 8 10 -16.45 16.45 12 8 9 16.45 -16.45 13 9 12 40.41 -40.41 14 9 11 -5.62 5.62 15 10 11 59 -59 16 11 14 12.43 -12.43 17 11 13 40.96 -40.96 18 12 23 -19.29 19.29 19 12 13 -40.29 40.29 20 14 16 12.43 -12.43 21 15 21 2.17 -2.17 22 15 21 2.17 -2.17 23 16 19 18.63 -18.63 24 16 17 -4.34 4.34 25 17 18 -3.75 3.75 26 19 20 9.32 -9.32 27 19 20 9.32 -9.32 28 20 23 9.32 -9.32 29 20 23 9.32 -9.32 30 24 15 6.2 -6.2 53
  • 11. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) D. Graph between Max Branch %MVA Limit, % LODF and % PTDF. The table 5 shows the Contingency Analysis of 24 bus system when 10-12 line is open after placing the FACTS device on the line 6-10i.e. (Compensating the line reactance 70% to its natural value). The overloaded line is 9-12 is comes into normal condition which is shown in figure 6. The number of violations are reduced to 219 to 189 are shown in table 6.The LODF, PTDF calculations for 24 bus system as shown in tables 7 and 8. The graph between Max Branch % MVA Limit, %LODF and %PTDF are shown in D. Some of the lines are carrying more power than its limit. Action should be taken to solve these MVA violations. After reducing the reactance of 6-10 line is 0.03334 to 0.023338 (70% compensation) and MVA limit of 9-12 line is changed to 75% to 100% then the lines have come back to within its operational limits.  For Multiple Contingency (N-1-1) Analysis: Figure 7: N-1-1 Line contingency on 24 bus system 54
  • 12. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) 38 Start time 24 jun 14,1:51:28 No of processed 38 end time 24 jun 14,1:51:28 0 Total run time No of violations 177 Avg time per ctg 55 E. Result and Discussion for 24 Bus system: TABLE 9 N-1-1 Contingency Analysis of 24 bus system Total no of contingencies pm pm No of unsolvable 0.43 sec 0.011 sec TABLE 10 Results of Multiple Contingency Analyses. S.NO Label Violations Max Branch % 1 L_0000011-0000022C1 10 233 2 L_0000011-0000033C1 5 160.4 3 L_0000011-0000055C1 12 160.4 4 L_0000022-0000044C1 10 191.7 5 L_0000022-0000066C1 6 160.4 6 L_0000033-0000099C1 3 160.4 7 L_0000033-00002424C1 5 160.4 8 L_0000044-0000099C1 3 160.4 9 L_0000055-00001010C1 4 160.4 10 L_0000066-00001010C1 4 160.4 11 L_0000077-0000088C1 9 160.4 12 L_0000088-0000099C1 3 160.4 13 L_0000088-00001010C1 3 160.4 14 L_0000099-00001111C1 5 160.4 15 L_0000099-00001212C1 4 160.4 16 L_00001010-00001111C1 6 160.4 17 L_00001010-00001212C1 7 160.4 18 L_00001111-00001313C1 4 160.4 19 L_00001111-00001414C1 3 160.4 20 L_00001212-00001313C1 4 160.4 21 L_00001212-00002323C1 3 160.4 22 L_00001313-00002323C1 3 160.4 23 L_00001414-00001616C1 4 160.4 24 L_00001515-00001616C1 3 160.4 25 L_00001515-00002121C1 3 160.4 26 L_00001515-00002121C2 5 160.4 27 L_00001616-00001717C1 5 323.1 28 L_00001616-00001919C1 4 160.4 29 L_00001717-00001818C1 5 323.1 30 L_00001717-00002222C1 3 160.4 31 L_00001818-00002121C1 4 160.4 32 L_00001818-00002121C2 4 160.4 33 L_00001919-00002020C1 3 160.4 34 L_00001919-00002020C2 3 160.4 35 L_00002020-00002323C1 3 160.4 36 L_00002020-00002323C2 3 160.4 37 L_00002121-00002222C1 3 103.6 38 L_00002424-00001515C1 6 160.4
  • 13. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 11 LODF of 24 Bus System.  N-1-1 Contingency with 15-21(1) Line open. S.NO From Line To Line % LODF MW From MW To 1 1 2 -1.5 242.7 -242.1 2 1 3 2.8 73.4 -70.1 3 1 5 -1.3 153.8 -147 4 2 4 -0.4 157 -145 5 2 6 -1 85.1 -81 6 3 9 -5.8 37.4 -36.9 7 3 24 8.7 -52.3 52.4 8 4 9 -0.4 -11 12.6 9 5 10 -1.3 51 -50 10 6 10 -1 26 -25.5 11 7 8 0 25 -23 12 8 9 0.4 -25.1 25.5 13 8 10 -0.4 -36.9 37.7 14 9 11 -3.3 -31.2 31.2 15 9 12 -2.6 -30.1 30.2 16 10 11 -1.7 -6.6 6.7 17 10 12 -1.1 -5.6 5.6 18 11 13 -0.3 -15.1 15.5 19 11 14 -4.7 -22.8 22.9 20 12 13 -1.4 -16.7 17 21 12 23 -2.3 -19.2 19.4 22 13 23 -1.7 -12.5 12.5 23 14 16 -4.7 -122.9 123.8 24 15 16 -14.6 25.7 -25.7 25 15 21 0 0 0 26 15 21 -76.7 -118.5 119.4 27 24 15 8.7 -52.4 52.8 28 16 17 -23.3 -201 202.3 29 16 19 4 152.9 -152.1 30 17 18 -23.3 -202.3 203 31 17 22 0 0 0 32 18 21 -11.6 -79 79.2 33 18 21 -11.6 -79 79.2 34 19 20 2 26.1 -26 35 19 20 2 26.1 -26 36 20 23 2 -24 24.1 37 20 23 2 -24 24.1 38 21 22 0 -157.9 160 56
  • 14. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 12 LODF of 24 Bus System. 57  N-1-1 Contingency with 17-22 Line open. S.NO From Line To Line % LODF MW From MW To 1 1 2 0.8 242.7 -242.1 2 1 3 -1.6 73.4 -70.1 3 1 5 0.8 153.8 -147 4 2 4 0.2 157 -145 5 2 6 0.6 85.1 -81 6 3 9 3.3 37.4 -36.9 7 3 24 -4.8 -52.3 52.4 8 4 9 0.2 -11 12.6 9 5 10 0.8 51 -50 10 6 10 0.6 26 -25.5 11 7 8 0 25 -23 12 8 9 -0.2 -25.1 25.5 13 8 10 0.2 -36.9 37.7 14 9 11 1.8 -31.2 31.2 15 9 12 1.5 -30.1 30.2 16 10 11 1 -6.6 6.7 17 10 12 0.6 -5.6 5.6 18 11 13 0.2 -15.1 15.5 19 11 14 2.6 -22.8 22.9 20 12 13 0.8 -16.7 17 21 12 23 1.3 -19.2 19.4 22 13 23 1 -12.5 12.5 23 14 16 2.6 -122.9 123.8 24 15 16 8.2 25.7 -25.7 25 15 21 0 0 0 26 15 21 -13 -118.5 119.4 27 24 15 -4.8 -52.4 52.8 28 16 17 13 -201 202.3 29 16 19 -2.2 152.9 -152.1 30 17 18 -87 -202.3 203 31 17 22 0 0 0 32 18 21 -43.5 -79 79.2 33 18 21 -43.5 -79 79.2 34 19 20 -1.1 26.1 -26 35 19 20 -1.1 26.1 -26 36 20 23 -1.1 -24 24.1 37 20 23 -1.1 -24 24.1 38 21 22 -100 -157.9 160
  • 15. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 13 PTDF of 24 Bus System.  N-1-1 Contingency with 15-21(1) Line open. S.NO From Line To Line % PTDF From % PTDF To 1 1 3 -2.81 2.81 2 3 24 -8.65 8.65 3 3 9 5.84 -5.84 4 9 12 2.62 -2.62 5 9 11 3.26 -3.26 6 11 14 4.67 -4.67 7 12 23 2.25 -2.25 8 14 16 4.67 -4.67 9 15 21 76.75 -76.75 10 15 16 14.6 -14.6 11 16 19 -3.98 3.98 12 16 17 23.25 -23.25 13 17 18 23.25 -23.25 14 18 21 11.63 -11.63 15 18 21 11.63 -11.63 16 24 15 -8.65 8.65 TABLE 14 PTDF of 24 Bus System. S.NO From Line To Line % PTDF From % PTDF To 1 3 24 4.83 -4.83 2 3 9 -3.26 3.26 3 11 14 -2.61 2.61 4 14 16 -2.61 2.61 5 15 21 12.99 -12.99 6 15 16 -8.16 8.16 7 16 19 2.22 -2.22 8 16 17 -12.99 12.99 9 17 18 87.01 -87.01 10 18 21 43.5 -43.5 11 18 21 43.5 -43.5 12 21 22 100 -100 58  N-1-1 Contingency with 17-22 Line open. F.Graph Between Max Branch % MVA Limit, % LODF and % PTDF for the line 15-21(1).
  • 16. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) G. Graph between Max Branch % MVA Limit, % LODF and % PTDF for the line 17-22. For the Contingency Analysis of a 24 bus power system, the table 9 represents Multiple Contingency Analysis of a24 bus system. When the lines 15-21(1) and 17-22 were opened before placing the FACTS device in the most positive sensitivity line 6-10. The overloaded lines were 15-21(2) and 21-22 is shown in figure 7.The total number of violations in the Multiple Contingency Analysis were 177 which is shown in table 10. The LODF and PTDF values calculated for both lines 15-21(1) and 17-22 were shown in tables 11, 12, 13 and 14. The graphs were drawn between the values of Max Branch % MVA Limit, % LODF and % PTDF is shown in F and G. X. AFTER REMEDIAL ACTION TAKEN ON 24 BUS SYSTEM Figure 8. Multiple Contingency (N-1-1) Line violations solved after placing the FACTS device on line 6-10. 59
  • 17. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) H. Result and Discussion for violations solved after placing FACTS device on 24 bus system: TABLE 15 N-1-1 Contingency Analysis of 24 Bus System. S.NO Label Violations Max Branch % MVA Limit 1 L_0000011-0000022C1 8 228.4 2 L_0000011-0000033C1 5 108.9 3 L_0000011-0000055C1 9 152.8 4 L_0000022-0000044C1 8 192.2 5 L_0000022-0000066C1 5 100.3 6 L_0000033-0000099C1 2 7 L_0000033-00002424C1 4 109.2 8 L_0000044-0000099C1 2 9 L_0000055-00001010C1 3 10 L_0000066-00001010C1 2 11 L_0000077-0000088C1 7 108.3 12 L_0000088-0000099C1 2 13 L_0000088-00001010C1 2 14 L_0000099-00001111C1 4 122.5 15 L_0000099-00001212C1 3 16 L_00001010-00001111C1 3 17 L_00001010-00001212C1 4 100.6 18 L_00001111-00001313C1 3 19 L_00001111-00001414C1 2 20 L_00001212-00001313C1 3 21 L_00001212-00002323C1 2 22 L_00001313-00002323C1 2 23 L_00001414-00001616C1 4 111.2 24 L_00001515-00001616C1 2 25 L_00001515-00002121C1 2 26 L_00001515-00002121C2 5 139.8 27 L_00001616-00001717C1 4 258.5 28 L_00001616-00001919C1 3 113.1 29 L_00001717-00001818C1 4 258.5 30 L_00001717-00002222C1 2 31 L_00001818-00002121C1 4 151 32 L_00001818-00002121C2 4 151 33 L_00001919-00002020C1 2 34 L_00001919-00002020C2 2 35 L_00002020-00002323C1 2 36 L_00002020-00002323C2 2 37 L_00002121-00002222C1 4 117.5 38 L_00002424-00001515C1 5 109.2 TABLE 16 Result of N-1-1 Contingency Analysis Violations solved after placing FACTS device on 24 bus system. 60 Total no of contingencies 38 Start time 25 jun 14,1:51:28 pm No of processed 38 end time 25 jun 14,1:51:28 pm No of unsolvable 0 Total run time 0.33 sec No of violations 136 Avg time per ctg 0.009 sec
  • 18. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 17 LODF of 24 Bus system after placing FACTS device in line 6-10. 61  N-1-1 Contingency with 15-21(1) line open. S.NO From Line To Line % LODF MW From MW To 1 1 2 -1.2 235.9 -235.4 2 1 3 2.7 75.7 -72.2 3 1 5 -1.6 158.5 -151.5 4 2 4 -0.5 159.4 -147.1 5 2 6 -0.6 76 -72.1 6 3 9 -5.9 38.4 -37.8 7 3 24 8.6 -51.2 51.3 8 4 9 -0.5 -8.9 10.5 9 5 10 -1.6 55.5 -54.3 10 6 10 -0.6 17.1 -16.9 11 7 8 0 25 -23.1 12 8 9 0.4 -25.4 25.9 13 8 10 -0.4 -36.5 37.3 14 9 11 -3.3 -29.8 29.9 15 9 12 -2.7 -28.7 28.8 16 10 11 -1.6 -8.6 8.7 17 10 12 -1 -7.5 7.5 18 11 13 -0.3 -15.1 15.5 19 11 14 -4.7 -23.5 23.5 20 12 13 -1.4 -16.9 17.2 21 12 23 -2.2 -19.5 19.7 22 13 23 -1.7 -12.7 12.7 23 14 16 -4.7 -123.5 124.4 24 15 16 -14.6 26.1 -26.1 25 15 21 0 0 0 26 15 21 -76.8 -117.8 118.7 27 24 15 8.6 -51.3 51.7 28 16 17 -23.2 -201.7 203 29 16 19 4 153.4 -152.6 30 17 18 -23.2 -203 203.7 31 17 22 0 0 0 32 18 21 -11.6 -79.4 79.6 33 18 21 -11.6 -79.4 79.6 34 19 20 2 26.3 -26.3 35 19 20 2 26.3 -26.3 36 20 23 2 -23.7 23.8 37 20 23 2 -23.7 23.8 38 21 22 0 -157.9 160
  • 19. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 18 LODF of 24 Bus system after placing FACTS device on line 6-10. S.NO From Line To Line % LODF MW From MW To 1 1 2 0.7 235.9 -235.4 2 1 3 -1.5 75.7 -72.2 3 1 5 0.9 158.5 -151.5 4 2 4 0.3 159.4 -147.1 5 2 6 0.4 76 -72.1 6 3 9 3.3 38.4 -37.8 7 3 24 -4.8 -51.2 51.3 8 4 9 0.3 -8.9 10.5 9 5 10 0.9 55.5 -54.3 10 6 10 0.4 17.1 -16.9 11 7 8 0 25 -23.1 12 8 9 -0.2 -25.4 25.9 13 8 10 0.2 -36.5 37.3 14 9 11 1.9 -29.8 29.9 15 9 12 1.5 -28.7 28.8 16 10 11 0.9 -8.6 8.7 17 10 12 0.6 -7.5 7.5 18 11 13 0.2 -15.1 15.5 19 11 14 2.6 -23.5 23.5 20 12 13 0.8 -16.9 17.2 21 12 23 1.3 -19.5 19.7 22 13 23 1 -12.7 12.7 23 14 16 2.6 -123.5 124.4 24 15 16 8.2 26.1 -26.1 25 15 21 0 0 0 26 15 21 -13 -117.8 118.7 27 24 15 -4.8 -51.3 51.7 28 16 17 13 -201.7 203 29 16 19 -2.2 153.4 -152.6 30 17 18 -87 -203 203.7 31 17 22 0 0 0 32 18 21 -43.5 -79.4 79.6 33 18 21 -43.5 -79.4 79.6 34 19 20 -1.1 26.3 -26.3 35 19 20 -1.1 26.3 -26.3 36 20 23 -1.1 -23.7 23.8 37 20 23 -1.1 -23.7 23.8 38 21 22 -100 -157.9 160 62  N-1-1 Contingency with 17-22 line open. TABLE 19 PTDF of 24 Bus system after placing FACTS device on line 6-10.  N-1-1 Contingency with 15-21(1) line open. S.NO From Line To Line % PTDF From% PTDF To 1 1 3 -2.72 2.72 2 3 24 -8.61 8.61 3 3 9 5.89 -5.89 4 9 12 2.68 -2.68 5 9 11 3.32 -3.32 6 11 14 4.65 -4.65 7 12 23 2.24 -2.24 8 14 16 4.65 -4.65 9 15 21 76.77 -76.77 10 15 16 14.62 -14.62 11 16 19 -3.96 3.96 12 16 17 23.23 -23.23 13 17 18 23.23 -23.23 14 18 21 11.61 -11.61 15 18 21 11.61 -11.61 16 24 15 -8.61 8.61
  • 20. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) TABLE 20 PTDF of 24 Bus system after placing FACTS device on line 6-10. S.NO From Line To Line % PTDF From % PTDF To 1 3 24 4.81 -4.81 2 3 9 -3.29 3.29 3 11 14 -2.6 2.6 4 14 16 -2.6 2.6 5 15 21 12.98 -12.98 6 15 16 -8.17 8.17 7 16 19 2.21 -2.21 8 16 17 -12.98 12.98 9 17 18 87.02 -87.02 10 18 21 43.51 -43.51 11 18 21 43.51 -43.51 12 21 22 100 -100 13 24 15 4.81 -4.81 63  N-1-1 Contingency with 17-22 line open. I. Graph Between Max Branch %MVA Limit, %LODF and %PTDF for the line 15-21(1). J. Graph Between Max Branch % MVA Limit, %LODF and %PTDF for the line 17-22. The table 15 shows the Multiple Contingency (N-1-1) Analysis of a 24 bus power system when the lines 15-21(1) and 17-22 were opened after placing the FACTS device on the most positive sensitive line 6-10. The overloaded lines 15-21(2), 17-22 were comes into normal condition which is shown in figure 8. The number of violations is reduced to 177 to 136 which is shown in table 16. The LODF, PTDF calculations for 24 bus power system is shown in tables 17, 18, 19 and 20.The graphs between the Max Branch %MVA Limit, % LODF, %PTDF are shown in figures I and J. Some of the lines are carrying more power than its limit. Actions should be taken to solve these MVA violations. After reducing the reactance of 6-10 line is 0.033340 to 0.023338 (70% compensation) and MVA limits are changes in the lines 15-21(1) as 100% to 175% and 17-22 line as 100% to 150% then the lines are comeback to within its operational limits.
  • 21. Contingency Analysis in Deregulated Power System Using Facts Device (TCSC) XI. CONCLUSION Contingency analysis is used to foretell the result of outages caused line outage in a power transmission system. FACTS devices like TCSC by limit the flows in the network will help to bring down the flows in solidly loaded lines. The limit violations in the power system are effectivelytakenaway after using the corrective actions.The security limits give an account from maximum violations of the element of test system and sensitivity analysis of both line outage distribution factor and power transfer distribution factor. Contingency Analysis helps particularly in the busy power system operators.In power world simulator the contingency analysis is not difficult to run the power system as compared to the other contingency analysis and it is more trustworthy. REFERENCES [1]. Chary, D. M., “Contingency Analysis in Power Systems, Transfer CapabilityComputation and Enhancement Using Facts Devices in Deregulated Power System.”Ph.D. diss., Jawaharlal Nehru Technological University, 2011. [2]. K. Radha Rani, J. Amarnath, and S. Kamakshaiah, “Contingency Analysis under Deregulated Power Systems”, ICGST-ACSE Journal, Volume 11, Issue 2, November 2011. [3]. Wood, A. J. Wallenberg, B. F., “Power Generation, Operation and Control”. 2nd ed.,New York/USA: 64 John Wiley& Sons, 1996, pp. 410-432. [4]. N-1-1 Contingency Analysis using Power World Simulator by Scott R. Dahman, P.E March 24, 2010, October 25, 2012 (revised). [5]. P.Preedavichit and S.C.Srivatsava, “Optimal Reactive Power Dispatch considering FACTS devices,” Electric Power Syst. Res., vol.46, pp. 251-257, Sep.1998. [6]. Teoman Guler, George Gross and Minghai Liu, “Generalized Line Outage Distribution Factors”, IEEE Trans. Power System, vol.22,no.2, pp.879-881, May 2007. [7]. Power World Corporation Simulator Version 16 user’s guide December 22, 2011. [8]. Garng. M. Huang and Yishan Li, “Impact of Thyristor Controlled Series Capacitor on Bulk Power System Reliability”, IEEE Trans. Power Systems, Vol.2, November 2002, pp. 975-980. [9]. Masachika Ishimaru, Ryuichi Yokoyama, Goro Shirai, Kwang Y. Lee, “Allocation and Design of Robust TCSC Controllers Based on Power System Stability Index”, IEEE Trans. Power Systems, Vol.1, November 2002, pp. 573-578. [10]. NERC, Transmission Planning Standards, www.NERC.com. [11]. PSS®E Program Manual, Version 32, Siemens PTI, June 2009. [12]. Contingency Analysis Baseline.doc, Final Release, IECSA Volume 2, D38. .