REAL TIME RESERVOIR OPERATION (VALIDATION PHASE) 
A CASE STUDY 
Falguni Baliarsingh1 
1Associate Professor, Department of Civil Engineering, College of Engineering and Technology, Bhubaneswar, 
Odisha, India 
Abstract 
The LP formulation with the selected set of penalties is run in the validation phase. There are two sub-phases in the validation 
phase. In the first sub-phase, three years corresponding to the flood, normal, and drought years are considered. The performance 
of these years is measured by the reservoir storage at the end of monsoon season and peak flow at d/s flood control point. In the 
second sub-phase, eight extreme floods from the history of the reservoir are chosen. The performances of these floods are 
measured by peak flow at d/s flood control point during each of the floods. The real time operation is done for three time 
intervals, viz. 24, 12 and 6 hours. 
Keywords: Real time reservoir operation, validation phase 
-------------------------------------------------------------------***------------------------------------------------------------------- 
1. INTRODUCTION 
Most of the living beings are affected by either too less or 
too much of water compared to the normal requirement. As 
the scarcity of water is a grave concern for management, so 
also the excess of it. The former situation leads to drought, 
and the latter to flood. Both are equally alarming. Structural 
and non-structural measures are required to mitigate these 
disaster situations (Mays and Tung, 1992). One of the major 
structural measures is construction of a dam across the river. 
Reservoir, created by construction of dam, can tackle both 
the situations, viz., drought and flood. It is natural for the 
beneficiaries of a reservoir to extract as much benefit as 
possible from a single or multi-reservoir system. 
At present, most of the reservoirs are for multipurpose, even 
though some of them were originally conceived for single 
purpose. The various purposes of reservoir include 
irrigation, hydropower, drinking water supply, low-flow 
augmentation, navigation, aquaculture etc. All these 
purposes come under the category of conservative purpose. 
The management of any of the conservative purposes is 
similar in nature, viz., to utilize the available water of the 
reservoir judiciously. The reservoir, built for flood control 
purpose on the other hand, uses the available empty space of 
reservoir to absorb the flood. In the case of such flood 
control reservoir, it is operated for flood control and 
conservative purposes during some periods (for example, 
monsoon period in India) and is operated for only 
conservative purposes during rest of the year. Hence, it is 
more difficult to operate a multipurpose flood control 
reservoir than a reservoir with conservative purposes alone. 
2. METHODOLOGY 
The following LP formulation is used in validation phases, 
which is very similar to the calibration phase. The only 
difference lies in the use of Muskingum equation. 
Conventional Muskingum equation was used in calibration 
phase in the previous paper, where as more accurate 
extended Muskingum equation is used in this validation 
phase. This LP formulation is used for operation intervals of 
24 hours, 12 hours and 6 hours. For illustration, the 
formulation is discussed for the operation interval of 24 
hours. The LP formulation is as follows. 
Minimize 
[ ] 
1 
LS t US t QI t QD t ROAI t ROAD t ROEI t ROED t 
L 
P LS P US P QI P QD P ROAI P ROAD P ROEI P ROED 
t 
Z        
 
  (1) 
S2 + CF * RPS2/2 = CF [I1 + I2]/2- CF [IR1 + IR2]/2 - CF * RPS1/2 + S1 (2) 
St + CF [RPSt-1 + RPSt]/2 - St-1 = CF [It-1 + It]/2 - CF [IRt-1 + IRt]/2 t = 3,4,....,L (3) 
St - USt + LSt = RCSt t = 2,3....,L (4)
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 459 
(5) 
(6) 
Qt - QIt - QDt = 0 t = 2, 3, ....,L (7) 
RPS2 - [ROAI1 + ROEI1] + [ROAD1 + ROED1] = RPS1 (8) 
RPSt - [ROAIt-1 + ROEIt-1] + [ROADt-1 + ROEDt-1] -RPSt-1 = 0 t = 3, 4....L (9) 
RPSMIN  RPSt  RPSMAX t = 2,3, ....,L (10) 
QDt  NDF t = 2,3, ....,L (11) 
ROAIt ROAIMAX; ROADt  ROADMAX t = 1,2, ……,L-1 (12) 
SDSL  St  SFRL t = 2,3, ……,L (13) 
Non-negative constraints on USt, LSt, QIt, QDt, ROAIt, ROADt, ROEIt, and ROEDt. t = 2,3, ……,L (14) 
Where 
Z is the objective function. 
LSt is the deviation of reservoir storage below the 
recommended rule curve storage at beginning of time period 
t. 
USt is the deviation of reservoir storage above the 
recommended rule curve storage at beginning of time period 
t. 
QIt is the difference between flow at Naraj and non-damaging 
flow at beginning of time period t, when the flow 
is more than non-damaging flow,. 
QDt is the flow at Naraj at beginning of time period t, when 
the flow is less than or equal to non-damaging flow. 
ROAIt is the increase of release from reservoir (summation 
of release for power and spill) within acceptable safe limit 
during time period t. 
ROADt is the decrease of release from reservoir within 
acceptable safe limit during time period t. 
ROEIt is the increase of release from reservoir beyond 
acceptable safe limit during time period t. 
ROEDt is the decrease of release from reservoir beyond 
acceptable safe limit during time period t. 
PLS, PUS, PQI, PQD are the relative penalties for unit change of 
LS, US, QI, QD respectively. 
PROEI, PROED, PROAI, PROAD are the relative penalties for unit 
change of ROEI, ROED, ROAI, ROAD respectively. 
St is the reservoir storage volume at beginning of time 
period t. 
CF is the conversion factor to convert from rate to volume 
of any variable. 
RPSt is the summation of release from reservoir for power 
and spill at beginning of time period t. 
It is inflow into the reservoir at beginning of time period t. 
IRt is the release from reservoir for irrigation at beginning of 
time period t. 
RCSt is the recommended rule curve storage at beginning of 
time period t. 
Qt is the flow at Naraj at beginning of time period t. 
DCt is d/s catchment contribution at beginning of time 
period t. 
is the Muskingum coefficient for release from 
Hirakud at beginning of time period. 
is the Muskingum coefficient for release from 
Hirakud at end of time period. 
is the Muskingum coefficient for d/s catchment 
contribution at beginning of time period. 
is the Muskingum coefficient for d/s catchment 
contribution at end of time period. 
C2 is the Muskingum coefficient for flow at Naraj at end of 
time period. 
RPSMIN is the minimum required release from reservoir for 
power and spill. 
RPSMAX is the maximum release capacity from reservoir 
for power and spill. 
ROAIMAX is the safe limit of increase of release from 
reservoir during a specific time period. 
ROADMAX is the safe limit of decrease of release from 
reservoir during a specific time period. 
SDSL is the reservoir storage at dead storage level. 
SFRL is the reservoir storage at full reservoir level. 
t is the time period. 
L is the operating horizon for each iteration of the LP model. 
3. VALIDATION PHASE 
The performance of the three calibration floods during 
calibration phase is compared and a suitable set of penalties 
(PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 
1 : 8) for objective function of the LP formulation is 
selected. This set of penalties is applied in other situations to 
H C1 
H C0 
K C0 
K C1 
t L 
Q C RPS C RPS C Q C DC C DC 
Q C RPS C DC C RPS C DC C Q 
t 
K 
t 
K 
t t 
H 
t 
H 
t 
H K H K 
3,4,...., 
0 1 1 2 1 0 1 1 
2 1 2 0 1 0 1 1 2 2 1 
 
     
     
  
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 460 
check the model performance in this validation phase. The situations for validation are taken in two ways; (i) the quantity of inflow into the reservoir for the whole monsoon of a year and (ii) the severity of floods. In the first category, the years with extremely high, extremely low, and normal quantity of inflow into the reservoir are selected for validation. In second category, severe floods are selected for validation. The extended Muskingum coefficients for various routing period are obtained for Hirakud Project (Baliarsingh, 2000) by following the procedure given by M. H. Khan (Khan, 1993) and are placed in table-2. The data from 1972 to 1995 is considered for validation phase as the measurement of d/s catchment contribution was started from 1972 onwards. During this period, the total quantity of inflow into the reservoir in monsoon season is extremely high in the year 1994, extremely low in the year 1979, and close to the average in the year of 1984. These quantities are 73.9, 10.5, and 33.3 TMCM respectively. The average inflow into the reservoir in monsoon season during 1972-1995 is 31 TMCM. So these years are selected for validation and referred as validation year 1, 2, and 3 respectively henceforth. The most severe floods among 43 floods during 1972 to 1995 are selected in a similar way as done in calibration phase. The details of these most severe floods are shown in the Table-1. There is no occurrence of flood during ninth block period in these years. Eight floods in the remaining eight block periods are selected for validation phase. These floods from first to eighth block periods are referred henceforth as validation floods 1 to 8 respectively. 4. RESULTS AND DISCUSSION OF VALIDATION PHASE This phase is divided into two stages. In first stage (section 4.1), the results of three validation years are discussed and in the second stage (section 4.2), the result of eight validation floods are discussed. The variable rule curve (rule curve for drought, normal, and flood situation) is recommended for Hirakud reservoir and is given in Fig.3 of the previous paper. The various rule curves are followed according to the type of year, i.e., the rule curve corresponding to drought situation is to be followed in the drought year and so also for normal and flood year. These types of year are characterized by total monsoon inflow into the reservoir, the classification of which is made as follow. 
From the historical data, it is observed that the maximum and minimum total quantity of inflow into the reservoir in a monsoon season is 86 and 10.5 TMCM respectively. The average value during these years is 31 TMCM. In a 100 points scale, 10.5, 31, and 86 TMCM are considered as 10, 50, and 90 points respectively. 10 points beyond 90 are reserved for more severe flood year than the year with 86 TMCM of total inflow into the reservoir. Similarly, 10 points on the lower side are reserved for more severe drought year than the year with 10.5 TMCM. A year is considered to be a drought year if the total inflow into the reservoir is less than 33 on 100 point scale, a normal year if it is between 33 and 67 and a flood year if it is above 67. 
The relationship of the total inflow into the reservoir and points in 100 point scale is determined by regression analysis with the data as 10, 50, 90 points corresponding to 10.5, 31, 86 TMCM and is given in equation 6.18. Y = 0.0108*X2 - 0.1344*X + 10.766 (15) Where Y is total inflow into the reservoir in the monsoon in TMCM X is point in 100 point scale. By following the above points system and the equation-15, it is found that the year with total inflow into the reservoir below 18 TMCM is drought year, 18 to 50.25 TMCM is normal year and above 50.25 TMCM is flood year. The reservoir is operated in this study by the LP model (equation-1 to equation-14) for all the three validation years and eight validation floods. Six years of data, i.e., 1973, 1976, 1977, 1980, 1982, and 1994, are used for validation floods. In the following two sub-sections, the results of validation years and validation floods are discussed independently. 4.1 Validation Years As discussed in section 3, the years 1979, 1984, and 1994 are selected for validation purpose as drought, normal, and flood years respectively. The penalties for various components in objective function of LP formulation, as obtained in calibration phase, PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 1 : 8, are used for the validation phase. The procedure of real time reservoir operation by adaptive planning, as explained in previous paper, is used in the validation phase also. For this purpose, forecasted inflows and d/s catchment contribution are required for five days at each time step. However, the data, generated by any forecasting model, will have error and uncertainty associated with the forecasts. Therefore, in the present case, the observed data is used as forecast. This will give good insight into the performance evaluation of the operating policy by avoiding the forecasted data with its uncertainty nature. It may be noted that the proposed optimization model can easily incorporate the forecasted data obtained from any forecasting approach. 
The performance of the reservoir operation is evaluated by the reservoir storage achieved on 1st October and the peak flow at Naraj during the operation. It is expected to achieve the full reservoir level i.e., 7.197 TMCM by 1st October and the peak flow at Naraj should be always less than non- damaging flow of 25.5 thousand cumecs. The performance of reservoir operation by the LP formulation for the years 1979, 1984, and 1994 is shown in the Table-3. The reservoir operation is done at an interval of 24 hours in this case. The reservoir reached the full reservoir level by 1st October with the proposed model for each of these three validation years.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 461 
Regarding the maximum flow at Naraj during these years, the peak flow during 1979 and 1984 is less than non- damaging flow, but during 1994, it is 29.19 thousand cumecs. The performance of the proposed model is compared with the performance of Hirakud authority in the same Table 3. The reservoir storage during 1979 and 1984 is much below than 7.197 TMCM, but it is full only during 1994 by the operation procedure followed by Hirakud Authority. The peak flow at Naraj during the operation by Hirakud authority is more than that of during the operation by the proposed model. The reservoir storage for each time period obtained from optimization model are compared with recommended variable rule curve for the validation years. Since the deviation above the recommended storage (PUS) is given lower penalty, the reservoir storage obtained from the model is always above the recommended storage. This implies that, the reservoir has higher storage after meeting the flood control obligations. However in the drought year (1979) as the inflow into the reservoir is very low, the storage level has gone below the recommended rule curve for certain period. Routed daily flow rate at Naraj obtained from the model for all the three validation years. It can be observed that only for two days in 1994, the flow rate has exceeded the non-damaging flow of 25.5 thousand cumecs. In all other periods the flow at Naraj was maintained below 25.5 thousand cumecs by the model. 4.2 Validation Floods Eight validation floods as shown in eight block periods (Table-1) were considered for validation. These floods occurred during six different years: Two each in 1973 and 1994, and one each in 1976, 1977, 1980, and 1982. The reservoir is operated once in 24 hours by the proposed LP model for filling during the monsoon period, from 1st July to 1st October. During flood, the reservoir operation is also done once in 12 hours and once in 6 hours along with once in 24 hours to compare the performance of operation at various operation durations. The forecasted data (in the present case, observed flows are considered as forecasted data) for 5 days is used irrespective of frequency of operation. The reservoir storage as per the rule curve in a particular type of year is followed as discussed before. The reservoir operation is done by the proposed model as follows during all the above six years for comparison purpose. 
The reservoir is assumed to be at dead storage level on 1st July. The LP model (equation-1 to equation-14) is run once in 24 hours with advance five days data of inflow into the reservoir and d/s catchment contribution. The recommended variable rule curve as per the type of year (drought, normal, or flood) is followed. The release from reservoir for next five days will be obtained by running the LP model. Only the release for first day is implemented. Again, the LP model is run for the next day with the forecasted data of next five days. In this way, operation of reservoir continues up to the first day of any flood duration. During the flood, the release decision is made for next period, where the duration of period is 24 hours, 12 hours, or 6 hours. However, during the flood also the data of advance five days is used by LP model. For example, for 6 hours duration operation, the number of periods that considered in the optimization model is 20. At the end of flood, the water level in reservoir is reached at three different levels for the various durations of operation. After the flood, the reservoir is operated once in 24 hours only with each of these three levels achieved at the end of flood. In this way, the operation is continued till 1st October. The duration of operation is named by the duration of reservoir operation during the flood. Comparison of performance of the reservoir operation by the proposed LP model with an interval of 24 hours, 12 hours, and 6 hours during the flood and by Hirakud authority is shown in Table-4. The performance is evaluated by peak flow at Naraj during the flood. The peak flow at Naraj obtained by proposed optimization model is less than that obtained by Hirakud authority in eight floods except the validation flood numbers 3 and 8 for all operation durations. For the validation flood number 3, peak flow obtained by proposed model with 24 hours operation duration is 24.76 thousand cumecs, which is more than that obtained by Hirakud authority of 22.93 thousand cumecs. For the validation flood number 8, the peaks obtained are 36.5 and 36.0 thousand cumecs respectively and the difference is quite small. Among the different operation durations, peak flow by 24 hours operation is always more than the peak flow achieved by either 12 or 6 hours operation. The performance of 12 hours and 6 hours operation is not consistant. The peak at Naraj obtained by 6 hours operation is either same or less than that obtained by 12 hours operation during most of the flood (5 validation floods). The time of occurrences of peak flow at Naraj during the floods by each of the models are also shown in Table-4. The time difference of occurrence of peak during the operation by each model differs maximum by one day for flood numbers 2, 5, 6 and it varies from one day to five days for the other floods. In each of the floods, peak flow at Naraj occurs during the flood. The reservoir is brought to full reservoir level at the end of monsoon season for each of these six years by the reservoir operation with proposed optimization model irrespective of time of operational duration. The reservoir was also actually filled up by the method adopted by Hirakud authority in five years except in 1982 in which it was brought up to 6.329 TMCM. So the optimization model is meeting the performance criteria of filling the reservoir by 1st October for all the flood events. 5. CONCLUSIONS 
The real time operation of the Hirakud reservoir is proposed to be done by the LP formulation given by equation-1 to equation-14. The penalties for different components of objective function in LP formulation are determined in the calibration phase. The ratio of penalties PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 1 : 8 is found suitable during calibration. This ratio of penalties is
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 462 
validated by reservoir operation during 3 years and also for 8 severe floods. The performance during validation phase is quite satisfactory. So this ratio is recommended for future use during reservoir operation. Among the three operation durations chosen during validation phase, the reservoir operation by 6 hours is preferable for flood control purpose. In all the cases, the performance by 6 hours operation duration is better than that by 24 hours duration. 
REFERENCES 
[1] Khan, M. H., (1993). “Muskingum flood routing model for multiple tributaries”, Water Resour. Res., 29(4), 1057-1062. 
[2] Baliarsingh, F., (2000), Long-term and short-term optimal reservoir operation for flood control, Ph. D. Thesis submitted, IIT, Kharagpur. 
[3] Mays, L. W., and Y-K. Tung, (1992). Hydrosystems engineering and management, Mc-Graw-Hill Inc., Singapore. 
Table 1: Data of Severe Floods Among Forty-three Floods form 1972 to 1995 in Ten Days Block Period-Wise. 
Duration of block period 
1st July - 10th July 
11th July - 20th July 
21st July - 31th July 
1st Aug - 10th Aug 
11th Aug - 20th Aug 
21st Aug - 31st Aug 
1st Sep - 10th Sep 
11th Sep - 20th Sep 
21st Sep - 30th Sep 
Block period No. 
1 
2 
3 
4 
5 
6 
7 
8 
9 
Duration of occurrence 
09/07/73 - 17/07/73 
08/07/94 - 19/07/94 
20/07/94 - 25/07/94 
07/08/77 - 11/08/77 
11/08/76 - 18/08/76 
30/08/82 - 04/09/82 
02/09/73 - 06/09/73 
19/09/80 - 30/09/80 
No flood during ninth block period 
Peak inflow into the reservoir (T. Cumecs) 
18.4 
25.8 
19.8 
18.0 
21.4 
26.9 
18.8 
37.8 
Peak calculated d/s catchment contribution (T. Cumecs) 
16.7 
15.9 
09.6 
10.1 
20.6 
44.9 
12.1 
11.3 
Table 2: Parameters of Extended Muskingum Method. 
Routing interval (Hours) 
Coefficients of extended Muskingum equation 
C0H 
C0K 
C1H 
C1K 
C2 
24 
0.513 
1.138 
0.082 
-0.092 
0.509 
12 
0.236 
0.691 
-0.164 
-0.180 
0.855 
06 
0.107 
0.656 
-0.100 
-0.436 
0.958 
Table 3: Comparison of Performance of Reservoir Operation by Hirakud Authority and Proposed Optimization Model for Three Validation Years. 
Approach 
Performance 
Validation Years 
1979 
1984 
1994 
Proposed optimization (LP) model (24 Hours operation duration) 
Reservoir storage on 1st of october (TMCM) 
7.197 
7.197 
7.197 
Peak flow at Naraj during whole monsoon season (T. Cumecs) 
12.27 
18.68 
29.19 
Operation by Hirakud authority 
Reservoir storage on 1st of October(TMCM) 
4.824 
6.692 
7.197 
Peak flow at Naraj during whole monsoon season (T. Cumecs) 
18.9 
25.05 
30.63
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 463 
Table 4: Comparison of Performance of Reservoir Operation by Hirakud Authority and Proposed Model for Eight Validation Floods. 
Validation flood number. 
Duration of flood 
Occurrence of peak inflow into the reservoir 
Operation model 
Performance during flood 
Peak flow at Naraj (T. Cumecs) 
Time of occurrence 
1 
09/07/73 to 17/07/73 
10/07/73 (12 hours) 
Hirakud authority 
23.60 
15/07/73 (00 hours) 
Proposed model (24 Hours) 
19.52 
16/07/73 (00 hours) 
Proposed model (12 Hours) 
18.90 
16/07/73 (00 hours) 
Proposed model (06 Hours) 
18.53 
16/07/73 (06 hours) 
2 
08/07/94 to 19/07/94 
11/07/94 (09 hours) 
Hirakud authority 
29.03 
13/07/94 (18 hours) 
Proposed model (24 Hours) 
26.95 
14/07/94 (00 hours) 
Proposed model (12 Hours) 
26.00 
13/07/94 (00 hours) 
Proposed model (06 Hours) 
22.15 
13/07/94 (06 hours) 
3 
20/07/94 to 25/07/94 
21/07/94 (03 hours) 
Hirakud authority 
22.93 
23/07/94 (09 hours) 
Proposed model (24 Hours) 
24.76 
20/07/94 (00 hours) 
Proposed model (12 Hours) 
16.10 
20/07/94 (00 hours) 
Proposed model (06 Hours) 
16.30 
20/07/94 (00 hours) 
4 
07/08/77 to 11/08/77 
08/08/77 (06 hours) 
Hirakud authority 
17.80 
11/08/77 (21 hours) 
Proposed model (24 Hours) 
14.90 
09/08/77 (00 hours) 
Proposed model (12 Hours) 
13.80 
07/08/77 (00 hours) 
Proposed model (06 Hours) 
13.80 
07/08/77 (00 hours) 
5 
11/08/76 to 18/08/76 
15/08/76 (15 hours) 
Hirakud authority 
25.90 
15/08/76 (00 hours) 
Proposed model (24 Hours) 
20.90 
15/08/76 (00 hours) 
Proposed model (12 Hours) 
17.80 
15/08/76 (12 hours) 
Proposed model (06 Hours) 
17.60 
16/08/76 (00 hours) 
6 
30/08/82 to 04/09/82 
31/08/82 (09 hours) 
Hirakud authority 
44.90 
31/08/82 (15 hours) 
Proposed model (24 Hours) 
31.60 
31/08/82 (00 hours) 
Proposed model (12 Hours) 
27.60 
31/08/82 (00 hours) 
Proposed model (06 Hours) 
27.70 
01/09/82 (00 hours) 
7 
02/09/73 to 06/09/73 
03/09/73 (06 hours) 
Hirakud authority 
23.43 
06/09/73 (18 hours) 
Proposed model (24 Hours) 
14.20 
06/09/73 (00 hours) 
Proposed model (12 Hours) 
13.20 
02/09/73 (00 hours) 
Proposed model (06 Hours) 
13.20 
02/09/73 (00 hours) 
8 
19/09/80 to 30/09/80 
20/09/80 (12 hours) 
Hirakud authority 
36.00 
22/09/80 (05 hours) 
Proposed model (24 Hours) 
36.50 
20/09/80 (00 hours) 
Proposed model (12 Hours) 
33.50 
20/09/80 (00 hours) 
Proposed model (06 Hours) 
33.70 
20/09/80 (18 hours)

Contenu connexe

Tendances

Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...
Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...
Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...AM Publications
 
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...Flood frequency analysis of river kosi, uttarakhand, india using statistical ...
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...eSAT Journals
 
A study on comparision of runoff estimated by Empirical formulae with Measure...
A study on comparision of runoff estimated by Empirical formulae with Measure...A study on comparision of runoff estimated by Empirical formulae with Measure...
A study on comparision of runoff estimated by Empirical formulae with Measure...Ahmed Ali S D
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood designSharifah Ain
 
Q921 re1 lec8 v1
Q921 re1 lec8 v1Q921 re1 lec8 v1
Q921 re1 lec8 v1AFATous
 
IRJET-Morphometric Analysis of Vela Hari Watershed using GIS
IRJET-Morphometric Analysis of Vela Hari Watershed using GISIRJET-Morphometric Analysis of Vela Hari Watershed using GIS
IRJET-Morphometric Analysis of Vela Hari Watershed using GISIRJET Journal
 
Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulicsSaad Raja
 
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera Regulator
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera RegulatorSuspended Sediment Rating Curve for Tigris River Upstream Al- Betera Regulator
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera RegulatorIJRES Journal
 
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...SandroSnchezZamora
 
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...Khalid Al-Khidir
 
IRJET- Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...
IRJET-	 Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...IRJET-	 Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...
IRJET- Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...IRJET Journal
 
Tomographic inverse estimation of aquifer properties based on pressure varia...
Tomographic inverse estimation of aquifer properties based on  pressure varia...Tomographic inverse estimation of aquifer properties based on  pressure varia...
Tomographic inverse estimation of aquifer properties based on pressure varia...Velimir (monty) Vesselinov
 

Tendances (20)

Geo Hydrology
Geo Hydrology Geo Hydrology
Geo Hydrology
 
Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...
Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...
Groundwater Quality Modelling using Coupled Galerkin Finite Element and Modif...
 
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...Flood frequency analysis of river kosi, uttarakhand, india using statistical ...
Flood frequency analysis of river kosi, uttarakhand, india using statistical ...
 
A study on comparision of runoff estimated by Empirical formulae with Measure...
A study on comparision of runoff estimated by Empirical formulae with Measure...A study on comparision of runoff estimated by Empirical formulae with Measure...
A study on comparision of runoff estimated by Empirical formulae with Measure...
 
Floods
FloodsFloods
Floods
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood design
 
Q921 re1 lec8 v1
Q921 re1 lec8 v1Q921 re1 lec8 v1
Q921 re1 lec8 v1
 
Hwre en nu 35,44
Hwre en nu 35,44Hwre en nu 35,44
Hwre en nu 35,44
 
IRJET-Morphometric Analysis of Vela Hari Watershed using GIS
IRJET-Morphometric Analysis of Vela Hari Watershed using GISIRJET-Morphometric Analysis of Vela Hari Watershed using GIS
IRJET-Morphometric Analysis of Vela Hari Watershed using GIS
 
Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulics
 
Hydrological modelling
Hydrological modellingHydrological modelling
Hydrological modelling
 
my published paper
my published papermy published paper
my published paper
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
 
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera Regulator
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera RegulatorSuspended Sediment Rating Curve for Tigris River Upstream Al- Betera Regulator
Suspended Sediment Rating Curve for Tigris River Upstream Al- Betera Regulator
 
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...
Todorovic, P. (1978). Modelos estocásticos de inundaciones. Investigación de ...
 
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...
Seismic time fractal dimension for characterizing Shajara Reservoirs of The P...
 
Presentation aboout flood routing
Presentation aboout flood routingPresentation aboout flood routing
Presentation aboout flood routing
 
IRJET- Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...
IRJET-	 Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...IRJET-	 Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...
IRJET- Morphometric Estimation of Parameters of Uttar Mand River Basin, Sata...
 
C04651725
C04651725C04651725
C04651725
 
Tomographic inverse estimation of aquifer properties based on pressure varia...
Tomographic inverse estimation of aquifer properties based on  pressure varia...Tomographic inverse estimation of aquifer properties based on  pressure varia...
Tomographic inverse estimation of aquifer properties based on pressure varia...
 

En vedette

Experimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenatedExperimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenatedeSAT Publishing House
 
System of quasilinear equations of reaction diffusion
System of quasilinear equations of reaction diffusionSystem of quasilinear equations of reaction diffusion
System of quasilinear equations of reaction diffusioneSAT Publishing House
 
Investigation of mechanical properties on vinylester based bio composite with...
Investigation of mechanical properties on vinylester based bio composite with...Investigation of mechanical properties on vinylester based bio composite with...
Investigation of mechanical properties on vinylester based bio composite with...eSAT Publishing House
 
A study on modelling and simulation of photovoltaic cells
A study on modelling and simulation of photovoltaic cellsA study on modelling and simulation of photovoltaic cells
A study on modelling and simulation of photovoltaic cellseSAT Publishing House
 
Nutrients retention in functional beef burgers with especial emphasis on lipi...
Nutrients retention in functional beef burgers with especial emphasis on lipi...Nutrients retention in functional beef burgers with especial emphasis on lipi...
Nutrients retention in functional beef burgers with especial emphasis on lipi...eSAT Publishing House
 
Detection and identification of chemical agent using atomic absorption spectr...
Detection and identification of chemical agent using atomic absorption spectr...Detection and identification of chemical agent using atomic absorption spectr...
Detection and identification of chemical agent using atomic absorption spectr...eSAT Publishing House
 
Defense mechanism for d do s attack through machine learning
Defense mechanism for d do s attack through machine learningDefense mechanism for d do s attack through machine learning
Defense mechanism for d do s attack through machine learningeSAT Publishing House
 
Limiting the energy drain in wireless ad hoc sensor networks
Limiting the energy drain in wireless ad hoc sensor networksLimiting the energy drain in wireless ad hoc sensor networks
Limiting the energy drain in wireless ad hoc sensor networkseSAT Publishing House
 
Text file encryption using fft technique in lab view 8.6
Text file encryption using fft technique in lab view 8.6Text file encryption using fft technique in lab view 8.6
Text file encryption using fft technique in lab view 8.6eSAT Publishing House
 
Density and compaction characteristics of wma using additives
Density and compaction characteristics of wma using additivesDensity and compaction characteristics of wma using additives
Density and compaction characteristics of wma using additiveseSAT Publishing House
 
A survey on nuclear to-cytoplasmic ratio analysis
A survey on nuclear to-cytoplasmic ratio analysisA survey on nuclear to-cytoplasmic ratio analysis
A survey on nuclear to-cytoplasmic ratio analysiseSAT Publishing House
 
Pile response due to earthquake induced lateral spreading
Pile response due to earthquake induced lateral spreadingPile response due to earthquake induced lateral spreading
Pile response due to earthquake induced lateral spreadingeSAT Publishing House
 
Developing reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systemsDeveloping reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systemseSAT Publishing House
 
Night image enhancement using fusion technique
Night image enhancement using fusion techniqueNight image enhancement using fusion technique
Night image enhancement using fusion techniqueeSAT Publishing House
 
Mammogram image segmentation using rough
Mammogram image segmentation using roughMammogram image segmentation using rough
Mammogram image segmentation using rougheSAT Publishing House
 
Ultra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at differentUltra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at differenteSAT Publishing House
 
Supervised machine learning based dynamic estimation
Supervised machine learning based dynamic estimationSupervised machine learning based dynamic estimation
Supervised machine learning based dynamic estimationeSAT Publishing House
 
Comparison of friction stirs welding technique with conventional welding methods
Comparison of friction stirs welding technique with conventional welding methodsComparison of friction stirs welding technique with conventional welding methods
Comparison of friction stirs welding technique with conventional welding methodseSAT Publishing House
 
Bounds on inverse domination in squares of graphs
Bounds on inverse domination in squares of graphsBounds on inverse domination in squares of graphs
Bounds on inverse domination in squares of graphseSAT Publishing House
 
Fpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp converterFpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp convertereSAT Publishing House
 

En vedette (20)

Experimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenatedExperimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenated
 
System of quasilinear equations of reaction diffusion
System of quasilinear equations of reaction diffusionSystem of quasilinear equations of reaction diffusion
System of quasilinear equations of reaction diffusion
 
Investigation of mechanical properties on vinylester based bio composite with...
Investigation of mechanical properties on vinylester based bio composite with...Investigation of mechanical properties on vinylester based bio composite with...
Investigation of mechanical properties on vinylester based bio composite with...
 
A study on modelling and simulation of photovoltaic cells
A study on modelling and simulation of photovoltaic cellsA study on modelling and simulation of photovoltaic cells
A study on modelling and simulation of photovoltaic cells
 
Nutrients retention in functional beef burgers with especial emphasis on lipi...
Nutrients retention in functional beef burgers with especial emphasis on lipi...Nutrients retention in functional beef burgers with especial emphasis on lipi...
Nutrients retention in functional beef burgers with especial emphasis on lipi...
 
Detection and identification of chemical agent using atomic absorption spectr...
Detection and identification of chemical agent using atomic absorption spectr...Detection and identification of chemical agent using atomic absorption spectr...
Detection and identification of chemical agent using atomic absorption spectr...
 
Defense mechanism for d do s attack through machine learning
Defense mechanism for d do s attack through machine learningDefense mechanism for d do s attack through machine learning
Defense mechanism for d do s attack through machine learning
 
Limiting the energy drain in wireless ad hoc sensor networks
Limiting the energy drain in wireless ad hoc sensor networksLimiting the energy drain in wireless ad hoc sensor networks
Limiting the energy drain in wireless ad hoc sensor networks
 
Text file encryption using fft technique in lab view 8.6
Text file encryption using fft technique in lab view 8.6Text file encryption using fft technique in lab view 8.6
Text file encryption using fft technique in lab view 8.6
 
Density and compaction characteristics of wma using additives
Density and compaction characteristics of wma using additivesDensity and compaction characteristics of wma using additives
Density and compaction characteristics of wma using additives
 
A survey on nuclear to-cytoplasmic ratio analysis
A survey on nuclear to-cytoplasmic ratio analysisA survey on nuclear to-cytoplasmic ratio analysis
A survey on nuclear to-cytoplasmic ratio analysis
 
Pile response due to earthquake induced lateral spreading
Pile response due to earthquake induced lateral spreadingPile response due to earthquake induced lateral spreading
Pile response due to earthquake induced lateral spreading
 
Developing reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systemsDeveloping reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systems
 
Night image enhancement using fusion technique
Night image enhancement using fusion techniqueNight image enhancement using fusion technique
Night image enhancement using fusion technique
 
Mammogram image segmentation using rough
Mammogram image segmentation using roughMammogram image segmentation using rough
Mammogram image segmentation using rough
 
Ultra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at differentUltra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at different
 
Supervised machine learning based dynamic estimation
Supervised machine learning based dynamic estimationSupervised machine learning based dynamic estimation
Supervised machine learning based dynamic estimation
 
Comparison of friction stirs welding technique with conventional welding methods
Comparison of friction stirs welding technique with conventional welding methodsComparison of friction stirs welding technique with conventional welding methods
Comparison of friction stirs welding technique with conventional welding methods
 
Bounds on inverse domination in squares of graphs
Bounds on inverse domination in squares of graphsBounds on inverse domination in squares of graphs
Bounds on inverse domination in squares of graphs
 
Fpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp converterFpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp converter
 

Similaire à Real time reservoir operation (validation phase)

Chapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisChapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisGodisgoodtube
 
3 comparison of actual release schedule and optimal
3 comparison of actual release schedule and optimal3 comparison of actual release schedule and optimal
3 comparison of actual release schedule and optimalprjpublications
 
Comparison of actual release schedule
Comparison of actual release scheduleComparison of actual release schedule
Comparison of actual release scheduleprj_publication
 
Optimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesOptimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesIAEME Publication
 
Real time reservoir operation (calibration phase) a case study
Real time reservoir operation (calibration phase) a case studyReal time reservoir operation (calibration phase) a case study
Real time reservoir operation (calibration phase) a case studyeSAT Publishing House
 
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...eSAT Journals
 
Numerical simulation of tidal circulation in the
Numerical simulation of tidal circulation in theNumerical simulation of tidal circulation in the
Numerical simulation of tidal circulation in theeSAT Publishing House
 
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind TunnelExperimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnelijtsrd
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET Journal
 
Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)Malla Reddy University
 
Comparison of actual release schedule and optimal
Comparison of actual release schedule and optimalComparison of actual release schedule and optimal
Comparison of actual release schedule and optimalIAEME Publication
 
Comparison of actual release schedule and optimal
Comparison of actual release schedule and optimalComparison of actual release schedule and optimal
Comparison of actual release schedule and optimalprjpublications
 
Mathematical modeling approach for flood management
Mathematical modeling approach for flood managementMathematical modeling approach for flood management
Mathematical modeling approach for flood managementprjpublications
 
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...NanubalaDhruvan
 

Similaire à Real time reservoir operation (validation phase) (20)

Chapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisChapter Seven: Applications of System Analysis
Chapter Seven: Applications of System Analysis
 
3 comparison of actual release schedule and optimal
3 comparison of actual release schedule and optimal3 comparison of actual release schedule and optimal
3 comparison of actual release schedule and optimal
 
Comparison of actual release schedule
Comparison of actual release scheduleComparison of actual release schedule
Comparison of actual release schedule
 
C-039.pdf
C-039.pdfC-039.pdf
C-039.pdf
 
Optimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesOptimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniques
 
Hydrology.pdf
Hydrology.pdfHydrology.pdf
Hydrology.pdf
 
Real time reservoir operation (calibration phase) a case study
Real time reservoir operation (calibration phase) a case studyReal time reservoir operation (calibration phase) a case study
Real time reservoir operation (calibration phase) a case study
 
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...
Numerical simulation of tidal circulation in the pichavaram mangrove estuary ...
 
Numerical simulation of tidal circulation in the
Numerical simulation of tidal circulation in theNumerical simulation of tidal circulation in the
Numerical simulation of tidal circulation in the
 
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind TunnelExperimental Investigations and Computational Analysis on Subsonic Wind Tunnel
Experimental Investigations and Computational Analysis on Subsonic Wind Tunnel
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
Pstj 1342
Pstj 1342Pstj 1342
Pstj 1342
 
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
 
Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)
 
Comparison of actual release schedule and optimal
Comparison of actual release schedule and optimalComparison of actual release schedule and optimal
Comparison of actual release schedule and optimal
 
Comparison of actual release schedule and optimal
Comparison of actual release schedule and optimalComparison of actual release schedule and optimal
Comparison of actual release schedule and optimal
 
Mathematical modeling
Mathematical modelingMathematical modeling
Mathematical modeling
 
Mathematical modeling approach for flood management
Mathematical modeling approach for flood managementMathematical modeling approach for flood management
Mathematical modeling approach for flood management
 
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...
LINEAR PROGRAMMING APPROACH FOR OPTIMAL LAND AND WATER RESOURCE ALLOCATION UN...
 
Ijmet 10 01_182
Ijmet 10 01_182Ijmet 10 01_182
Ijmet 10 01_182
 

Plus de eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

Plus de eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Dernier

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

Real time reservoir operation (validation phase)

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 458 REAL TIME RESERVOIR OPERATION (VALIDATION PHASE) A CASE STUDY Falguni Baliarsingh1 1Associate Professor, Department of Civil Engineering, College of Engineering and Technology, Bhubaneswar, Odisha, India Abstract The LP formulation with the selected set of penalties is run in the validation phase. There are two sub-phases in the validation phase. In the first sub-phase, three years corresponding to the flood, normal, and drought years are considered. The performance of these years is measured by the reservoir storage at the end of monsoon season and peak flow at d/s flood control point. In the second sub-phase, eight extreme floods from the history of the reservoir are chosen. The performances of these floods are measured by peak flow at d/s flood control point during each of the floods. The real time operation is done for three time intervals, viz. 24, 12 and 6 hours. Keywords: Real time reservoir operation, validation phase -------------------------------------------------------------------***------------------------------------------------------------------- 1. INTRODUCTION Most of the living beings are affected by either too less or too much of water compared to the normal requirement. As the scarcity of water is a grave concern for management, so also the excess of it. The former situation leads to drought, and the latter to flood. Both are equally alarming. Structural and non-structural measures are required to mitigate these disaster situations (Mays and Tung, 1992). One of the major structural measures is construction of a dam across the river. Reservoir, created by construction of dam, can tackle both the situations, viz., drought and flood. It is natural for the beneficiaries of a reservoir to extract as much benefit as possible from a single or multi-reservoir system. At present, most of the reservoirs are for multipurpose, even though some of them were originally conceived for single purpose. The various purposes of reservoir include irrigation, hydropower, drinking water supply, low-flow augmentation, navigation, aquaculture etc. All these purposes come under the category of conservative purpose. The management of any of the conservative purposes is similar in nature, viz., to utilize the available water of the reservoir judiciously. The reservoir, built for flood control purpose on the other hand, uses the available empty space of reservoir to absorb the flood. In the case of such flood control reservoir, it is operated for flood control and conservative purposes during some periods (for example, monsoon period in India) and is operated for only conservative purposes during rest of the year. Hence, it is more difficult to operate a multipurpose flood control reservoir than a reservoir with conservative purposes alone. 2. METHODOLOGY The following LP formulation is used in validation phases, which is very similar to the calibration phase. The only difference lies in the use of Muskingum equation. Conventional Muskingum equation was used in calibration phase in the previous paper, where as more accurate extended Muskingum equation is used in this validation phase. This LP formulation is used for operation intervals of 24 hours, 12 hours and 6 hours. For illustration, the formulation is discussed for the operation interval of 24 hours. The LP formulation is as follows. Minimize [ ] 1 LS t US t QI t QD t ROAI t ROAD t ROEI t ROED t L P LS P US P QI P QD P ROAI P ROAD P ROEI P ROED t Z           (1) S2 + CF * RPS2/2 = CF [I1 + I2]/2- CF [IR1 + IR2]/2 - CF * RPS1/2 + S1 (2) St + CF [RPSt-1 + RPSt]/2 - St-1 = CF [It-1 + It]/2 - CF [IRt-1 + IRt]/2 t = 3,4,....,L (3) St - USt + LSt = RCSt t = 2,3....,L (4)
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 459 (5) (6) Qt - QIt - QDt = 0 t = 2, 3, ....,L (7) RPS2 - [ROAI1 + ROEI1] + [ROAD1 + ROED1] = RPS1 (8) RPSt - [ROAIt-1 + ROEIt-1] + [ROADt-1 + ROEDt-1] -RPSt-1 = 0 t = 3, 4....L (9) RPSMIN  RPSt  RPSMAX t = 2,3, ....,L (10) QDt  NDF t = 2,3, ....,L (11) ROAIt ROAIMAX; ROADt  ROADMAX t = 1,2, ……,L-1 (12) SDSL  St  SFRL t = 2,3, ……,L (13) Non-negative constraints on USt, LSt, QIt, QDt, ROAIt, ROADt, ROEIt, and ROEDt. t = 2,3, ……,L (14) Where Z is the objective function. LSt is the deviation of reservoir storage below the recommended rule curve storage at beginning of time period t. USt is the deviation of reservoir storage above the recommended rule curve storage at beginning of time period t. QIt is the difference between flow at Naraj and non-damaging flow at beginning of time period t, when the flow is more than non-damaging flow,. QDt is the flow at Naraj at beginning of time period t, when the flow is less than or equal to non-damaging flow. ROAIt is the increase of release from reservoir (summation of release for power and spill) within acceptable safe limit during time period t. ROADt is the decrease of release from reservoir within acceptable safe limit during time period t. ROEIt is the increase of release from reservoir beyond acceptable safe limit during time period t. ROEDt is the decrease of release from reservoir beyond acceptable safe limit during time period t. PLS, PUS, PQI, PQD are the relative penalties for unit change of LS, US, QI, QD respectively. PROEI, PROED, PROAI, PROAD are the relative penalties for unit change of ROEI, ROED, ROAI, ROAD respectively. St is the reservoir storage volume at beginning of time period t. CF is the conversion factor to convert from rate to volume of any variable. RPSt is the summation of release from reservoir for power and spill at beginning of time period t. It is inflow into the reservoir at beginning of time period t. IRt is the release from reservoir for irrigation at beginning of time period t. RCSt is the recommended rule curve storage at beginning of time period t. Qt is the flow at Naraj at beginning of time period t. DCt is d/s catchment contribution at beginning of time period t. is the Muskingum coefficient for release from Hirakud at beginning of time period. is the Muskingum coefficient for release from Hirakud at end of time period. is the Muskingum coefficient for d/s catchment contribution at beginning of time period. is the Muskingum coefficient for d/s catchment contribution at end of time period. C2 is the Muskingum coefficient for flow at Naraj at end of time period. RPSMIN is the minimum required release from reservoir for power and spill. RPSMAX is the maximum release capacity from reservoir for power and spill. ROAIMAX is the safe limit of increase of release from reservoir during a specific time period. ROADMAX is the safe limit of decrease of release from reservoir during a specific time period. SDSL is the reservoir storage at dead storage level. SFRL is the reservoir storage at full reservoir level. t is the time period. L is the operating horizon for each iteration of the LP model. 3. VALIDATION PHASE The performance of the three calibration floods during calibration phase is compared and a suitable set of penalties (PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 1 : 8) for objective function of the LP formulation is selected. This set of penalties is applied in other situations to H C1 H C0 K C0 K C1 t L Q C RPS C RPS C Q C DC C DC Q C RPS C DC C RPS C DC C Q t K t K t t H t H t H K H K 3,4,...., 0 1 1 2 1 0 1 1 2 1 2 0 1 0 1 1 2 2 1              
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 460 check the model performance in this validation phase. The situations for validation are taken in two ways; (i) the quantity of inflow into the reservoir for the whole monsoon of a year and (ii) the severity of floods. In the first category, the years with extremely high, extremely low, and normal quantity of inflow into the reservoir are selected for validation. In second category, severe floods are selected for validation. The extended Muskingum coefficients for various routing period are obtained for Hirakud Project (Baliarsingh, 2000) by following the procedure given by M. H. Khan (Khan, 1993) and are placed in table-2. The data from 1972 to 1995 is considered for validation phase as the measurement of d/s catchment contribution was started from 1972 onwards. During this period, the total quantity of inflow into the reservoir in monsoon season is extremely high in the year 1994, extremely low in the year 1979, and close to the average in the year of 1984. These quantities are 73.9, 10.5, and 33.3 TMCM respectively. The average inflow into the reservoir in monsoon season during 1972-1995 is 31 TMCM. So these years are selected for validation and referred as validation year 1, 2, and 3 respectively henceforth. The most severe floods among 43 floods during 1972 to 1995 are selected in a similar way as done in calibration phase. The details of these most severe floods are shown in the Table-1. There is no occurrence of flood during ninth block period in these years. Eight floods in the remaining eight block periods are selected for validation phase. These floods from first to eighth block periods are referred henceforth as validation floods 1 to 8 respectively. 4. RESULTS AND DISCUSSION OF VALIDATION PHASE This phase is divided into two stages. In first stage (section 4.1), the results of three validation years are discussed and in the second stage (section 4.2), the result of eight validation floods are discussed. The variable rule curve (rule curve for drought, normal, and flood situation) is recommended for Hirakud reservoir and is given in Fig.3 of the previous paper. The various rule curves are followed according to the type of year, i.e., the rule curve corresponding to drought situation is to be followed in the drought year and so also for normal and flood year. These types of year are characterized by total monsoon inflow into the reservoir, the classification of which is made as follow. From the historical data, it is observed that the maximum and minimum total quantity of inflow into the reservoir in a monsoon season is 86 and 10.5 TMCM respectively. The average value during these years is 31 TMCM. In a 100 points scale, 10.5, 31, and 86 TMCM are considered as 10, 50, and 90 points respectively. 10 points beyond 90 are reserved for more severe flood year than the year with 86 TMCM of total inflow into the reservoir. Similarly, 10 points on the lower side are reserved for more severe drought year than the year with 10.5 TMCM. A year is considered to be a drought year if the total inflow into the reservoir is less than 33 on 100 point scale, a normal year if it is between 33 and 67 and a flood year if it is above 67. The relationship of the total inflow into the reservoir and points in 100 point scale is determined by regression analysis with the data as 10, 50, 90 points corresponding to 10.5, 31, 86 TMCM and is given in equation 6.18. Y = 0.0108*X2 - 0.1344*X + 10.766 (15) Where Y is total inflow into the reservoir in the monsoon in TMCM X is point in 100 point scale. By following the above points system and the equation-15, it is found that the year with total inflow into the reservoir below 18 TMCM is drought year, 18 to 50.25 TMCM is normal year and above 50.25 TMCM is flood year. The reservoir is operated in this study by the LP model (equation-1 to equation-14) for all the three validation years and eight validation floods. Six years of data, i.e., 1973, 1976, 1977, 1980, 1982, and 1994, are used for validation floods. In the following two sub-sections, the results of validation years and validation floods are discussed independently. 4.1 Validation Years As discussed in section 3, the years 1979, 1984, and 1994 are selected for validation purpose as drought, normal, and flood years respectively. The penalties for various components in objective function of LP formulation, as obtained in calibration phase, PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 1 : 8, are used for the validation phase. The procedure of real time reservoir operation by adaptive planning, as explained in previous paper, is used in the validation phase also. For this purpose, forecasted inflows and d/s catchment contribution are required for five days at each time step. However, the data, generated by any forecasting model, will have error and uncertainty associated with the forecasts. Therefore, in the present case, the observed data is used as forecast. This will give good insight into the performance evaluation of the operating policy by avoiding the forecasted data with its uncertainty nature. It may be noted that the proposed optimization model can easily incorporate the forecasted data obtained from any forecasting approach. The performance of the reservoir operation is evaluated by the reservoir storage achieved on 1st October and the peak flow at Naraj during the operation. It is expected to achieve the full reservoir level i.e., 7.197 TMCM by 1st October and the peak flow at Naraj should be always less than non- damaging flow of 25.5 thousand cumecs. The performance of reservoir operation by the LP formulation for the years 1979, 1984, and 1994 is shown in the Table-3. The reservoir operation is done at an interval of 24 hours in this case. The reservoir reached the full reservoir level by 1st October with the proposed model for each of these three validation years.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 461 Regarding the maximum flow at Naraj during these years, the peak flow during 1979 and 1984 is less than non- damaging flow, but during 1994, it is 29.19 thousand cumecs. The performance of the proposed model is compared with the performance of Hirakud authority in the same Table 3. The reservoir storage during 1979 and 1984 is much below than 7.197 TMCM, but it is full only during 1994 by the operation procedure followed by Hirakud Authority. The peak flow at Naraj during the operation by Hirakud authority is more than that of during the operation by the proposed model. The reservoir storage for each time period obtained from optimization model are compared with recommended variable rule curve for the validation years. Since the deviation above the recommended storage (PUS) is given lower penalty, the reservoir storage obtained from the model is always above the recommended storage. This implies that, the reservoir has higher storage after meeting the flood control obligations. However in the drought year (1979) as the inflow into the reservoir is very low, the storage level has gone below the recommended rule curve for certain period. Routed daily flow rate at Naraj obtained from the model for all the three validation years. It can be observed that only for two days in 1994, the flow rate has exceeded the non-damaging flow of 25.5 thousand cumecs. In all other periods the flow at Naraj was maintained below 25.5 thousand cumecs by the model. 4.2 Validation Floods Eight validation floods as shown in eight block periods (Table-1) were considered for validation. These floods occurred during six different years: Two each in 1973 and 1994, and one each in 1976, 1977, 1980, and 1982. The reservoir is operated once in 24 hours by the proposed LP model for filling during the monsoon period, from 1st July to 1st October. During flood, the reservoir operation is also done once in 12 hours and once in 6 hours along with once in 24 hours to compare the performance of operation at various operation durations. The forecasted data (in the present case, observed flows are considered as forecasted data) for 5 days is used irrespective of frequency of operation. The reservoir storage as per the rule curve in a particular type of year is followed as discussed before. The reservoir operation is done by the proposed model as follows during all the above six years for comparison purpose. The reservoir is assumed to be at dead storage level on 1st July. The LP model (equation-1 to equation-14) is run once in 24 hours with advance five days data of inflow into the reservoir and d/s catchment contribution. The recommended variable rule curve as per the type of year (drought, normal, or flood) is followed. The release from reservoir for next five days will be obtained by running the LP model. Only the release for first day is implemented. Again, the LP model is run for the next day with the forecasted data of next five days. In this way, operation of reservoir continues up to the first day of any flood duration. During the flood, the release decision is made for next period, where the duration of period is 24 hours, 12 hours, or 6 hours. However, during the flood also the data of advance five days is used by LP model. For example, for 6 hours duration operation, the number of periods that considered in the optimization model is 20. At the end of flood, the water level in reservoir is reached at three different levels for the various durations of operation. After the flood, the reservoir is operated once in 24 hours only with each of these three levels achieved at the end of flood. In this way, the operation is continued till 1st October. The duration of operation is named by the duration of reservoir operation during the flood. Comparison of performance of the reservoir operation by the proposed LP model with an interval of 24 hours, 12 hours, and 6 hours during the flood and by Hirakud authority is shown in Table-4. The performance is evaluated by peak flow at Naraj during the flood. The peak flow at Naraj obtained by proposed optimization model is less than that obtained by Hirakud authority in eight floods except the validation flood numbers 3 and 8 for all operation durations. For the validation flood number 3, peak flow obtained by proposed model with 24 hours operation duration is 24.76 thousand cumecs, which is more than that obtained by Hirakud authority of 22.93 thousand cumecs. For the validation flood number 8, the peaks obtained are 36.5 and 36.0 thousand cumecs respectively and the difference is quite small. Among the different operation durations, peak flow by 24 hours operation is always more than the peak flow achieved by either 12 or 6 hours operation. The performance of 12 hours and 6 hours operation is not consistant. The peak at Naraj obtained by 6 hours operation is either same or less than that obtained by 12 hours operation during most of the flood (5 validation floods). The time of occurrences of peak flow at Naraj during the floods by each of the models are also shown in Table-4. The time difference of occurrence of peak during the operation by each model differs maximum by one day for flood numbers 2, 5, 6 and it varies from one day to five days for the other floods. In each of the floods, peak flow at Naraj occurs during the flood. The reservoir is brought to full reservoir level at the end of monsoon season for each of these six years by the reservoir operation with proposed optimization model irrespective of time of operational duration. The reservoir was also actually filled up by the method adopted by Hirakud authority in five years except in 1982 in which it was brought up to 6.329 TMCM. So the optimization model is meeting the performance criteria of filling the reservoir by 1st October for all the flood events. 5. CONCLUSIONS The real time operation of the Hirakud reservoir is proposed to be done by the LP formulation given by equation-1 to equation-14. The penalties for different components of objective function in LP formulation are determined in the calibration phase. The ratio of penalties PQD : PUS : PROAI : PROAD : PQI, PLS, PROEI, PROED :: 1 : 3 : 1 : 1 : 8 is found suitable during calibration. This ratio of penalties is
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 462 validated by reservoir operation during 3 years and also for 8 severe floods. The performance during validation phase is quite satisfactory. So this ratio is recommended for future use during reservoir operation. Among the three operation durations chosen during validation phase, the reservoir operation by 6 hours is preferable for flood control purpose. In all the cases, the performance by 6 hours operation duration is better than that by 24 hours duration. REFERENCES [1] Khan, M. H., (1993). “Muskingum flood routing model for multiple tributaries”, Water Resour. Res., 29(4), 1057-1062. [2] Baliarsingh, F., (2000), Long-term and short-term optimal reservoir operation for flood control, Ph. D. Thesis submitted, IIT, Kharagpur. [3] Mays, L. W., and Y-K. Tung, (1992). Hydrosystems engineering and management, Mc-Graw-Hill Inc., Singapore. Table 1: Data of Severe Floods Among Forty-three Floods form 1972 to 1995 in Ten Days Block Period-Wise. Duration of block period 1st July - 10th July 11th July - 20th July 21st July - 31th July 1st Aug - 10th Aug 11th Aug - 20th Aug 21st Aug - 31st Aug 1st Sep - 10th Sep 11th Sep - 20th Sep 21st Sep - 30th Sep Block period No. 1 2 3 4 5 6 7 8 9 Duration of occurrence 09/07/73 - 17/07/73 08/07/94 - 19/07/94 20/07/94 - 25/07/94 07/08/77 - 11/08/77 11/08/76 - 18/08/76 30/08/82 - 04/09/82 02/09/73 - 06/09/73 19/09/80 - 30/09/80 No flood during ninth block period Peak inflow into the reservoir (T. Cumecs) 18.4 25.8 19.8 18.0 21.4 26.9 18.8 37.8 Peak calculated d/s catchment contribution (T. Cumecs) 16.7 15.9 09.6 10.1 20.6 44.9 12.1 11.3 Table 2: Parameters of Extended Muskingum Method. Routing interval (Hours) Coefficients of extended Muskingum equation C0H C0K C1H C1K C2 24 0.513 1.138 0.082 -0.092 0.509 12 0.236 0.691 -0.164 -0.180 0.855 06 0.107 0.656 -0.100 -0.436 0.958 Table 3: Comparison of Performance of Reservoir Operation by Hirakud Authority and Proposed Optimization Model for Three Validation Years. Approach Performance Validation Years 1979 1984 1994 Proposed optimization (LP) model (24 Hours operation duration) Reservoir storage on 1st of october (TMCM) 7.197 7.197 7.197 Peak flow at Naraj during whole monsoon season (T. Cumecs) 12.27 18.68 29.19 Operation by Hirakud authority Reservoir storage on 1st of October(TMCM) 4.824 6.692 7.197 Peak flow at Naraj during whole monsoon season (T. Cumecs) 18.9 25.05 30.63
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 09 | Sep-2014, Available @ http://www.ijret.org 463 Table 4: Comparison of Performance of Reservoir Operation by Hirakud Authority and Proposed Model for Eight Validation Floods. Validation flood number. Duration of flood Occurrence of peak inflow into the reservoir Operation model Performance during flood Peak flow at Naraj (T. Cumecs) Time of occurrence 1 09/07/73 to 17/07/73 10/07/73 (12 hours) Hirakud authority 23.60 15/07/73 (00 hours) Proposed model (24 Hours) 19.52 16/07/73 (00 hours) Proposed model (12 Hours) 18.90 16/07/73 (00 hours) Proposed model (06 Hours) 18.53 16/07/73 (06 hours) 2 08/07/94 to 19/07/94 11/07/94 (09 hours) Hirakud authority 29.03 13/07/94 (18 hours) Proposed model (24 Hours) 26.95 14/07/94 (00 hours) Proposed model (12 Hours) 26.00 13/07/94 (00 hours) Proposed model (06 Hours) 22.15 13/07/94 (06 hours) 3 20/07/94 to 25/07/94 21/07/94 (03 hours) Hirakud authority 22.93 23/07/94 (09 hours) Proposed model (24 Hours) 24.76 20/07/94 (00 hours) Proposed model (12 Hours) 16.10 20/07/94 (00 hours) Proposed model (06 Hours) 16.30 20/07/94 (00 hours) 4 07/08/77 to 11/08/77 08/08/77 (06 hours) Hirakud authority 17.80 11/08/77 (21 hours) Proposed model (24 Hours) 14.90 09/08/77 (00 hours) Proposed model (12 Hours) 13.80 07/08/77 (00 hours) Proposed model (06 Hours) 13.80 07/08/77 (00 hours) 5 11/08/76 to 18/08/76 15/08/76 (15 hours) Hirakud authority 25.90 15/08/76 (00 hours) Proposed model (24 Hours) 20.90 15/08/76 (00 hours) Proposed model (12 Hours) 17.80 15/08/76 (12 hours) Proposed model (06 Hours) 17.60 16/08/76 (00 hours) 6 30/08/82 to 04/09/82 31/08/82 (09 hours) Hirakud authority 44.90 31/08/82 (15 hours) Proposed model (24 Hours) 31.60 31/08/82 (00 hours) Proposed model (12 Hours) 27.60 31/08/82 (00 hours) Proposed model (06 Hours) 27.70 01/09/82 (00 hours) 7 02/09/73 to 06/09/73 03/09/73 (06 hours) Hirakud authority 23.43 06/09/73 (18 hours) Proposed model (24 Hours) 14.20 06/09/73 (00 hours) Proposed model (12 Hours) 13.20 02/09/73 (00 hours) Proposed model (06 Hours) 13.20 02/09/73 (00 hours) 8 19/09/80 to 30/09/80 20/09/80 (12 hours) Hirakud authority 36.00 22/09/80 (05 hours) Proposed model (24 Hours) 36.50 20/09/80 (00 hours) Proposed model (12 Hours) 33.50 20/09/80 (00 hours) Proposed model (06 Hours) 33.70 20/09/80 (18 hours)