A Presentation
                          on

                  EXCELLENCE
                              IN
              WATER MANAGEMENT
                     2008
     By

             ABAN POWER COMPANY LIMITED

                                                1

 12/9/2008           Aban CII_wate r Award 08




              COMPANY PROFILE
             Part of LANCO group

– Independent Power Project (IPP) with
  Natural gas based Combined cycle
  power plant of Capacity 119.8 MWH
– Established thro International
 Competitive Bidding (ICB) route
– Power supply to the TNEB Grid on
  Long-term basis
                                                2

 12/9/2008           Aban CII_wate r Award 08
CDM APPROVED
            Smoke free chi m ne y




  ØABAN is the First project in the world for a gas
  based combined cycle power plant to obtain
  CDM tag under AM 0029 methodology.
  Ø Registered as CDM Project with UNFCCC on
  29th May 2007
  VER 2005 – 68946
  CER 2006 – 213891
  CER 2007 – 215925
                                                           3

12/9/2008                       Aban CII_wate r Award 08




    ISO 14001 & OHSAS 18001 CERTIFIED




                                                           4

12/9/2008                       Aban CII_wate r Award 08
N ATUR AL
           GAS



                                                                                           PROCESS FLOW
                                                            G ENER ATOR


               C                        T                        G
                                                                                                                                                      FLUE G AS TO
                     GAS TU RBINE
                                                                                                                                                      ATM OSPH ERE




  AIR
                                                                                                        HR G
                                                                                                          S
                                    FLUE GAS TO
                                       HRS G




                                                           BY PASS S TACK
                                                                                                                                                      M AIN STAC K




                                                                             STEA M TO                                                       BL

                                                                             TU RBINE                                                         O
                                                            ST
                             G                                                                                                                W


                                                                                                                                              D
                                                                                                                                              O
                                                                                                                 FEED                         W
                                                                                                                WATER TO                      N
                                                                                                                 HRS G


                                                                                                                                                                GT WAS H / C T
                                                                                                                                       GUA RD PO ND             BLO W DO WN
                                                                                               C OND ENSATE
                                                  AIR CO OLED C OND ENSO R                     BAC K TO H RSG

                                                                                         HOT
                                                                                         WEL
                                                                                         L


                                                                                                                                                              SO LAR EVAPO RATO N PO NDS
                     WATER F OM
                            R                                                                                              R.O PLANT
                     TWAD BO RAD                           D . PLANT
                                                             M
                                                                               M AKE UP TO HRSG


                                                                                                                                           REJ ECTS TO
                                                                                          PERM EATE - FO R                                SO LAR PO NDS
                                                                                             RECY CLE




                                                                                                                                                                                 5

         12/9/2008                                                   Aban CII_wate r Award 08




     WATER CONSERVATION PROJECTS – DESIGN
                   STAGE
                              Air Cooled
Dry Low NOX                   Condenser

Sav ings in m3/yr                                                                                                          Sav ings in m3/yr
2006-07 : 148750                                                                                                           2006-07 : 2061368
2007-08 : 148750                                                                                                           2007-08 : 2142673




                                                                     RWHP
                                                                       18,000 m3/yr


                                                                                                                                                                                 6

         12/9/2008                                                   Aban CII_wate r Award 08
DRY LOW NOx BURNERS
TYP ICAL PO W ER P LANT                    ABAN                   Re marks
Supe r he ate d Ste am is       No steam or No             Saving on natural
consume d for re ducing the     DM wate r                  re source s
NO x le ve l
Minimum 45 ppm of NO x          Maximum of 20              Ne w standard / be nch
le ve l in the emission e ven   ppm of NO x in the         mark
after Wate r or steam           e mission.
inje ction
About 1402 kg/day of NO x       About 374 kg/day           Le ss pollution – be tte r
e mitte d in the flue gas       of NO x is only            e nvironment
                                e mitte d
425 MT/d of steam is            No nee d of ste am         State of the art
nee de d for re ducing NOx      or water                   technology
le ve l to 45 ppm (max)
Efficie ncy is less             Highly e fficie nt         Profit and saving on
                                (more than 47 %)
                                Aban CII_wate r Award 08   natural resource s.




                      DRY LOW NOx BURNERS
     TYPICAL POWER                               ABAN               Remarks
         PLANT
Cost of ste am injection would NIL tre atme nt cost so           No impact on
re sult in 4.52 crore s pe r   savings is 4.52 crore s           e nvironment
annum approx                   pe r annum approx                 Re duction in
DM wate r consumption is 335 DM wate r                           wate r
ltrs / MWH                   consumption is NIL                  consumption
                             litres / MWH                        En vironme ntal
                                                                 investment can
Cost of the proje ct –              Cost of the proje ct
                                                                 be paid back
Additional to existing HRSG         Rs.16 crores approx
                                                                 Ze ro discharge
piping
                                                                 of e fflue nts
Efflue nt gene ration in the        No ge ne ration of           was possible
steam or DM wate r                  e ffluent
production

                                Aban CII_wate r Award 08
DRY LOW NOx BURNERS
              Method                        Period               Saving of water
DLN B URNERS FOR GAS 2005 – 2006                               102000 m3 Rs. 307.2
TURBINE –            (eigh t mon ths                                     Lakhs
                                       of operation)
Selected a GT with DLN
burners (GE 6FA Gas
                                       2006 – 2007             148750 m3 Rs. 448
Turbine) in place of
                                                                         Lakhs
conventional turbine
wi thout DLN
Result: Savings include s the          2007-2008               148750 m3 Rs. 448
cost of production for ste am
using DM wate r, fue l,
                                                                         Lakhs
chemical dosing and handling
of e fflue nt gene ration &
reduce d e miss ion, water                                                      9
conservat ion
          12/9/2008           Aban CII_wate r Award 08




                     AIR COOLED CONDENSERS

               Method                       Period              Saving of w ater

AIR COOLED                               2005 – 2006 1353056 m 3 Rs. 406
CONDE NSERS –                            (eigh t mon ths         Lakhs
                                         of operation)

Installed Air Cooled
                            2006 – 2007 2061368 m 3 Rs. 618
Condensers in place of
conventional cooling towers                         Lakhs

Result: Consumpti on is 102
litres/MWH instead of 2500 2007-2008                           2142673 m 3 Rs. 642
lit/MWH                                                                    Lakhs


                                                                               10

         12/9/2008                  Aban CII_wate r Award 08
AIR COOLED HEAT EXCHANGERS

              Method                       Period             Saving of w ater

AIR COOLED HEAT                       2005 – 2006            36000 m 3 Rs. 10.80
EXCHANGERS–                           (eigh t mon ths of               Lakhs
                                      operation )
Installed Air Cooled Heat
Exchangers (ACHE) for            2006 – 2007                 51000 m 3 Rs. 15.30
Closed Cooling water                                                   Lakhs
system (CCW) in pl ace of
conventional cooling towers
using water resource.            2007-2008                   51000 m 3 Rs. 15.30
Result: Consumption is                                                 Lakhs
almost NIL requirement of
water; hence saving of 6.07
m 3 /Hr 12/9/2008           Aban CII_wate r Award 08
                                                                              11




           RAIN WATER HARVESTING POND
               Method                      Period            Saving of w ater
Storm water reservoir –                                                 Rs. 10.8
18000 KL approximate                                                    Lakhs –
capacity with 9 percolation                                             Proactive
pits.                                                                   practice
Utilizing this water as and                                             to enrich
                                       2006-07 &            36000 m 3
when required for                                                       water
maintaining:                           2007-08                          table
14985 trees,
22000 shrubs
11000 hedges
15000 Sq Mt of Lawn
                                                                              12

        12/9/2008                Aban CII_wate r Award 08
WATER CONSERVATION PROJECTS –
                CONTINUAL IMPROVEMENT

                                           Auxiliary Cooling Water
                                                   Sav ings in m3/yr
                                                   2006-07 : 3240
                                                   2007-08 : 3240
Reverse Osmosi s

Sav ings in m3/yr
2006-07 : 2448
2007-08 : 3366




                                                                        13

      12/9/2008         Aban CII_wate r Award 08




         IMPROVEMENT IN R.O RECOVERY
              Method               Period             Saving of w ater

R.O PLANT Pre treatment- 2006-07                     2448 m 3     Rs. 0.74
Feed pH brought down                                              Lakhs
from 7.0-7.5 to 6.0-6.2 by
acid treatment thereby        2007-08                3366 m 3     Rs. 1.01
keeping LS I close to zero or                                     Lakhs
slightly negati ve
Result : Per meate increased
by 0.9 m3 /hr



                                                                        14

      12/9/2008         Aban CII_wate r Award 08
R.O– Improved performance after pretreatment
                             modification
           EFFLUENT fro m DM                                                     ACW, BOILE R
                     DM
           PLANT     PL ANT       N PIT                                          BLOW DOWN


                                                                HRSG
                                                                SUMP


                                                                        HCL
                       DMF                                              FeCl3
                                                                        POLY
    C. F

                                             GUA RD
                                             POND                 SETT LING
                                                                  TANK




  HP PU MP
                                                                                REJE CT

                                  R.O SKID


                                                                              PERME ATE
R.O Treatment after
modi fications
                                                                                          15

           12/9/2008               Aban CII_wate r Award 08




                               C.T – COC INCREASE
                 Method                       Period          Saving of w ater

By Increase in Cycle of        2006-07 & 6480 m 3                             Rs. 3.45
    Concentration – COC – in 2007-08                                          Lakhs
    Auxiliary Cooling Tower
    from 5 COC to 8 COC
Result:
A) Reduction in consumption
    of water by 270 M3/ Month
B) Cost saving in reduction of
    chemical treatment Rs.
    6044 per month

                                                                                          16

           12/9/2008               Aban CII_wate r Award 08
Raw Water Con sumption
        12000



        10000



         8000
in Kl




         6000



         4000



         2000



           0
                05




                  5




                06
                  6




                  6




                07

                07




                08
                  7

                  7




                  8



                08
                07




                08
                06
                 5



                06




                 6




                 7




                 8
               -0




             r- 0
               -0




             r -0




               -0




               -0
              -0




              -0




            r-0




              -0
            n-




            n-




            n-
            g-




            g-




            g-
            b-




            b-
            g-
            b-




          ec




           ct
          ec




          ec
           ct




           ct




           ct
         Ap




         Ap
         Ap
         Ju




         Ju




         Ju
         Au




         Au




         Au
         Au




         Fe




         Fe
         Fe
         O




         O




         O




         O
         D




         D




         D
                                                Mont hs


                                  Aban CII_wate r Award 08




                    SPECIFIC WATER CONSUMPTION

           Year             Annual Water               Generation   M 3/
                            Consumption                 (MWh)       MWh
                               (M 3)
     2005 – 06                 45200                   564298.49     0.08
    (8 months)
        2006 - 07              45270                 858903.454     0.057

        2007 - 08              25390                 893525.054     0.0284

                                                                        18
                12/9/2008         Aban CII_wate r Award 08
SPECIFIC WATER CONSUMPTION
                                     Specific Water Consumption
     0.09
     0.08
     0.07
     0.06
m3/MWH




     0.05
     0.04
     0.03
     0.02
     0.01
     0.00
                         2005-06                         2006-07             2007-08
                                                          Year
                                                                                            19
            12/9/2008                        Aban CII_wate r Award 08




                        R e c yc le d /Unit G e n e ra tio n in M 3 /M W H

 0.0 45
 0.0 40
                                0 .03 8
 0.0 35
 0.0 30
 0.0 25                                                           0.025             0.025
 0.0 20
 0.0 15
 0.0 10
 0.0 05
 0.0 00
                        2 005 -0 6                      20 06-0 7            20 07-08
                                                          Yea r

                                             Aban CII_wate r Award 08
GOOD G REE N GOVE RNA NCE A WARD - 2007




            Aban CII_wate r Award 08




CII ENE RGY EFFICIE NT UNIT AWA RD - 2008




            Aban CII_wate r Award 08
IN A NUT SHELL
The project was implemented with:
v Zero Discharge facility
v R.O plant to recycle the effluents & rejects to
solar evaporation ponds
v GT with DLN burners does not require steam
or water
vEnergy and water saving A.C.C & A.C.H.E
system in place of conventional cooling towers
vISO 14001 & OHSAS 18001 Certified
v CDM Approved Project

                                                    23

    12/9/2008       Aban CII_wate r Award 08




                    Thanks

                                                    24

    12/9/2008       Aban CII_wate r Award 08

Contenu connexe

Plus de India Water Portal

Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
India Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
India Water Portal
 
Water quality
Water qualityWater quality
Water quality
India Water Portal
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
India Water Portal
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
India Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
India Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
India Water Portal
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
India Water Portal
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
India Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
India Water Portal
 

Plus de India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Dernier

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Dernier (20)

SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Presentation on Excellence in Water Management by Aban Power Company Limited.

  • 1. A Presentation on EXCELLENCE IN WATER MANAGEMENT 2008 By ABAN POWER COMPANY LIMITED 1 12/9/2008 Aban CII_wate r Award 08 COMPANY PROFILE Part of LANCO group – Independent Power Project (IPP) with Natural gas based Combined cycle power plant of Capacity 119.8 MWH – Established thro International Competitive Bidding (ICB) route – Power supply to the TNEB Grid on Long-term basis 2 12/9/2008 Aban CII_wate r Award 08
  • 2. CDM APPROVED Smoke free chi m ne y ØABAN is the First project in the world for a gas based combined cycle power plant to obtain CDM tag under AM 0029 methodology. Ø Registered as CDM Project with UNFCCC on 29th May 2007 VER 2005 – 68946 CER 2006 – 213891 CER 2007 – 215925 3 12/9/2008 Aban CII_wate r Award 08 ISO 14001 & OHSAS 18001 CERTIFIED 4 12/9/2008 Aban CII_wate r Award 08
  • 3. N ATUR AL GAS PROCESS FLOW G ENER ATOR C T G FLUE G AS TO GAS TU RBINE ATM OSPH ERE AIR HR G S FLUE GAS TO HRS G BY PASS S TACK M AIN STAC K STEA M TO BL TU RBINE O ST G W D O FEED W WATER TO N HRS G GT WAS H / C T GUA RD PO ND BLO W DO WN C OND ENSATE AIR CO OLED C OND ENSO R BAC K TO H RSG HOT WEL L SO LAR EVAPO RATO N PO NDS WATER F OM R R.O PLANT TWAD BO RAD D . PLANT M M AKE UP TO HRSG REJ ECTS TO PERM EATE - FO R SO LAR PO NDS RECY CLE 5 12/9/2008 Aban CII_wate r Award 08 WATER CONSERVATION PROJECTS – DESIGN STAGE Air Cooled Dry Low NOX Condenser Sav ings in m3/yr Sav ings in m3/yr 2006-07 : 148750 2006-07 : 2061368 2007-08 : 148750 2007-08 : 2142673 RWHP 18,000 m3/yr 6 12/9/2008 Aban CII_wate r Award 08
  • 4. DRY LOW NOx BURNERS TYP ICAL PO W ER P LANT ABAN Re marks Supe r he ate d Ste am is No steam or No Saving on natural consume d for re ducing the DM wate r re source s NO x le ve l Minimum 45 ppm of NO x Maximum of 20 Ne w standard / be nch le ve l in the emission e ven ppm of NO x in the mark after Wate r or steam e mission. inje ction About 1402 kg/day of NO x About 374 kg/day Le ss pollution – be tte r e mitte d in the flue gas of NO x is only e nvironment e mitte d 425 MT/d of steam is No nee d of ste am State of the art nee de d for re ducing NOx or water technology le ve l to 45 ppm (max) Efficie ncy is less Highly e fficie nt Profit and saving on (more than 47 %) Aban CII_wate r Award 08 natural resource s. DRY LOW NOx BURNERS TYPICAL POWER ABAN Remarks PLANT Cost of ste am injection would NIL tre atme nt cost so No impact on re sult in 4.52 crore s pe r savings is 4.52 crore s e nvironment annum approx pe r annum approx Re duction in DM wate r consumption is 335 DM wate r wate r ltrs / MWH consumption is NIL consumption litres / MWH En vironme ntal investment can Cost of the proje ct – Cost of the proje ct be paid back Additional to existing HRSG Rs.16 crores approx Ze ro discharge piping of e fflue nts Efflue nt gene ration in the No ge ne ration of was possible steam or DM wate r e ffluent production Aban CII_wate r Award 08
  • 5. DRY LOW NOx BURNERS Method Period Saving of water DLN B URNERS FOR GAS 2005 – 2006 102000 m3 Rs. 307.2 TURBINE – (eigh t mon ths Lakhs of operation) Selected a GT with DLN burners (GE 6FA Gas 2006 – 2007 148750 m3 Rs. 448 Turbine) in place of Lakhs conventional turbine wi thout DLN Result: Savings include s the 2007-2008 148750 m3 Rs. 448 cost of production for ste am using DM wate r, fue l, Lakhs chemical dosing and handling of e fflue nt gene ration & reduce d e miss ion, water 9 conservat ion 12/9/2008 Aban CII_wate r Award 08 AIR COOLED CONDENSERS Method Period Saving of w ater AIR COOLED 2005 – 2006 1353056 m 3 Rs. 406 CONDE NSERS – (eigh t mon ths Lakhs of operation) Installed Air Cooled 2006 – 2007 2061368 m 3 Rs. 618 Condensers in place of conventional cooling towers Lakhs Result: Consumpti on is 102 litres/MWH instead of 2500 2007-2008 2142673 m 3 Rs. 642 lit/MWH Lakhs 10 12/9/2008 Aban CII_wate r Award 08
  • 6. AIR COOLED HEAT EXCHANGERS Method Period Saving of w ater AIR COOLED HEAT 2005 – 2006 36000 m 3 Rs. 10.80 EXCHANGERS– (eigh t mon ths of Lakhs operation ) Installed Air Cooled Heat Exchangers (ACHE) for 2006 – 2007 51000 m 3 Rs. 15.30 Closed Cooling water Lakhs system (CCW) in pl ace of conventional cooling towers using water resource. 2007-2008 51000 m 3 Rs. 15.30 Result: Consumption is Lakhs almost NIL requirement of water; hence saving of 6.07 m 3 /Hr 12/9/2008 Aban CII_wate r Award 08 11 RAIN WATER HARVESTING POND Method Period Saving of w ater Storm water reservoir – Rs. 10.8 18000 KL approximate Lakhs – capacity with 9 percolation Proactive pits. practice Utilizing this water as and to enrich 2006-07 & 36000 m 3 when required for water maintaining: 2007-08 table 14985 trees, 22000 shrubs 11000 hedges 15000 Sq Mt of Lawn 12 12/9/2008 Aban CII_wate r Award 08
  • 7. WATER CONSERVATION PROJECTS – CONTINUAL IMPROVEMENT Auxiliary Cooling Water Sav ings in m3/yr 2006-07 : 3240 2007-08 : 3240 Reverse Osmosi s Sav ings in m3/yr 2006-07 : 2448 2007-08 : 3366 13 12/9/2008 Aban CII_wate r Award 08 IMPROVEMENT IN R.O RECOVERY Method Period Saving of w ater R.O PLANT Pre treatment- 2006-07 2448 m 3 Rs. 0.74 Feed pH brought down Lakhs from 7.0-7.5 to 6.0-6.2 by acid treatment thereby 2007-08 3366 m 3 Rs. 1.01 keeping LS I close to zero or Lakhs slightly negati ve Result : Per meate increased by 0.9 m3 /hr 14 12/9/2008 Aban CII_wate r Award 08
  • 8. R.O– Improved performance after pretreatment modification EFFLUENT fro m DM ACW, BOILE R DM PLANT PL ANT N PIT BLOW DOWN HRSG SUMP HCL DMF FeCl3 POLY C. F GUA RD POND SETT LING TANK HP PU MP REJE CT R.O SKID PERME ATE R.O Treatment after modi fications 15 12/9/2008 Aban CII_wate r Award 08 C.T – COC INCREASE Method Period Saving of w ater By Increase in Cycle of 2006-07 & 6480 m 3 Rs. 3.45 Concentration – COC – in 2007-08 Lakhs Auxiliary Cooling Tower from 5 COC to 8 COC Result: A) Reduction in consumption of water by 270 M3/ Month B) Cost saving in reduction of chemical treatment Rs. 6044 per month 16 12/9/2008 Aban CII_wate r Award 08
  • 9. Raw Water Con sumption 12000 10000 8000 in Kl 6000 4000 2000 0 05 5 06 6 6 07 07 08 7 7 8 08 07 08 06 5 06 6 7 8 -0 r- 0 -0 r -0 -0 -0 -0 -0 r-0 -0 n- n- n- g- g- g- b- b- g- b- ec ct ec ec ct ct ct Ap Ap Ap Ju Ju Ju Au Au Au Au Fe Fe Fe O O O O D D D Mont hs Aban CII_wate r Award 08 SPECIFIC WATER CONSUMPTION Year Annual Water Generation M 3/ Consumption (MWh) MWh (M 3) 2005 – 06 45200 564298.49 0.08 (8 months) 2006 - 07 45270 858903.454 0.057 2007 - 08 25390 893525.054 0.0284 18 12/9/2008 Aban CII_wate r Award 08
  • 10. SPECIFIC WATER CONSUMPTION Specific Water Consumption 0.09 0.08 0.07 0.06 m3/MWH 0.05 0.04 0.03 0.02 0.01 0.00 2005-06 2006-07 2007-08 Year 19 12/9/2008 Aban CII_wate r Award 08 R e c yc le d /Unit G e n e ra tio n in M 3 /M W H 0.0 45 0.0 40 0 .03 8 0.0 35 0.0 30 0.0 25 0.025 0.025 0.0 20 0.0 15 0.0 10 0.0 05 0.0 00 2 005 -0 6 20 06-0 7 20 07-08 Yea r Aban CII_wate r Award 08
  • 11. GOOD G REE N GOVE RNA NCE A WARD - 2007 Aban CII_wate r Award 08 CII ENE RGY EFFICIE NT UNIT AWA RD - 2008 Aban CII_wate r Award 08
  • 12. IN A NUT SHELL The project was implemented with: v Zero Discharge facility v R.O plant to recycle the effluents & rejects to solar evaporation ponds v GT with DLN burners does not require steam or water vEnergy and water saving A.C.C & A.C.H.E system in place of conventional cooling towers vISO 14001 & OHSAS 18001 Certified v CDM Approved Project 23 12/9/2008 Aban CII_wate r Award 08 Thanks 24 12/9/2008 Aban CII_wate r Award 08