3. Research Goal Outline Approach Method properties IS Projects Requirements Engineering KAOS I*/Tropos GBRAM Development Methods Linear Iterative Incremental IS Projects Large, structured Complex Environment Small, innovative Conclusion Future work
28. Small innovativeGBRAM KAOS I*/Tropos Requirement Engineering: Iterative Linear Incremental Development Method:
29. Understanding Level of stakeholder involvement Conclusion Complexity Operations Some methods are more suited than others for specific types of projects.Using existing classification of projects, suitable methods for a new IS project can be selected In the future this method can be applied to other (e.g. testing) or more ‘detailed’ (e.g. Scrum) models. Supported by empirical data (best practices). Requirements Engineering Environment People Development Method IS Project