Agile Project Management and
PRINCE2® In Projects

Agile Project Management and PRINCE2® In Projects

Case Study on Using
AgilePM
in a
PRINCE2 Project
This presentation will be taking a look at a project where
“Agile Project Management” and PRINCE2 methods of
project delivery were successfully employed together. The
project was for the delivery a new bandwidth usage protocol
configuration onto a Bank’s National Network to enable
Application bandwidth prioritization usage as the new
applications, and hence teller system, was being moved to
Java functionality.
Presenter
Antony C. Della Porta
• Over 25 years experience of working in project delivery,
rescue and consultancy roles
• Major verticals such as Finance, Travel, Media and
Pharmaceuticals.

• Established trainer in delivering courses in Project
Management methodologies, and courses relevant to the
delivery and realisation of business strategy.
• Started using PRINCE2®, in earnest, over 14 years ago,
along with Agile Project management
• Successfully managed and implemented a number of
PRINCE2® -AgilePM projects
• APMG accredited and member of Institute of Consultants

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Training ByteSize

Specialists in Project and
Programme Management
Training
•

Training Bytesize Ltd is the largest provider of multi-lingual
online bespoke project management training courses in
English, German, Polish, French, Spanish and Arabic.

•

APMG accredited Courses that offer a really interactive
way to learn, using audio, animation, interactive
exercises and exam simulators.

•

The team is one of the most experienced in the Project
and Programme industry and have been responsible for
developing courses used by over 5,000 companies
worldwide

•

Specialists in developing e-learning for the fastest
growing project management qualifications

•

International presence in the UK, Germany, Poland,
Denmark, Australia, USA

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Agile Project Management and
PRINCE2® In Projects

Introduction to Relationship between
PRINCE2 and AgilePM methodologies

•

The following slide will show a graphic view of
the correlation of processes in PRINCE2 and
the Phases employed by Atern Agile Project
Management

•

AgilePM established with PRINCE2

•

Correlation of the Processes/Stages to
Phases/Increments

•

Relationship of plans and lifecycles

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Process Overview of PRINCE2 and AgilePM

Key: AgilePM; PRINCE2®

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
The Project A Bank Network Upgrade
•
•

•
•
•

•
•

Part of bank teller system replacement programme to employ Java based
applications
Network to introduce QoS (Quality of Service) banding
– Gold for high demand applications (40% b/w)
– Silver for general demand applications (next 30%)
– Bronze – backoffice applications (20% b/w)
QoS was a new concept indicating that the required solution to Prioritize traffic
would have to evolve
Scope was two years old so requirements would have to be reviewed as well as
equipment
Proof of Concept (PoC)facilities no longer available from the incoming Telco
(Optus)so alternative had to be sourced
PoC was allocated one (1) month to complete defining, testing and piloting the
Gold, Silver and, as Could, Bronze.
Estimates for Effort would be broad as new functionality and no known active
solution for this type of network

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
The Project Plan •

Initial Project Start Up employing PRINCE2® as the primary methodology

•

Stage 1- (P2) Initiating a Project used to setup and review Project in detail

•

Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators

•

Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot

•

Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator

•

Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out

•

Stage 6 – (P2) First group of Retail Banks for Live Upgrade

•

Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
SU and Stages 1-2 – PRINCE2 – High Level

•

Initial Project Start Up employing PRINCE2® as the primary methodology

•

Stage 1- (P2) Initiating a Project used to setup and review Project in detail

•

Stage 2 - (P2) Seek Integrators and Hardware requirements

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
SU and Stages 1-2 – PRINCE2 - Detail
•

Starting Up a Project: document and sign-off Project Brief and
Approach - Use a hybrid of methodology using PRINCE2 and Agile

•

Initiating a Project: Usual IP activities and preparing Stage 2 ,

planning the project to engage both delivery approaches: Agile
for the PoC and PRINCE2 for the main rollout and overall
Organisation and governance mapping for Roles and
Responsibilities

•

Stage 2
o

Review current scope (2 years old at this point)

o

Define resource requirements (original Proof of Concept facilities no longer valid)

o

Define Approach for PoC delivery (AgilePM) for Stage 3

o

Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase
(Exploration and Engineering Timeboxes)

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 3 – AgilePM managed Increment (P2 stage) HighLevel

•

Stage 3 – (APM) Define and Develop requirements for technical solution,
deploy 1st and 2nd Pilots to check initial design

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 3 – AgilePM Development Phase

•
•
•
•

Use Feasibility/Foundations to define and prioritize the requirements to be delivered
over how many increments.
Approach was to build the “Gold” application configuration requirements during the
1st increment and deploy into the 1st Pilot
Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further
refinement
2nd Pilot used for checking Telco configurations and hence full “Gold” function

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 4 – Joint AgilePM and PRINCE2
•

Agile: Refine Technical solution (Pilot feedback), 2nd Pilot

•

PRINCE2: Engage Integrator, Preparations for Hardware builds and
configuration

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 4 - PRINCE2 managed stage – AgilePM Develop solution
Agile:
• Refine Technical solution for Gold using Pilot feedback (1st Pilot)
• Commence development of configurations for Silver and Bronze
• Deploy Silver and Bronze solutions and commence 2nd Pilot

PRINCE2
• Engage Integrator
• Start planning the roll-out stages 6 and 7 with Integrator
• Define and order hardware requirements

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution

•

AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot

•

PRINCE2 - Plan National Roll-Out in detail

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM Develop solution
AgilePM
• Timeboxes under this Development Increment used to
• Refine Silver and Bronze applications
• Develop other requirements (including any dropped from earlier Timeboxes)
• Complete Pilot stage and sign-off developed solution now ready for
Deployment and hand back to PRINCE2
PRINCE2
• Finalize plans for 1st Stage roll-out in Stage 6
• Ensure resources in place and hardware (replacement network) preconfigured

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out

•

Stage 6 – (P2) First group of Retail Banks for Live Upgrade

•

Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out
•

Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4
nights

•

Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of
the Roll-out plan and upgrade the remaining 345 Nation-wide branches

•

Post Project – Agile to monitor the success of the Bandwidth Prioritization

Stage
7

Stage
6

Controlling
a Stage

MP

Work
Packag
e1

S
t
a
g
e

B
o
u
n
d
a
r
y

Controlling
a Stage

MP

C
l
o
s
i
n
g

P
r
o
j
e
c
t

Work
Packag
e1

Post Project

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Summary of Presentation
• PRINCE2 and Atern AgilePM can be used to deliver projects of
varying delivery requirements and needs
• Most projects are probably in reality managed this way

• There are some direct correlations between the
processes/phases of both methodologies
• Not necessary to marry these up directly, more important to
know and understand how each can be best employed for
each project

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Contact Details
Antony della Porta - Training Byte Size Ltd
Mobile: +44 7533 240 675
Office: +44 (0)1270 653111
Email: antony@trainingbytesize.com
The Dowery, 22 Barker Street, Nantwich,
Cheshire CW5 5TE

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Any Questions on the implementation
of Agile Project Management or how
to use Agile PM in a PRINCE2
environment please contact us for
further information
+44 (0)1270 653111
learning@trainingbytesize.com

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Contenu connexe

Tendances

What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...
Invensis Learning
 
PRINCE2 Overview
PRINCE2 OverviewPRINCE2 Overview
PRINCE2 Overview
projectingIT
 

Tendances (20)

What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...
 
PRINCE2 - Presentation
PRINCE2 - PresentationPRINCE2 - Presentation
PRINCE2 - Presentation
 
Agile cevik yaklasim ile scrum yontemi
Agile cevik yaklasim ile scrum yontemiAgile cevik yaklasim ile scrum yontemi
Agile cevik yaklasim ile scrum yontemi
 
PRINCE2 Agile™ Guidance Preview (published by Axelos)
PRINCE2 Agile™ Guidance Preview (published by Axelos)PRINCE2 Agile™ Guidance Preview (published by Axelos)
PRINCE2 Agile™ Guidance Preview (published by Axelos)
 
Scrumban
ScrumbanScrumban
Scrumban
 
Agile project management
Agile project management Agile project management
Agile project management
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Basics of agile
Basics of agileBasics of agile
Basics of agile
 
PRINCE2 Overview
PRINCE2 OverviewPRINCE2 Overview
PRINCE2 Overview
 
An Introduction to Agile
An Introduction to AgileAn Introduction to Agile
An Introduction to Agile
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2
 
Agile pm v2
Agile pm v2Agile pm v2
Agile pm v2
 
Agile introduction
Agile introductionAgile introduction
Agile introduction
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
 
PMI-ACP - Agile Framework
PMI-ACP - Agile FrameworkPMI-ACP - Agile Framework
PMI-ACP - Agile Framework
 
Agile project management
Agile project managementAgile project management
Agile project management
 
The Modern PMO
The Modern PMOThe Modern PMO
The Modern PMO
 
12 Benefits of Adopting Agile
12 Benefits of Adopting Agile 12 Benefits of Adopting Agile
12 Benefits of Adopting Agile
 
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 

En vedette

9 lat pracy zdalnej - czego się nauczyłem?
9 lat pracy zdalnej - czego się nauczyłem?9 lat pracy zdalnej - czego się nauczyłem?
9 lat pracy zdalnej - czego się nauczyłem?
Pawel Wrzeszcz
 
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
projectingIT
 
Mix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding resultsMix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding results
Edward Gould
 
Proof Of Concept Presentation on Concept
Proof Of Concept Presentation on ConceptProof Of Concept Presentation on Concept
Proof Of Concept Presentation on Concept
University of Limerick
 

En vedette (20)

Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project delivery
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESS
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® Practitioner
 
9 lat pracy zdalnej - czego się nauczyłem?
9 lat pracy zdalnej - czego się nauczyłem?9 lat pracy zdalnej - czego się nauczyłem?
9 lat pracy zdalnej - czego się nauczyłem?
 
Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...
Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...
Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...
 
Agile effort estimation
Agile effort estimation Agile effort estimation
Agile effort estimation
 
Proof-Of-Concept
Proof-Of-ConceptProof-Of-Concept
Proof-Of-Concept
 
Similarities and differences between PMBOK® Guide and PRINCE2® method
Similarities and differences between PMBOK® Guide and PRINCE2® methodSimilarities and differences between PMBOK® Guide and PRINCE2® method
Similarities and differences between PMBOK® Guide and PRINCE2® method
 
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
 
Mix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding resultsMix Agile with Prince 2 for rewarding results
Mix Agile with Prince 2 for rewarding results
 
Scrum under PRINCE 2
Scrum under PRINCE 2Scrum under PRINCE 2
Scrum under PRINCE 2
 
Open Source Cyber Weaponry
Open Source Cyber WeaponryOpen Source Cyber Weaponry
Open Source Cyber Weaponry
 
Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2
 
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
 
Proof Of Concept Presentation on Concept
Proof Of Concept Presentation on ConceptProof Of Concept Presentation on Concept
Proof Of Concept Presentation on Concept
 
Proof of Concept Workshop
Proof of Concept WorkshopProof of Concept Workshop
Proof of Concept Workshop
 
Planning open stack-poc
Planning open stack-pocPlanning open stack-poc
Planning open stack-poc
 
Big Data Proof of Concept
Big Data Proof of ConceptBig Data Proof of Concept
Big Data Proof of Concept
 
Agile vs. waterfall - The fundamentals differences
Agile vs. waterfall - The fundamentals differencesAgile vs. waterfall - The fundamentals differences
Agile vs. waterfall - The fundamentals differences
 
How to Build a Proof of Concept
How to Build a Proof of Concept How to Build a Proof of Concept
How to Build a Proof of Concept
 

Similaire à A real life case study of using Agile and PRINCE2 together - AgilePM

Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Apple Taton
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
Lucie Budíková
 
Project Management in Agile Organizations - Stage Gate and Agile
Project Management in Agile Organizations - Stage Gate and AgileProject Management in Agile Organizations - Stage Gate and Agile
Project Management in Agile Organizations - Stage Gate and Agile
Knowit_TM
 

Similaire à A real life case study of using Agile and PRINCE2 together - AgilePM (20)

How "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same projectHow "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same project
 
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
 
Apqp la
Apqp laApqp la
Apqp la
 
Prince2 Agile Frukostmöte
Prince2 Agile FrukostmötePrince2 Agile Frukostmöte
Prince2 Agile Frukostmöte
 
PRINCE2 Executive Briefing
PRINCE2 Executive BriefingPRINCE2 Executive Briefing
PRINCE2 Executive Briefing
 
prince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfprince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdf
 
Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...
Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...
Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...
 
8 reasons to adopt AgilePM
8 reasons to adopt AgilePM8 reasons to adopt AgilePM
8 reasons to adopt AgilePM
 
ince2pri
ince2priince2pri
ince2pri
 
Ralph Jocham, Effective Agile | Agile Turkey Summit 2013
Ralph Jocham, Effective Agile | Agile Turkey Summit 2013Ralph Jocham, Effective Agile | Agile Turkey Summit 2013
Ralph Jocham, Effective Agile | Agile Turkey Summit 2013
 
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Lietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO genericLietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO generic
 
Mobile app development project lifecycle
Mobile app development project lifecycleMobile app development project lifecycle
Mobile app development project lifecycle
 
Agile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAPAgile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAP
 
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
 
Agile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with DenodoAgile Development Lifecycle and Best Practices with Denodo
Agile Development Lifecycle and Best Practices with Denodo
 
PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil
PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil
PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil
 
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
 
Project Management in Agile Organizations - Stage Gate and Agile
Project Management in Agile Organizations - Stage Gate and AgileProject Management in Agile Organizations - Stage Gate and Agile
Project Management in Agile Organizations - Stage Gate and Agile
 

Plus de Training Bytesize (6)

Introduction to Agile change agent
Introduction to Agile change agentIntroduction to Agile change agent
Introduction to Agile change agent
 
AgileBA introduction and certification options
AgileBA introduction and certification optionsAgileBA introduction and certification options
AgileBA introduction and certification options
 
Better business cases overview
Better business cases   overview Better business cases   overview
Better business cases overview
 
CP3P Public Private Partnerships Training
CP3P Public Private Partnerships TrainingCP3P Public Private Partnerships Training
CP3P Public Private Partnerships Training
 
Tbs presentation v3
Tbs presentation v3Tbs presentation v3
Tbs presentation v3
 
Better business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case ModelBetter business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case Model
 

Dernier

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Dernier (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

A real life case study of using Agile and PRINCE2 together - AgilePM

  • 1. Project Challenge 2013 Presentation by Antony Della Porta Lead Trainer Training Byte Size Ltd PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 2. Agile Project Management and PRINCE2® In Projects Agile Project Management and PRINCE2® In Projects Case Study on Using AgilePM in a PRINCE2 Project This presentation will be taking a look at a project where “Agile Project Management” and PRINCE2 methods of project delivery were successfully employed together. The project was for the delivery a new bandwidth usage protocol configuration onto a Bank’s National Network to enable Application bandwidth prioritization usage as the new applications, and hence teller system, was being moved to Java functionality.
  • 3. Presenter Antony C. Della Porta • Over 25 years experience of working in project delivery, rescue and consultancy roles • Major verticals such as Finance, Travel, Media and Pharmaceuticals. • Established trainer in delivering courses in Project Management methodologies, and courses relevant to the delivery and realisation of business strategy. • Started using PRINCE2®, in earnest, over 14 years ago, along with Agile Project management • Successfully managed and implemented a number of PRINCE2® -AgilePM projects • APMG accredited and member of Institute of Consultants PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 4. Training ByteSize Specialists in Project and Programme Management Training • Training Bytesize Ltd is the largest provider of multi-lingual online bespoke project management training courses in English, German, Polish, French, Spanish and Arabic. • APMG accredited Courses that offer a really interactive way to learn, using audio, animation, interactive exercises and exam simulators. • The team is one of the most experienced in the Project and Programme industry and have been responsible for developing courses used by over 5,000 companies worldwide • Specialists in developing e-learning for the fastest growing project management qualifications • International presence in the UK, Germany, Poland, Denmark, Australia, USA PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 5. Agile Project Management and PRINCE2® In Projects Introduction to Relationship between PRINCE2 and AgilePM methodologies • The following slide will show a graphic view of the correlation of processes in PRINCE2 and the Phases employed by Atern Agile Project Management • AgilePM established with PRINCE2 • Correlation of the Processes/Stages to Phases/Increments • Relationship of plans and lifecycles PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 6. Process Overview of PRINCE2 and AgilePM Key: AgilePM; PRINCE2® PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 7. The Project A Bank Network Upgrade • • • • • • • Part of bank teller system replacement programme to employ Java based applications Network to introduce QoS (Quality of Service) banding – Gold for high demand applications (40% b/w) – Silver for general demand applications (next 30%) – Bronze – backoffice applications (20% b/w) QoS was a new concept indicating that the required solution to Prioritize traffic would have to evolve Scope was two years old so requirements would have to be reviewed as well as equipment Proof of Concept (PoC)facilities no longer available from the incoming Telco (Optus)so alternative had to be sourced PoC was allocated one (1) month to complete defining, testing and piloting the Gold, Silver and, as Could, Bronze. Estimates for Effort would be broad as new functionality and no known active solution for this type of network PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 8. The Project Plan • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot • Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator • Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 9. SU and Stages 1-2 – PRINCE2 – High Level • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Seek Integrators and Hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 10. SU and Stages 1-2 – PRINCE2 - Detail • Starting Up a Project: document and sign-off Project Brief and Approach - Use a hybrid of methodology using PRINCE2 and Agile • Initiating a Project: Usual IP activities and preparing Stage 2 , planning the project to engage both delivery approaches: Agile for the PoC and PRINCE2 for the main rollout and overall Organisation and governance mapping for Roles and Responsibilities • Stage 2 o Review current scope (2 years old at this point) o Define resource requirements (original Proof of Concept facilities no longer valid) o Define Approach for PoC delivery (AgilePM) for Stage 3 o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase (Exploration and Engineering Timeboxes) PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 11. Stage 3 – AgilePM managed Increment (P2 stage) HighLevel • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st and 2nd Pilots to check initial design PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 12. Stage 3 – AgilePM Development Phase • • • • Use Feasibility/Foundations to define and prioritize the requirements to be delivered over how many increments. Approach was to build the “Gold” application configuration requirements during the 1st increment and deploy into the 1st Pilot Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further refinement 2nd Pilot used for checking Telco configurations and hence full “Gold” function PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 13. Stage 4 – Joint AgilePM and PRINCE2 • Agile: Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2: Engage Integrator, Preparations for Hardware builds and configuration PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 14. Stage 4 - PRINCE2 managed stage – AgilePM Develop solution Agile: • Refine Technical solution for Gold using Pilot feedback (1st Pilot) • Commence development of configurations for Silver and Bronze • Deploy Silver and Bronze solutions and commence 2nd Pilot PRINCE2 • Engage Integrator • Start planning the roll-out stages 6 and 7 with Integrator • Define and order hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 15. Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution • AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2 - Plan National Roll-Out in detail PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 16. Stage 5 - PRINCE2 managed stage – AgilePM Develop solution AgilePM • Timeboxes under this Development Increment used to • Refine Silver and Bronze applications • Develop other requirements (including any dropped from earlier Timeboxes) • Complete Pilot stage and sign-off developed solution now ready for Deployment and hand back to PRINCE2 PRINCE2 • Finalize plans for 1st Stage roll-out in Stage 6 • Ensure resources in place and hardware (replacement network) preconfigured PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 17. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 18. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4 nights • Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of the Roll-out plan and upgrade the remaining 345 Nation-wide branches • Post Project – Agile to monitor the success of the Bandwidth Prioritization Stage 7 Stage 6 Controlling a Stage MP Work Packag e1 S t a g e B o u n d a r y Controlling a Stage MP C l o s i n g P r o j e c t Work Packag e1 Post Project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 19. Summary of Presentation • PRINCE2 and Atern AgilePM can be used to deliver projects of varying delivery requirements and needs • Most projects are probably in reality managed this way • There are some direct correlations between the processes/phases of both methodologies • Not necessary to marry these up directly, more important to know and understand how each can be best employed for each project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 20. Contact Details Antony della Porta - Training Byte Size Ltd Mobile: +44 7533 240 675 Office: +44 (0)1270 653111 Email: antony@trainingbytesize.com The Dowery, 22 Barker Street, Nantwich, Cheshire CW5 5TE PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 21. Any Questions on the implementation of Agile Project Management or how to use Agile PM in a PRINCE2 environment please contact us for further information +44 (0)1270 653111 learning@trainingbytesize.com PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.