Overview
Introduction of boiler
Classification of boiler
Boiler instrumentation
Boiler control
conclusion
INTRODUCTION
 A boiler is a closed vessel in which water or other fluid is
heated. The heated or vaporized fluid exits the boiler for
use in various processes or heating applications.
 Instrumentation and controls in a boiler plant encompass
an enormous range of equipment from simple industrial
plant to the complex in the large utility station.
 The boiler control system is the means by which the
balance of energy & mass into and out of the boiler are
achieved. Inputs are fuel, combustion air, atomizing air or
steam &feed water. Of these, fuel is the major energy input.
Combustion air is the major mass input. Outputs are
steam, flue gas, blow down, radiation & soot blowing.
Classification of boiler
Boiler are classified on following configuration
 Fire tube boiler
 Water tube boiler
Fire tube boiler
Here, water partially fills a boiler barrel with a small volume
left above to accommodate the steam (steam space).
This is the type of boiler used in nearly all steam locomotives.
The heat source is inside a furnace or firebox that has to be kept
permanently surrounded by the water in order to maintain the
temperature of the heating surface just below boiling point.
Diagram of a fire-tube boiler
Water tube boiler
 In this type, the water tubes are arranged inside a furnace
in a number of possible configurations:
 often the water tubes connect large drums, the lower ones
containing water and the upper ones, steam and water; in
other cases, such as a mono tube boiler, water is circulated
by a pump through a succession of coils.
Diagram of a water-tube boiler
- High temperature resistant optical system consists of quartz and
corundum, which can be normally operated in a certain amount of purging
air.
- Screen menu setting, remote control in central control room, for forward and
retract movement of camera.
- Horizontal mounting and large field angle probe
- System is equipped with automatic forward and backward protection
device, which can automatically withdraw from furnace when no pressure in
cooling air.
Furnace TV :
FLOW METER
 The flow meter is designed to measure flow rate of a fluid.
 Measurement is based on Faraday’s law of
induction, according to which a voltage is induced in an
electrically conductive body which passes through a
magnetic field.
 The following expression is applicable to the voltage.
U = K * B * V * D
 Where:
U = induced voltage
K = an instrument constant
B = magnetic field strength
V = mean velocity
D = pipe diameter
Boiler control
+INPUT OUTPUT
FIRING
RATE
DEMAND
FUEL DEMAND
AIR DEMAND
FEEDWATER CONTROL
STEAM TEMPERATURE
CONTROL
BOILER
BLOCK DIAGRAM DESCRIPTION
 The block diagram of boiler control is shown in above
figure the output from the boiler i.e, the steam outputs and
the level of water is given to transmitters.
The major loops in boiler control are
1) Combustion control
2) Feed water control
COMBUSTION CONTROL
 A combustion control system is broken down into
(a) fuel control and
(b) combustion air control subsystems.
HARDWARES USED IN COMBUSTION CONTROL
ON/OFF controls
Positioning systems
Metering control system
FEED WATER CONTROL
 Feed water control is the regulation of water to the boiler
drum. It provide a mass accounting system for steam
leading and feed water entering the boiler.
 Proper boiler operation requires that the level of water in
the steam drum should be maintained within certain band.
 A decrease in this level may uncover boiler tubes, allowing
them to become overheated.
Levelling Vessel Level Control by-
Feed Water Control
BCP
CV to 1st stage DSH water Drain CVs to
Condensor
From Separator-B
BCP Discharge
CV to Eco. I/L
Levelling Vessel
From Separator-A
Drain CVs to
OAC/Waste
ADVANTAGES
 Multiple element feedwater control can help:
i. Faster response of systems.
ii. More accurate control.
iii. Maximum system stability.
 Metering control system maintains combustion efficiency
over wide load changes and over long period of time.
DISADVANTAGES
 Boilers require quick responding controls.
 Level of the water in the boiler must be kept above 50% of
height.
CONCLUSION
The various goals of boiler control includes:
1. To minimize excess air
2. To minimize blow down
3. To minimize steam pressure
4. To measure efficiency
BOILER INSTRUMENTATION

Contenu connexe

Tendances

Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its InternalsAshrant Dass
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.Anuj Maurya
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam TurbineSumit Sharma
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 
Practical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansPractical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansLiving Online
 
Condensers and cooling towers
Condensers and cooling towersCondensers and cooling towers
Condensers and cooling towersmrmayurgohil91
 
Water tube boiler working and function
Water tube boiler working and functionWater tube boiler working and function
Water tube boiler working and functionShahid Akram
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTDilip Kumar
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementAnkur Gaikwad
 
Boiler Water Circulation Pumps
Boiler Water Circulation PumpsBoiler Water Circulation Pumps
Boiler Water Circulation PumpsGerard B. Hawkins
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 

Tendances (20)

Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Practical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansPractical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and Technicians
 
Drun level control
Drun level controlDrun level control
Drun level control
 
Condensers and cooling towers
Condensers and cooling towersCondensers and cooling towers
Condensers and cooling towers
 
Water tube boiler working and function
Water tube boiler working and functionWater tube boiler working and function
Water tube boiler working and function
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENT
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency Improvement
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
 
Boiler Water Circulation Pumps
Boiler Water Circulation PumpsBoiler Water Circulation Pumps
Boiler Water Circulation Pumps
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Drum level
Drum levelDrum level
Drum level
 

Similaire à BOILER INSTRUMENTATION

Boiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptBoiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptEsosa8
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxSatwikSingh25
 
How to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerHow to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerMd Rabiul Hasan
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...Radha Krishna Sahoo
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)sneh patel
 
mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfMOHDAHMED52
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyShobhan Biswas
 
Panipat thermal power station training ppt
Panipat thermal power station training pptPanipat thermal power station training ppt
Panipat thermal power station training pptMohit Verma
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safetyRakeshBhowmick1
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plantTarek Erin
 
Presentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxPresentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxKarthikSrinivasan94
 
highpressureboilers-160202172011.pdf
highpressureboilers-160202172011.pdfhighpressureboilers-160202172011.pdf
highpressureboilers-160202172011.pdfMVNandan
 
High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilerssneh patel
 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01arvind singh rathore
 
Boiler, Steam Trapes, Insulation and Steam Distribution System
Boiler, Steam Trapes,  Insulation and Steam Distribution SystemBoiler, Steam Trapes,  Insulation and Steam Distribution System
Boiler, Steam Trapes, Insulation and Steam Distribution SystemWasiullah Khan
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 

Similaire à BOILER INSTRUMENTATION (20)

Boiler
BoilerBoiler
Boiler
 
Boiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptBoiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.ppt
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
How to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boilerHow to improve the efficiency of water tube boiler
How to improve the efficiency of water tube boiler
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
 
mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdf
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical only
 
Panipat thermal power station training ppt
Panipat thermal power station training pptPanipat thermal power station training ppt
Panipat thermal power station training ppt
 
Boiler and its types
Boiler and its types Boiler and its types
Boiler and its types
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safety
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
Presentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxPresentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptx
 
highpressureboilers-160202172011.pdf
highpressureboilers-160202172011.pdfhighpressureboilers-160202172011.pdf
highpressureboilers-160202172011.pdf
 
High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilers
 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
 
Boiler, Steam Trapes, Insulation and Steam Distribution System
Boiler, Steam Trapes,  Insulation and Steam Distribution SystemBoiler, Steam Trapes,  Insulation and Steam Distribution System
Boiler, Steam Trapes, Insulation and Steam Distribution System
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 

Dernier

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Dernier (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

BOILER INSTRUMENTATION

  • 1. SUBMITED TO: SUBMITTED BY: Mr. P.K.GANGULY Er.NAVEEN KUMAR (Seminar Cordinator) 10ESEEE055
  • 2. Overview Introduction of boiler Classification of boiler Boiler instrumentation Boiler control conclusion
  • 3. INTRODUCTION  A boiler is a closed vessel in which water or other fluid is heated. The heated or vaporized fluid exits the boiler for use in various processes or heating applications.  Instrumentation and controls in a boiler plant encompass an enormous range of equipment from simple industrial plant to the complex in the large utility station.  The boiler control system is the means by which the balance of energy & mass into and out of the boiler are achieved. Inputs are fuel, combustion air, atomizing air or steam &feed water. Of these, fuel is the major energy input. Combustion air is the major mass input. Outputs are steam, flue gas, blow down, radiation & soot blowing.
  • 4. Classification of boiler Boiler are classified on following configuration  Fire tube boiler  Water tube boiler
  • 5. Fire tube boiler Here, water partially fills a boiler barrel with a small volume left above to accommodate the steam (steam space). This is the type of boiler used in nearly all steam locomotives. The heat source is inside a furnace or firebox that has to be kept permanently surrounded by the water in order to maintain the temperature of the heating surface just below boiling point.
  • 6. Diagram of a fire-tube boiler
  • 7. Water tube boiler  In this type, the water tubes are arranged inside a furnace in a number of possible configurations:  often the water tubes connect large drums, the lower ones containing water and the upper ones, steam and water; in other cases, such as a mono tube boiler, water is circulated by a pump through a succession of coils.
  • 8. Diagram of a water-tube boiler
  • 9.
  • 10. - High temperature resistant optical system consists of quartz and corundum, which can be normally operated in a certain amount of purging air. - Screen menu setting, remote control in central control room, for forward and retract movement of camera. - Horizontal mounting and large field angle probe - System is equipped with automatic forward and backward protection device, which can automatically withdraw from furnace when no pressure in cooling air. Furnace TV :
  • 11. FLOW METER  The flow meter is designed to measure flow rate of a fluid.  Measurement is based on Faraday’s law of induction, according to which a voltage is induced in an electrically conductive body which passes through a magnetic field.  The following expression is applicable to the voltage. U = K * B * V * D  Where: U = induced voltage K = an instrument constant B = magnetic field strength V = mean velocity D = pipe diameter
  • 12. Boiler control +INPUT OUTPUT FIRING RATE DEMAND FUEL DEMAND AIR DEMAND FEEDWATER CONTROL STEAM TEMPERATURE CONTROL BOILER
  • 13. BLOCK DIAGRAM DESCRIPTION  The block diagram of boiler control is shown in above figure the output from the boiler i.e, the steam outputs and the level of water is given to transmitters. The major loops in boiler control are 1) Combustion control 2) Feed water control
  • 14. COMBUSTION CONTROL  A combustion control system is broken down into (a) fuel control and (b) combustion air control subsystems.
  • 15. HARDWARES USED IN COMBUSTION CONTROL ON/OFF controls Positioning systems Metering control system
  • 16. FEED WATER CONTROL  Feed water control is the regulation of water to the boiler drum. It provide a mass accounting system for steam leading and feed water entering the boiler.  Proper boiler operation requires that the level of water in the steam drum should be maintained within certain band.  A decrease in this level may uncover boiler tubes, allowing them to become overheated.
  • 17. Levelling Vessel Level Control by- Feed Water Control BCP CV to 1st stage DSH water Drain CVs to Condensor From Separator-B BCP Discharge CV to Eco. I/L Levelling Vessel From Separator-A Drain CVs to OAC/Waste
  • 18. ADVANTAGES  Multiple element feedwater control can help: i. Faster response of systems. ii. More accurate control. iii. Maximum system stability.  Metering control system maintains combustion efficiency over wide load changes and over long period of time.
  • 19. DISADVANTAGES  Boilers require quick responding controls.  Level of the water in the boiler must be kept above 50% of height.
  • 20. CONCLUSION The various goals of boiler control includes: 1. To minimize excess air 2. To minimize blow down 3. To minimize steam pressure 4. To measure efficiency