2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
1.
Define
Business
Need
1.
Define
Business
Need
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Objectives
What you need before you start
Deliverables
1. Capture the business requirements
2. Obtain full stakeholder buy in to any resulting plans and
timelines
1. Key Contact Details
2. Business Requirements
1. Formal Business Requirement statement
2. Confirmed buy-in.
3. Budget Estimate
1.11.1
1.21.2
1.31.3
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
1.41.4
Risk
Assessment
1.51.5
Scope and
Communication
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
1.11.1
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
Risk
Assessment
1.51.5 Scope and
Communication
1.1 Identify Business Requirement1.1 Identify Business Requirement
Ensure that it is the business requirement that is captured and not the anticipated solution toEnsure that it is the business requirement that is captured and not the anticipated solution to
the requirement. e.g. When the business requirement is expressed like this: “We need athe requirement. e.g. When the business requirement is expressed like this: “We need a
software package to deliver presentations on the intranet”, the business requirement is to besoftware package to deliver presentations on the intranet”, the business requirement is to be
able to deliver presentations on the intranet. The software package is a potential solution. Itable to deliver presentations on the intranet. The software package is a potential solution. It
may be that outsourcing the work is more cost effective than buying software, support andmay be that outsourcing the work is more cost effective than buying software, support and
training to use it.training to use it.
Challenge the business in terms of how requirement might best be delivered. Again, make sureChallenge the business in terms of how requirement might best be delivered. Again, make sure
you and your stakeholders know the difference between the requirement and the solution.you and your stakeholders know the difference between the requirement and the solution.
Once you establish the difference it is more straight forward to challenge the preconceivedOnce you establish the difference it is more straight forward to challenge the preconceived
ideas about how best to deliver a solution.ideas about how best to deliver a solution.
Timescale – be realistic and recognise that timing may be a critical component of the businessTimescale – be realistic and recognise that timing may be a critical component of the business
requirement. If the solution is needed yesterday, a quick solution might be the most pragmaticrequirement. If the solution is needed yesterday, a quick solution might be the most pragmatic
– even if it’s not the most cost effective. But beware – the need for speed is often over– even if it’s not the most cost effective. But beware – the need for speed is often over
emphasised. Ensure that all stakeholders are aware of the risk to cost and quality of solution byemphasised. Ensure that all stakeholders are aware of the risk to cost and quality of solution by
prioritising speed of delivery.prioritising speed of delivery.
Make sure there is not already a solution in place. Another part of the business may haveMake sure there is not already a solution in place. Another part of the business may have
already dealt with this business problem.already dealt with this business problem.
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
Risk
Assessment
Scope and
Communication
1.2 Knowledge Capture1.2 Knowledge Capture
Perform a thorough fact-find. Understand the current situation and the problem thatPerform a thorough fact-find. Understand the current situation and the problem that
requires a solution. Get beneath the skin of the issues and understand the widerrequires a solution. Get beneath the skin of the issues and understand the wider
implications. Without gathering solutions, gather a set of needs (SPIN – Solution, Problem,implications. Without gathering solutions, gather a set of needs (SPIN – Solution, Problem,
Implication, Need)Implication, Need)
Identify any initial risks to the procurement process. Examples of common risks to aIdentify any initial risks to the procurement process. Examples of common risks to a
procurement project include: falling foul of IT security policy; failure to get budget sign off;procurement project include: falling foul of IT security policy; failure to get budget sign off;
failure to meet implementation deadline; failure to get project sponsorship.failure to meet implementation deadline; failure to get project sponsorship.
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
1.21.2
1.31.3
1.41.4
1.51.5
1.11.1
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
Risk
Assessment
Scope and
Communication
1.3 Stakeholder Consultation1.3 Stakeholder Consultation
Identify all of the relevant stakeholders who have an interest in the business requirement. ThisIdentify all of the relevant stakeholders who have an interest in the business requirement. This
will include budget holders as well as others on whom a solution is dependent e.g. IT securitywill include budget holders as well as others on whom a solution is dependent e.g. IT security
and ensure that input from all correct areas is receivedand ensure that input from all correct areas is received
Identify what roles and responsibilities each stakeholder has and ensure that their agreement isIdentify what roles and responsibilities each stakeholder has and ensure that their agreement is
obtained and that commitment is gained from all those stakeholders to drive the projectobtained and that commitment is gained from all those stakeholders to drive the project
towards to a successful result.towards to a successful result.
Key stakeholders to identify are: Sponsor (person who can ensure that the requirement isKey stakeholders to identify are: Sponsor (person who can ensure that the requirement is
agreed, resources are made available and a solution approved), procurement team (the peopleagreed, resources are made available and a solution approved), procurement team (the people
who will act on a day to day basis to drive the project forward) and a budget holder (the personwho will act on a day to day basis to drive the project forward) and a budget holder (the person
who can make appropriate funds available).who can make appropriate funds available).
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
1.31.3
1.51.5
1.11.1
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
Risk
Assessment
Scope and
Communication
1.4 Risk Assessment1.4 Risk Assessment
Assess the initial risk (high level), anything that may get in the way of aAssess the initial risk (high level), anything that may get in the way of a
successful conclusion to the procurement activitysuccessful conclusion to the procurement activity
Pay particular attention to any health & safety issues associated with thePay particular attention to any health & safety issues associated with the
procurement activity or the solution.procurement activity or the solution.
Also pay particular attention to environmental or sustainability issues asAlso pay particular attention to environmental or sustainability issues as
well as ethical and international sourcing issueswell as ethical and international sourcing issues
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
1.41.4
1.51.5
1.11.1
Identify Business
Requirement
Knowledge
Capture
Stakeholder
Consultation
Risk
Assessment
Scope and
Communication
1.5 Scope and Communication1.5 Scope and Communication
Confirm the scope of the procurement exercise. In which businesses/regionsConfirm the scope of the procurement exercise. In which businesses/regions
will it cover. What is the budget likely to be and what impact if any, will thatwill it cover. What is the budget likely to be and what impact if any, will that
have on scope. What are the quality constraints?have on scope. What are the quality constraints?
Communicate and clarify the business requirement across all stakeholdersCommunicate and clarify the business requirement across all stakeholders
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
1.51.5
1.11.1
Objectives
What you need before you start
Deliverables
1. Agree Procurement Approach and timescales
2. Evaluate current environment and decide on the procurement
process
1. Formal Business requirement statement
2. Resources identified and committed
3. Buy-in obtained from all stakeholders
1. Procurement Plan
2. Estimated budget
3. Sign off on estimated budget
2.12.1
2.22.2
2.32.3
Team Kick
Off
Market
Research
Define
Success
2.42.4 Agree
Strategy
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Team Kick
Off
Market
Research
Define
Success
Agree
Strategy
2.1 Team Kick Off2.1 Team Kick Off
This is an opportunity to bring the team together to gainThis is an opportunity to bring the team together to gain
mutual understanding & buy-in to project objectives, roles,mutual understanding & buy-in to project objectives, roles,
responsibilities & actions.responsibilities & actions.
Bear in mind that the scale of this event depends on theBear in mind that the scale of this event depends on the
scale of the procurement activity. It could range from asscale of the procurement activity. It could range from as
trivial as a quick chat over a coffee to an off-sitetrivial as a quick chat over a coffee to an off-site
conference.conference.
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
2.12.1
2.22.2
2.32.3
2.42.4
Team Kick
Off
Market
Research
Define
Success
Agree
Strategy
2.2 Market Research2.2 Market Research
Gather as much information as possible in order to establish a range ofGather as much information as possible in order to establish a range of
approaches, products and services that will meet the business need.approaches, products and services that will meet the business need.
Identify what traditional and innovative solutions may be available.Identify what traditional and innovative solutions may be available.
Use as many sources of information as you have access to including theUse as many sources of information as you have access to including the
internet and the existing knowledge from stakeholdersinternet and the existing knowledge from stakeholders
2.12.1
2.22.2
2.32.3
2.42.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Team Kick
Off
Market
Research
Define
Success
Agree
Strategy
2.3 Define Success2.3 Define Success
Define the criteria by which a successful solution will beDefine the criteria by which a successful solution will be
judged.judged.
Define the minimum quality criteria, the cost range and theDefine the minimum quality criteria, the cost range and the
deadline for delivery.deadline for delivery.
2.12.1
2.22.2
2.32.3
2.42.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Team Kick
Off
Market
Research
Define
Success
Agree
Strategy
2.4 Agree Strategy2.4 Agree Strategy
Compile market research and make recommendations as theCompile market research and make recommendations as the
proposed strategy. e.g. outsourced solution vs. in-houseproposed strategy. e.g. outsourced solution vs. in-house
developed and managed.developed and managed.
Include within the strategy, some thinking about the purchase toInclude within the strategy, some thinking about the purchase to
pay processes to identify potential problems or opportunities forpay processes to identify potential problems or opportunities for
efficienciesefficiencies
Collaborate with stakeholders to ensure that they all have inputCollaborate with stakeholders to ensure that they all have input
to the procurement approach and strategy.to the procurement approach and strategy.
Obtain formal agreement to the strategy before moving theObtain formal agreement to the strategy before moving the
process forwardprocess forward
2.12.1
2.22.2
2.42.4
2.42.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
3.13.1
3.23.2
3.33.3
3.43.4
Develop Pre-qual
Strategy
Score, Filter
& Notify
Develop &
Launch Tender
Assess
& Filter
Objectives
What you need before you start
Deliverables
1. To select the right suppliers and value proposition to be taken
forward to final negotiation.
1. Procurement Strategy
2. Market Research
1. Shortlist of suppliers
2. An agreed procurement approach with shortlisted suppliers
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Develop Pre-qual
Strategy
Score, Filter
& Notify
Develop &
Launch Tender
Assess
& Filter
3.1 Develop Pre-qualification Strategy3.1 Develop Pre-qualification Strategy
It is important that the number of suppliers taken forward to negotiation is a small as possible therefore it isIt is important that the number of suppliers taken forward to negotiation is a small as possible therefore it is
important to develop some strict criteria that must be met in order to eliminate suppliers which would ultimatelyimportant to develop some strict criteria that must be met in order to eliminate suppliers which would ultimately
not succeed.not succeed.
Agree and document the key criteria by which the supplier will be selected and develop a qualificationAgree and document the key criteria by which the supplier will be selected and develop a qualification
questionnaire to be completed by responding suppliers.questionnaire to be completed by responding suppliers.
Develop a scoring mechanism and apply weighting to each criteria to ensure that priorities are addressed. Don’tDevelop a scoring mechanism and apply weighting to each criteria to ensure that priorities are addressed. Don’t
be too rigid at this stage. It may be that new information is learned as suppliers submit responses that will changebe too rigid at this stage. It may be that new information is learned as suppliers submit responses that will change
your view of the criteria.your view of the criteria.
3.13.1
3.23.2
3.33.3
3.43.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Develop Pre-qual
Strategy
Score, Filter
& Notify
Develop &
Launch Tender
Assess
& Filter
3.2 Score, Filter and Notify3.2 Score, Filter and Notify
Based on suppliers responses, score each responseBased on suppliers responses, score each response
against the weighted selection criteriaagainst the weighted selection criteria
Confer with stakeholders and agree which supplier toConfer with stakeholders and agree which supplier to
shortlist based on preferred commercial model andshortlist based on preferred commercial model and
pricing principles as well as the weighted selectionpricing principles as well as the weighted selection
criteria scorescriteria scores
Document which suppliers are unsuccessful includingDocument which suppliers are unsuccessful including
rationale for non-selection and notify successful andrationale for non-selection and notify successful and
unsuccessful suppliersunsuccessful suppliers
3.13.1
3.23.2
3.33.3
3.43.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Develop Pre-qual
Strategy
Score, Filter
& Notify
Develop &
Launch Tender
Assess
& Filter
3.13.1
3.23.2
3.33.3
3.43.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
3.3 Develop and Launch Tender3.3 Develop and Launch Tender
Amend the tender based on lessons learned fromAmend the tender based on lessons learned from
responses and prepare the relevant documents toresponses and prepare the relevant documents to
be issued to shortlisted suppliers.be issued to shortlisted suppliers.
Develop a set of weighted criteria by which tenderDevelop a set of weighted criteria by which tender
responses will be assessed and agree this, togetherresponses will be assessed and agree this, together
with the rest of the tender, with stakeholderswith the rest of the tender, with stakeholders
Prepare all relevant communication to ensure thatPrepare all relevant communication to ensure that
suppliers are aware of what is expected of themsuppliers are aware of what is expected of them
and issue all tender documentation to suppliers.and issue all tender documentation to suppliers.
Consider contractual terms and conditions as wellConsider contractual terms and conditions as well
as day to day operational considerations. Matteras day to day operational considerations. Matter
such as health and safety, invoicing and paymentsuch as health and safety, invoicing and payment
arrangements should all be clarified at this stage.arrangements should all be clarified at this stage.
For goods and services that will be orderedFor goods and services that will be ordered
regularly, ensure that the internal procedures forregularly, ensure that the internal procedures for
placing and approving orders are understood andplacing and approving orders are understood and
documented as this may have an impact on the waydocumented as this may have an impact on the way
the supplier is expected to interact with thethe supplier is expected to interact with the
businessbusiness
Develop Pre-qual
Strategy
Score, Filter
& Notify
Develop &
Launch Tender
Assess
& Filter
3.4 Assess and Filter3.4 Assess and Filter
The purpose of this stage is to assess theThe purpose of this stage is to assess the
capability of the suppliers that havecapability of the suppliers that have
responded to tender and to ascertain if andresponded to tender and to ascertain if and
how they can fulfil the requirements of thehow they can fulfil the requirements of the
tender.tender.
As they are received, score the responsesAs they are received, score the responses
against agreed weighted criteria. Ifagainst agreed weighted criteria. If
possible, filter further to eliminate weakerpossible, filter further to eliminate weaker
suppliers.suppliers.
3.13.1
3.23.2
3.33.3
3.43.4
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
4.14.1
4.34.3
4.44.4
4.54.5
Prepare Negotiation
Strategy
Conduct
Negotiations
Finalise
Contract
Award
4.24.2 P2P Design
Objectives
What you need before you start
Deliverables
1. Complete Negotiations and select best supplier
2. Award contract
1. Filtered List of Suppliers
2. Knowledge of Purchase to Pay process stakeholders
1. Agreed Purchase to Pay processes and KPIs
2. Signed Contract
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Prepare Negotiation
Strategy
Conduct
Negotiations
Finalise
Contract
Award
P2P Design
4.1 Prepare Negotiation Strategy4.1 Prepare Negotiation Strategy
Prepare for the negotiation with short listed suppliers. DecidePrepare for the negotiation with short listed suppliers. Decide
on the approach (face to face conversations, a collectiveon the approach (face to face conversations, a collective
supplier conference and auction etc.) Based on thesupplier conference and auction etc.) Based on the
submissions , the pricing principles, the commercial model,submissions , the pricing principles, the commercial model,
services level and the contract terms and conditions may haveservices level and the contract terms and conditions may have
been amended.been amended.
Finalise the approach to these and ensure that there is legalFinalise the approach to these and ensure that there is legal
support available if necessarysupport available if necessary
4.14.1
4.34.3
4.44.4
4.54.5
4.24.2
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Prepare Negotiation
Strategy
Conduct
Negotiations
Finalise
Contract
Award
P2P Design
4.2 Purchase to Pay process design4.2 Purchase to Pay process design
Explore the process by which goods and services will beExplore the process by which goods and services will be
purchased. Look for opportunities to reduce business riskpurchased. Look for opportunities to reduce business risk
reduce process time and effort and develop efficiencies.reduce process time and effort and develop efficiencies.
Will there be a need for a requisition and approval process. WillWill there be a need for a requisition and approval process. Will
there be purchase orders and how will they be placed? How willthere be purchase orders and how will they be placed? How will
payment be made? Against a schedule, in response to invoices?payment be made? Against a schedule, in response to invoices?
Will invoices be paper or electronic. Will invoices be sentWill invoices be paper or electronic. Will invoices be sent
directly to AP or will the business need to see them first? Howdirectly to AP or will the business need to see them first? How
will segregation of responsibilities be employed to minimisewill segregation of responsibilities be employed to minimise
risk? Will the supplier need to put in place new or revisedrisk? Will the supplier need to put in place new or revised
processes? Will there be training required either internally orprocesses? Will there be training required either internally or
within the supplier?within the supplier?
Document the Purchase to Pay processes including details of anyDocument the Purchase to Pay processes including details of any
authorisations that will be required .authorisations that will be required .
Identify and agree relevant Key Performance IndicatorsIdentify and agree relevant Key Performance Indicators
4.14.1
4.34.3
4.44.4
4.54.5
4.24.2
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Prepare Negotiation
Strategy
Conduct
Negotiations
Finalise
Contract
Award
P2P Design
4.3 Conduct Negotiations4.3 Conduct Negotiations
There are two primary goals in the negotiation:There are two primary goals in the negotiation:
1. To negotiate prices that deliver lowest total cost1. To negotiate prices that deliver lowest total cost
of ownership while maintaining the suppliers’of ownership while maintaining the suppliers’
commercial viability.commercial viability.
2. Minimise/transfer risk: Commercial, reputational2. Minimise/transfer risk: Commercial, reputational
health and safety etc.health and safety etc.
4.14.1
4.34.3
4.44.4
4.54.5
4.24.2
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Conduct
Negotiations
Finalise
Contract
Award
P2P Design
4.4 Finalise Contract4.4 Finalise Contract
Finalise commercial agreement and contractual termsFinalise commercial agreement and contractual terms
with the supplier in preparation for award and agreewith the supplier in preparation for award and agree
achieved savings with budget holders and log themachieved savings with budget holders and log them
on the savings registeron the savings register
4.14.1
4.34.3
4.44.4
4.54.5
4.24.2
Prepare Negotiation
Strategy
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Prepare Negotiation
Strategy
Conduct
Negotiations
Finalise
Contract
Award
P2P Design
4.5 Award Contract4.5 Award Contract
Communicate the award of contract to successful as wellCommunicate the award of contract to successful as well
as the unsuccessful suppliers. Communicate also toas the unsuccessful suppliers. Communicate also to
relevant internal audiences. Ensure the contract is in placerelevant internal audiences. Ensure the contract is in place
prior to commencement of the service or product beingprior to commencement of the service or product being
purchasedpurchased
Be prepared to provide feedback to the suppliers aboutBe prepared to provide feedback to the suppliers about
their performance throughout the process. Apart fromtheir performance throughout the process. Apart from
being a professional courtesy it can help maintain abeing a professional courtesy it can help maintain a
positive relationship with the unsuccessful supplierspositive relationship with the unsuccessful suppliers
4.14.1
4.34.3
4.44.4
4.54.5
4.24.2
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
4.14.1
4.24.2
4.34.3
Launch
Supplier
Post Procurement
Review
Objectives
What you need before you start
Deliverables
1. To ensure that the supplier is fully prepared to deliver all aspects of the contract
2. To ensure that all parties are familiar with agreed P2Ppolicies and procedures
3. To initiate the relevant performance measures and reporting
1. Signed contract in place
2. P2P policies and processes agreed
3. SLAs and KPIs agreed and understood
1. Business Requirement met
Continuous
Integration
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Launch
Supplier
Post Procurement
Review
4.1 Launch Supplier4.1 Launch Supplier
Ensure stakeholders are aware of key changes to the agreement andEnsure stakeholders are aware of key changes to the agreement and
processes Develop and agree communication plan. This can range fromprocesses Develop and agree communication plan. This can range from
distributing an email to interested parties to a full scale event to launch adistributing an email to interested parties to a full scale event to launch a
major suppliermajor supplier
Initiate training programmes internally and ensure that supplier trainingInitiate training programmes internally and ensure that supplier training
is underwayis underway
Continuous
Integration
4.14.1
4.24.2
4.34.3
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Launch
Supplier
Post Procurement
Review
4.2 Post Procurement Review4.2 Post Procurement Review
Monitor and review P2P process to identifyMonitor and review P2P process to identify
weaknesses and learningsweaknesses and learnings
Document learning points and recommendDocument learning points and recommend
amendmentsamendments
Continuous
Integration
4.14.1
4.24.2
4.34.3
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract
Launch
Supplier
Post Procurement
Review
4.3 Continuous Integration4.3 Continuous Integration
Initiate performance monitoring and amend processes asInitiate performance monitoring and amend processes as
improvements are identifiedimprovements are identified
Continuous
Integration
4.14.1
4.24.2
4.34.3
1.
Define
Business
Need
1.
Define
Business
Need
2.
Develop
Procurement
Strategy
2.
Develop
Procurement
Strategy
3.
Supplier
Evaluation &
Selection
3.
Supplier
Evaluation &
Selection
5.
Induction &
Integration
5.
Induction &
Integration
4.
Negotiation
and Award of
Contract
4.
Negotiation
and Award of
Contract

Contenu connexe

Tendances

Strategic Sourcing
Strategic Sourcing Strategic Sourcing
Strategic Sourcing mubarak2009
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practicesremoeneltigre
 
The role of procurement
The role of procurementThe role of procurement
The role of procurementbarvie
 
Introduction to purchasing and supply chain management | Factors Driving SCM ...
Introduction to purchasing and supply chain management | Factors Driving SCM ...Introduction to purchasing and supply chain management | Factors Driving SCM ...
Introduction to purchasing and supply chain management | Factors Driving SCM ...FaHaD .H. NooR
 
Presentation on procurement
Presentation on procurementPresentation on procurement
Presentation on procurementMuhammad Fahim
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing StrategiesShaikh Mahmood
 
Basics Of Procurement Process
Basics Of Procurement ProcessBasics Of Procurement Process
Basics Of Procurement ProcessRameswara Vedula
 
31185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-631185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-6sneha dwivedi
 
ppt on source and procurement
ppt on source and procurement ppt on source and procurement
ppt on source and procurement sohag abdal
 
Steps Of Strategic Procurement Process PowerPoint Presentation Slides
Steps Of Strategic Procurement Process PowerPoint Presentation SlidesSteps Of Strategic Procurement Process PowerPoint Presentation Slides
Steps Of Strategic Procurement Process PowerPoint Presentation SlidesSlideTeam
 
Purchase Manager
Purchase ManagerPurchase Manager
Purchase ManagerASHISH BAID
 
Procurement management
Procurement managementProcurement management
Procurement managementSuperstarRr
 
Purchasing and procurement in Material management
 Purchasing and procurement in Material management Purchasing and procurement in Material management
Purchasing and procurement in Material managementKaustubh Vartak
 
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...Bill Kohnen
 
Procedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersProcedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersQusi Alqarqaz
 
Effective Contract Management
Effective Contract ManagementEffective Contract Management
Effective Contract ManagementDr Gordon Murray
 

Tendances (20)

Procurement: Strategies | Best Practices
Procurement: Strategies | Best PracticesProcurement: Strategies | Best Practices
Procurement: Strategies | Best Practices
 
Strategic Sourcing
Strategic Sourcing Strategic Sourcing
Strategic Sourcing
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practices
 
The role of procurement
The role of procurementThe role of procurement
The role of procurement
 
Introduction to purchasing and supply chain management | Factors Driving SCM ...
Introduction to purchasing and supply chain management | Factors Driving SCM ...Introduction to purchasing and supply chain management | Factors Driving SCM ...
Introduction to purchasing and supply chain management | Factors Driving SCM ...
 
Presentation on procurement
Presentation on procurementPresentation on procurement
Presentation on procurement
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing Strategies
 
Basics Of Procurement Process
Basics Of Procurement ProcessBasics Of Procurement Process
Basics Of Procurement Process
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
31185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-631185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-6
 
ppt on source and procurement
ppt on source and procurement ppt on source and procurement
ppt on source and procurement
 
Steps Of Strategic Procurement Process PowerPoint Presentation Slides
Steps Of Strategic Procurement Process PowerPoint Presentation SlidesSteps Of Strategic Procurement Process PowerPoint Presentation Slides
Steps Of Strategic Procurement Process PowerPoint Presentation Slides
 
Procurement
ProcurementProcurement
Procurement
 
Purchase Manager
Purchase ManagerPurchase Manager
Purchase Manager
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Purchasing and procurement in Material management
 Purchasing and procurement in Material management Purchasing and procurement in Material management
Purchasing and procurement in Material management
 
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...
Strategic Sourcing and B2B E Commerce Solutions For ASEAN Purchasing Professi...
 
procurement cycle
procurement cycleprocurement cycle
procurement cycle
 
Procedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersProcedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliers
 
Effective Contract Management
Effective Contract ManagementEffective Contract Management
Effective Contract Management
 

En vedette

Process flow map
Process flow map   Process flow map
Process flow map adimak
 
Public Sector Construction Procurement Changes - Government Trial Projects
Public Sector Construction Procurement Changes - Government Trial ProjectsPublic Sector Construction Procurement Changes - Government Trial Projects
Public Sector Construction Procurement Changes - Government Trial ProjectsRob Garvey
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesPavitr1203
 
Importance of Sustainable Procurement Practices
Importance of Sustainable Procurement PracticesImportance of Sustainable Procurement Practices
Importance of Sustainable Procurement PracticesBrickworkSourcing
 
Engineering Procurement & Construction Making India Brick by Brick
Engineering Procurement & Construction Making India Brick by BrickEngineering Procurement & Construction Making India Brick by Brick
Engineering Procurement & Construction Making India Brick by Brickelithomas202
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyAhmed Mahmoud
 
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...John Buchovecky
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzDerek Hendrikz
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement methodhiewliming
 
Golden Book of e-Procurement Good Practices
Golden Book of e-Procurement Good PracticesGolden Book of e-Procurement Good Practices
Golden Book of e-Procurement Good PracticesNicolas Loozen
 
3 other methods of procurement
3 other methods of procurement3 other methods of procurement
3 other methods of procurementJoy Irman
 
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...Indonesian Procurement Society
 
Trends in public and private sector in india
Trends in public and private sector in indiaTrends in public and private sector in india
Trends in public and private sector in indiaAshutosh Gupta
 

En vedette (20)

Process flow map
Process flow map   Process flow map
Process flow map
 
As Is Psc April, 2010
As Is   Psc April, 2010As Is   Psc April, 2010
As Is Psc April, 2010
 
Public Sector Construction Procurement Changes - Government Trial Projects
Public Sector Construction Procurement Changes - Government Trial ProjectsPublic Sector Construction Procurement Changes - Government Trial Projects
Public Sector Construction Procurement Changes - Government Trial Projects
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
 
Ppp
PppPpp
Ppp
 
Importance of Sustainable Procurement Practices
Importance of Sustainable Procurement PracticesImportance of Sustainable Procurement Practices
Importance of Sustainable Procurement Practices
 
Engineering Procurement & Construction Making India Brick by Brick
Engineering Procurement & Construction Making India Brick by BrickEngineering Procurement & Construction Making India Brick by Brick
Engineering Procurement & Construction Making India Brick by Brick
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
 
Supply Chain in Abbot
Supply Chain in AbbotSupply Chain in Abbot
Supply Chain in Abbot
 
5 Central Public Procurement Functions Identification, Combination, Separatio...
5 Central Public Procurement Functions Identification, Combination, Separatio...5 Central Public Procurement Functions Identification, Combination, Separatio...
5 Central Public Procurement Functions Identification, Combination, Separatio...
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek Hendrikz
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Golden Book of e-Procurement Good Practices
Golden Book of e-Procurement Good PracticesGolden Book of e-Procurement Good Practices
Golden Book of e-Procurement Good Practices
 
3 other methods of procurement
3 other methods of procurement3 other methods of procurement
3 other methods of procurement
 
Procurement process
Procurement processProcurement process
Procurement process
 
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
 
Trends in public and private sector in india
Trends in public and private sector in indiaTrends in public and private sector in india
Trends in public and private sector in india
 
PROCUREMENT
PROCUREMENTPROCUREMENT
PROCUREMENT
 
e-Procurement in Indian Government
e-Procurement in Indian Governmente-Procurement in Indian Government
e-Procurement in Indian Government
 

Similaire à Developing a Procurement Strategy

Chapter 2 (perspectives on the organizational buyer)
Chapter 2 (perspectives on the organizational buyer)Chapter 2 (perspectives on the organizational buyer)
Chapter 2 (perspectives on the organizational buyer)Abdul Jawad Chaudhry
 
Business Case Template
Business Case TemplateBusiness Case Template
Business Case TemplateDemand Metric
 
Procurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlProcurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlInstitute of Consulting
 
Project on IFB Industries Ltd.
Project on IFB Industries Ltd.Project on IFB Industries Ltd.
Project on IFB Industries Ltd.Kaustubh Taparia
 
Jh tdg stakeholdersandprioritywise_june_2015
Jh tdg stakeholdersandprioritywise_june_2015Jh tdg stakeholdersandprioritywise_june_2015
Jh tdg stakeholdersandprioritywise_june_2015John Hudson
 
Quiterian sales guideline eng
Quiterian sales guideline engQuiterian sales guideline eng
Quiterian sales guideline engJosep Arroyo
 
Chapter 5 The Search For A Sound Business Idea
Chapter 5 The Search For A Sound Business IdeaChapter 5 The Search For A Sound Business Idea
Chapter 5 The Search For A Sound Business IdeaDr. John V. Padua
 
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptx
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptxEntrepreneurial processssssssssssssssssssssssssssssssssssssss.pptx
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptxAngeliqueVicente1
 
Business continuity in general
Business continuity in generalBusiness continuity in general
Business continuity in generalJohn Johari
 
BFS Capability & Services Version AUG 2016
BFS Capability & Services Version AUG 2016BFS Capability & Services Version AUG 2016
BFS Capability & Services Version AUG 2016Nikhil Shah
 
Entrepreneurship: Business planning Chapter Two
Entrepreneurship: Business planning Chapter TwoEntrepreneurship: Business planning Chapter Two
Entrepreneurship: Business planning Chapter TwoAYNETUTEREFE1
 
Apparel textile-webinar
Apparel textile-webinarApparel textile-webinar
Apparel textile-webinarAnu Sri
 
Apparel textile-webinar
Apparel textile-webinarApparel textile-webinar
Apparel textile-webinarAnu Sri
 
OUTSTANDING OUTSOURCING - Checklist
OUTSTANDING OUTSOURCING - ChecklistOUTSTANDING OUTSOURCING - Checklist
OUTSTANDING OUTSOURCING - ChecklistJoe Orlando
 

Similaire à Developing a Procurement Strategy (20)

Chapter 2 (perspectives on the organizational buyer)
Chapter 2 (perspectives on the organizational buyer)Chapter 2 (perspectives on the organizational buyer)
Chapter 2 (perspectives on the organizational buyer)
 
7 next steps
7   next steps7   next steps
7 next steps
 
Tachyon_Global_Advisors(2)
Tachyon_Global_Advisors(2)Tachyon_Global_Advisors(2)
Tachyon_Global_Advisors(2)
 
Business Case Template
Business Case TemplateBusiness Case Template
Business Case Template
 
Building Partnership Through Procurement
Building Partnership Through ProcurementBuilding Partnership Through Procurement
Building Partnership Through Procurement
 
Procurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlProcurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission Control
 
Project on IFB Industries Ltd.
Project on IFB Industries Ltd.Project on IFB Industries Ltd.
Project on IFB Industries Ltd.
 
Jh tdg stakeholdersandprioritywise_june_2015
Jh tdg stakeholdersandprioritywise_june_2015Jh tdg stakeholdersandprioritywise_june_2015
Jh tdg stakeholdersandprioritywise_june_2015
 
Quiterian sales guideline eng
Quiterian sales guideline engQuiterian sales guideline eng
Quiterian sales guideline eng
 
Chapter 5 The Search For A Sound Business Idea
Chapter 5 The Search For A Sound Business IdeaChapter 5 The Search For A Sound Business Idea
Chapter 5 The Search For A Sound Business Idea
 
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptx
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptxEntrepreneurial processssssssssssssssssssssssssssssssssssssss.pptx
Entrepreneurial processssssssssssssssssssssssssssssssssssssss.pptx
 
Deal Making Strategy
Deal Making StrategyDeal Making Strategy
Deal Making Strategy
 
Cbap babok ppt day 1 bapm ea
Cbap babok ppt day 1   bapm eaCbap babok ppt day 1   bapm ea
Cbap babok ppt day 1 bapm ea
 
Business continuity in general
Business continuity in generalBusiness continuity in general
Business continuity in general
 
BFS Capability & Services Version AUG 2016
BFS Capability & Services Version AUG 2016BFS Capability & Services Version AUG 2016
BFS Capability & Services Version AUG 2016
 
Entrepreneurship: Business planning Chapter Two
Entrepreneurship: Business planning Chapter TwoEntrepreneurship: Business planning Chapter Two
Entrepreneurship: Business planning Chapter Two
 
Apparel textile-webinar
Apparel textile-webinarApparel textile-webinar
Apparel textile-webinar
 
Apparel textile-webinar
Apparel textile-webinarApparel textile-webinar
Apparel textile-webinar
 
Trusted Business Advisor
Trusted Business AdvisorTrusted Business Advisor
Trusted Business Advisor
 
OUTSTANDING OUTSOURCING - Checklist
OUTSTANDING OUTSOURCING - ChecklistOUTSTANDING OUTSOURCING - Checklist
OUTSTANDING OUTSOURCING - Checklist
 

Dernier

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Dernier (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Developing a Procurement Strategy

  • 1. 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 1. Define Business Need 1. Define Business Need 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 2. Objectives What you need before you start Deliverables 1. Capture the business requirements 2. Obtain full stakeholder buy in to any resulting plans and timelines 1. Key Contact Details 2. Business Requirements 1. Formal Business Requirement statement 2. Confirmed buy-in. 3. Budget Estimate 1.11.1 1.21.2 1.31.3 Identify Business Requirement Knowledge Capture Stakeholder Consultation 1.41.4 Risk Assessment 1.51.5 Scope and Communication 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 3. 1.11.1 Identify Business Requirement Knowledge Capture Stakeholder Consultation Risk Assessment 1.51.5 Scope and Communication 1.1 Identify Business Requirement1.1 Identify Business Requirement Ensure that it is the business requirement that is captured and not the anticipated solution toEnsure that it is the business requirement that is captured and not the anticipated solution to the requirement. e.g. When the business requirement is expressed like this: “We need athe requirement. e.g. When the business requirement is expressed like this: “We need a software package to deliver presentations on the intranet”, the business requirement is to besoftware package to deliver presentations on the intranet”, the business requirement is to be able to deliver presentations on the intranet. The software package is a potential solution. Itable to deliver presentations on the intranet. The software package is a potential solution. It may be that outsourcing the work is more cost effective than buying software, support andmay be that outsourcing the work is more cost effective than buying software, support and training to use it.training to use it. Challenge the business in terms of how requirement might best be delivered. Again, make sureChallenge the business in terms of how requirement might best be delivered. Again, make sure you and your stakeholders know the difference between the requirement and the solution.you and your stakeholders know the difference between the requirement and the solution. Once you establish the difference it is more straight forward to challenge the preconceivedOnce you establish the difference it is more straight forward to challenge the preconceived ideas about how best to deliver a solution.ideas about how best to deliver a solution. Timescale – be realistic and recognise that timing may be a critical component of the businessTimescale – be realistic and recognise that timing may be a critical component of the business requirement. If the solution is needed yesterday, a quick solution might be the most pragmaticrequirement. If the solution is needed yesterday, a quick solution might be the most pragmatic – even if it’s not the most cost effective. But beware – the need for speed is often over– even if it’s not the most cost effective. But beware – the need for speed is often over emphasised. Ensure that all stakeholders are aware of the risk to cost and quality of solution byemphasised. Ensure that all stakeholders are aware of the risk to cost and quality of solution by prioritising speed of delivery.prioritising speed of delivery. Make sure there is not already a solution in place. Another part of the business may haveMake sure there is not already a solution in place. Another part of the business may have already dealt with this business problem.already dealt with this business problem. 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 4. Identify Business Requirement Knowledge Capture Stakeholder Consultation Risk Assessment Scope and Communication 1.2 Knowledge Capture1.2 Knowledge Capture Perform a thorough fact-find. Understand the current situation and the problem thatPerform a thorough fact-find. Understand the current situation and the problem that requires a solution. Get beneath the skin of the issues and understand the widerrequires a solution. Get beneath the skin of the issues and understand the wider implications. Without gathering solutions, gather a set of needs (SPIN – Solution, Problem,implications. Without gathering solutions, gather a set of needs (SPIN – Solution, Problem, Implication, Need)Implication, Need) Identify any initial risks to the procurement process. Examples of common risks to aIdentify any initial risks to the procurement process. Examples of common risks to a procurement project include: falling foul of IT security policy; failure to get budget sign off;procurement project include: falling foul of IT security policy; failure to get budget sign off; failure to meet implementation deadline; failure to get project sponsorship.failure to meet implementation deadline; failure to get project sponsorship. 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 1.21.2 1.31.3 1.41.4 1.51.5 1.11.1
  • 5. Identify Business Requirement Knowledge Capture Stakeholder Consultation Risk Assessment Scope and Communication 1.3 Stakeholder Consultation1.3 Stakeholder Consultation Identify all of the relevant stakeholders who have an interest in the business requirement. ThisIdentify all of the relevant stakeholders who have an interest in the business requirement. This will include budget holders as well as others on whom a solution is dependent e.g. IT securitywill include budget holders as well as others on whom a solution is dependent e.g. IT security and ensure that input from all correct areas is receivedand ensure that input from all correct areas is received Identify what roles and responsibilities each stakeholder has and ensure that their agreement isIdentify what roles and responsibilities each stakeholder has and ensure that their agreement is obtained and that commitment is gained from all those stakeholders to drive the projectobtained and that commitment is gained from all those stakeholders to drive the project towards to a successful result.towards to a successful result. Key stakeholders to identify are: Sponsor (person who can ensure that the requirement isKey stakeholders to identify are: Sponsor (person who can ensure that the requirement is agreed, resources are made available and a solution approved), procurement team (the peopleagreed, resources are made available and a solution approved), procurement team (the people who will act on a day to day basis to drive the project forward) and a budget holder (the personwho will act on a day to day basis to drive the project forward) and a budget holder (the person who can make appropriate funds available).who can make appropriate funds available). 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 1.31.3 1.51.5 1.11.1
  • 6. Identify Business Requirement Knowledge Capture Stakeholder Consultation Risk Assessment Scope and Communication 1.4 Risk Assessment1.4 Risk Assessment Assess the initial risk (high level), anything that may get in the way of aAssess the initial risk (high level), anything that may get in the way of a successful conclusion to the procurement activitysuccessful conclusion to the procurement activity Pay particular attention to any health & safety issues associated with thePay particular attention to any health & safety issues associated with the procurement activity or the solution.procurement activity or the solution. Also pay particular attention to environmental or sustainability issues asAlso pay particular attention to environmental or sustainability issues as well as ethical and international sourcing issueswell as ethical and international sourcing issues 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 1.41.4 1.51.5 1.11.1
  • 7. Identify Business Requirement Knowledge Capture Stakeholder Consultation Risk Assessment Scope and Communication 1.5 Scope and Communication1.5 Scope and Communication Confirm the scope of the procurement exercise. In which businesses/regionsConfirm the scope of the procurement exercise. In which businesses/regions will it cover. What is the budget likely to be and what impact if any, will thatwill it cover. What is the budget likely to be and what impact if any, will that have on scope. What are the quality constraints?have on scope. What are the quality constraints? Communicate and clarify the business requirement across all stakeholdersCommunicate and clarify the business requirement across all stakeholders 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 1.51.5 1.11.1
  • 8. Objectives What you need before you start Deliverables 1. Agree Procurement Approach and timescales 2. Evaluate current environment and decide on the procurement process 1. Formal Business requirement statement 2. Resources identified and committed 3. Buy-in obtained from all stakeholders 1. Procurement Plan 2. Estimated budget 3. Sign off on estimated budget 2.12.1 2.22.2 2.32.3 Team Kick Off Market Research Define Success 2.42.4 Agree Strategy 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 9. Team Kick Off Market Research Define Success Agree Strategy 2.1 Team Kick Off2.1 Team Kick Off This is an opportunity to bring the team together to gainThis is an opportunity to bring the team together to gain mutual understanding & buy-in to project objectives, roles,mutual understanding & buy-in to project objectives, roles, responsibilities & actions.responsibilities & actions. Bear in mind that the scale of this event depends on theBear in mind that the scale of this event depends on the scale of the procurement activity. It could range from asscale of the procurement activity. It could range from as trivial as a quick chat over a coffee to an off-sitetrivial as a quick chat over a coffee to an off-site conference.conference. 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 2.12.1 2.22.2 2.32.3 2.42.4
  • 10. Team Kick Off Market Research Define Success Agree Strategy 2.2 Market Research2.2 Market Research Gather as much information as possible in order to establish a range ofGather as much information as possible in order to establish a range of approaches, products and services that will meet the business need.approaches, products and services that will meet the business need. Identify what traditional and innovative solutions may be available.Identify what traditional and innovative solutions may be available. Use as many sources of information as you have access to including theUse as many sources of information as you have access to including the internet and the existing knowledge from stakeholdersinternet and the existing knowledge from stakeholders 2.12.1 2.22.2 2.32.3 2.42.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 11. Team Kick Off Market Research Define Success Agree Strategy 2.3 Define Success2.3 Define Success Define the criteria by which a successful solution will beDefine the criteria by which a successful solution will be judged.judged. Define the minimum quality criteria, the cost range and theDefine the minimum quality criteria, the cost range and the deadline for delivery.deadline for delivery. 2.12.1 2.22.2 2.32.3 2.42.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 12. Team Kick Off Market Research Define Success Agree Strategy 2.4 Agree Strategy2.4 Agree Strategy Compile market research and make recommendations as theCompile market research and make recommendations as the proposed strategy. e.g. outsourced solution vs. in-houseproposed strategy. e.g. outsourced solution vs. in-house developed and managed.developed and managed. Include within the strategy, some thinking about the purchase toInclude within the strategy, some thinking about the purchase to pay processes to identify potential problems or opportunities forpay processes to identify potential problems or opportunities for efficienciesefficiencies Collaborate with stakeholders to ensure that they all have inputCollaborate with stakeholders to ensure that they all have input to the procurement approach and strategy.to the procurement approach and strategy. Obtain formal agreement to the strategy before moving theObtain formal agreement to the strategy before moving the process forwardprocess forward 2.12.1 2.22.2 2.42.4 2.42.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 13. 3.13.1 3.23.2 3.33.3 3.43.4 Develop Pre-qual Strategy Score, Filter & Notify Develop & Launch Tender Assess & Filter Objectives What you need before you start Deliverables 1. To select the right suppliers and value proposition to be taken forward to final negotiation. 1. Procurement Strategy 2. Market Research 1. Shortlist of suppliers 2. An agreed procurement approach with shortlisted suppliers 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 14. Develop Pre-qual Strategy Score, Filter & Notify Develop & Launch Tender Assess & Filter 3.1 Develop Pre-qualification Strategy3.1 Develop Pre-qualification Strategy It is important that the number of suppliers taken forward to negotiation is a small as possible therefore it isIt is important that the number of suppliers taken forward to negotiation is a small as possible therefore it is important to develop some strict criteria that must be met in order to eliminate suppliers which would ultimatelyimportant to develop some strict criteria that must be met in order to eliminate suppliers which would ultimately not succeed.not succeed. Agree and document the key criteria by which the supplier will be selected and develop a qualificationAgree and document the key criteria by which the supplier will be selected and develop a qualification questionnaire to be completed by responding suppliers.questionnaire to be completed by responding suppliers. Develop a scoring mechanism and apply weighting to each criteria to ensure that priorities are addressed. Don’tDevelop a scoring mechanism and apply weighting to each criteria to ensure that priorities are addressed. Don’t be too rigid at this stage. It may be that new information is learned as suppliers submit responses that will changebe too rigid at this stage. It may be that new information is learned as suppliers submit responses that will change your view of the criteria.your view of the criteria. 3.13.1 3.23.2 3.33.3 3.43.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 15. Develop Pre-qual Strategy Score, Filter & Notify Develop & Launch Tender Assess & Filter 3.2 Score, Filter and Notify3.2 Score, Filter and Notify Based on suppliers responses, score each responseBased on suppliers responses, score each response against the weighted selection criteriaagainst the weighted selection criteria Confer with stakeholders and agree which supplier toConfer with stakeholders and agree which supplier to shortlist based on preferred commercial model andshortlist based on preferred commercial model and pricing principles as well as the weighted selectionpricing principles as well as the weighted selection criteria scorescriteria scores Document which suppliers are unsuccessful includingDocument which suppliers are unsuccessful including rationale for non-selection and notify successful andrationale for non-selection and notify successful and unsuccessful suppliersunsuccessful suppliers 3.13.1 3.23.2 3.33.3 3.43.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 16. Develop Pre-qual Strategy Score, Filter & Notify Develop & Launch Tender Assess & Filter 3.13.1 3.23.2 3.33.3 3.43.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract 3.3 Develop and Launch Tender3.3 Develop and Launch Tender Amend the tender based on lessons learned fromAmend the tender based on lessons learned from responses and prepare the relevant documents toresponses and prepare the relevant documents to be issued to shortlisted suppliers.be issued to shortlisted suppliers. Develop a set of weighted criteria by which tenderDevelop a set of weighted criteria by which tender responses will be assessed and agree this, togetherresponses will be assessed and agree this, together with the rest of the tender, with stakeholderswith the rest of the tender, with stakeholders Prepare all relevant communication to ensure thatPrepare all relevant communication to ensure that suppliers are aware of what is expected of themsuppliers are aware of what is expected of them and issue all tender documentation to suppliers.and issue all tender documentation to suppliers. Consider contractual terms and conditions as wellConsider contractual terms and conditions as well as day to day operational considerations. Matteras day to day operational considerations. Matter such as health and safety, invoicing and paymentsuch as health and safety, invoicing and payment arrangements should all be clarified at this stage.arrangements should all be clarified at this stage. For goods and services that will be orderedFor goods and services that will be ordered regularly, ensure that the internal procedures forregularly, ensure that the internal procedures for placing and approving orders are understood andplacing and approving orders are understood and documented as this may have an impact on the waydocumented as this may have an impact on the way the supplier is expected to interact with thethe supplier is expected to interact with the businessbusiness
  • 17. Develop Pre-qual Strategy Score, Filter & Notify Develop & Launch Tender Assess & Filter 3.4 Assess and Filter3.4 Assess and Filter The purpose of this stage is to assess theThe purpose of this stage is to assess the capability of the suppliers that havecapability of the suppliers that have responded to tender and to ascertain if andresponded to tender and to ascertain if and how they can fulfil the requirements of thehow they can fulfil the requirements of the tender.tender. As they are received, score the responsesAs they are received, score the responses against agreed weighted criteria. Ifagainst agreed weighted criteria. If possible, filter further to eliminate weakerpossible, filter further to eliminate weaker suppliers.suppliers. 3.13.1 3.23.2 3.33.3 3.43.4 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 18. 4.14.1 4.34.3 4.44.4 4.54.5 Prepare Negotiation Strategy Conduct Negotiations Finalise Contract Award 4.24.2 P2P Design Objectives What you need before you start Deliverables 1. Complete Negotiations and select best supplier 2. Award contract 1. Filtered List of Suppliers 2. Knowledge of Purchase to Pay process stakeholders 1. Agreed Purchase to Pay processes and KPIs 2. Signed Contract 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 19. Prepare Negotiation Strategy Conduct Negotiations Finalise Contract Award P2P Design 4.1 Prepare Negotiation Strategy4.1 Prepare Negotiation Strategy Prepare for the negotiation with short listed suppliers. DecidePrepare for the negotiation with short listed suppliers. Decide on the approach (face to face conversations, a collectiveon the approach (face to face conversations, a collective supplier conference and auction etc.) Based on thesupplier conference and auction etc.) Based on the submissions , the pricing principles, the commercial model,submissions , the pricing principles, the commercial model, services level and the contract terms and conditions may haveservices level and the contract terms and conditions may have been amended.been amended. Finalise the approach to these and ensure that there is legalFinalise the approach to these and ensure that there is legal support available if necessarysupport available if necessary 4.14.1 4.34.3 4.44.4 4.54.5 4.24.2 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 20. Prepare Negotiation Strategy Conduct Negotiations Finalise Contract Award P2P Design 4.2 Purchase to Pay process design4.2 Purchase to Pay process design Explore the process by which goods and services will beExplore the process by which goods and services will be purchased. Look for opportunities to reduce business riskpurchased. Look for opportunities to reduce business risk reduce process time and effort and develop efficiencies.reduce process time and effort and develop efficiencies. Will there be a need for a requisition and approval process. WillWill there be a need for a requisition and approval process. Will there be purchase orders and how will they be placed? How willthere be purchase orders and how will they be placed? How will payment be made? Against a schedule, in response to invoices?payment be made? Against a schedule, in response to invoices? Will invoices be paper or electronic. Will invoices be sentWill invoices be paper or electronic. Will invoices be sent directly to AP or will the business need to see them first? Howdirectly to AP or will the business need to see them first? How will segregation of responsibilities be employed to minimisewill segregation of responsibilities be employed to minimise risk? Will the supplier need to put in place new or revisedrisk? Will the supplier need to put in place new or revised processes? Will there be training required either internally orprocesses? Will there be training required either internally or within the supplier?within the supplier? Document the Purchase to Pay processes including details of anyDocument the Purchase to Pay processes including details of any authorisations that will be required .authorisations that will be required . Identify and agree relevant Key Performance IndicatorsIdentify and agree relevant Key Performance Indicators 4.14.1 4.34.3 4.44.4 4.54.5 4.24.2 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 21. Prepare Negotiation Strategy Conduct Negotiations Finalise Contract Award P2P Design 4.3 Conduct Negotiations4.3 Conduct Negotiations There are two primary goals in the negotiation:There are two primary goals in the negotiation: 1. To negotiate prices that deliver lowest total cost1. To negotiate prices that deliver lowest total cost of ownership while maintaining the suppliers’of ownership while maintaining the suppliers’ commercial viability.commercial viability. 2. Minimise/transfer risk: Commercial, reputational2. Minimise/transfer risk: Commercial, reputational health and safety etc.health and safety etc. 4.14.1 4.34.3 4.44.4 4.54.5 4.24.2 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 22. Conduct Negotiations Finalise Contract Award P2P Design 4.4 Finalise Contract4.4 Finalise Contract Finalise commercial agreement and contractual termsFinalise commercial agreement and contractual terms with the supplier in preparation for award and agreewith the supplier in preparation for award and agree achieved savings with budget holders and log themachieved savings with budget holders and log them on the savings registeron the savings register 4.14.1 4.34.3 4.44.4 4.54.5 4.24.2 Prepare Negotiation Strategy 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 23. Prepare Negotiation Strategy Conduct Negotiations Finalise Contract Award P2P Design 4.5 Award Contract4.5 Award Contract Communicate the award of contract to successful as wellCommunicate the award of contract to successful as well as the unsuccessful suppliers. Communicate also toas the unsuccessful suppliers. Communicate also to relevant internal audiences. Ensure the contract is in placerelevant internal audiences. Ensure the contract is in place prior to commencement of the service or product beingprior to commencement of the service or product being purchasedpurchased Be prepared to provide feedback to the suppliers aboutBe prepared to provide feedback to the suppliers about their performance throughout the process. Apart fromtheir performance throughout the process. Apart from being a professional courtesy it can help maintain abeing a professional courtesy it can help maintain a positive relationship with the unsuccessful supplierspositive relationship with the unsuccessful suppliers 4.14.1 4.34.3 4.44.4 4.54.5 4.24.2 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 24. 4.14.1 4.24.2 4.34.3 Launch Supplier Post Procurement Review Objectives What you need before you start Deliverables 1. To ensure that the supplier is fully prepared to deliver all aspects of the contract 2. To ensure that all parties are familiar with agreed P2Ppolicies and procedures 3. To initiate the relevant performance measures and reporting 1. Signed contract in place 2. P2P policies and processes agreed 3. SLAs and KPIs agreed and understood 1. Business Requirement met Continuous Integration 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 25. Launch Supplier Post Procurement Review 4.1 Launch Supplier4.1 Launch Supplier Ensure stakeholders are aware of key changes to the agreement andEnsure stakeholders are aware of key changes to the agreement and processes Develop and agree communication plan. This can range fromprocesses Develop and agree communication plan. This can range from distributing an email to interested parties to a full scale event to launch adistributing an email to interested parties to a full scale event to launch a major suppliermajor supplier Initiate training programmes internally and ensure that supplier trainingInitiate training programmes internally and ensure that supplier training is underwayis underway Continuous Integration 4.14.1 4.24.2 4.34.3 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 26. Launch Supplier Post Procurement Review 4.2 Post Procurement Review4.2 Post Procurement Review Monitor and review P2P process to identifyMonitor and review P2P process to identify weaknesses and learningsweaknesses and learnings Document learning points and recommendDocument learning points and recommend amendmentsamendments Continuous Integration 4.14.1 4.24.2 4.34.3 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract
  • 27. Launch Supplier Post Procurement Review 4.3 Continuous Integration4.3 Continuous Integration Initiate performance monitoring and amend processes asInitiate performance monitoring and amend processes as improvements are identifiedimprovements are identified Continuous Integration 4.14.1 4.24.2 4.34.3 1. Define Business Need 1. Define Business Need 2. Develop Procurement Strategy 2. Develop Procurement Strategy 3. Supplier Evaluation & Selection 3. Supplier Evaluation & Selection 5. Induction & Integration 5. Induction & Integration 4. Negotiation and Award of Contract 4. Negotiation and Award of Contract