SERI INTAN APARTMENT TYPE B - INTERMEDIATE
LEE PEI GIE
TIMBER LOUVRED WINDOW 16 /11 / 2015
A
B
C
D
E
F
G
Precast Concrete Lintel
115 mm x 150mm depth precastconcrete grade 20
lintel reinforced with 2 nos 12mm diameter high tensile
bars and 6mm mild steel stirrup at150mm centre and
bedded in cementand sand (1:3) mortar.
Packing Piece
75mm x 20mm sawn pressure treated Grade B timber
guard fixed to brickwork & concrete work.
Purpose made window and frame
585mm x 940mm Grade B hardwood timber window
frames all as per manufacture detail.
Aluminium Adjustable Louvre Window
Pair single control aluminium adjustable louvre stiles
880mm high each with clips for 7 nos 150mm wide
glass louvred & screwed to timber frame.
Glazing
512mm x 150mm x6mm thick clear glass and fix into
clips of louvred stiles.
Painting
Prepare and apply one coat of Nippon Hydro Primer or
other approved equivalentprimer paints as described
on:
General surface of timber not exceeding 150mm girth
Knotting, stopping and applyone coat of Nippon Hydro
Primer,one Nippon Odourlite Undercoatand two
finishing coats ofNippon Odourlite or other approved
equivalentgloss paintas described on:
Glasslouvredwindow
M
M
NO
NO
NO
M
M²
2
6
2
2
14
13
2
TO COLLECTION (RM)
LEE PEI GIE
SERI INTAN APARTMENT TYPE B - INTERMEDIATE
TIMBER FRAME DOOR 16 /11 / 2015
A
B
C
D
E
F
G
H
I
Precast Concrete Lintel
115 mm x 150mm depth precastconcrete grade 20
lintel reinforced with 2 nos 12mm diameter high tensile
bars and 6mm mild steel stirrup at150mm centre and
bedded in cementand sand (1:3) mortar.
Packing Piece
75mm x 20mm sawn pressure treated Grade B timber
guard fixed to brickwork & concrete work.
Timber Door Frame
115mmx60mm grade B wrot pressure treated timber
rebated head & jambs screwed to packing piece.
Timber Door Leaf
780mm x 2070mm x35mm thick Grade B hardwood
timber flush door all as per manufacture details.
Ironmongeries
Supply and fix the following or other
equal and approved ironmongerycomplete
with requisite matching screws:-
Allgood 100mm 2 steel butt hinges and fix to door leaf.
Dexter by Schlage J54CNA630 stainless steel cylinder
lockset.
Painting
Prepare and apply one coat of Nippon Hydro Primer or
other approved equivalent primer paints as described
on:
Timber guard and timber frame not exceeding
150mm girth
Knotting, stopping and applyone coat of Nippon Hydro
Primer,one Nippon Odourlite Undercoatand two
finishing coats of Nippon Odourlite or other approved
equivalentgloss enamel paint as desribed on:
Timber door frame,exceeding 150mm butnot
exceeding 300mm
Knotting, stopping and applyone coat of Nippon Hydro
Primer,one Nippon Odourlite Undercoatand two
finishing coats of Nippon Odourlite or other approved
equivalentgloss paint as desribed on:
Timberpanel doorleaf,over300mm girth
M
M
M
NO
NO
NO
M
M
M²
1
5
5
1
3
1
10
5
3
TO COLLECTION (RM)

Contenu connexe

Tendances

Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windowsEst
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows마 이환
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors Luke D'Arcy
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 

Tendances (20)

Bq floor
Bq floorBq floor
Bq floor
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
ECA form
ECA formECA form
ECA form
 
Spun pile
Spun pileSpun pile
Spun pile
 
Lift Design
Lift  DesignLift  Design
Lift Design
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 

En vedette

Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESR.R.G.S Bandara
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1Anne Allan
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying courseJavid Hussain
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016Est
 
Measurement assignment 2 (group)
Measurement assignment 2 (group)Measurement assignment 2 (group)
Measurement assignment 2 (group)Syafiq Zariful
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment PresentationHaziq1511
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1armada7000
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Anne Allan
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)ALISON TANG
 
Bq preamble
Bq preambleBq preamble
Bq preambleaizat76
 

En vedette (20)

Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016
 
Measurement assignment 2 (group)
Measurement assignment 2 (group)Measurement assignment 2 (group)
Measurement assignment 2 (group)
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
How to pour concrete
How to pour concreteHow to pour concrete
How to pour concrete
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 

Similaire à Bill of Quantities ( Door and Window )

Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)Kitsen K100 Detailed Pictures (components, packaging & loading and projects)
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)AshleyLiKITSEN
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Trevain Bechan
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
Porta Cabin Presentation
Porta Cabin PresentationPorta Cabin Presentation
Porta Cabin Presentationamcoengg
 
Catalog - pvc panel
Catalog - pvc panelCatalog - pvc panel
Catalog - pvc panelJustin Guo
 
Warmline range Data Sheets
Warmline range  Data SheetsWarmline range  Data Sheets
Warmline range Data SheetsMarcus Maher
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition postersTej Raj Upreti
 
Tech_Brochure_Cladding_Remake_Booklet_LQ_Email
Tech_Brochure_Cladding_Remake_Booklet_LQ_EmailTech_Brochure_Cladding_Remake_Booklet_LQ_Email
Tech_Brochure_Cladding_Remake_Booklet_LQ_EmailMiddle East Insulation LLC
 

Similaire à Bill of Quantities ( Door and Window ) (20)

Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Item
ItemItem
Item
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)Kitsen K100 Detailed Pictures (components, packaging & loading and projects)
Kitsen K100 Detailed Pictures (components, packaging & loading and projects)
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
Porta Cabin Presentation
Porta Cabin PresentationPorta Cabin Presentation
Porta Cabin Presentation
 
Branddeur
Branddeur Branddeur
Branddeur
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Steel Siding 101
Steel Siding 101Steel Siding 101
Steel Siding 101
 
Partitions
PartitionsPartitions
Partitions
 
WOODlife Eco Decking
WOODlife Eco DeckingWOODlife Eco Decking
WOODlife Eco Decking
 
Catalog - pvc panel
Catalog - pvc panelCatalog - pvc panel
Catalog - pvc panel
 
Warmline range Data Sheets
Warmline range  Data SheetsWarmline range  Data Sheets
Warmline range Data Sheets
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition posters
 
Tech_Brochure_Cladding_Remake_Booklet_LQ_Email
Tech_Brochure_Cladding_Remake_Booklet_LQ_EmailTech_Brochure_Cladding_Remake_Booklet_LQ_Email
Tech_Brochure_Cladding_Remake_Booklet_LQ_Email
 

Plus de Lee Pei Gie

ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
Software application
Software application Software application
Software application Lee Pei Gie
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Lee Pei Gie
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Strategic Proposal
Strategic ProposalStrategic Proposal
Strategic ProposalLee Pei Gie
 
Strategic Proposal
Strategic ProposalStrategic Proposal
Strategic ProposalLee Pei Gie
 
Building Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamBuilding Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamLee Pei Gie
 
Storm water management
Storm water managementStorm water management
Storm water managementLee Pei Gie
 
Management Process
Management ProcessManagement Process
Management ProcessLee Pei Gie
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive ReportLee Pei Gie
 
A Tale of Two Businesses
A Tale of Two BusinessesA Tale of Two Businesses
A Tale of Two BusinessesLee Pei Gie
 
Account Ratio Analysis
Account Ratio AnalysisAccount Ratio Analysis
Account Ratio AnalysisLee Pei Gie
 
Mathematics survey on gym
Mathematics survey on gymMathematics survey on gym
Mathematics survey on gymLee Pei Gie
 

Plus de Lee Pei Gie (14)

ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
Software application
Software application Software application
Software application
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Strategic Proposal
Strategic ProposalStrategic Proposal
Strategic Proposal
 
Strategic Proposal
Strategic ProposalStrategic Proposal
Strategic Proposal
 
Building Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamBuilding Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah Alam
 
Storm water management
Storm water managementStorm water management
Storm water management
 
Management Process
Management ProcessManagement Process
Management Process
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive Report
 
A Tale of Two Businesses
A Tale of Two BusinessesA Tale of Two Businesses
A Tale of Two Businesses
 
Account Ratio Analysis
Account Ratio AnalysisAccount Ratio Analysis
Account Ratio Analysis
 
Mathematics survey on gym
Mathematics survey on gymMathematics survey on gym
Mathematics survey on gym
 

Dernier

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 

Dernier (20)

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 

Bill of Quantities ( Door and Window )

  • 1. SERI INTAN APARTMENT TYPE B - INTERMEDIATE LEE PEI GIE TIMBER LOUVRED WINDOW 16 /11 / 2015 A B C D E F G Precast Concrete Lintel 115 mm x 150mm depth precastconcrete grade 20 lintel reinforced with 2 nos 12mm diameter high tensile bars and 6mm mild steel stirrup at150mm centre and bedded in cementand sand (1:3) mortar. Packing Piece 75mm x 20mm sawn pressure treated Grade B timber guard fixed to brickwork & concrete work. Purpose made window and frame 585mm x 940mm Grade B hardwood timber window frames all as per manufacture detail. Aluminium Adjustable Louvre Window Pair single control aluminium adjustable louvre stiles 880mm high each with clips for 7 nos 150mm wide glass louvred & screwed to timber frame. Glazing 512mm x 150mm x6mm thick clear glass and fix into clips of louvred stiles. Painting Prepare and apply one coat of Nippon Hydro Primer or other approved equivalentprimer paints as described on: General surface of timber not exceeding 150mm girth Knotting, stopping and applyone coat of Nippon Hydro Primer,one Nippon Odourlite Undercoatand two finishing coats ofNippon Odourlite or other approved equivalentgloss paintas described on: Glasslouvredwindow M M NO NO NO M M² 2 6 2 2 14 13 2 TO COLLECTION (RM)
  • 2. LEE PEI GIE SERI INTAN APARTMENT TYPE B - INTERMEDIATE TIMBER FRAME DOOR 16 /11 / 2015 A B C D E F G H I Precast Concrete Lintel 115 mm x 150mm depth precastconcrete grade 20 lintel reinforced with 2 nos 12mm diameter high tensile bars and 6mm mild steel stirrup at150mm centre and bedded in cementand sand (1:3) mortar. Packing Piece 75mm x 20mm sawn pressure treated Grade B timber guard fixed to brickwork & concrete work. Timber Door Frame 115mmx60mm grade B wrot pressure treated timber rebated head & jambs screwed to packing piece. Timber Door Leaf 780mm x 2070mm x35mm thick Grade B hardwood timber flush door all as per manufacture details. Ironmongeries Supply and fix the following or other equal and approved ironmongerycomplete with requisite matching screws:- Allgood 100mm 2 steel butt hinges and fix to door leaf. Dexter by Schlage J54CNA630 stainless steel cylinder lockset. Painting Prepare and apply one coat of Nippon Hydro Primer or other approved equivalent primer paints as described on: Timber guard and timber frame not exceeding 150mm girth Knotting, stopping and applyone coat of Nippon Hydro Primer,one Nippon Odourlite Undercoatand two finishing coats of Nippon Odourlite or other approved equivalentgloss enamel paint as desribed on: Timber door frame,exceeding 150mm butnot exceeding 300mm Knotting, stopping and applyone coat of Nippon Hydro Primer,one Nippon Odourlite Undercoatand two finishing coats of Nippon Odourlite or other approved equivalentgloss paint as desribed on: Timberpanel doorleaf,over300mm girth M M M NO NO NO M M M² 1 5 5 1 3 1 10 5 3 TO COLLECTION (RM)