POWER Engineers, Inc. Introduction
Power Industry Trends
Business Challenge
POWER’s Approach
Tools
Program Controls Process
Program Business Rhythm
POWER360
o Extending and Integrating Primavera
Using P6 on Energy Program “Gotchas”
Questions
Topics
Consulting engineering firm specializing in needs of energy industry.
1,700 employees, 30+ offices nationwide.
Ranked among top 3 transmission/distribution engineering firms for past 10 years.
Offers complete multidiscipline engineering, environmental, construction management and
program management services.
Experience includes
some of the largest
transmission
projects in the
country
POWER Engineers, Inc.
The global power industry needs more electric transmission capacity
and reliability
Global Electricity Projections 2008 – 2035 from Energy Information
Administration (EIA)
Electricity generation increases 84%
Renewables increases 125%
Natural gas increases 101%
Nuclear generation increases 89%
Coal Increases 67%
Power Industry Trends
Source: http://www.eia.gov/forecasts/ieo/pdf/0484(2011).pdf
Today’s Program Management Challenge
Rapid
Deployments
Implementation,
Roll-out
and training
Third Party
Integrations
Security
Support
Client Specific
Data
Structures
Employee
Controlled
Devices
Joint
Ventures
Global
Users
Non
Employees
Mobile
Users
Network
Employees
Owner
Specific
Reporting
Requirements Applications
Contributors/
Collaborators/
Consumers/
Power Users
Technology Environment Projection
• Web Servers: IIS, JBOSS, WebLogic, Java
• Application Servers: Citrix XenApp
• Operating Systems: 32-bit/64-bit
• DataBase: Oracle 10g/11g
• Authentication/Identity Management
• Data Access & Management
Complex Infrastructure
POWER’s Approach
1. Technology
Cloud Platform
• P6 R8.2
• PCM V14
• Integrate with In-
House POWER360
GIS/Document
Management
2. Program Controls Process
Data Structures
• EPS
• WBS
• CLI Cost Codes
Processes
Lifecycle
3. Program Rhythm
Business Cycle
• Update
• Analysis
• Reporting
• Review
Technology – POWER Engineers Private Cloud
Powered by LoadSpring SpringBoard
SpringBoard™
---
Location-Aware
Cloud Platform
POWER Engineers
Secure External
Access to Program
Data
Data
2
Data
1
POWER360
Secure Integration Pipe
Federated Services
Implementation
Services
GlobalView™
LoadSpring
Academy™
Mobile Access
POWER360 provides:
Permitting and Right-of-Way Constraint Management
Manage/mitigate permitting constraints
Manage/mitigate ROW acquisition constraints
Active Public Involvement
Managing public input
Gaining public support
Detailed Geospatial Data Analysis
High resolution imagery
Map Services
Document Management
Custom Owner Specific Dashboard Reporting
Integrated with POWER360 On-Premise Solution
POWER360 - Integrated GIS
POWER360 – Custom Dashboarding
POWER360 – Custom Dashboarding
Importance of Initial Data Structure
Program
Program
Management
PM Ops
Outages
Program
Milestones
Environmental
Env Impact
Statement
Environmental
Monitoring
Environmental
Surveys
Permitting
Federal
State
County
Right of Way
Segment 1
Segment 2
Segment 3
Substations
Substation A
Substation B
Substation C
Transmission
Lines
Segment 1
Segment 2
Segment 3
Template Work Breakdown Structure
Program Management Execution Processes
Topics
1. Program Management 9. Right of Way Acquisition
2. Safety 10. Supply Chain Management
3. QA/QC Assurance Plan 11. Program Scheduling
4. Program Communication Plan 12. Cost Management
5. Public Agency Coordination 13. Engineering
6. Public Involvement 14. Construction Management
7. Environmental & Permitting 15. Startup & Commissioning
8. Geoengineering & Geosciences
Transmission Line Program Lifecycle
0
Started
(Authorized)
1
Initiated
(Aligned)
2
Planned
4
Operational
3
Baselined
Program Mobilization
Structured Program Business Rhythm
Risks Issues
• Stakeholders
• Public
• News Bulletins
Actual
Costs
Schedule/Scope
Status
Communication
Compare to
Baseline
Program Office
Status
Reports
Analysis
Status
Update
Capture Progress Assess and Prepare Communicate
Technology
“Classical” critical-path Planners prefer P6 Professional
Learning when to go to P6 Pro vs. P6 Web
Importance of partnering with a specialist firm
Oracle Support Required
Integrating with Existing Programs
Think of Program Structure as “Template” vs. “Mandate”
Unique Owner Requirements with non-optimal data structures
Program Data Reporting Requirements Not Addressed in Contracts with
Subcontractors
Owner Culture
Using P6 on Energy Program “Gotchas”
Cloud-based Primavera that scales with program demand and removes up-front
investment in infrastructure
Templated Data Structure and Configuration providing for rapid startup and
planning of Programs
Ability for all stakeholders to connect including external subcontractors and
Owners
A Program by Program cost recovery structure that allows for costs to be
recovered at the Program Level
Questions?
Results Summary

Contenu connexe

Tendances

01 17-12 itp tools training and other resources -pump-fan-motor focus panel
01 17-12  itp tools training and other resources -pump-fan-motor focus panel01 17-12  itp tools training and other resources -pump-fan-motor focus panel
01 17-12 itp tools training and other resources -pump-fan-motor focus panelPreston Roberts
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt
 
TW Statement of Compliance GREP 2014-2015_LOW RES
TW Statement of Compliance GREP 2014-2015_LOW RESTW Statement of Compliance GREP 2014-2015_LOW RES
TW Statement of Compliance GREP 2014-2015_LOW RESNaomi Sunderland
 
World Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISWorld Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISsmrobb
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningAdvisian
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryAdvisian
 
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...Komandur Sunder Raj, P.E.
 
Retrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyRetrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyMcKenney's Inc
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001nooone
 

Tendances (12)

Session B2 - Project Cost Control
Session B2 - Project Cost ControlSession B2 - Project Cost Control
Session B2 - Project Cost Control
 
01 17-12 itp tools training and other resources -pump-fan-motor focus panel
01 17-12  itp tools training and other resources -pump-fan-motor focus panel01 17-12  itp tools training and other resources -pump-fan-motor focus panel
01 17-12 itp tools training and other resources -pump-fan-motor focus panel
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12
 
TW Statement of Compliance GREP 2014-2015_LOW RES
TW Statement of Compliance GREP 2014-2015_LOW RESTW Statement of Compliance GREP 2014-2015_LOW RES
TW Statement of Compliance GREP 2014-2015_LOW RES
 
Tata_Proof
Tata_ProofTata_Proof
Tata_Proof
 
World Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GISWorld Pipelines - Better Together - SCADA and GIS
World Pipelines - Better Together - SCADA and GIS
 
Coal Fleet Overview 2010
Coal Fleet Overview   2010Coal Fleet Overview   2010
Coal Fleet Overview 2010
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...
2007 ASME Power Conference Maximizing Value of Existing Nuclear Power Plant G...
 
Retrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyRetrocommissioning Heightens Efficiency
Retrocommissioning Heightens Efficiency
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001
 

En vedette

Www.7aramy kotob.tk-planning.scheduling.using.primavera
Www.7aramy kotob.tk-planning.scheduling.using.primaveraWww.7aramy kotob.tk-planning.scheduling.using.primavera
Www.7aramy kotob.tk-planning.scheduling.using.primaveraYasser Nassr
 
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14p6academy
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14p6academy
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Mohamed Adel
 
Importance of Microsoft Project and Primavera
Importance of Microsoft Project and Primavera Importance of Microsoft Project and Primavera
Importance of Microsoft Project and Primavera Sagar Tilwani
 

En vedette (7)

Www.7aramy kotob.tk-planning.scheduling.using.primavera
Www.7aramy kotob.tk-planning.scheduling.using.primaveraWww.7aramy kotob.tk-planning.scheduling.using.primavera
Www.7aramy kotob.tk-planning.scheduling.using.primavera
 
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
 
Oracle Primavera P6 Enterprise Project - Synergy
Oracle Primavera P6 Enterprise Project - SynergyOracle Primavera P6 Enterprise Project - Synergy
Oracle Primavera P6 Enterprise Project - Synergy
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1
 
Importance of Microsoft Project and Primavera
Importance of Microsoft Project and Primavera Importance of Microsoft Project and Primavera
Importance of Microsoft Project and Primavera
 
PM using P6
PM using P6PM using P6
PM using P6
 

Similaire à Primavera_large energy program case study

Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Publicdmader
 
Primavera p6 and contract management together - Oracle Primavera Collaborate 14
Primavera p6 and contract management together - Oracle Primavera Collaborate 14Primavera p6 and contract management together - Oracle Primavera Collaborate 14
Primavera p6 and contract management together - Oracle Primavera Collaborate 14p6academy
 
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfShow & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfSIFOfgem
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives Raffaele de Amicis
 
ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...Jim Jenkins
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerJim Jenkins
 
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereUsing Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereSafe Software
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT ConvergenceSchneider Electric
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015Sayan Ml
 
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded Industries
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded IndustriesSPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded Industries
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded IndustriesSPLCouncil
 
Lekia Ross Resume_2016
Lekia Ross Resume_2016Lekia Ross Resume_2016
Lekia Ross Resume_2016Lekia Ross
 
Engineering Services Department (ME217)
Engineering Services Department (ME217)Engineering Services Department (ME217)
Engineering Services Department (ME217)Jo Balucanag - Bitonio
 
Michael Haftel Resume-2016
Michael Haftel Resume-2016Michael Haftel Resume-2016
Michael Haftel Resume-2016Michael Haftel
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryThomas Russell, PE
 
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case Study
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case StudyDOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case Study
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case StudyCenter for Sustainable Energy
 
Storm Outage Restoration Conference: Data Management & Technology Application...
Storm Outage Restoration Conference: Data Management & Technology Application...Storm Outage Restoration Conference: Data Management & Technology Application...
Storm Outage Restoration Conference: Data Management & Technology Application...philbrown49
 

Similaire à Primavera_large energy program case study (20)

Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Public
 
Tralli
TralliTralli
Tralli
 
Primavera p6 and contract management together - Oracle Primavera Collaborate 14
Primavera p6 and contract management together - Oracle Primavera Collaborate 14Primavera p6 and contract management together - Oracle Primavera Collaborate 14
Primavera p6 and contract management together - Oracle Primavera Collaborate 14
 
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfShow & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
 
SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives SUNSHINE short overview of the project and its objectives
SUNSHINE short overview of the project and its objectives
 
ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_sampler
 
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereUsing Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
 
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded Industries
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded IndustriesSPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded Industries
SPLC 2018 Summit: Beyond Tier 1: Addressing Impacts of Embedded Industries
 
Lekia Ross Resume_2016
Lekia Ross Resume_2016Lekia Ross Resume_2016
Lekia Ross Resume_2016
 
Engineering Services Department (ME217)
Engineering Services Department (ME217)Engineering Services Department (ME217)
Engineering Services Department (ME217)
 
Michael Haftel Resume-2016
Michael Haftel Resume-2016Michael Haftel Resume-2016
Michael Haftel Resume-2016
 
Angel David Rodriguez - Resume
Angel David Rodriguez - ResumeAngel David Rodriguez - Resume
Angel David Rodriguez - Resume
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_Summary
 
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case Study
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case StudyDOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case Study
DOE’s Local Energy Assurance Planning Initiative: The Chula Vista Case Study
 
Ccse leap presentation
Ccse leap presentationCcse leap presentation
Ccse leap presentation
 
Storm Outage Restoration Conference: Data Management & Technology Application...
Storm Outage Restoration Conference: Data Management & Technology Application...Storm Outage Restoration Conference: Data Management & Technology Application...
Storm Outage Restoration Conference: Data Management & Technology Application...
 

Plus de Cameron

Demo project planning and control training with lego
Demo project planning and control training with legoDemo project planning and control training with lego
Demo project planning and control training with legoCameron
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBSCameron
 
Vessel fabrication sequence
Vessel fabrication sequenceVessel fabrication sequence
Vessel fabrication sequenceCameron
 
Ignite_VR Course Guide
Ignite_VR Course GuideIgnite_VR Course Guide
Ignite_VR Course GuideCameron
 
20070620 turner international-639-kb
20070620 turner international-639-kb20070620 turner international-639-kb
20070620 turner international-639-kbCameron
 
Sri Rama Jayam Journal
Sri Rama Jayam JournalSri Rama Jayam Journal
Sri Rama Jayam JournalCameron
 
ReTHINK: Leadership_In_You
ReTHINK: Leadership_In_YouReTHINK: Leadership_In_You
ReTHINK: Leadership_In_YouCameron
 
52.02.positive business
52.02.positive business52.02.positive business
52.02.positive businessCameron
 
Re_THINK Spark
Re_THINK SparkRe_THINK Spark
Re_THINK SparkCameron
 
Rethink be an iconoclast
Rethink be an iconoclastRethink be an iconoclast
Rethink be an iconoclastCameron
 
Humor_iconoclast
Humor_iconoclast Humor_iconoclast
Humor_iconoclast Cameron
 

Plus de Cameron (11)

Demo project planning and control training with lego
Demo project planning and control training with legoDemo project planning and control training with lego
Demo project planning and control training with lego
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBS
 
Vessel fabrication sequence
Vessel fabrication sequenceVessel fabrication sequence
Vessel fabrication sequence
 
Ignite_VR Course Guide
Ignite_VR Course GuideIgnite_VR Course Guide
Ignite_VR Course Guide
 
20070620 turner international-639-kb
20070620 turner international-639-kb20070620 turner international-639-kb
20070620 turner international-639-kb
 
Sri Rama Jayam Journal
Sri Rama Jayam JournalSri Rama Jayam Journal
Sri Rama Jayam Journal
 
ReTHINK: Leadership_In_You
ReTHINK: Leadership_In_YouReTHINK: Leadership_In_You
ReTHINK: Leadership_In_You
 
52.02.positive business
52.02.positive business52.02.positive business
52.02.positive business
 
Re_THINK Spark
Re_THINK SparkRe_THINK Spark
Re_THINK Spark
 
Rethink be an iconoclast
Rethink be an iconoclastRethink be an iconoclast
Rethink be an iconoclast
 
Humor_iconoclast
Humor_iconoclast Humor_iconoclast
Humor_iconoclast
 

Primavera_large energy program case study

  • 1. Large Energy Programs Case Study Primavera P6 R8.2 Warren Krueger – LoadSpring Solutions, Inc. John Moorman –POWER Engineers, Inc.
  • 2. POWER Engineers, Inc. Introduction Power Industry Trends Business Challenge POWER’s Approach Tools Program Controls Process Program Business Rhythm POWER360 o Extending and Integrating Primavera Using P6 on Energy Program “Gotchas” Questions Topics
  • 3. Consulting engineering firm specializing in needs of energy industry. 1,700 employees, 30+ offices nationwide. Ranked among top 3 transmission/distribution engineering firms for past 10 years. Offers complete multidiscipline engineering, environmental, construction management and program management services. Experience includes some of the largest transmission projects in the country POWER Engineers, Inc.
  • 4. The global power industry needs more electric transmission capacity and reliability Global Electricity Projections 2008 – 2035 from Energy Information Administration (EIA) Electricity generation increases 84% Renewables increases 125% Natural gas increases 101% Nuclear generation increases 89% Coal Increases 67% Power Industry Trends Source: http://www.eia.gov/forecasts/ieo/pdf/0484(2011).pdf
  • 5. Today’s Program Management Challenge Rapid Deployments Implementation, Roll-out and training Third Party Integrations Security Support Client Specific Data Structures Employee Controlled Devices Joint Ventures Global Users Non Employees Mobile Users Network Employees Owner Specific Reporting Requirements Applications Contributors/ Collaborators/ Consumers/ Power Users
  • 6. Technology Environment Projection • Web Servers: IIS, JBOSS, WebLogic, Java • Application Servers: Citrix XenApp • Operating Systems: 32-bit/64-bit • DataBase: Oracle 10g/11g • Authentication/Identity Management • Data Access & Management Complex Infrastructure
  • 7. POWER’s Approach 1. Technology Cloud Platform • P6 R8.2 • PCM V14 • Integrate with In- House POWER360 GIS/Document Management 2. Program Controls Process Data Structures • EPS • WBS • CLI Cost Codes Processes Lifecycle 3. Program Rhythm Business Cycle • Update • Analysis • Reporting • Review
  • 8. Technology – POWER Engineers Private Cloud Powered by LoadSpring SpringBoard SpringBoard™ --- Location-Aware Cloud Platform POWER Engineers Secure External Access to Program Data Data 2 Data 1 POWER360 Secure Integration Pipe Federated Services Implementation Services GlobalView™ LoadSpring Academy™ Mobile Access
  • 9. POWER360 provides: Permitting and Right-of-Way Constraint Management Manage/mitigate permitting constraints Manage/mitigate ROW acquisition constraints Active Public Involvement Managing public input Gaining public support Detailed Geospatial Data Analysis High resolution imagery Map Services Document Management Custom Owner Specific Dashboard Reporting Integrated with POWER360 On-Premise Solution
  • 11. POWER360 – Custom Dashboarding
  • 12. POWER360 – Custom Dashboarding
  • 13. Importance of Initial Data Structure Program Program Management PM Ops Outages Program Milestones Environmental Env Impact Statement Environmental Monitoring Environmental Surveys Permitting Federal State County Right of Way Segment 1 Segment 2 Segment 3 Substations Substation A Substation B Substation C Transmission Lines Segment 1 Segment 2 Segment 3
  • 15. Program Management Execution Processes Topics 1. Program Management 9. Right of Way Acquisition 2. Safety 10. Supply Chain Management 3. QA/QC Assurance Plan 11. Program Scheduling 4. Program Communication Plan 12. Cost Management 5. Public Agency Coordination 13. Engineering 6. Public Involvement 14. Construction Management 7. Environmental & Permitting 15. Startup & Commissioning 8. Geoengineering & Geosciences
  • 18. Structured Program Business Rhythm Risks Issues • Stakeholders • Public • News Bulletins Actual Costs Schedule/Scope Status Communication Compare to Baseline Program Office Status Reports Analysis Status Update Capture Progress Assess and Prepare Communicate
  • 19. Technology “Classical” critical-path Planners prefer P6 Professional Learning when to go to P6 Pro vs. P6 Web Importance of partnering with a specialist firm Oracle Support Required Integrating with Existing Programs Think of Program Structure as “Template” vs. “Mandate” Unique Owner Requirements with non-optimal data structures Program Data Reporting Requirements Not Addressed in Contracts with Subcontractors Owner Culture Using P6 on Energy Program “Gotchas”
  • 20. Cloud-based Primavera that scales with program demand and removes up-front investment in infrastructure Templated Data Structure and Configuration providing for rapid startup and planning of Programs Ability for all stakeholders to connect including external subcontractors and Owners A Program by Program cost recovery structure that allows for costs to be recovered at the Program Level Questions? Results Summary