Personal Information
Entreprise/Lieu de travail
Egypt, Non-US Egypt
Profession
Senior Industrial Engineer
Secteur d’activité
Real Estate/ Construction / Architecture
Mots-clés
project
primavera
project management
lean manufacturing
work study
production
productivity
time study
industrial engineering
management
Tout plus
Présentations
(6)J’aime
(11)The Five Whys - Are We Doing it Wrong?
Mike Rother
•
il y a 10 ans
Top 5 Deep Learning and AI Stories - October 6, 2017
NVIDIA
•
il y a 6 ans
Pollen VC Building A Digital Lending Business
Pollen VC
•
il y a 8 ans
What have we learnt about Lean?
Lean Enterprise Academy
•
il y a 8 ans
A3 Management - From Structured Problem-Solving to Workplace Development (Part 1 of 2)
TKMG, Inc.
•
il y a 13 ans
How Kata Fits In
Mike Rother
•
il y a 9 ans
A Practical Approach to Strategy Deployment
Gerardo Aulinger
•
il y a 11 ans
Identifying Waste
Operational Excellence Consulting
•
il y a 10 ans
Innovation: An Odyssey in Learning
EMC Network, LLC
•
il y a 9 ans
Best Practices Fusion: Lean Six Sigma & CMMI
ggack
•
il y a 15 ans
work study impact on productivity
Mohammad Younus
•
il y a 12 ans
Personal Information
Entreprise/Lieu de travail
Egypt, Non-US Egypt
Profession
Senior Industrial Engineer
Secteur d’activité
Real Estate/ Construction / Architecture
Mots-clés
project
primavera
project management
lean manufacturing
work study
production
productivity
time study
industrial engineering
management
Tout plus