Types of Cost in Projects


Ricardo Viana Vargas, MSc, IPMA-B, PMP
ricardo.vargas@macrosolutions.com.br

                  © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Ricardo Viana Vargas, MSc, IPMA-B, PMP
Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible
for over 80 major projects in various countries in the areas of petroleum, energy, infrastructure, telecommunications,
information technology and finances, comprising an investment portfolio of over 18 billion dollars.


He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute (PMI),
the largest project management organization in the world with close to 500,000 members and certified professionals in 175
countries.

Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over
200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the
development of project management and the PMI Professional Development Product of the Year award for the PMDome®
workshop, considered the best project management training solution in the world.

He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized
journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in
the world for project management, and also chaired the official translation of PMBOK into Portuguese.

He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas
Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is
certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management
Association. He attended the Program on Negotiation for Executives at Harvard Law School.

Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most
solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000
collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to
dedicate himself on a fulltime basis to the internationalization of his project management activities.

He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association
(AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk
Management International Association (PRMIA).

                                                                                                                                 2
                      © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
Cost

       Cost can be described as

   • Direct and Indirect
   • Variable, Fixed and Semi-variable
   • Recurring and non-recurring




           © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Direct Costs



 Can be traced back             Are specifically               Include materials,
  to a product and            identified by their               labor and other
  can be measured                 objectives                      direct costs




          © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Direct Costs - Examples


   Direct                                                         Direct work
                            Direct labor
  materials                                                          hours


   Use of                       Use of                            Number of
 equipments                    facilities                         employees


              Use of                       Consumption
             materials                      of services

        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Indirect Costs



                                              Costs not directly related to
  Not directly identifiable
                                                  the project product




                                             Include
      Belong to the core
                                             • Fringe benefits
  supporting business, but
                                             • Indirect manufacturing expenses
 cannot be directly assigned
                                             • General indirect expenses
   to projects or individual                 • General and administrative
          contracts                            expenses



         © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Variable Costs



   Vary as changes in the                         Can or cannot be
      production are                            proportional to these
       implemented                               production changes



   Include expenses with
 equipments and materials,
                                              If there’s no production,
   performance bonuses,
                                               there’s no variable cost
      freight and sales
  comissions, for example


         © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Fixed Costs

 Remain constant in the total, independently of the
 amount of work performed

 Remain the same even when the production line
 pauses or is null

 Include costs like rent, depreciation,
 administrative team salaries and general expenses




        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Recurring and non-recurring Costs

    Recurring Costs

    • Repetitive, directs or indirects, which vary
      depending on the production
    • Daily/weekly/monthly/etc costs

    Non-recurring costs

    • One-time expense only
    • Development, investment and other costs that are
      paid only once




         © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Visit
   www.ricardo-vargas.com
to access other presentations,
podcasts, videos and technical
content about project , risk and
    portfolio management.

           © BY MACROSOLUTIONS SA

Contenu connexe

Tendances

Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Engineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structuresEngineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structuresRAMPRASAD KUMAWAT
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 
Construction equipment- classification, factors affecting its selection.pptx
Construction equipment- classification, factors affecting its selection.pptxConstruction equipment- classification, factors affecting its selection.pptx
Construction equipment- classification, factors affecting its selection.pptxShivamKumar423966
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimatinghatim ahmed
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...A Makwana
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Shrikant Kate
 

Tendances (20)

Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
labour management
labour managementlabour management
labour management
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Engineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structuresEngineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structures
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Construction equipment- classification, factors affecting its selection.pptx
Construction equipment- classification, factors affecting its selection.pptxConstruction equipment- classification, factors affecting its selection.pptx
Construction equipment- classification, factors affecting its selection.pptx
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimating
 
Contracts
ContractsContracts
Contracts
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Bar chart
Bar chartBar chart
Bar chart
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
 

Similaire à Types of Cost in Projects

Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaRicardo Viana Vargas
 
Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Ricardo Viana Vargas
 
Portfolio Management – Basic Concepts
Portfolio Management – Basic ConceptsPortfolio Management – Basic Concepts
Portfolio Management – Basic ConceptsRicardo Viana Vargas
 
Implementing a Project Office Management
Implementing a Project Office ManagementImplementing a Project Office Management
Implementing a Project Office ManagementRicardo Viana Vargas
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesRicardo Viana Vargas
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?Ricardo Viana Vargas
 
LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009LINKIES.
 
Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonRicardo Viana Vargas
 
Avoid Unhappy Returns: Proactively Plug Your Revenue Leaks
Avoid Unhappy Returns: Proactively Plug Your Revenue LeaksAvoid Unhappy Returns: Proactively Plug Your Revenue Leaks
Avoid Unhappy Returns: Proactively Plug Your Revenue LeaksDevOps.com
 
Skills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerSkills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerRicardo Viana Vargas
 
Software as a Service Advantages
Software as a Service AdvantagesSoftware as a Service Advantages
Software as a Service Advantagescorncrew1
 
How to Measure BCWP (Earned Value)
How to Measure BCWP (Earned Value)How to Measure BCWP (Earned Value)
How to Measure BCWP (Earned Value)Ricardo Viana Vargas
 

Similaire à Types of Cost in Projects (20)

Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization Criteria
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
The Subdivision of Project Scope
The Subdivision of Project ScopeThe Subdivision of Project Scope
The Subdivision of Project Scope
 
Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)
 
Portfolio Management – Basic Concepts
Portfolio Management – Basic ConceptsPortfolio Management – Basic Concepts
Portfolio Management – Basic Concepts
 
Implementing a Project Office Management
Implementing a Project Office ManagementImplementing a Project Office Management
Implementing a Project Office Management
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?
 
Ethics in Contracts
Ethics in ContractsEthics in Contracts
Ethics in Contracts
 
LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009
 
Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
 
3 Basic Tips for PMO Success
3  Basic Tips for  PMO Success3  Basic Tips for  PMO Success
3 Basic Tips for PMO Success
 
Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio Comparison
 
Why Communications Management?
Why Communications Management?Why Communications Management?
Why Communications Management?
 
Avoid Unhappy Returns: Proactively Plug Your Revenue Leaks
Avoid Unhappy Returns: Proactively Plug Your Revenue LeaksAvoid Unhappy Returns: Proactively Plug Your Revenue Leaks
Avoid Unhappy Returns: Proactively Plug Your Revenue Leaks
 
Skills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerSkills and Characteristics of a Project Manager
Skills and Characteristics of a Project Manager
 
Quality Control Tools
Quality Control ToolsQuality Control Tools
Quality Control Tools
 
Software as a Service Advantages
Software as a Service AdvantagesSoftware as a Service Advantages
Software as a Service Advantages
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
 
How to Measure BCWP (Earned Value)
How to Measure BCWP (Earned Value)How to Measure BCWP (Earned Value)
How to Measure BCWP (Earned Value)
 

Plus de Ricardo Viana Vargas

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionRicardo Viana Vargas
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)Ricardo Viana Vargas
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoFluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoRicardo Viana Vargas
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Ricardo Viana Vargas
 
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Ricardo Viana Vargas
 
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Ricardo Viana Vargas
 
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Ricardo Viana Vargas
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsRicardo Viana Vargas
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseRicardo Viana Vargas
 
Milestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosMilestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosRicardo Viana Vargas
 
Milestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - FundamentalsMilestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - FundamentalsRicardo Viana Vargas
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisDiagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisRicardo Viana Vargas
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeDiagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeRicardo Viana Vargas
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoDiagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoRicardo Viana Vargas
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Ricardo Viana Vargas
 
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo Viana Vargas
 
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaFlujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaRicardo Viana Vargas
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ricardo Viana Vargas
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschAblaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschRicardo Viana Vargas
 
Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...Ricardo Viana Vargas
 

Plus de Ricardo Viana Vargas (20)

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoFluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª Edição
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
 
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
 
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
 
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
 
Milestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosMilestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos Básicos
 
Milestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - FundamentalsMilestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - Fundamentals
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisDiagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeDiagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoDiagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
 
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_es
 
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaFlujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschAblaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
 
Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...
 

Dernier

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 

Dernier (20)

(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Types of Cost in Projects

  • 1. Types of Cost in Projects Ricardo Viana Vargas, MSc, IPMA-B, PMP ricardo.vargas@macrosolutions.com.br © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 2. Ricardo Viana Vargas, MSc, IPMA-B, PMP Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible for over 80 major projects in various countries in the areas of petroleum, energy, infrastructure, telecommunications, information technology and finances, comprising an investment portfolio of over 18 billion dollars. He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute (PMI), the largest project management organization in the world with close to 500,000 members and certified professionals in 175 countries. Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over 200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the development of project management and the PMI Professional Development Product of the Year award for the PMDome® workshop, considered the best project management training solution in the world. He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in the world for project management, and also chaired the official translation of PMBOK into Portuguese. He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management Association. He attended the Program on Negotiation for Executives at Harvard Law School. Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000 collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to dedicate himself on a fulltime basis to the internationalization of his project management activities. He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association (AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk Management International Association (PRMIA). 2 © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
  • 3. Cost Cost can be described as • Direct and Indirect • Variable, Fixed and Semi-variable • Recurring and non-recurring © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 4. Direct Costs Can be traced back Are specifically Include materials, to a product and identified by their labor and other can be measured objectives direct costs © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 5. Direct Costs - Examples Direct Direct work Direct labor materials hours Use of Use of Number of equipments facilities employees Use of Consumption materials of services © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 6. Indirect Costs Costs not directly related to Not directly identifiable the project product Include Belong to the core • Fringe benefits supporting business, but • Indirect manufacturing expenses cannot be directly assigned • General indirect expenses to projects or individual • General and administrative contracts expenses © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 7. Variable Costs Vary as changes in the Can or cannot be production are proportional to these implemented production changes Include expenses with equipments and materials, If there’s no production, performance bonuses, there’s no variable cost freight and sales comissions, for example © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 8. Fixed Costs Remain constant in the total, independently of the amount of work performed Remain the same even when the production line pauses or is null Include costs like rent, depreciation, administrative team salaries and general expenses © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 9. Recurring and non-recurring Costs Recurring Costs • Repetitive, directs or indirects, which vary depending on the production • Daily/weekly/monthly/etc costs Non-recurring costs • One-time expense only • Development, investment and other costs that are paid only once © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS