A GPAllied White Paper
Establishing the Discipline of Executing
We can’t keep doing what we have always done
and expect different results.
70% of maintenance and reliability projects fail due to poor execution.
Learn why and what you can do to improve your odds.
By: Michael J. Aroney, Principal
February 21, 2013
A DIVISION OF ALLIED RELIABILITY GROUP
4200 Faber Place Drive
Charleston, SC 29405
888.335.8276
www.gpallied.com
© 2013 GPAllied Page 1
Contents
A Reliability Improvement Project Is Like a Piece
of Equipment ............................................................1
What to Execute........................................................3
How to Execute.........................................................3
Summary...................................................................5
A Reliability Improvement Project Is
Like a Piece of Equipment
An asset or piece of equipment and its components
have failure modes that can be plotted on a P-F curve
(Figure 1) based on when a defect first presents itself,
progressive loss of functionality, and eventual failure.
“P” is the point at which a defect presents itself and
failure starts to occur. Without any repair to eliminate
the defect, its severity will increase, functionality will
decrease, and failure will occur at point “F”. At this
point, it typically costs four (4) times the amount and
takes ten (10) times the effort to make a repair than if
the defect were removed somewhere before point “F”.
How Predictive Maintenance (PdM) Works – Early Identification of Defects
Figure 1: P-F Curve
Page 2 Establishing the Discipline of Executing
The objective then is to use methods that will allow
for the early detection of defects to provide ample
time for corrective and mitigating actions to eliminate
them and restore functionality. This requires an
optimized mix of Condition Based Maintenance (CBM)
technologies and Preventive Maintenance (PM)
inspections focused on failure modes.
This approach allows for an early identification of
defects as close to point “P” as possible. It provides
time to plan the work needed to eliminate the defect
and take mitigating actions to eliminate the likelihood
that a particular defect will reoccur or lessen the
severity of impact to the asset if it does present itself
again. Early identification and elimination of defects
and actions to prevent their reoccurrence is a risk
mitigation strategy to ensure that the functionality of
the asset is maintained. For assets, this is what we
would call an optimized Equipment Maintenance Plan
(EMP).
Reliability and maintenance process improvement
projects are like assets. A project has components and
each component has failure modes. When a defect is
introduced to a project’s component, it will lose
functionality until point “F” is reached. Project failure
is defined as exceeding the project scope in terms of
cost and time, underachieving target functionality,
and not providing the return on investment in the
business case for change.
A project’s major components typically fall into the
following categories:
• Active leadership engagement and
governance;
• Effective communication;
• Training that develops understanding,
knowledge, and ability to execute;
• An organization aligned to reinforce new
behaviors and results;
• Employees that are actively engaged in design
and implementation of the project’s
functionality; and
• Buy-in by all members of the organization
affected by the project.
Sample Failure Modes
Listed here are some failure modes that are
associated with these project components.
Active Leadership Engagement and Governance:
• Lack of skill.
• Too busy to actively participate.
• Not setting priorities on competing initiatives.
• Implementation responsibility delegated
completely to supervisors.
Effective Communication:
• No formal communication process.
• Ineffective communication.
• No feedback mechanism established.
• Low participation in communication by
managers and supervisors.
Training That Develops Understanding, Knowledge
and Ability to Execute:
• Short cuts, especially on understanding (5
days to 1 day).
• Focus on technical training only and
neglecting the development of execution
skills when 30% of the challenge is technical
and 70% is execution.
• Training that does not address the four (4)
levels of learning: like it, learn it, use it,
improve performance.
An Organization Aligned to Reinforce New Behaviors
and Results:
• 30% of an organization’s performance
challenges are technical in nature while 70%
of the challenges are organizational, yet the
norm is to focus 100% of a project’s effort on
only the technical issues.
• Every organization is perfectly aligned for the
results it gets. Failure to realign its controls
and mechanisms to reinforce new behaviors
will result in a failed project – often referred
to as a “flavor of the month”.
© 2013 GPAllied Page 3
• Strong silos resulting in process
fragmentation characterized by the attitude
of “that’s not my job”.
• It is too hard to use the Computerized
Maintenance Management System (CMMS),
resulting in work-arounds.
Employees That Are Actively Engaged in Design and
Implementation of the Project’s Functionality:
• Low trust and empowerment – “us/them”
adversarial relationship.
• Culture of “dependency” – there is a lack of
initiative and people are waiting to be told
what to do.
• Not understanding “how will it affect me”.
• No business case for change and burning
platform.
Buy-in by All Members of the Organization Affected
by the Project:
• Poor past successes with project
implementations – “here we go again”
mentality resulting in a “hunker down”
response.
• Not identifying “what’s in it for me”.
• Functional affiliation – agreeing that change
must occur, but it is “them” who need to
change.
What to Execute
70% of project failures are due to poor execution.
There are four (4) key disciplines to execution and by
addressing the six (6) critical project components of a
project that are listed above, the organization will
achieve the discipline to execute effectively by: 1)
engaging people and keeping them focused on goals,
2) establishing what must be done to achieve these
goals, 3) keeping the organization focused on what
matters, and 4) keeping the organization accountable
for results.
How to Execute
The methods used to establish a discipline of
execution enable the organization’s leadership to
filter through all of the competing priorities that
detract from a project’s successful implementation.
To accomplish this, a charter is established defining
the business case for change, the current state, the
target state, and a strategy for closing the gaps. Then
a governance structure is established (Figure 2) with
clearly defined goals, roles, and expectations for
execution and a method for tracking progress.
Figure 2: Governance Structure Example
Page 4 Establishing the Discipline of Executing
The governance structure in the asset/project defect
analogy executes the EMP, and in the case of the
asset reliability improvement project, a Project
Maintenance Plan. In this regard, the Corporate
Executive Steering Group and Site Leadership Team
play the role of reliability engineers. The Process
Champions are the maintenance engineers. The
Project Teams are the craftsmen. The Change
Management Team is the PdM/PM technicians, the
Site Facilitator is the asset reliability project manager,
and the Corporate Facilitator is the asset reliability
program manager.
The Project Teams, the craftsmen, are commissioned
and trained to reengineer the maintenance and
reliability processes and establish standards and
methods that will ensure effective asset health
management. The net results are improved reliability,
increased capacity, and lower operating cost. The
Project Team Champions are responsible for ensuring
that the gaps between current state and target state
are “fixed” and the project functionality is achieved.
The Change Management Team, the PdM/PM
technicians, monitors and inspects the project
execution to identify “defects” such as the ones that
were previously identified. These defects, if not
removed, will prevent the project’s full functionality
from being achieved and contribute to its eventual
failure by becoming another poorly executed “flavor
of the month”. Defects identified by this project CBM
process are identified as technical or organizational by
the Change Management Team analysts. Technical
defects are handed over to the Champions for
“fixing”. Organizational defects require that the
Leadership Team, and in some cases the Executive
Steering Group, are engaged to eliminate the defect
through an organization change or through their
active participation to mitigate its reoccurrence. The
governance structure has a supporting process and
tools that facilitate execution of the project and
greatly increase the likelihood of success. An example
governance process and the associated tools are
shown in Figure 3.
Figure 3: Governance Process and Tools for Execution
© 2013 GPAllied Page 5
Summary
The difference between doing the same old things
and expecting different results and actually getting
different results is seeing and doing things differently.
As previously stated, 70% of project failures are due
to poor execution. Achieving success requires a
discipline of execution. The organization must be
aligned to engage people and keep them focused on
goals. If people do not know the goals, let alone what
to do to achieve them on a day-to-day basis, then
failure is predictable. Additionally, the organization
must keep score and be held accountable for results.
The governance structure and process outlined here
provides the mechanisms for how to execute. They
allow leadership to filter through all of the competing
priorities and ensure successful execution of
performance changes. It all starts with aligning the
leadership on a common goal and establishing the
business case for change, a vision of the target state’s
goals, and how progress and accountability will be
achieved. Put the pieces in place to drive the
discipline to engage, execute, and sustain.
© 2013 GPAllied Establishing the Discipline of Executing
About GPAllied
GPAllied is the most diverse manufacturing and
industrial reliability and operations consulting,
training, and services company in the world. This
diversity enables us to develop significant value
propositions for our clients by delivering solutions
across different industries, geographies, and—most
importantly—across different aspects of an operation.
As a result of our commitment to delivering greater
value to our manufacturing and industrial clients, we
have brought together premiere industry leading
experts to form the GPAllied team. Our specialists
demonstrate expertise across all industry sectors and
specialty fields including: Lean, Reliability Engineering,
Six Sigma, Condition Monitoring, Change
Management, Maintenance Planning and Scheduling,
Workforce Development, and Craft Skills Training.
For more information about GPAllied, please contact:
World Headquarters
888.335.8276
info@gpallied.com
www.gpallied.com

Contenu connexe

Tendances

Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & Scheduling
PowerEDGE
 
PD188 Maintenance Planning & Scheduling
PD188 Maintenance Planning & SchedulingPD188 Maintenance Planning & Scheduling
PD188 Maintenance Planning & Scheduling
petroEDGE
 
Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for website
Adrien Boespflug
 
Jayanto bose prashantshrivastava
Jayanto bose prashantshrivastavaJayanto bose prashantshrivastava
Jayanto bose prashantshrivastava
PMI2011
 
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Wally Wilson
 

Tendances (20)

Roles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance SupervisorRoles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance Supervisor
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & Scheduling
 
Maintenance Planning Checklist
Maintenance Planning ChecklistMaintenance Planning Checklist
Maintenance Planning Checklist
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
PdM Maturity Matrix Poster
PdM Maturity Matrix PosterPdM Maturity Matrix Poster
PdM Maturity Matrix Poster
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
PD188 Maintenance Planning & Scheduling
PD188 Maintenance Planning & SchedulingPD188 Maintenance Planning & Scheduling
PD188 Maintenance Planning & Scheduling
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Wrench Time
Wrench TimeWrench Time
Wrench Time
 
Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for website
 
Agile Continuous improvement
Agile Continuous improvementAgile Continuous improvement
Agile Continuous improvement
 
An introduction to the PDCA cycle
An introduction to the PDCA cycle An introduction to the PDCA cycle
An introduction to the PDCA cycle
 
Putting the Ready in Business Readiness
Putting the Ready in Business ReadinessPutting the Ready in Business Readiness
Putting the Ready in Business Readiness
 
Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0
 
Management Skills
Management SkillsManagement Skills
Management Skills
 
Jayanto bose prashantshrivastava
Jayanto bose prashantshrivastavaJayanto bose prashantshrivastava
Jayanto bose prashantshrivastava
 
Project management
Project managementProject management
Project management
 
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellence
 
Performance Improvement Culture
Performance Improvement CulturePerformance Improvement Culture
Performance Improvement Culture
 

En vedette

Why RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital VersionWhy RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital Version
Ricky Smith CMRP, CMRT
 
Failure elimination made_simple_article_1_bk
Failure elimination made_simple_article_1_bkFailure elimination made_simple_article_1_bk
Failure elimination made_simple_article_1_bk
Ricky Smith CMRP, CMRT
 

En vedette (17)

P-F Interval Made Simple
P-F Interval Made SimpleP-F Interval Made Simple
P-F Interval Made Simple
 
Toll Box Talk - How Bearings Fail
Toll Box Talk - How Bearings FailToll Box Talk - How Bearings Fail
Toll Box Talk - How Bearings Fail
 
Why RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital VersionWhy RCM Doesn't Work Report - Digital Version
Why RCM Doesn't Work Report - Digital Version
 
Maturity Matrix for Reliability Engineering in Spanish
Maturity Matrix for Reliability Engineering in SpanishMaturity Matrix for Reliability Engineering in Spanish
Maturity Matrix for Reliability Engineering in Spanish
 
Failure elimination made_simple_article_1_bk
Failure elimination made_simple_article_1_bkFailure elimination made_simple_article_1_bk
Failure elimination made_simple_article_1_bk
 
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesCondition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
 
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
 
Gates Belts PM Manual
Gates Belts PM ManualGates Belts PM Manual
Gates Belts PM Manual
 
Mean Time Between Failure Vs Cost
Mean Time Between Failure Vs CostMean Time Between Failure Vs Cost
Mean Time Between Failure Vs Cost
 
Case Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing FailureCase Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing Failure
 
Developing Effective Work Procedures Training
Developing Effective Work Procedures TrainingDeveloping Effective Work Procedures Training
Developing Effective Work Procedures Training
 
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
 
World Class Maintenance WebEx Slides
World Class Maintenance WebEx SlidesWorld Class Maintenance WebEx Slides
World Class Maintenance WebEx Slides
 
7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACAS7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACAS
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 

Similaire à Establishing the Discipline of Executing Maintenance Work

Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
PMI2011
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02
PMI_IREP_TP
 
Recruitment and Selection ProjectArie McQuarley.docx
Recruitment and Selection ProjectArie McQuarley.docxRecruitment and Selection ProjectArie McQuarley.docx
Recruitment and Selection ProjectArie McQuarley.docx
audeleypearl
 
SAP and Change Management
SAP and Change ManagementSAP and Change Management
SAP and Change Management
Flevy.com Best Practices
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
charisellington63520
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
Jeff McClay
 

Similaire à Establishing the Discipline of Executing Maintenance Work (20)

Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
EjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOqEjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOq
 
Recruitment and Selection ProjectArie McQuarley.docx
Recruitment and Selection ProjectArie McQuarley.docxRecruitment and Selection ProjectArie McQuarley.docx
Recruitment and Selection ProjectArie McQuarley.docx
 
SAP and Change Management
SAP and Change ManagementSAP and Change Management
SAP and Change Management
 
School district gets an a+ in primavera people soft integration by doing thei...
School district gets an a+ in primavera people soft integration by doing thei...School district gets an a+ in primavera people soft integration by doing thei...
School district gets an a+ in primavera people soft integration by doing thei...
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdfoperatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
 
Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit
 
Implementing strategic planning getting the thing to work - robert l walker usc
Implementing strategic planning getting the thing to work -  robert l walker uscImplementing strategic planning getting the thing to work -  robert l walker usc
Implementing strategic planning getting the thing to work - robert l walker usc
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
 
ISO_2
ISO_2ISO_2
ISO_2
 
Agile governance towards facilitative project management - article - fortes ...
Agile governance  towards facilitative project management - article - fortes ...Agile governance  towards facilitative project management - article - fortes ...
Agile governance towards facilitative project management - article - fortes ...
 
Project report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaProject report submitted in IIM Calcutta
Project report submitted in IIM Calcutta
 
You Have All the Right Pieces, but Do You Have the Right Glue?
You Have All the Right Pieces, but Do You Have the Right Glue?You Have All the Right Pieces, but Do You Have the Right Glue?
You Have All the Right Pieces, but Do You Have the Right Glue?
 
Steps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalSteps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortal
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
Breaking the Project Failure Cycle
Breaking the Project Failure CycleBreaking the Project Failure Cycle
Breaking the Project Failure Cycle
 

Plus de Ricky Smith CMRP, CMRT

Plus de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
 

Dernier

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Establishing the Discipline of Executing Maintenance Work

  • 1. We optimize your people, processes, and technology so that you can achieve sustainable, reliable results A GPAllied White Paper Establishing the Discipline of Executing We can’t keep doing what we have always done and expect different results. 70% of maintenance and reliability projects fail due to poor execution. Learn why and what you can do to improve your odds. By: Michael J. Aroney, Principal February 21, 2013 A DIVISION OF ALLIED RELIABILITY GROUP 4200 Faber Place Drive Charleston, SC 29405 888.335.8276 www.gpallied.com
  • 2.
  • 3. © 2013 GPAllied Page 1 Contents A Reliability Improvement Project Is Like a Piece of Equipment ............................................................1 What to Execute........................................................3 How to Execute.........................................................3 Summary...................................................................5 A Reliability Improvement Project Is Like a Piece of Equipment An asset or piece of equipment and its components have failure modes that can be plotted on a P-F curve (Figure 1) based on when a defect first presents itself, progressive loss of functionality, and eventual failure. “P” is the point at which a defect presents itself and failure starts to occur. Without any repair to eliminate the defect, its severity will increase, functionality will decrease, and failure will occur at point “F”. At this point, it typically costs four (4) times the amount and takes ten (10) times the effort to make a repair than if the defect were removed somewhere before point “F”. How Predictive Maintenance (PdM) Works – Early Identification of Defects Figure 1: P-F Curve
  • 4. Page 2 Establishing the Discipline of Executing The objective then is to use methods that will allow for the early detection of defects to provide ample time for corrective and mitigating actions to eliminate them and restore functionality. This requires an optimized mix of Condition Based Maintenance (CBM) technologies and Preventive Maintenance (PM) inspections focused on failure modes. This approach allows for an early identification of defects as close to point “P” as possible. It provides time to plan the work needed to eliminate the defect and take mitigating actions to eliminate the likelihood that a particular defect will reoccur or lessen the severity of impact to the asset if it does present itself again. Early identification and elimination of defects and actions to prevent their reoccurrence is a risk mitigation strategy to ensure that the functionality of the asset is maintained. For assets, this is what we would call an optimized Equipment Maintenance Plan (EMP). Reliability and maintenance process improvement projects are like assets. A project has components and each component has failure modes. When a defect is introduced to a project’s component, it will lose functionality until point “F” is reached. Project failure is defined as exceeding the project scope in terms of cost and time, underachieving target functionality, and not providing the return on investment in the business case for change. A project’s major components typically fall into the following categories: • Active leadership engagement and governance; • Effective communication; • Training that develops understanding, knowledge, and ability to execute; • An organization aligned to reinforce new behaviors and results; • Employees that are actively engaged in design and implementation of the project’s functionality; and • Buy-in by all members of the organization affected by the project. Sample Failure Modes Listed here are some failure modes that are associated with these project components. Active Leadership Engagement and Governance: • Lack of skill. • Too busy to actively participate. • Not setting priorities on competing initiatives. • Implementation responsibility delegated completely to supervisors. Effective Communication: • No formal communication process. • Ineffective communication. • No feedback mechanism established. • Low participation in communication by managers and supervisors. Training That Develops Understanding, Knowledge and Ability to Execute: • Short cuts, especially on understanding (5 days to 1 day). • Focus on technical training only and neglecting the development of execution skills when 30% of the challenge is technical and 70% is execution. • Training that does not address the four (4) levels of learning: like it, learn it, use it, improve performance. An Organization Aligned to Reinforce New Behaviors and Results: • 30% of an organization’s performance challenges are technical in nature while 70% of the challenges are organizational, yet the norm is to focus 100% of a project’s effort on only the technical issues. • Every organization is perfectly aligned for the results it gets. Failure to realign its controls and mechanisms to reinforce new behaviors will result in a failed project – often referred to as a “flavor of the month”.
  • 5. © 2013 GPAllied Page 3 • Strong silos resulting in process fragmentation characterized by the attitude of “that’s not my job”. • It is too hard to use the Computerized Maintenance Management System (CMMS), resulting in work-arounds. Employees That Are Actively Engaged in Design and Implementation of the Project’s Functionality: • Low trust and empowerment – “us/them” adversarial relationship. • Culture of “dependency” – there is a lack of initiative and people are waiting to be told what to do. • Not understanding “how will it affect me”. • No business case for change and burning platform. Buy-in by All Members of the Organization Affected by the Project: • Poor past successes with project implementations – “here we go again” mentality resulting in a “hunker down” response. • Not identifying “what’s in it for me”. • Functional affiliation – agreeing that change must occur, but it is “them” who need to change. What to Execute 70% of project failures are due to poor execution. There are four (4) key disciplines to execution and by addressing the six (6) critical project components of a project that are listed above, the organization will achieve the discipline to execute effectively by: 1) engaging people and keeping them focused on goals, 2) establishing what must be done to achieve these goals, 3) keeping the organization focused on what matters, and 4) keeping the organization accountable for results. How to Execute The methods used to establish a discipline of execution enable the organization’s leadership to filter through all of the competing priorities that detract from a project’s successful implementation. To accomplish this, a charter is established defining the business case for change, the current state, the target state, and a strategy for closing the gaps. Then a governance structure is established (Figure 2) with clearly defined goals, roles, and expectations for execution and a method for tracking progress. Figure 2: Governance Structure Example
  • 6. Page 4 Establishing the Discipline of Executing The governance structure in the asset/project defect analogy executes the EMP, and in the case of the asset reliability improvement project, a Project Maintenance Plan. In this regard, the Corporate Executive Steering Group and Site Leadership Team play the role of reliability engineers. The Process Champions are the maintenance engineers. The Project Teams are the craftsmen. The Change Management Team is the PdM/PM technicians, the Site Facilitator is the asset reliability project manager, and the Corporate Facilitator is the asset reliability program manager. The Project Teams, the craftsmen, are commissioned and trained to reengineer the maintenance and reliability processes and establish standards and methods that will ensure effective asset health management. The net results are improved reliability, increased capacity, and lower operating cost. The Project Team Champions are responsible for ensuring that the gaps between current state and target state are “fixed” and the project functionality is achieved. The Change Management Team, the PdM/PM technicians, monitors and inspects the project execution to identify “defects” such as the ones that were previously identified. These defects, if not removed, will prevent the project’s full functionality from being achieved and contribute to its eventual failure by becoming another poorly executed “flavor of the month”. Defects identified by this project CBM process are identified as technical or organizational by the Change Management Team analysts. Technical defects are handed over to the Champions for “fixing”. Organizational defects require that the Leadership Team, and in some cases the Executive Steering Group, are engaged to eliminate the defect through an organization change or through their active participation to mitigate its reoccurrence. The governance structure has a supporting process and tools that facilitate execution of the project and greatly increase the likelihood of success. An example governance process and the associated tools are shown in Figure 3. Figure 3: Governance Process and Tools for Execution
  • 7. © 2013 GPAllied Page 5 Summary The difference between doing the same old things and expecting different results and actually getting different results is seeing and doing things differently. As previously stated, 70% of project failures are due to poor execution. Achieving success requires a discipline of execution. The organization must be aligned to engage people and keep them focused on goals. If people do not know the goals, let alone what to do to achieve them on a day-to-day basis, then failure is predictable. Additionally, the organization must keep score and be held accountable for results. The governance structure and process outlined here provides the mechanisms for how to execute. They allow leadership to filter through all of the competing priorities and ensure successful execution of performance changes. It all starts with aligning the leadership on a common goal and establishing the business case for change, a vision of the target state’s goals, and how progress and accountability will be achieved. Put the pieces in place to drive the discipline to engage, execute, and sustain.
  • 8. © 2013 GPAllied Establishing the Discipline of Executing About GPAllied GPAllied is the most diverse manufacturing and industrial reliability and operations consulting, training, and services company in the world. This diversity enables us to develop significant value propositions for our clients by delivering solutions across different industries, geographies, and—most importantly—across different aspects of an operation. As a result of our commitment to delivering greater value to our manufacturing and industrial clients, we have brought together premiere industry leading experts to form the GPAllied team. Our specialists demonstrate expertise across all industry sectors and specialty fields including: Lean, Reliability Engineering, Six Sigma, Condition Monitoring, Change Management, Maintenance Planning and Scheduling, Workforce Development, and Craft Skills Training. For more information about GPAllied, please contact: World Headquarters 888.335.8276 info@gpallied.com www.gpallied.com