SlideShare une entreprise Scribd logo
1  sur  45
Télécharger pour lire hors ligne
Regional Slum Upgrading Working Group
APMCHUD
‫ری‬‫ه‬‫ش‬‫ان‬‫م‬‫ا‬‫س‬‫ب‬‫ان‬‫ق‬‫ط‬‫ا‬‫ن‬‫م‬‫ازی‬‫س‬‫به‬‫ای‬‫و‬‫ق‬‫ط‬‫ن‬‫م‬‫روه‬‫گ‬‫ر‬‫ا‬‫ک‬
‫ا‬‫ی‬‫س‬‫آ‬-‫و‬‫ی‬‫س‬‫و‬‫ن‬‫ا‬‫ی‬‫ق‬‫ا‬
Islamic Republic of Iran
Ministry of Road & Urban Development
Iranian Urban Development &Revitalization Corporation
November 2015
In the Name of God
Background :
 The first session of the Asia-Pacific
Ministerial Conference on Housing
and Urban Development was held
under the heading of Housing and
Human Settlement on December 16,
2006 in New Delhi.
ٌِ‫پیشی‬:
‫دس‬16‫دسـبهجش‬2006‫ًـخـستـیي‬‫اجـالس‬ِ‫هـٌطق‬‫ای‬‫ٍصسای‬‫هـسکي‬ٍ‫شْشسبصی‬ِ‫هـٌطق‬‫آسـیب‬
ٍِ‫اقـیبًَسی‬‫دس‬‫دّـلی‬ًَ‫ثب‬‫هـَضَع‬‫هـسکي‬ٍ‫اسکبى‬‫ثشش‬‫ثشگضاس‬‫گشدیذ‬.
Background:
The five working groups on the themes of:
 WG1:Urban and Rural Planning and Management (India)
 WG2:Upgrading of Slums and Informal Settlements (Iran)
 WG3:Delivery of Basic Services(Sri Lanka- Maldives)
 WG4:Financing Sustainable Housing(Korea)
 WG5:Urban Development with a focus on Natural and Climate
Change related Disasters(Indonesia)
ٌِ‫پیشی‬:
‫هذیزیت‬ٍِ‫تزًاه‬‫ریشی‬‫ضْزی‬ٍ‫رٍستایی‬(‫ٌّذ‬)
‫تْساسی‬‫هٌاطق‬‫ًاتساهاى‬‫ضْزی‬(‫ایزاى‬)
ِ‫ارائ‬‫خذهات‬ِ‫پای‬(‫سزیالًکا‬ٍَ‫هالذی‬)
‫تاهیي‬‫هالی‬‫پایذار‬(ُ‫کز‬‫جٌَتی‬)
‫ضْزساسی‬ٍِ‫تَسع‬‫ضْزی‬‫تا‬‫هحَریت‬‫کاّص‬‫تالیا‬ٍ‫سَاًح‬‫هزتثط‬‫تا‬‫تغییزات‬‫طثیعی‬ٍ‫اقلیوی‬(‫اًذًٍشی‬)
Tehran Conference:
 The second conference was held in
Tehran on 12 to 14 May 2008 with
the theme of Sustainable Urban
Development Associating Growth
with Equity and Identity.
‫تْشاى‬ ‫اجالس‬:
‫دس‬12‫تب‬14‫هی‬2008‫هَضَع‬ ‫ثب‬ ‫دٍم‬ ‫اجالس‬«‫پبیذاس‬ ‫شْشی‬ ِ‫تَسع‬:‫َّیت‬ ‫ثب‬ ‫سشذ‬ ‫ّوشاّی‬»
‫گشدیذ‬ ‫ثشگضاس‬ ‫تْشاى‬ ‫دس‬.
Tehran Conference:
 The Urban Development & Revitalization Corporation of
Iran (UDRC) succeeded in obtaining the approval of
the working group for the establishment of the
secretariat of the Slum Upgrading Working Group and to
have it included in the Tehran Declaration and Action
Plan.
‫تْشاى‬ ‫اجالس‬:
‫ششکت‬‫عـوشاى‬ٍ‫ثْسبصی‬‫شـْشی‬‫ایـشاى‬‫هَفق‬‫شـذ‬ِ‫کـ‬‫پــیشٌْبد‬‫تـشکیل‬ًِ‫دثـیشخب‬
ٍُ‫کــبسگش‬‫تخصصی‬‫ثـْـسبصی‬‫هٌـبطق‬‫ًبثـسبهبى‬‫شْشی‬‫سا‬ِ‫ث‬‫تصَیت‬‫اعضب‬‫ثشسبًذ‬ِ‫ک‬
‫ایي‬‫هْن‬‫دس‬ِ‫ثیبًی‬ٍِ‫ثشًبه‬‫ع‬‫ـ‬‫ولیبتی‬‫تْشاى‬‫دسج‬ُ‫گشدیذ‬‫است‬.
Solo Conference:
 The third conference was held in Solo
on 22 to24 June 2010 with the theme
of Empowering Communities For
Sustainable Urbanization.
َ‫سَل‬ ‫اجالس‬:
‫دس‬22‫تب‬24‫طٍئي‬2010‫هَضَع‬ ‫ثب‬ ‫سَم‬ ‫اجالس‬«‫پبیذاس‬ ‫شْشی‬ ِ‫تَسع‬ ‫ثشای‬ ‫جَاهع‬ ‫تَاًوٌذسبصی‬
»‫گشدیذ‬ ‫ثشگضاس‬ َ‫سَل‬ ‫دس‬.
Amman Conference:
 The fourth conference was held in
Amman on 10 to 12 December 2012
with the theme of Youth and IT in
Sustainable Urban Development.
‫اهبى‬ ‫اجالس‬:
‫چْبسهیي‬‫اجالس‬‫دس‬‫سبل‬2012‫ثب‬‫هَضَع‬«‫جَاًبى‬ٍ‫في‬‫آٍسی‬‫اطالعبت‬‫دس‬ِ‫تَسع‬‫شْشی‬»‫دس‬
،‫اهبى‬‫اسدى‬‫ثشگضاس‬‫گشدیذ‬.
Seoul Conference:
 The fifth conference was held in
Seoul on 3rd – 5th November,
2014 with the theme of Equal
Opportunity for Sustainable
‫سئَل‬ ‫اجالس‬:
‫پٌجویي‬‫اجالس‬‫دس‬‫سبل‬2014‫ثب‬‫هَضَع‬«‫فشصت‬‫ّبی‬‫ثشاثش‬‫ثشای‬ِ‫تَسع‬‫پبیذاس‬»‫دس‬،‫سئَل‬
ُ‫کش‬‫جٌَثی‬‫ثشگضاس‬‫گشدیذ‬.
Executive Branch
Research Core
Organizational
Relations
NGOs, CBOs
Municipality Core
Stakeholders
‫ششکت‬‫دس‬‫اٍلیي‬‫قذم‬‫سبختبس‬ٍُ‫کبسگش‬‫سا‬‫طشاحی‬‫ًوَد‬ٍ‫تصوین‬‫گشفت‬ِ‫ک‬‫ایشاى‬ِ‫ث‬
‫عٌَاى‬‫پبیلَت‬‫آى‬‫سا‬ِ‫ث‬‫آصهَى‬‫ثگزاسد‬.
IRAN
 As a first step the structure of the working group was designed and
it was decided that Iran would implement it as a pilot.
The Regional Slum Upgrading Working Group
Actions
a. APMCHUD is to establish regional Slum Upgrading
Working Group to coordinate the following activities:
A. Data collection and monitoring
B. Experience sharing on good practices and policies
C. Capacity building
‫اقذاهبت‬:
‫الف‬)‫اجالع‬‫ٍصسای‬‫هؼکي‬ٍ‫ؿْشػبصی‬‫آػیب‬–،ِ‫اقیبًَػی‬ٍُ‫کبسگش‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫ثْؼبصی‬
‫ّبی‬ُ‫ػکًَتگب‬‫غیشسػوی‬‫سا‬ِ‫ث‬‫هٌػَس‬‫ّوبٌّگی‬‫ّب‬‫فعبلیت‬‫ی‬‫صیش‬‫تبػیغ‬‫کٌذ‬:
‫اطالعبتی‬ ‫ّبی‬ُ‫داد‬ ‫پبیؾ‬ ٍ ‫آٍسی‬‫جوع‬
‫ّب‬ ‫ػیبػت‬ ٍ ‫عولکشدی‬ ‫ّبی‬ًَِ‫ًو‬ ‫ثْتشیي‬ ‫هَسد‬ ‫دس‬ ‫تجشثیبت‬ ‫تجبدل‬
‫ػبصی‬‫غشفیت‬
Tehran Action Plan
Actions
b. Regional Working Groups will set up networks comprising research
institutions; governmental institutions; and civil society, community-
based, and non-governmental organizations. The Regional Working
Groups are invited to establish and maintain web-based knowledge bases
to facilitate exchange of documented slum upgrading experiences and
other related data. These knowledge bases shall be linked to the
APMCHUD website.
‫اقذاهبت‬:
‫ة‬)‫ّبی‬ٍُ‫کبسگش‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫ثبیؼت‬‫هی‬.‫ایي‬‫ای‬ِ‫ؿجک‬‫هتـکل‬‫اص‬‫ًْبدّبی‬،‫پظٍّـی‬‫ًْبدّبی‬‫دٍلتی‬ٍ
ِ‫جبهع‬،‫هذًی‬‫ػبصهبًْبی‬‫هجتٌی‬‫ثش‬‫جَاهع‬ٍ‫ػبصهبى‬‫ّبی‬‫غیش‬‫دٍلتی‬‫ایجبد‬‫کٌٌذ‬ٍُ‫کبسگش‬‫ّب‬‫ثشای‬‫تبػیغ‬ٍ
‫حفع‬‫ّبی‬ُ‫پبیگب‬‫علوی‬‫ای‬ِ‫ؿجک‬‫جْت‬‫تؼْیل‬‫دس‬‫تجبدل‬‫تجشثیبت‬‫هؼتٌذ‬‫دس‬ٌِ‫صهی‬‫ثْؼبصی‬‫ّبی‬ُ‫ػکًَتگب‬
‫غیشسػوی‬ٍ‫دیگش‬‫اطالعبت‬ِ‫هٌطق‬‫دعَت‬‫ؿًَذ‬‫هی‬.‫ایي‬ُ‫پبیگب‬‫ّبی‬‫اطالعبتی‬‫هی‬‫ثبیؼت‬ِ‫ث‬ِ‫ؿجک‬‫ایٌتشًتی‬
‫اجالع‬‫ٍصسای‬‫هؼکي‬ٍ‫ؿْشػبصی‬ِ‫هٌطق‬‫هتصل‬‫ؿًَذ‬.
Tehran Action Plan
Actions
c. The Regional Working Groups are to report regularly to the
APMCHUD Secretariat and to the biannual conference.
d. The Islamic Republic of Iran is prepared to set up such a Regional
Working Group and a Network on urban slum upgrading focusing on the
three identified activity areas (data collection and monitoring; experience
sharing; and capacity building). Furthermore, the Islamic Republic of
Iran is willing to provide the facilities for coordinating this Regional
initiative.
e. Other Member States are invited to create additional Regional
Working Groups.
‫اقذاهات‬:
‫ج‬)‫ّای‬ٍُ‫کارگز‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫تایذ‬ِ‫ت‬‫طَر‬‫هٌظن‬ِ‫ت‬ًِ‫دتیزخا‬‫اجالس‬‫ٍسرای‬‫هسکي‬ٍ‫ضْزساسی‬ِ‫هٌطق‬‫آسیا‬-ِ‫اقیاًَسی‬ٍ‫اجالس‬ًِ‫دٍساال‬‫آى‬
‫گشارش‬‫دٌّذ‬.
‫د‬)‫جوَْری‬‫اسالهی‬‫ایزاى‬‫آهادگی‬‫خَد‬‫را‬‫تزای‬‫تزپایی‬‫چٌیي‬ٍُ‫کارگز‬‫ای‬ِ‫هٌطق‬ٍ‫ساسی‬ِ‫ضثک‬‫تْساسی‬‫ّای‬ُ‫سکًَتگا‬‫غیزرسوی‬‫ضْزی‬‫تا‬‫تاکیذ‬‫تز‬ِ‫س‬
ٌِ‫سهی‬‫فعالیتی‬‫تعزیف‬ُ‫ضذ‬‫هطخص‬(‫گزدآٍری‬‫ّای‬ُ‫داد‬‫اطالعاتی‬ٍ‫پایص‬،‫آى‬‫تثادل‬‫تجزتیات‬ٍ‫ساسی‬‫ظزفیت‬)‫اعالم‬‫هی‬‫دارد‬.‫ّوچٌیي‬‫جوَْری‬
‫اسالهی‬‫ایزاى‬‫توایل‬‫دارد‬‫تسْیالت‬‫السم‬‫را‬‫تزای‬‫ّواٌّگی‬‫هیاى‬‫ایي‬ًَِ‫گ‬‫ّای‬ِ‫تزًاه‬‫ای‬ِ‫هٌطق‬‫فزاّن‬‫آٍرد‬.
‫ّـ‬)‫سایز‬‫کطَرّای‬ِ‫هٌطق‬ِ‫ت‬‫ایجاد‬ٍُ‫کارگز‬‫ّای‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫دیگز‬‫دعَت‬‫هی‬‫ضًَذ‬.
Tehran Action Plan
Actions
Government will analyze and disseminate a wide range of slum
upgrading innovative options including on tenure security, strengthening
the financial networks for slum upgrading programmes and formalizing
people- based approach as part of the planning process.
‫اقذاهبت‬:
‫دٍلت‬‫ّب‬‫طیفی‬‫ٍػیع‬‫اص‬‫اهکبًبت‬ًِ‫ًَآٍسا‬‫ثشای‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬‫سا‬‫هَسد‬‫ثشسػی‬‫قشاس‬
ُ‫داد‬ٍِ‫اؿبع‬‫هی‬،‫ًوبیٌذ‬‫ایي‬‫اهکبًبت‬‫ؿبهل‬‫اهٌیت‬‫حق‬،‫تصشف‬‫گؼتشؽ‬ِ‫ؿجک‬‫ّبی‬‫تبهیي‬‫هبلی‬
‫ثشای‬ِ‫ثشًبه‬‫ّبی‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬ٍ‫سػویت‬‫ثخـیذى‬ِ‫ث‬‫سٍیکشدی‬‫هشدم‬‫هحَس‬
ِ‫ث‬‫عٌَاى‬‫ثخـی‬‫اص‬‫فشآیٌذ‬ِ‫ثشًبه‬،‫سیضی‬‫هی‬‫ثبؿذ‬.
Solo Implementation Plan
Actions
Government will analyze and disseminate a wide range of slum
upgrading innovative options including on tenure security, strengthening
the financial networks for slum upgrading programmes and formalizing
people- based approach as part of the planning process.
‫اقذاهبت‬:
‫دٍلت‬‫ّب‬‫طیفی‬‫ٍػیع‬‫اص‬‫اهکبًبت‬ًِ‫ًَآٍسا‬‫ثشای‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬‫سا‬‫هَسد‬‫ثشسػی‬‫قشاس‬
ُ‫داد‬ٍِ‫اؿبع‬‫هی‬،‫ًوبیٌذ‬‫ایي‬‫اهکبًبت‬‫ؿبهل‬‫اهٌیت‬‫حق‬،‫تصشف‬‫گؼتشؽ‬ِ‫ؿجک‬‫ّبی‬‫تبهیي‬‫هبلی‬
‫ثشای‬ِ‫ثشًبه‬‫ّبی‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬ٍ‫سػویت‬‫ثخـیذى‬ِ‫ث‬‫سٍیکشدی‬‫هشدم‬‫هحَس‬
ِ‫ث‬‫عٌَاى‬‫ثخـی‬‫اص‬‫فشآیٌذ‬ِ‫ثشًبه‬،‫سیضی‬‫هی‬‫ثبؿذ‬.
Solo Implementation Plan
WG2: Slum Upgrading – Livelihood Opportunities for Youth
A. Prioritized socio-economic enabling in upgrading of informal settlements.
B. Utilize Information Technology as an effective instrument for engaging youth
in slum upgrading.
C. Pilot-testing the slum upgrading database and indicators in three volunteer
countries, Jordan, Indonesia and Iran, and present the results between April -
June 2013.
D. Vigorously participate in the Virtual Scientific Committee established by the
Secretariat of the Slum Upgrading Working Group to share information and
experiences, establish and regularly update the joint slum upgrading
database. ‫الف‬)‫اٍلَیت‬‫ثٌذی‬‫تَاًوٌذػبصی‬‫اجتوبعی‬-‫اقتصبدی‬‫دس‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫غیش‬‫سػوی‬.
‫ة‬)ُ‫ثْش‬‫گیشی‬‫اصفٌبٍسی‬‫اطالعبت‬‫ثعٌَاى‬‫اثضاسی‬‫هَثش‬‫ثشای‬‫هـبسکت‬‫جَاًبى‬‫دس‬‫ثْؼبصی‬‫هٌبطق‬
‫ًبثؼبهبى‬‫ؿْشی‬.
‫ج‬)‫عولیبت‬‫آصهبیـی‬‫جوع‬‫آٍسی‬ُ‫پبیگب‬ُ‫داد‬ٍ‫ؿبخص‬‫ّب‬‫دس‬ِ‫ػ‬‫کـَس‬‫داٍطلت‬:‫ایشاى،اسدى‬ٍ
‫اًذًٍضی‬ٍِ‫اسائ‬‫ی‬‫ًتبیج‬‫ثذػت‬ُ‫آهذ‬‫ثیي‬‫آٍسیل‬‫تب‬‫طٍئي‬2013.
‫د‬)‫هـبسکت‬ِ‫ّو‬ِ‫جبًج‬‫دس‬ِ‫کویت‬‫ی‬‫علوی‬‫هجبصی‬‫ایجبد‬ُ‫ؿذ‬‫تَػط‬ًِ‫دثیشخب‬ٍُ‫کبسگش‬‫ثْؼبصی‬‫هٌبطق‬
‫ًبثؼبهبى‬‫ؿْشی‬‫ثشای‬ِ‫ث‬‫هـبسکت‬‫گزاؿتي‬‫اطالعبت‬ٍ‫تجشثیبت‬ٍ‫ایجبد‬ٍ‫ثشٍصسػبًی‬‫هٌػن‬ُ‫پبیگب‬
ُ‫داد‬‫ثْؼبصی‬‫هٌبطق‬‫ًبثؼبهبى‬‫ؿْشی‬
Amman Action Plan
 The secretariat was established in UDRC.
 UDRC has approved and allocated the budget for the secretariat every
year.
 Design and Set up a website for Working Group(www.rsuwgmeeting.org)
Actions to Date
ًِ‫دثیشخب‬‫دس‬‫ششکت‬‫عوشاى‬ٍ‫ثْسبصی‬‫شْشی‬‫ایشاى‬‫تشکیل‬‫گشدیذ‬.
‫سبصهبى‬‫تصَیت‬ُ‫کشد‬‫است‬ِ‫ک‬ِ‫ّشسبل‬ِ‫ثَدج‬‫ای‬‫سا‬ِ‫ث‬ًِ‫دثیشخب‬‫اختصبص‬‫دّذ‬.
ٍُ‫کبسگش‬ ‫سبیت‬ ‫ٍة‬ ‫اًذاصی‬ ُ‫سا‬ ٍ ‫طشاحی‬(www.rsuwgmeeting.org)
 The First Meeting of the Regional Slum Upgrading Working Group was
held in Tehran on 2 – 4 July, 2012 .
Actions to Date
‫اٍلیي‬‫ًشست‬‫تخصصی‬ٍُ‫کبسگش‬‫ثْسبصی‬‫هٌبطق‬‫ًبثسبهبى‬‫شْشی‬‫آسیب‬–ِ‫اقیبًَسی‬‫دس‬‫تْشاى‬‫دس‬‫تبسیخ‬12‫تب‬
14‫تیش‬ُ‫هب‬1391‫ثشگضاس‬‫گشدیذ‬.
 Holding a meeting with the ambassadors of countries of the region in
Tehran
Actions to Date
‫ثشگضاسی‬ِ‫جلس‬‫ثب‬‫سفشای‬‫کشَسّبی‬ِ‫هٌطق‬‫دس‬‫تْشاى‬
The First Meeting of the Regional Slum Upgrading Working Group
The First Meeting of the Regional Slum Upgrading Working Group
The First Meeting of the Regional Slum Upgrading Working Group
The First Meeting of the Regional Slum Upgrading Working Group
 The Second Meeting of the Regional Slum Upgrading Working Group
was held in Amman on 10 – 12 December, 2012 .
Actions to Date
‫دٍهیي‬‫ًشست‬‫تخصصی‬ٍُ‫کبسگش‬‫ثْسبصی‬‫هٌبطق‬‫ًبثسبهبى‬‫شْشی‬‫آسیب‬–ِ‫اقیبًَسی‬‫دس‬‫اهبى‬‫دس‬‫تبسیخ‬19‫تب‬
21‫آرس‬ُ‫هب‬1391‫ثشگضاس‬‫گشدیذ‬.
The Second Meeting of the Regional Slum Upgrading Working Group
Actions to Date
SEOUL IMPLEMENTATION PLAN
WG2: Slum Upgrading
a) Prioritize socio-economic enablement in urban regeneration of slum,
informal settlements and deteriorated fabrics though a citywide,
street-based approach;
b) Exploit the role of the provision of basic services and infrastructure,
as well as public catalytic projects to stimulate development and
enrich urban space;
ٍُ‫کارگر‬2:‫برابر‬ ‫فرصتْای‬ ‫ایجاد‬ ‫هٌظَر‬ ِ‫ب‬ ‫فرٍدست‬ ٍ ‫ًابساهاى‬ ‫سکًَتگاّْای‬ ‫بْسازی‬
‫الف‬)‫اجتواعی‬ ‫ساسی‬ ‫تَاًوٌذ‬ ِ‫ت‬ ‫تخطی‬ ‫اٍلَیت‬-‫اس‬ ُ‫فزسـَد‬ ‫تافتْـای‬ ٍ ‫فزٍدسـت‬ ٍ ‫غیزرسوی‬ ‫سکًَتگاّْای‬ ‫ضْزی‬ ‫ساسی‬ ُ‫سًذ‬ ‫تاس‬ ‫در‬ ‫اقتصادی‬
‫ضْز‬ ‫رٍیکزدی‬ ‫طزیق‬-‫خیاتاى‬ ٍ ‫ًگز‬-‫هحَر؛‬
‫ب‬)‫غٌـای‬ ٍ ِ‫تَسع‬ ‫تزای‬ ُ‫اًگیش‬ ‫ایجاد‬ ‫هٌظَر‬ ِ‫ت‬ ‫راتط‬ ‫عوَهی‬ ‫ّای‬ ُ‫پزٍص‬ ‫ّوچٌیي‬ ٍ ،‫اساسی‬ ‫سیزساختْای‬ ٍ ‫خذهات‬ ‫تذارک‬ ‫ًقص‬ ‫اس‬ ‫گیزی‬ ُ‫تْز‬
‫ضْزی؛‬ ‫فضای‬
SEOUL IMPLEMENTATION PLAN
WG2: Slum Upgrading
c) Develop policies for promoting equal opportunities in slums
and creating inclusive cities without discrimination through
facilitating the participation of slum-dwellers in the decision-
making process;
d) Share knowledge and experiences by contributing to the best
practices database and the competitive award established by
the WG2 Secretariat;
‫ج‬)‫خط‬ ‫تذٍیي‬­‫هطی‬­‫فزصت‬ ‫گستزش‬ ٍ ‫تزٍیج‬ ‫تزای‬ ‫ّا‬­‫ضـْزّای‬ ‫ایجاد‬ ٍ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫در‬ ‫تزاتز‬ ‫ّای‬
‫گیزی؛‬ ‫تصوین‬ ‫فزآیٌذ‬ ‫در‬ ‫سکًَتگاّْا‬ ‫ًَع‬ ‫ایي‬ ‫ساکٌاى‬ ‫هطارکت‬ ‫اهز‬ ‫در‬ ‫تسْیل‬ ‫طزیق‬ ‫اس‬ ‫تثعیض‬ ‫تذٍى‬ ‫فزاگیز‬
‫ت‬)‫گذاردى‬ ‫اضتزاک‬ ِ‫ت‬ًَِ‫ًو‬ ‫تْتزیي‬ ‫دادى‬ ‫قزار‬ ‫تا‬ ‫تجزتیات‬ ٍ ‫داًص‬­‫اطالعاتی‬ ُ‫پایگا‬ ‫در‬ ‫عولکزدی‬ ‫ّای‬
ٍُ‫گز‬ ‫کار‬ ًِ‫دتیزخا‬ ‫تَسط‬ ٌِ‫سهی‬ ‫ایي‬ ‫در‬ ‫رقاتت‬ ‫ایجاد‬ ‫تزای‬ ُ‫جایش‬ ‫تعییي‬ ٍ2‫؛‬
SEOUL IMPLEMENTATION PLAN
WG2: Slum Upgrading
e) Scale up the experience gained by volunteer countries in the
pilot-testing slum indicators across the region for inclusion in
the slum upgrading database;
f) Prepare national reports highlighting respective best practices
and employing slum upgrading indicators for setting slum
upgrading goals, targets, and timelines;
‫ث‬)‫ـاخص‬‫ـ‬‫ض‬ ‫ـی‬‫ـ‬‫آسهایط‬ ‫ـاتی‬‫ـ‬‫ارسی‬ ‫در‬ ‫ـة‬‫ـ‬‫داٍطل‬ ‫ـَرّای‬‫ـ‬‫کط‬ ‫ـط‬‫ـ‬‫تَس‬ ُ‫ـذ‬‫ـ‬‫ض‬ ‫ـة‬‫ـ‬‫کس‬ ‫ـات‬‫ـ‬‫تجزتی‬ ‫ـشایص‬‫ـ‬‫اف‬­‫ـای‬‫ـ‬ّ
ُ‫سکًَتگا‬­‫ًاتساهاى؛‬ ‫سکًَتگاّْای‬ ‫تْساسی‬ ‫اطالعاتی‬ ُ‫پایگا‬ ‫در‬ ‫درج‬ ‫تزای‬ ِ‫هٌطق‬ ‫سزاسز‬ ‫در‬ ‫ًاتساهاى‬ ‫ّای‬
‫ج‬)ًَِ‫ًو‬ ‫تْتزیي‬ ‫تز‬ ‫تأکیذ‬ ‫تا‬ ‫هلی‬ ‫گشارش‬ ِ‫تْی‬­ِ‫تـ‬ ٍ ِ‫هزتَطـ‬ ‫عولکـزدی‬ ‫ّـای‬­‫ضـاخص‬ ‫کـارگیزی‬­‫ّـای‬
ٍ ‫ّـا‬ ِ‫ساغـ‬ ‫تْسـاسی‬ ‫سهاًثٌـذی‬ ‫جـذٍل‬ ٍ ،‫هقاصـذ‬ ، ‫اّـذا‬ ‫تعیـیي‬ ‫تزای‬ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫تْساسی‬
‫ًاتساهاى‬ ‫سکًَتگاّْای‬
SEOUL IMPLEMENTATION PLAN
WG2: Slum Upgrading
g) Present the results of this pilot-testing exercise and share
information and experiences in upgrading slums in the
forthcoming Expert Woking Group meeting organised by the
Islamic Republic of Iran in 2015;
h) Expand the level and scope of participation in the Virtual
Scientific Committee established by the he Islamic Republic of
Iran for the Slum Upgrading Working Group to share
information and experiences.
‫چ‬)‫تْسـاسی‬ ِ‫تـ‬ ‫هزتـَب‬ ‫تجزتیـات‬ ٍ ‫اطالعـات‬ ‫گـذاردى‬ ‫اضـتزاک‬ ِ‫ت‬ ٍ ًَِ‫ًو‬ ‫آسهایطی‬ ‫ارسیاتی‬ ‫ایي‬ ‫ًتایج‬ ِ‫ارائ‬
ٍُ‫کارگز‬ ‫کارضٌاسی‬ ‫ًطست‬ ‫یک‬ ‫در‬ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬­‫سال‬ ‫در‬ ِ‫ک‬ ‫ّا‬2015‫اسـالهی‬ ‫جوْـَری‬ ‫ّوت‬ ِ‫ت‬
‫ضذ؛‬ ‫خَاّذ‬ ‫تزگشار‬ ‫ایزاى‬
‫ح‬)‫کـار‬ ‫تـزای‬ ‫ایـزاى‬ ‫اسـالهی‬ ‫جوَْری‬ ‫ّوت‬ ِ‫ت‬ ِ‫ک‬ ‫هجاسی‬ ‫علوی‬ ِ‫کویت‬ ‫در‬ ‫هطارکت‬ ٌِ‫داه‬ ٍ ‫سطح‬ ‫گستزش‬
ُ‫ضذ‬ ‫ایجاد‬ ‫تجزتیات‬ ٍ ‫اطالعات‬ ‫گذاردى‬ ‫اضتزاک‬ ِ‫ت‬ ٍ ‫تثادل‬ ‫هٌظَر‬ ِ‫ت‬ ٍ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫تْساسی‬ ٍُ‫گز‬
‫است‬.
Introduction
ِ‫ث‬‫هَجت‬ِ‫ثشًبه‬‫اجشایی‬‫ػئَل‬ِ‫ک‬‫دس‬‫پٌجویي‬‫اجالع‬‫ٍصسا‬‫دس‬‫ػبل‬2014‫تصَیت‬،‫ؿذ‬‫کـَسّبی‬َ‫عض‬
‫ثبیذ‬«‫طی‬‫ًـؼت‬‫آتی‬ٍُ‫کبسگش‬‫تخصصی‬‫ثْؼبصی‬‫هٌبطق‬‫ًبثؼبهبى‬‫ؿْشی‬ِ‫ک‬ِ‫ث‬‫ّوت‬‫جوَْسی‬‫اػالهی‬
‫ایشاى‬‫دس‬‫ػبل‬2015‫ثشپب‬‫هی‬‫ؿَد‬ِ‫ث‬‫تجبدل‬‫اطالعبت‬ٍ‫تجشثیبت‬‫خَد‬‫دس‬‫ایي‬ٌِ‫صهی‬‫ثپشداصًذ‬».‫گشدّن‬‫آیی‬
‫تخصصی‬8-10ُ‫آرسهب‬ُ‫هب‬1394‫دس‬‫تْشاى‬‫ثشگضاس‬‫خَاّذ‬‫ؿذ‬.
 The Seoul Implementation Plan adopted in 2014 by the
5th APMCHUD requires that member states “share
information and experiences in upgrading slums in a
forthcoming Expert Working Group meeting organized by
the Islamic Republic of Iran in 2015”. The Expert
Meeting is to take place in Tehran, from 29 of November
to the first of December 2015.
Objectives
The objectives of the 3rd RSUWG Expert Meeting are to:
Promote socio-economic approaches in regeneration of slums,
informal settlements and deteriorated fabrics;
Exploit the role of public catalytic projects to stimulate
development and enrich urban space in the Asia-Pacific Region;
‫اص‬ ‫اًذ‬ ‫عجبست‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کبسگش‬ ‫تخصصی‬ ‫ًـؼت‬ ‫ػَهیي‬ ‫اّذاف‬:
‫اجتوبعی‬ ‫سٍیکشدّبی‬ ‫گؼتشؽ‬ ٍ ‫تشٍیج‬-‫ثبفتْبی‬ ٍ ،‫غیشسػوی‬ ٍ ‫ًبثؼبهبى‬ ‫ػکًَتگبّْبی‬ ‫ػبصی‬ ُ‫ثبصصًذ‬ ‫اقتصبدی‬
‫فشػَدُ؛‬
‫آػیب‬ ِ‫هٌطق‬ ‫دس‬ ‫ؿْشی‬ ‫فضبی‬ ‫غٌبی‬ ٍ ِ‫تَػع‬ ‫ایجبد‬ ‫ثشای‬ ِ‫تَػع‬ ‫هحشک‬ ‫ّبی‬ ُ‫پشٍط‬ ‫ًقؾ‬ ‫اص‬ ‫گیشی‬ ُ‫ثْش‬-ِ‫اقیبًَػی‬‫؛‬
Objectives
‫تـشیح‬‫دس‬ ‫ثشاثش‬ ‫فشصتْبی‬ ‫گؼتشؽ‬ ٍ ‫تشٍیج‬ ‫ثشای‬ ُ‫دٌّذ‬ ِ‫تَػع‬ ‫ػیبػتْبی‬ ‫ساػتبی‬ ‫دس‬ ‫ّبیی‬ ِ‫تَصی‬ ‫تفؼیش‬ ٍ
ٍ ‫آػیب‬ ‫هٌبطق‬ ‫دس‬ ‫تجعیض‬ ‫اص‬ ‫فبسغ‬ ٍ ‫ؿوَل‬ ِ‫ّو‬ ٍ ‫فشاگیش‬ ‫ؿْشّبی‬ ‫ایجبد‬ ٍ ‫ًبثؼبهبى‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬
‫اقیبًَػیِ؛‬
‫اجشا‬ ٍ ‫هـی‬ ‫خط‬ ‫ثیي‬ ِ‫فبصل‬ ٍ ‫ؿکبف‬ ‫حزف‬ ‫ثشای‬ ‫اجشا‬ ‫قبثل‬ ٍ ‫هوکي‬ ‫ساّکبسّبی‬ ‫یبفتي‬(‫اجشای‬ ٍ ‫ػیبػتْب‬
‫آًْب‬)‫اص‬ ِ‫ک‬ ‫تجشثیبتی‬ ٍ ‫دسػْب‬ ٍ ‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬ ‫ثشسػی‬ ‫طشیق‬ ‫اص‬ ‫ؿْشی‬ ‫ػبصی‬ ُ‫ثبصصًذ‬ ٌِ‫صهی‬ ‫دس‬
‫آػیب‬ ِ‫هٌطق‬-‫اػت؛‬ ُ‫ؿذ‬ ِ‫گشفت‬ ‫فشا‬ ِ‫اقیبًَػی‬
‫اجشایی‬ ‫ّبی‬ ِ‫ثشًبه‬ ٍ ‫ّب‬ ِ‫ثیبًی‬ ‫ساػتبی‬ ‫دس‬ ‫ػئَل‬ ‫اجشایی‬ ِ‫ثشًبه‬ ‫اجشای‬ ‫دس‬ ‫هـبسکت‬APMCHUDُ‫ٍیظ‬ ِ‫ث‬ ،
ٍُ‫گش‬ ‫کبس‬ ِ‫ثشًبه‬2‫ػبکٌبى‬ ‫ثشای‬ ‫ثشاثش‬ ‫ّبی‬ ‫فشصت‬ ‫ایجبد‬ ٍ ‫ًبثؼبهبى‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ‫ثشای‬
‫ػکًَتگبّْب‬ ‫ایي‬
Elaborate recommendations for developing policies for promoting
equal opportunities in slums and creating inclusive cities without
discrimination in Asia and the Pacific;
Find feasible solutions to bridge the gap between policy and practice in
urban regeneration by reviewing best practices and lessons learnt in the
Asia Pacific region;
Contribute to implementing the Seoul Implementation Plan in
anticipation of the APMCHUD declarations and implementation plans, in
particular WG2 Slum Upgrading toward Equal Opportunity;
Objectives
‫ًبثؼبهبى؛‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ٍ ‫ؿٌبػبیی‬ ٌِ‫صهی‬ ‫دس‬ ‫اطالعبت‬ ‫تجبدل‬
ٍ ‫هجبصی؛‬ ‫علوی‬ ِ‫کویت‬ ‫طشیق‬ ‫اص‬ ‫اطالعبت‬ ‫تجبدل‬ ‫هؤثش‬ ‫ّبی‬ َُ‫ؿی‬ ٍ ‫ساّْب‬ ‫ثشسػی‬
‫اص‬ ‫پغ‬ ِ‫تَػع‬ ‫کبس‬ ‫دػتَس‬ ‫تصَیت‬ ‫هَسد‬ ‫دس‬ ‫هتحذ‬ ‫هلل‬ ‫ػبصهبى‬ ‫ًـؼت‬ ‫ًتبیج‬ ِ‫ث‬ ِ‫تَج‬2015‫ّبیی‬ ِ‫تَصی‬ ‫تـشیح‬ ‫ثشای‬
‫هتحذ‬ ‫هلل‬ ‫ؿْشی‬ ‫پبیذاس‬ ِ‫تَػع‬ ٍ ‫هؼکي‬ ‫کٌفشاًغ‬ ‫دس‬ ‫جذیذ‬ ‫ؿْشی‬ ‫کبس‬ ‫دػتَس‬ ٌِ‫صهی‬ ‫دس‬(‫ّجیتبت‬3.)
Share experiences on slum identification and slum upgrading;
Examine ways and means of effective information sharing through the Virtual
Scientific Committee; and
Take note of the results of the United Nations Summit to adopt the post-2015
development agenda to elaborate recommendations for a new Urban Agenda in
the United Nations Conference on Housing and Sustainable Urban Development
(Habitat III) in 2016.
Theme
The main theme of the 3rd RSUWG Expert Meeting is "Slum Upgrading: Bridging the
Gap between Policy and Practice". Under this theme the Meeting will explore four
elaborated sub-themes with regards to the Seoul Implementation Plan:
1-Best Practices
Share knowledge and experiences by contributing to a best practices database established
by the WG2 Secretariat;
2-Slum Identification Indicators
Review the lessons learnt in testing slum identification indicators in pilot areas for
inclusion in the slum upgrading database;
‫اص‬ ‫اػهت‬ ‫عجهبست‬ ‫ؿهْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کبسگش‬ ‫تخصصی‬ ‫ًـؼت‬ ‫ػَهیي‬ ‫هضوَى‬:«‫ثْؼهبصی‬
‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬:‫اجشا‬ ٍ ‫هـی‬ ‫خط‬ ‫هیبى‬ ‫پل‬ ‫ایجبد‬»(‫آًْهب‬ ‫اجهشای‬ ٍ ‫ػیبػهتْب‬.)،‫هضهوَى‬ ‫ایهي‬ ‫چْهبسچَة‬ ‫دس‬
‫گیشد‬ ‫هی‬ ‫قشاس‬ ‫دقیق‬ ‫ثشسػی‬ ‫هَسد‬ ‫ًـؼت‬ ‫ایي‬ ‫دس‬ ‫ػئَل‬ ‫اجشایی‬ ِ‫ثشًبه‬ ِ‫ث‬ ِ‫تَج‬ ‫ثب‬ ‫هـشٍح‬ ‫جبًجی‬ ‫هضوَى‬ ‫چْبس‬:
•‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬:‫ًهبم‬ ‫ّوهیي‬ ِ‫ثه‬ ‫اطالعهبتی‬ ‫پبیگهبّی‬ ‫دس‬ ‫هـبسکت‬ ‫ثب‬ ‫تجشثیبت‬ ٍ ‫داًؾ‬ ‫تجبدل‬(ُ‫پبیگهب‬
‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬ ‫اطالعبتی‬)ٍُ‫کبسگش‬ ًِ‫دثیشخب‬ ِ‫ک‬2‫اػت؛‬ ُ‫کشد‬ ‫ایجبد‬
•‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ؿٌبػبیی‬ ‫ّبی‬ ‫ؿبخص‬:‫ؿٌبػبیی‬ ‫ػٌجؾ‬ ٌِ‫صهی‬ ‫دس‬ ِ‫ک‬ ‫ّبیی‬ ُ‫آهَص‬ ‫ثشسػی‬ ٍ ‫هشٍس‬
‫ًبثؼهبهبى‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ‫اطالعبتی‬ ُ‫پبیگب‬ ‫دس‬ ‫کشدى‬ ‫لحبظ‬ ‫ثشای‬ ‫آصهبیـی‬ ‫هٌبطق‬ ‫دس‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬
‫اػت؛‬ ُ‫ؿذ‬ ِ‫فشاگشفت‬
Theme
3-Slum Upgrading Indicators
Review the lessons learnt in testing slum upgrading indicators in pilot
areas for inclusion in the slum upgrading database; and
4-Virtual Scientific Committee
Review the results of user analysis of the Virtual Scientific Committee to
increase the level and scope of participation.
•‫ؿهْشی‬ ‫ًبثؼهبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ّبی‬ ‫ؿبخص‬:‫ؿٌبػهبیی‬ ‫ػهٌجؾ‬ ِ‫صهیٌه‬ ‫دس‬ ِ‫که‬ ‫ّهبیی‬ ُ‫آههَص‬ ‫ثشسػهی‬ ٍ ‫ههشٍس‬
‫ثْؼهبصی‬ ‫اطالعهبتی‬ ُ‫پبیگب‬ ‫دس‬ ‫کشدى‬ ‫لحبظ‬ ‫ثشای‬ ‫آصهبیـی‬ ‫هٌبطق‬ ‫دس‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ّبی‬ ‫ؿبخص‬
‫اػت؛‬ ُ‫ؿذ‬ ِ‫فشاگشفت‬ ‫ًبثؼبهبى‬ ‫ػکًَتگبّْبی‬
•‫هجبصی‬ ‫علوی‬ ِ‫کویت‬:ُ‫گؼهتش‬ ٍ ‫ػطح‬ ‫افضایؾ‬ ‫ثشای‬ ‫هجبصی‬ ‫علوی‬ ِ‫کویت‬ ‫اص‬ ‫کبسثشاى‬ ‫تحلیل‬ ‫ًتبیج‬ ‫ثشسػی‬ ٍ ‫هشٍس‬
‫هـبسکت‬.
2nd Meeting of the Bureau of APMCHUD
Holding 2nd Meeting of the Bureau of APMCHUD in the first of December
2015 in Tehran.
Venue, Hotel and Accommodation
‫هحل‬‫ًشست‬ٍ‫اقبهت‬‫سٍسبی‬‫ّیبت‬‫ّب‬ٍ‫ًوبیٌذگی‬‫ّبی‬‫آًبى‬‫دس‬‫ّتل‬‫پٌج‬ُ‫ستبس‬ِ‫الل‬‫هی‬‫ثبشذ‬ٍٍ‫سصس‬‫اص‬‫طشیق‬ًِ‫دثیشخب‬
‫ًشست‬‫اًجبم‬‫هی‬‫گیشد‬.
ِ‫کلی‬ٌِ‫ّضی‬‫ّبی‬‫اقبهت‬‫،پزیشایی‬ٍ‫حول‬ٍ‫ًقل‬‫دس‬‫سطح‬‫شْش‬‫تْشاى‬‫تَسط‬‫ششکت‬‫عوشاى‬ٍ‫ثْسبصی‬‫شْشی‬‫ایشاى‬‫پَشش‬
ُ‫داد‬‫هی‬‫شَد‬.
 The meeting and Reservations for Heads of Delegations and the Delegates will
be made through the Secretariat at the Five-Star Laleh Hotel.
 As a courtesy for the Third meeting of the Working Group all
accommodations and transportation costs during the meeting in the city of
Tehran will be covered by UDRC.
Holding of the third meeting of the Regional Slum
Upgrading Working Group in November of 2015.
To establish the full regional virtual Scientific Advisory
Board and invite all regional countries to present their experts
for membership in it.
‫ًشست‬ ‫سَهیي‬ ‫برگساری‬‫هٌاطق‬ ‫بْسازی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کارگر‬ ‫تخصصی‬
‫ًابساهاى‬‫ًَاهبرسال‬ ‫در‬ ‫شْری‬2015.
‫برای‬ ِ‫هٌطق‬ ‫کشَرّای‬ ‫توام‬ ‫از‬ ‫دعَت‬ ٍ ًِ‫دبیرخا‬ ‫علوی‬ ‫ّیات‬ ‫کردى‬ ‫ای‬ ِ‫هٌطق‬
‫ایي‬ ‫در‬ ‫عضَیت‬ ‫برای‬ ‫آًْا‬ ‫هتخصصیي‬ ‫هعرفی‬ًِ‫بذ‬
Future Action
Notification Working Group meeting to the relevant countries
Emphasis on the presence of member countries in the Third
Meeting of the Regional Slum Upgrading Working Group
Attending member countries in the virtual scientific board
Attending ambassadors and experts representing the relevant
countries in the opening ceremony
Expectations
‫هزتثط‬ ‫کطَرّای‬ ِ‫ت‬ ٍُ‫کارگز‬ ‫ًطست‬ ‫رساًی‬ ‫اطالع‬
‫هذکَر‬ ‫ًطست‬ ‫در‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کارگز‬ َ‫عض‬ ‫کطَرّای‬ ‫حضَر‬ ‫تز‬ ‫تاکیذ‬
‫هجاسی‬ ‫علوی‬ ِ‫کویت‬ ‫در‬ ٍُ‫کارگز‬ َ‫عض‬ ‫کطَرّای‬ ‫حضَر‬
‫ًطست‬ ِ‫افتتاحی‬ ‫در‬ ‫هزتثط‬ ‫کطَرّای‬ ‫ّای‬ ‫ًوایٌذگی‬ ‫کارضٌاساى‬ ٍ ‫سفزا‬ ‫حضَر‬
We look forward to the active
participation of your delegation at the
Third meeting of the Working Group.
‫در‬ ‫شوا‬ ُ‫ًوایٌذ‬ ‫فعال‬ ‫حضَر‬ ‫اًتظار‬ ‫در‬‫سَهیي‬
‫ّستین‬ ٍُ‫کارگر‬ ‫ًشست‬.
Thank you for your time

Contenu connexe

En vedette

Groundwater Quality Slum Areas Hyderabad
Groundwater Quality Slum Areas HyderabadGroundwater Quality Slum Areas Hyderabad
Groundwater Quality Slum Areas HyderabadSai Bhaskar Reddy Nakka
 
toMOUD-slum-free-planning-June2010
toMOUD-slum-free-planning-June2010toMOUD-slum-free-planning-June2010
toMOUD-slum-free-planning-June2010Paromita Roy
 
Role of Community Centres in Slum Upgradation
Role of Community Centres in Slum UpgradationRole of Community Centres in Slum Upgradation
Role of Community Centres in Slum UpgradationManas Murthy
 
Slum freedelhi principles-roadmap
Slum freedelhi principles-roadmapSlum freedelhi principles-roadmap
Slum freedelhi principles-roadmapParomita Roy
 
Dharavi Slum British School in Baku
Dharavi Slum British School in BakuDharavi Slum British School in Baku
Dharavi Slum British School in BakuAlekper
 
Mcd Dda Slum Strategy Romi Roy
Mcd Dda Slum Strategy Romi RoyMcd Dda Slum Strategy Romi Roy
Mcd Dda Slum Strategy Romi RoyParomita Roy
 
Slum Upgrading Agra, India 2012
Slum Upgrading Agra, India 2012Slum Upgrading Agra, India 2012
Slum Upgrading Agra, India 2012Nicholas Socrates
 
Dharavi slums and Housing
Dharavi slums and HousingDharavi slums and Housing
Dharavi slums and HousingAnjuman e Islam
 
Mumbai – Redevelopment of Dharavi RA.ppt
Mumbai – Redevelopment of Dharavi RA.pptMumbai – Redevelopment of Dharavi RA.ppt
Mumbai – Redevelopment of Dharavi RA.ppttonybattista
 
Slums in India
Slums in IndiaSlums in India
Slums in IndiaAndrezz16
 
8. slums & the metropolis
8. slums & the metropolis8. slums & the metropolis
8. slums & the metropolissaiyangoku
 

En vedette (19)

Groundwater Quality Slum Areas Hyderabad
Groundwater Quality Slum Areas HyderabadGroundwater Quality Slum Areas Hyderabad
Groundwater Quality Slum Areas Hyderabad
 
toMOUD-slum-free-planning-June2010
toMOUD-slum-free-planning-June2010toMOUD-slum-free-planning-June2010
toMOUD-slum-free-planning-June2010
 
Role of Community Centres in Slum Upgradation
Role of Community Centres in Slum UpgradationRole of Community Centres in Slum Upgradation
Role of Community Centres in Slum Upgradation
 
Slum freedelhi principles-roadmap
Slum freedelhi principles-roadmapSlum freedelhi principles-roadmap
Slum freedelhi principles-roadmap
 
Dharavi Slum British School in Baku
Dharavi Slum British School in BakuDharavi Slum British School in Baku
Dharavi Slum British School in Baku
 
Mcd Dda Slum Strategy Romi Roy
Mcd Dda Slum Strategy Romi RoyMcd Dda Slum Strategy Romi Roy
Mcd Dda Slum Strategy Romi Roy
 
Slum Upgrading Agra, India 2012
Slum Upgrading Agra, India 2012Slum Upgrading Agra, India 2012
Slum Upgrading Agra, India 2012
 
Dharavi slums and Housing
Dharavi slums and HousingDharavi slums and Housing
Dharavi slums and Housing
 
Mumbai – Redevelopment of Dharavi RA.ppt
Mumbai – Redevelopment of Dharavi RA.pptMumbai – Redevelopment of Dharavi RA.ppt
Mumbai – Redevelopment of Dharavi RA.ppt
 
Kk Surface Miner
Kk Surface MinerKk Surface Miner
Kk Surface Miner
 
National Policies & Programs for Slum Upgrading in India: Bridging the Gap be...
National Policies & Programs for Slum Upgrading in India: Bridging the Gap be...National Policies & Programs for Slum Upgrading in India: Bridging the Gap be...
National Policies & Programs for Slum Upgrading in India: Bridging the Gap be...
 
Slums in India
Slums in IndiaSlums in India
Slums in India
 
Understanding squatters and slums in the context of urban planning and develo...
Understanding squatters and slums in the context of urban planning and develo...Understanding squatters and slums in the context of urban planning and develo...
Understanding squatters and slums in the context of urban planning and develo...
 
Dharavi
DharaviDharavi
Dharavi
 
Pune city
Pune cityPune city
Pune city
 
Mumbai Slums
Mumbai SlumsMumbai Slums
Mumbai Slums
 
Mumbai's Dharavi slums
Mumbai's Dharavi slumsMumbai's Dharavi slums
Mumbai's Dharavi slums
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
8. slums & the metropolis
8. slums & the metropolis8. slums & the metropolis
8. slums & the metropolis
 

Similaire à General Presentation of the Regional Slum Upgrading Working Group (RSUWG) - APMCHUD

City Development Program
City Development ProgramCity Development Program
City Development Programushfia
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.FMINigeria
 
ADB Sustainable Development Timeline
ADB Sustainable Development TimelineADB Sustainable Development Timeline
ADB Sustainable Development TimelineOlivier Serrat
 
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015GlobalCompact
 
293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_ChinaMichael Midling
 
Ta1.01 santaella.unwdf capacity building jasc inegi - vr1.0
Ta1.01 santaella.unwdf   capacity building jasc inegi - vr1.0Ta1.01 santaella.unwdf   capacity building jasc inegi - vr1.0
Ta1.01 santaella.unwdf capacity building jasc inegi - vr1.0Statistics South Africa
 
AmmanIinstitute Status Report- June 2009
AmmanIinstitute Status Report- June 2009AmmanIinstitute Status Report- June 2009
AmmanIinstitute Status Report- June 2009Amman.institute
 
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...Dr Lendy Spires
 
Ortigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationOrtigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationiBoP Asia
 
BTOR Baku (Aizerbaijan) 27 October-31 October 2014
BTOR Baku (Aizerbaijan) 27 October-31 October 2014BTOR Baku (Aizerbaijan) 27 October-31 October 2014
BTOR Baku (Aizerbaijan) 27 October-31 October 2014Emilio Valli
 
Salah Taha - CV 16
Salah Taha - CV 16Salah Taha - CV 16
Salah Taha - CV 16Salah Taha
 
ICBRR-Integtrated Community Based Risk Reduction
ICBRR-Integtrated Community Based Risk ReductionICBRR-Integtrated Community Based Risk Reduction
ICBRR-Integtrated Community Based Risk ReductionShesh Kafle
 
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...আকিব রায়হান
 

Similaire à General Presentation of the Regional Slum Upgrading Working Group (RSUWG) - APMCHUD (20)

From Seoul to New Delhi: Report of Activities 2014~2016: Regional Slum Upgrad...
From Seoul to New Delhi: Report of Activities 2014~2016: Regional Slum Upgrad...From Seoul to New Delhi: Report of Activities 2014~2016: Regional Slum Upgrad...
From Seoul to New Delhi: Report of Activities 2014~2016: Regional Slum Upgrad...
 
ICESCR Accomplishment Report
ICESCR Accomplishment ReportICESCR Accomplishment Report
ICESCR Accomplishment Report
 
City Development Program
City Development ProgramCity Development Program
City Development Program
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.
 
A7.1b
A7.1bA7.1b
A7.1b
 
SP - ERavineTC Ver. 26-08-06
SP - ERavineTC Ver. 26-08-06SP - ERavineTC Ver. 26-08-06
SP - ERavineTC Ver. 26-08-06
 
ADB Sustainable Development Timeline
ADB Sustainable Development TimelineADB Sustainable Development Timeline
ADB Sustainable Development Timeline
 
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015
NutShell – GCNI Tri-annual Newsletter April 2015 – July 2015
 
293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China
 
Ta1.01 santaella.unwdf capacity building jasc inegi - vr1.0
Ta1.01 santaella.unwdf   capacity building jasc inegi - vr1.0Ta1.01 santaella.unwdf   capacity building jasc inegi - vr1.0
Ta1.01 santaella.unwdf capacity building jasc inegi - vr1.0
 
Supporting Youth Livelihoods (2012 presentation): I.R. of Iran / UDRO - 2nd. ...
Supporting Youth Livelihoods (2012 presentation): I.R. of Iran / UDRO - 2nd. ...Supporting Youth Livelihoods (2012 presentation): I.R. of Iran / UDRO - 2nd. ...
Supporting Youth Livelihoods (2012 presentation): I.R. of Iran / UDRO - 2nd. ...
 
Presentation on the State of Osun Youth Employment Scheme (OYES)
Presentation on the State of Osun Youth Employment Scheme (OYES)Presentation on the State of Osun Youth Employment Scheme (OYES)
Presentation on the State of Osun Youth Employment Scheme (OYES)
 
AmmanIinstitute Status Report- June 2009
AmmanIinstitute Status Report- June 2009AmmanIinstitute Status Report- June 2009
AmmanIinstitute Status Report- June 2009
 
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...
UN PROJECT OFFICE ON GOVERNANCE (UNPOG) AND ITS POSSIBLE CONTRIBUTION TO ICTD...
 
Ortigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationOrtigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping Documentation
 
BTOR Baku (Aizerbaijan) 27 October-31 October 2014
BTOR Baku (Aizerbaijan) 27 October-31 October 2014BTOR Baku (Aizerbaijan) 27 October-31 October 2014
BTOR Baku (Aizerbaijan) 27 October-31 October 2014
 
Salah Taha - CV 16
Salah Taha - CV 16Salah Taha - CV 16
Salah Taha - CV 16
 
ICBRR-Integtrated Community Based Risk Reduction
ICBRR-Integtrated Community Based Risk ReductionICBRR-Integtrated Community Based Risk Reduction
ICBRR-Integtrated Community Based Risk Reduction
 
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...
BBS - Bangladesh Bureau Of Statistics presented by a group of students from U...
 

Plus de Regional Urban Upgrading Working Group (RUUWG)

ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان (مطالعه موردی: محلّ...
ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان  (مطالعه موردی: محلّ...ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان  (مطالعه موردی: محلّ...
ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان (مطالعه موردی: محلّ...Regional Urban Upgrading Working Group (RUUWG)
 
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...Regional Urban Upgrading Working Group (RUUWG)
 
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندج
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندجمقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندج
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندجRegional Urban Upgrading Working Group (RUUWG)
 
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)Regional Urban Upgrading Working Group (RUUWG)
 
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...Regional Urban Upgrading Working Group (RUUWG)
 
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...Regional Urban Upgrading Working Group (RUUWG)
 
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...Regional Urban Upgrading Working Group (RUUWG)
 
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانی
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانیبازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانی
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانیRegional Urban Upgrading Working Group (RUUWG)
 
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری نمونه موردی: محله ...
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری	 نمونه موردی: محله ...تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری	 نمونه موردی: محله ...
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری نمونه موردی: محله ...Regional Urban Upgrading Working Group (RUUWG)
 
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...Regional Urban Upgrading Working Group (RUUWG)
 
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران Regional Urban Upgrading Working Group (RUUWG)
 
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...Regional Urban Upgrading Working Group (RUUWG)
 
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران Regional Urban Upgrading Working Group (RUUWG)
 

Plus de Regional Urban Upgrading Working Group (RUUWG) (20)

Hippocrates and the Beatles Lessons for Informal Settlements
Hippocrates and the Beatles Lessons for Informal SettlementsHippocrates and the Beatles Lessons for Informal Settlements
Hippocrates and the Beatles Lessons for Informal Settlements
 
Design for Inclusivity: Urban Design Strategies for the Urban Poor at city pe...
Design for Inclusivity: Urban Design Strategies for the Urban Poor at city pe...Design for Inclusivity: Urban Design Strategies for the Urban Poor at city pe...
Design for Inclusivity: Urban Design Strategies for the Urban Poor at city pe...
 
Automation of Intervention Option for Addressing of Slums
Automation of Intervention Option for Addressing of SlumsAutomation of Intervention Option for Addressing of Slums
Automation of Intervention Option for Addressing of Slums
 
Integrating Informal Settlements in Urban Centers
Integrating Informal Settlements in Urban CentersIntegrating Informal Settlements in Urban Centers
Integrating Informal Settlements in Urban Centers
 
Cities Alliance Approach to Slum Upgrading
Cities Alliance Approach to Slum UpgradingCities Alliance Approach to Slum Upgrading
Cities Alliance Approach to Slum Upgrading
 
The Seventh Asia Pacific Ministerial Conference on Housing and Urban Developm...
The Seventh Asia Pacific Ministerial Conference on Housing and Urban Developm...The Seventh Asia Pacific Ministerial Conference on Housing and Urban Developm...
The Seventh Asia Pacific Ministerial Conference on Housing and Urban Developm...
 
طرح های توانمندسازی در حاشیه نشین های زاهدان
طرح های توانمندسازی در حاشیه نشین های زاهدانطرح های توانمندسازی در حاشیه نشین های زاهدان
طرح های توانمندسازی در حاشیه نشین های زاهدان
 
ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان (مطالعه موردی: محلّ...
ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان  (مطالعه موردی: محلّ...ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان  (مطالعه موردی: محلّ...
ساماندهی و توانمندسازی سکونتگاه های غیررسمی در شهر زنجان (مطالعه موردی: محلّ...
 
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...
استراتژی‌های توانمندسازی محلات حاشيه‌نشين (مطالعه موردی: محلات حاشيه‌نشين سيل...
 
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندج
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندجمقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندج
مقایسه شاخص‏های جمعیتی در سکونت‏گاه‏های رسمی و غیررسمی شهر سنندج
 
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)
تاثیر و تاثر اسکان غیررسمی و پراکنش افقی شهر (مطالعه موردی: شهر سنندج)
 
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...
بررسی عوامل موثر در فرایند شکل گیری سکونتگاههای خودانگیخته و غیررسمی و تبیین ...
 
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...
مفهوم بهسازی و توانمندسازی در سکونت‌گاه‌های فقیرنشین: تفاوت‌ها، معیارها و شاخ...
 
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...
ضرورت اتخاذ رویکرد پراگماتیستی نسبت به موضوع بازآفرینی شهری در عرصة آموزش آکا...
 
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانی
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانیبازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانی
بازآفرینی سکونتگاه‏های فقیرنشین شهری بر پایه بازاریابی مکان؛ چشم انداز جهانی
 
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری نمونه موردی: محله ...
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری	 نمونه موردی: محله ...تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری	 نمونه موردی: محله ...
تاثیر فضاهای باز جمعی بر امنیت سکونتگاه‏های فقیرنشین شهری نمونه موردی: محله ...
 
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...
نقش فضاهای عمومی برای زنان در جهت ارتقاء اجتماع پذیری درسکونتگاه های غیر رسمی...
 
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
 
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...
تحلیل راهبردی ظرفیتهای مدیریت شهری مرودشت در فرآیند تهیه و اجرای طرح توانمندس...
 
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران برنامـه ریـزی شهـری  برای کـم درآمـدها و فقـرا در ايـران
برنامـه ریـزی شهـری برای کـم درآمـدها و فقـرا در ايـران
 

Dernier

VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...Garima Khatri
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...Delhi Call Girls
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 

Dernier (20)

VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
 
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...
GFE Call Girls Service Indira Nagar Lucknow \ 9548273370 Indian Call Girls Se...
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 

General Presentation of the Regional Slum Upgrading Working Group (RSUWG) - APMCHUD

  • 1. Regional Slum Upgrading Working Group APMCHUD ‫ری‬‫ه‬‫ش‬‫ان‬‫م‬‫ا‬‫س‬‫ب‬‫ان‬‫ق‬‫ط‬‫ا‬‫ن‬‫م‬‫ازی‬‫س‬‫به‬‫ای‬‫و‬‫ق‬‫ط‬‫ن‬‫م‬‫روه‬‫گ‬‫ر‬‫ا‬‫ک‬ ‫ا‬‫ی‬‫س‬‫آ‬-‫و‬‫ی‬‫س‬‫و‬‫ن‬‫ا‬‫ی‬‫ق‬‫ا‬ Islamic Republic of Iran Ministry of Road & Urban Development Iranian Urban Development &Revitalization Corporation November 2015
  • 2. In the Name of God
  • 3. Background :  The first session of the Asia-Pacific Ministerial Conference on Housing and Urban Development was held under the heading of Housing and Human Settlement on December 16, 2006 in New Delhi. ٌِ‫پیشی‬: ‫دس‬16‫دسـبهجش‬2006‫ًـخـستـیي‬‫اجـالس‬ِ‫هـٌطق‬‫ای‬‫ٍصسای‬‫هـسکي‬ٍ‫شْشسبصی‬ِ‫هـٌطق‬‫آسـیب‬ ٍِ‫اقـیبًَسی‬‫دس‬‫دّـلی‬ًَ‫ثب‬‫هـَضَع‬‫هـسکي‬ٍ‫اسکبى‬‫ثشش‬‫ثشگضاس‬‫گشدیذ‬.
  • 4. Background: The five working groups on the themes of:  WG1:Urban and Rural Planning and Management (India)  WG2:Upgrading of Slums and Informal Settlements (Iran)  WG3:Delivery of Basic Services(Sri Lanka- Maldives)  WG4:Financing Sustainable Housing(Korea)  WG5:Urban Development with a focus on Natural and Climate Change related Disasters(Indonesia) ٌِ‫پیشی‬: ‫هذیزیت‬ٍِ‫تزًاه‬‫ریشی‬‫ضْزی‬ٍ‫رٍستایی‬(‫ٌّذ‬) ‫تْساسی‬‫هٌاطق‬‫ًاتساهاى‬‫ضْزی‬(‫ایزاى‬) ِ‫ارائ‬‫خذهات‬ِ‫پای‬(‫سزیالًکا‬ٍَ‫هالذی‬) ‫تاهیي‬‫هالی‬‫پایذار‬(ُ‫کز‬‫جٌَتی‬) ‫ضْزساسی‬ٍِ‫تَسع‬‫ضْزی‬‫تا‬‫هحَریت‬‫کاّص‬‫تالیا‬ٍ‫سَاًح‬‫هزتثط‬‫تا‬‫تغییزات‬‫طثیعی‬ٍ‫اقلیوی‬(‫اًذًٍشی‬)
  • 5. Tehran Conference:  The second conference was held in Tehran on 12 to 14 May 2008 with the theme of Sustainable Urban Development Associating Growth with Equity and Identity. ‫تْشاى‬ ‫اجالس‬: ‫دس‬12‫تب‬14‫هی‬2008‫هَضَع‬ ‫ثب‬ ‫دٍم‬ ‫اجالس‬«‫پبیذاس‬ ‫شْشی‬ ِ‫تَسع‬:‫َّیت‬ ‫ثب‬ ‫سشذ‬ ‫ّوشاّی‬» ‫گشدیذ‬ ‫ثشگضاس‬ ‫تْشاى‬ ‫دس‬.
  • 6. Tehran Conference:  The Urban Development & Revitalization Corporation of Iran (UDRC) succeeded in obtaining the approval of the working group for the establishment of the secretariat of the Slum Upgrading Working Group and to have it included in the Tehran Declaration and Action Plan. ‫تْشاى‬ ‫اجالس‬: ‫ششکت‬‫عـوشاى‬ٍ‫ثْسبصی‬‫شـْشی‬‫ایـشاى‬‫هَفق‬‫شـذ‬ِ‫کـ‬‫پــیشٌْبد‬‫تـشکیل‬ًِ‫دثـیشخب‬ ٍُ‫کــبسگش‬‫تخصصی‬‫ثـْـسبصی‬‫هٌـبطق‬‫ًبثـسبهبى‬‫شْشی‬‫سا‬ِ‫ث‬‫تصَیت‬‫اعضب‬‫ثشسبًذ‬ِ‫ک‬ ‫ایي‬‫هْن‬‫دس‬ِ‫ثیبًی‬ٍِ‫ثشًبه‬‫ع‬‫ـ‬‫ولیبتی‬‫تْشاى‬‫دسج‬ُ‫گشدیذ‬‫است‬.
  • 7. Solo Conference:  The third conference was held in Solo on 22 to24 June 2010 with the theme of Empowering Communities For Sustainable Urbanization. َ‫سَل‬ ‫اجالس‬: ‫دس‬22‫تب‬24‫طٍئي‬2010‫هَضَع‬ ‫ثب‬ ‫سَم‬ ‫اجالس‬«‫پبیذاس‬ ‫شْشی‬ ِ‫تَسع‬ ‫ثشای‬ ‫جَاهع‬ ‫تَاًوٌذسبصی‬ »‫گشدیذ‬ ‫ثشگضاس‬ َ‫سَل‬ ‫دس‬.
  • 8. Amman Conference:  The fourth conference was held in Amman on 10 to 12 December 2012 with the theme of Youth and IT in Sustainable Urban Development. ‫اهبى‬ ‫اجالس‬: ‫چْبسهیي‬‫اجالس‬‫دس‬‫سبل‬2012‫ثب‬‫هَضَع‬«‫جَاًبى‬ٍ‫في‬‫آٍسی‬‫اطالعبت‬‫دس‬ِ‫تَسع‬‫شْشی‬»‫دس‬ ،‫اهبى‬‫اسدى‬‫ثشگضاس‬‫گشدیذ‬.
  • 9. Seoul Conference:  The fifth conference was held in Seoul on 3rd – 5th November, 2014 with the theme of Equal Opportunity for Sustainable ‫سئَل‬ ‫اجالس‬: ‫پٌجویي‬‫اجالس‬‫دس‬‫سبل‬2014‫ثب‬‫هَضَع‬«‫فشصت‬‫ّبی‬‫ثشاثش‬‫ثشای‬ِ‫تَسع‬‫پبیذاس‬»‫دس‬،‫سئَل‬ ُ‫کش‬‫جٌَثی‬‫ثشگضاس‬‫گشدیذ‬.
  • 10.
  • 11. Executive Branch Research Core Organizational Relations NGOs, CBOs Municipality Core Stakeholders ‫ششکت‬‫دس‬‫اٍلیي‬‫قذم‬‫سبختبس‬ٍُ‫کبسگش‬‫سا‬‫طشاحی‬‫ًوَد‬ٍ‫تصوین‬‫گشفت‬ِ‫ک‬‫ایشاى‬ِ‫ث‬ ‫عٌَاى‬‫پبیلَت‬‫آى‬‫سا‬ِ‫ث‬‫آصهَى‬‫ثگزاسد‬. IRAN  As a first step the structure of the working group was designed and it was decided that Iran would implement it as a pilot. The Regional Slum Upgrading Working Group
  • 12. Actions a. APMCHUD is to establish regional Slum Upgrading Working Group to coordinate the following activities: A. Data collection and monitoring B. Experience sharing on good practices and policies C. Capacity building ‫اقذاهبت‬: ‫الف‬)‫اجالع‬‫ٍصسای‬‫هؼکي‬ٍ‫ؿْشػبصی‬‫آػیب‬–،ِ‫اقیبًَػی‬ٍُ‫کبسگش‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫ثْؼبصی‬ ‫ّبی‬ُ‫ػکًَتگب‬‫غیشسػوی‬‫سا‬ِ‫ث‬‫هٌػَس‬‫ّوبٌّگی‬‫ّب‬‫فعبلیت‬‫ی‬‫صیش‬‫تبػیغ‬‫کٌذ‬: ‫اطالعبتی‬ ‫ّبی‬ُ‫داد‬ ‫پبیؾ‬ ٍ ‫آٍسی‬‫جوع‬ ‫ّب‬ ‫ػیبػت‬ ٍ ‫عولکشدی‬ ‫ّبی‬ًَِ‫ًو‬ ‫ثْتشیي‬ ‫هَسد‬ ‫دس‬ ‫تجشثیبت‬ ‫تجبدل‬ ‫ػبصی‬‫غشفیت‬ Tehran Action Plan
  • 13. Actions b. Regional Working Groups will set up networks comprising research institutions; governmental institutions; and civil society, community- based, and non-governmental organizations. The Regional Working Groups are invited to establish and maintain web-based knowledge bases to facilitate exchange of documented slum upgrading experiences and other related data. These knowledge bases shall be linked to the APMCHUD website. ‫اقذاهبت‬: ‫ة‬)‫ّبی‬ٍُ‫کبسگش‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫ثبیؼت‬‫هی‬.‫ایي‬‫ای‬ِ‫ؿجک‬‫هتـکل‬‫اص‬‫ًْبدّبی‬،‫پظٍّـی‬‫ًْبدّبی‬‫دٍلتی‬ٍ ِ‫جبهع‬،‫هذًی‬‫ػبصهبًْبی‬‫هجتٌی‬‫ثش‬‫جَاهع‬ٍ‫ػبصهبى‬‫ّبی‬‫غیش‬‫دٍلتی‬‫ایجبد‬‫کٌٌذ‬ٍُ‫کبسگش‬‫ّب‬‫ثشای‬‫تبػیغ‬ٍ ‫حفع‬‫ّبی‬ُ‫پبیگب‬‫علوی‬‫ای‬ِ‫ؿجک‬‫جْت‬‫تؼْیل‬‫دس‬‫تجبدل‬‫تجشثیبت‬‫هؼتٌذ‬‫دس‬ٌِ‫صهی‬‫ثْؼبصی‬‫ّبی‬ُ‫ػکًَتگب‬ ‫غیشسػوی‬ٍ‫دیگش‬‫اطالعبت‬ِ‫هٌطق‬‫دعَت‬‫ؿًَذ‬‫هی‬.‫ایي‬ُ‫پبیگب‬‫ّبی‬‫اطالعبتی‬‫هی‬‫ثبیؼت‬ِ‫ث‬ِ‫ؿجک‬‫ایٌتشًتی‬ ‫اجالع‬‫ٍصسای‬‫هؼکي‬ٍ‫ؿْشػبصی‬ِ‫هٌطق‬‫هتصل‬‫ؿًَذ‬. Tehran Action Plan
  • 14. Actions c. The Regional Working Groups are to report regularly to the APMCHUD Secretariat and to the biannual conference. d. The Islamic Republic of Iran is prepared to set up such a Regional Working Group and a Network on urban slum upgrading focusing on the three identified activity areas (data collection and monitoring; experience sharing; and capacity building). Furthermore, the Islamic Republic of Iran is willing to provide the facilities for coordinating this Regional initiative. e. Other Member States are invited to create additional Regional Working Groups. ‫اقذاهات‬: ‫ج‬)‫ّای‬ٍُ‫کارگز‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫تایذ‬ِ‫ت‬‫طَر‬‫هٌظن‬ِ‫ت‬ًِ‫دتیزخا‬‫اجالس‬‫ٍسرای‬‫هسکي‬ٍ‫ضْزساسی‬ِ‫هٌطق‬‫آسیا‬-ِ‫اقیاًَسی‬ٍ‫اجالس‬ًِ‫دٍساال‬‫آى‬ ‫گشارش‬‫دٌّذ‬. ‫د‬)‫جوَْری‬‫اسالهی‬‫ایزاى‬‫آهادگی‬‫خَد‬‫را‬‫تزای‬‫تزپایی‬‫چٌیي‬ٍُ‫کارگز‬‫ای‬ِ‫هٌطق‬ٍ‫ساسی‬ِ‫ضثک‬‫تْساسی‬‫ّای‬ُ‫سکًَتگا‬‫غیزرسوی‬‫ضْزی‬‫تا‬‫تاکیذ‬‫تز‬ِ‫س‬ ٌِ‫سهی‬‫فعالیتی‬‫تعزیف‬ُ‫ضذ‬‫هطخص‬(‫گزدآٍری‬‫ّای‬ُ‫داد‬‫اطالعاتی‬ٍ‫پایص‬،‫آى‬‫تثادل‬‫تجزتیات‬ٍ‫ساسی‬‫ظزفیت‬)‫اعالم‬‫هی‬‫دارد‬.‫ّوچٌیي‬‫جوَْری‬ ‫اسالهی‬‫ایزاى‬‫توایل‬‫دارد‬‫تسْیالت‬‫السم‬‫را‬‫تزای‬‫ّواٌّگی‬‫هیاى‬‫ایي‬ًَِ‫گ‬‫ّای‬ِ‫تزًاه‬‫ای‬ِ‫هٌطق‬‫فزاّن‬‫آٍرد‬. ‫ّـ‬)‫سایز‬‫کطَرّای‬ِ‫هٌطق‬ِ‫ت‬‫ایجاد‬ٍُ‫کارگز‬‫ّای‬‫تخصصی‬‫ای‬ِ‫هٌطق‬‫دیگز‬‫دعَت‬‫هی‬‫ضًَذ‬. Tehran Action Plan
  • 15. Actions Government will analyze and disseminate a wide range of slum upgrading innovative options including on tenure security, strengthening the financial networks for slum upgrading programmes and formalizing people- based approach as part of the planning process. ‫اقذاهبت‬: ‫دٍلت‬‫ّب‬‫طیفی‬‫ٍػیع‬‫اص‬‫اهکبًبت‬ًِ‫ًَآٍسا‬‫ثشای‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬‫سا‬‫هَسد‬‫ثشسػی‬‫قشاس‬ ُ‫داد‬ٍِ‫اؿبع‬‫هی‬،‫ًوبیٌذ‬‫ایي‬‫اهکبًبت‬‫ؿبهل‬‫اهٌیت‬‫حق‬،‫تصشف‬‫گؼتشؽ‬ِ‫ؿجک‬‫ّبی‬‫تبهیي‬‫هبلی‬ ‫ثشای‬ِ‫ثشًبه‬‫ّبی‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬ٍ‫سػویت‬‫ثخـیذى‬ِ‫ث‬‫سٍیکشدی‬‫هشدم‬‫هحَس‬ ِ‫ث‬‫عٌَاى‬‫ثخـی‬‫اص‬‫فشآیٌذ‬ِ‫ثشًبه‬،‫سیضی‬‫هی‬‫ثبؿذ‬. Solo Implementation Plan
  • 16. Actions Government will analyze and disseminate a wide range of slum upgrading innovative options including on tenure security, strengthening the financial networks for slum upgrading programmes and formalizing people- based approach as part of the planning process. ‫اقذاهبت‬: ‫دٍلت‬‫ّب‬‫طیفی‬‫ٍػیع‬‫اص‬‫اهکبًبت‬ًِ‫ًَآٍسا‬‫ثشای‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬‫سا‬‫هَسد‬‫ثشسػی‬‫قشاس‬ ُ‫داد‬ٍِ‫اؿبع‬‫هی‬،‫ًوبیٌذ‬‫ایي‬‫اهکبًبت‬‫ؿبهل‬‫اهٌیت‬‫حق‬،‫تصشف‬‫گؼتشؽ‬ِ‫ؿجک‬‫ّبی‬‫تبهیي‬‫هبلی‬ ‫ثشای‬ِ‫ثشًبه‬‫ّبی‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫ًبثؼبهبى‬ٍ‫سػویت‬‫ثخـیذى‬ِ‫ث‬‫سٍیکشدی‬‫هشدم‬‫هحَس‬ ِ‫ث‬‫عٌَاى‬‫ثخـی‬‫اص‬‫فشآیٌذ‬ِ‫ثشًبه‬،‫سیضی‬‫هی‬‫ثبؿذ‬. Solo Implementation Plan
  • 17. WG2: Slum Upgrading – Livelihood Opportunities for Youth A. Prioritized socio-economic enabling in upgrading of informal settlements. B. Utilize Information Technology as an effective instrument for engaging youth in slum upgrading. C. Pilot-testing the slum upgrading database and indicators in three volunteer countries, Jordan, Indonesia and Iran, and present the results between April - June 2013. D. Vigorously participate in the Virtual Scientific Committee established by the Secretariat of the Slum Upgrading Working Group to share information and experiences, establish and regularly update the joint slum upgrading database. ‫الف‬)‫اٍلَیت‬‫ثٌذی‬‫تَاًوٌذػبصی‬‫اجتوبعی‬-‫اقتصبدی‬‫دس‬‫ثْؼبصی‬‫ػکًَت‬‫گبّْبی‬‫غیش‬‫سػوی‬. ‫ة‬)ُ‫ثْش‬‫گیشی‬‫اصفٌبٍسی‬‫اطالعبت‬‫ثعٌَاى‬‫اثضاسی‬‫هَثش‬‫ثشای‬‫هـبسکت‬‫جَاًبى‬‫دس‬‫ثْؼبصی‬‫هٌبطق‬ ‫ًبثؼبهبى‬‫ؿْشی‬. ‫ج‬)‫عولیبت‬‫آصهبیـی‬‫جوع‬‫آٍسی‬ُ‫پبیگب‬ُ‫داد‬ٍ‫ؿبخص‬‫ّب‬‫دس‬ِ‫ػ‬‫کـَس‬‫داٍطلت‬:‫ایشاى،اسدى‬ٍ ‫اًذًٍضی‬ٍِ‫اسائ‬‫ی‬‫ًتبیج‬‫ثذػت‬ُ‫آهذ‬‫ثیي‬‫آٍسیل‬‫تب‬‫طٍئي‬2013. ‫د‬)‫هـبسکت‬ِ‫ّو‬ِ‫جبًج‬‫دس‬ِ‫کویت‬‫ی‬‫علوی‬‫هجبصی‬‫ایجبد‬ُ‫ؿذ‬‫تَػط‬ًِ‫دثیشخب‬ٍُ‫کبسگش‬‫ثْؼبصی‬‫هٌبطق‬ ‫ًبثؼبهبى‬‫ؿْشی‬‫ثشای‬ِ‫ث‬‫هـبسکت‬‫گزاؿتي‬‫اطالعبت‬ٍ‫تجشثیبت‬ٍ‫ایجبد‬ٍ‫ثشٍصسػبًی‬‫هٌػن‬ُ‫پبیگب‬ ُ‫داد‬‫ثْؼبصی‬‫هٌبطق‬‫ًبثؼبهبى‬‫ؿْشی‬ Amman Action Plan
  • 18.  The secretariat was established in UDRC.  UDRC has approved and allocated the budget for the secretariat every year.  Design and Set up a website for Working Group(www.rsuwgmeeting.org) Actions to Date ًِ‫دثیشخب‬‫دس‬‫ششکت‬‫عوشاى‬ٍ‫ثْسبصی‬‫شْشی‬‫ایشاى‬‫تشکیل‬‫گشدیذ‬. ‫سبصهبى‬‫تصَیت‬ُ‫کشد‬‫است‬ِ‫ک‬ِ‫ّشسبل‬ِ‫ثَدج‬‫ای‬‫سا‬ِ‫ث‬ًِ‫دثیشخب‬‫اختصبص‬‫دّذ‬. ٍُ‫کبسگش‬ ‫سبیت‬ ‫ٍة‬ ‫اًذاصی‬ ُ‫سا‬ ٍ ‫طشاحی‬(www.rsuwgmeeting.org)
  • 19.  The First Meeting of the Regional Slum Upgrading Working Group was held in Tehran on 2 – 4 July, 2012 . Actions to Date ‫اٍلیي‬‫ًشست‬‫تخصصی‬ٍُ‫کبسگش‬‫ثْسبصی‬‫هٌبطق‬‫ًبثسبهبى‬‫شْشی‬‫آسیب‬–ِ‫اقیبًَسی‬‫دس‬‫تْشاى‬‫دس‬‫تبسیخ‬12‫تب‬ 14‫تیش‬ُ‫هب‬1391‫ثشگضاس‬‫گشدیذ‬.
  • 20.  Holding a meeting with the ambassadors of countries of the region in Tehran Actions to Date ‫ثشگضاسی‬ِ‫جلس‬‫ثب‬‫سفشای‬‫کشَسّبی‬ِ‫هٌطق‬‫دس‬‫تْشاى‬
  • 21. The First Meeting of the Regional Slum Upgrading Working Group
  • 22. The First Meeting of the Regional Slum Upgrading Working Group
  • 23. The First Meeting of the Regional Slum Upgrading Working Group
  • 24. The First Meeting of the Regional Slum Upgrading Working Group
  • 25.  The Second Meeting of the Regional Slum Upgrading Working Group was held in Amman on 10 – 12 December, 2012 . Actions to Date ‫دٍهیي‬‫ًشست‬‫تخصصی‬ٍُ‫کبسگش‬‫ثْسبصی‬‫هٌبطق‬‫ًبثسبهبى‬‫شْشی‬‫آسیب‬–ِ‫اقیبًَسی‬‫دس‬‫اهبى‬‫دس‬‫تبسیخ‬19‫تب‬ 21‫آرس‬ُ‫هب‬1391‫ثشگضاس‬‫گشدیذ‬.
  • 26. The Second Meeting of the Regional Slum Upgrading Working Group
  • 28.
  • 29. SEOUL IMPLEMENTATION PLAN WG2: Slum Upgrading a) Prioritize socio-economic enablement in urban regeneration of slum, informal settlements and deteriorated fabrics though a citywide, street-based approach; b) Exploit the role of the provision of basic services and infrastructure, as well as public catalytic projects to stimulate development and enrich urban space; ٍُ‫کارگر‬2:‫برابر‬ ‫فرصتْای‬ ‫ایجاد‬ ‫هٌظَر‬ ِ‫ب‬ ‫فرٍدست‬ ٍ ‫ًابساهاى‬ ‫سکًَتگاّْای‬ ‫بْسازی‬ ‫الف‬)‫اجتواعی‬ ‫ساسی‬ ‫تَاًوٌذ‬ ِ‫ت‬ ‫تخطی‬ ‫اٍلَیت‬-‫اس‬ ُ‫فزسـَد‬ ‫تافتْـای‬ ٍ ‫فزٍدسـت‬ ٍ ‫غیزرسوی‬ ‫سکًَتگاّْای‬ ‫ضْزی‬ ‫ساسی‬ ُ‫سًذ‬ ‫تاس‬ ‫در‬ ‫اقتصادی‬ ‫ضْز‬ ‫رٍیکزدی‬ ‫طزیق‬-‫خیاتاى‬ ٍ ‫ًگز‬-‫هحَر؛‬ ‫ب‬)‫غٌـای‬ ٍ ِ‫تَسع‬ ‫تزای‬ ُ‫اًگیش‬ ‫ایجاد‬ ‫هٌظَر‬ ِ‫ت‬ ‫راتط‬ ‫عوَهی‬ ‫ّای‬ ُ‫پزٍص‬ ‫ّوچٌیي‬ ٍ ،‫اساسی‬ ‫سیزساختْای‬ ٍ ‫خذهات‬ ‫تذارک‬ ‫ًقص‬ ‫اس‬ ‫گیزی‬ ُ‫تْز‬ ‫ضْزی؛‬ ‫فضای‬
  • 30. SEOUL IMPLEMENTATION PLAN WG2: Slum Upgrading c) Develop policies for promoting equal opportunities in slums and creating inclusive cities without discrimination through facilitating the participation of slum-dwellers in the decision- making process; d) Share knowledge and experiences by contributing to the best practices database and the competitive award established by the WG2 Secretariat; ‫ج‬)‫خط‬ ‫تذٍیي‬­‫هطی‬­‫فزصت‬ ‫گستزش‬ ٍ ‫تزٍیج‬ ‫تزای‬ ‫ّا‬­‫ضـْزّای‬ ‫ایجاد‬ ٍ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫در‬ ‫تزاتز‬ ‫ّای‬ ‫گیزی؛‬ ‫تصوین‬ ‫فزآیٌذ‬ ‫در‬ ‫سکًَتگاّْا‬ ‫ًَع‬ ‫ایي‬ ‫ساکٌاى‬ ‫هطارکت‬ ‫اهز‬ ‫در‬ ‫تسْیل‬ ‫طزیق‬ ‫اس‬ ‫تثعیض‬ ‫تذٍى‬ ‫فزاگیز‬ ‫ت‬)‫گذاردى‬ ‫اضتزاک‬ ِ‫ت‬ًَِ‫ًو‬ ‫تْتزیي‬ ‫دادى‬ ‫قزار‬ ‫تا‬ ‫تجزتیات‬ ٍ ‫داًص‬­‫اطالعاتی‬ ُ‫پایگا‬ ‫در‬ ‫عولکزدی‬ ‫ّای‬ ٍُ‫گز‬ ‫کار‬ ًِ‫دتیزخا‬ ‫تَسط‬ ٌِ‫سهی‬ ‫ایي‬ ‫در‬ ‫رقاتت‬ ‫ایجاد‬ ‫تزای‬ ُ‫جایش‬ ‫تعییي‬ ٍ2‫؛‬
  • 31. SEOUL IMPLEMENTATION PLAN WG2: Slum Upgrading e) Scale up the experience gained by volunteer countries in the pilot-testing slum indicators across the region for inclusion in the slum upgrading database; f) Prepare national reports highlighting respective best practices and employing slum upgrading indicators for setting slum upgrading goals, targets, and timelines; ‫ث‬)‫ـاخص‬‫ـ‬‫ض‬ ‫ـی‬‫ـ‬‫آسهایط‬ ‫ـاتی‬‫ـ‬‫ارسی‬ ‫در‬ ‫ـة‬‫ـ‬‫داٍطل‬ ‫ـَرّای‬‫ـ‬‫کط‬ ‫ـط‬‫ـ‬‫تَس‬ ُ‫ـذ‬‫ـ‬‫ض‬ ‫ـة‬‫ـ‬‫کس‬ ‫ـات‬‫ـ‬‫تجزتی‬ ‫ـشایص‬‫ـ‬‫اف‬­‫ـای‬‫ـ‬ّ ُ‫سکًَتگا‬­‫ًاتساهاى؛‬ ‫سکًَتگاّْای‬ ‫تْساسی‬ ‫اطالعاتی‬ ُ‫پایگا‬ ‫در‬ ‫درج‬ ‫تزای‬ ِ‫هٌطق‬ ‫سزاسز‬ ‫در‬ ‫ًاتساهاى‬ ‫ّای‬ ‫ج‬)ًَِ‫ًو‬ ‫تْتزیي‬ ‫تز‬ ‫تأکیذ‬ ‫تا‬ ‫هلی‬ ‫گشارش‬ ِ‫تْی‬­ِ‫تـ‬ ٍ ِ‫هزتَطـ‬ ‫عولکـزدی‬ ‫ّـای‬­‫ضـاخص‬ ‫کـارگیزی‬­‫ّـای‬ ٍ ‫ّـا‬ ِ‫ساغـ‬ ‫تْسـاسی‬ ‫سهاًثٌـذی‬ ‫جـذٍل‬ ٍ ،‫هقاصـذ‬ ، ‫اّـذا‬ ‫تعیـیي‬ ‫تزای‬ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫تْساسی‬ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬
  • 32. SEOUL IMPLEMENTATION PLAN WG2: Slum Upgrading g) Present the results of this pilot-testing exercise and share information and experiences in upgrading slums in the forthcoming Expert Woking Group meeting organised by the Islamic Republic of Iran in 2015; h) Expand the level and scope of participation in the Virtual Scientific Committee established by the he Islamic Republic of Iran for the Slum Upgrading Working Group to share information and experiences. ‫چ‬)‫تْسـاسی‬ ِ‫تـ‬ ‫هزتـَب‬ ‫تجزتیـات‬ ٍ ‫اطالعـات‬ ‫گـذاردى‬ ‫اضـتزاک‬ ِ‫ت‬ ٍ ًَِ‫ًو‬ ‫آسهایطی‬ ‫ارسیاتی‬ ‫ایي‬ ‫ًتایج‬ ِ‫ارائ‬ ٍُ‫کارگز‬ ‫کارضٌاسی‬ ‫ًطست‬ ‫یک‬ ‫در‬ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬­‫سال‬ ‫در‬ ِ‫ک‬ ‫ّا‬2015‫اسـالهی‬ ‫جوْـَری‬ ‫ّوت‬ ِ‫ت‬ ‫ضذ؛‬ ‫خَاّذ‬ ‫تزگشار‬ ‫ایزاى‬ ‫ح‬)‫کـار‬ ‫تـزای‬ ‫ایـزاى‬ ‫اسـالهی‬ ‫جوَْری‬ ‫ّوت‬ ِ‫ت‬ ِ‫ک‬ ‫هجاسی‬ ‫علوی‬ ِ‫کویت‬ ‫در‬ ‫هطارکت‬ ٌِ‫داه‬ ٍ ‫سطح‬ ‫گستزش‬ ُ‫ضذ‬ ‫ایجاد‬ ‫تجزتیات‬ ٍ ‫اطالعات‬ ‫گذاردى‬ ‫اضتزاک‬ ِ‫ت‬ ٍ ‫تثادل‬ ‫هٌظَر‬ ِ‫ت‬ ٍ ‫ًاتساهاى‬ ‫سکًَتگاّْای‬ ‫تْساسی‬ ٍُ‫گز‬ ‫است‬.
  • 33. Introduction ِ‫ث‬‫هَجت‬ِ‫ثشًبه‬‫اجشایی‬‫ػئَل‬ِ‫ک‬‫دس‬‫پٌجویي‬‫اجالع‬‫ٍصسا‬‫دس‬‫ػبل‬2014‫تصَیت‬،‫ؿذ‬‫کـَسّبی‬َ‫عض‬ ‫ثبیذ‬«‫طی‬‫ًـؼت‬‫آتی‬ٍُ‫کبسگش‬‫تخصصی‬‫ثْؼبصی‬‫هٌبطق‬‫ًبثؼبهبى‬‫ؿْشی‬ِ‫ک‬ِ‫ث‬‫ّوت‬‫جوَْسی‬‫اػالهی‬ ‫ایشاى‬‫دس‬‫ػبل‬2015‫ثشپب‬‫هی‬‫ؿَد‬ِ‫ث‬‫تجبدل‬‫اطالعبت‬ٍ‫تجشثیبت‬‫خَد‬‫دس‬‫ایي‬ٌِ‫صهی‬‫ثپشداصًذ‬».‫گشدّن‬‫آیی‬ ‫تخصصی‬8-10ُ‫آرسهب‬ُ‫هب‬1394‫دس‬‫تْشاى‬‫ثشگضاس‬‫خَاّذ‬‫ؿذ‬.  The Seoul Implementation Plan adopted in 2014 by the 5th APMCHUD requires that member states “share information and experiences in upgrading slums in a forthcoming Expert Working Group meeting organized by the Islamic Republic of Iran in 2015”. The Expert Meeting is to take place in Tehran, from 29 of November to the first of December 2015.
  • 34. Objectives The objectives of the 3rd RSUWG Expert Meeting are to: Promote socio-economic approaches in regeneration of slums, informal settlements and deteriorated fabrics; Exploit the role of public catalytic projects to stimulate development and enrich urban space in the Asia-Pacific Region; ‫اص‬ ‫اًذ‬ ‫عجبست‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کبسگش‬ ‫تخصصی‬ ‫ًـؼت‬ ‫ػَهیي‬ ‫اّذاف‬: ‫اجتوبعی‬ ‫سٍیکشدّبی‬ ‫گؼتشؽ‬ ٍ ‫تشٍیج‬-‫ثبفتْبی‬ ٍ ،‫غیشسػوی‬ ٍ ‫ًبثؼبهبى‬ ‫ػکًَتگبّْبی‬ ‫ػبصی‬ ُ‫ثبصصًذ‬ ‫اقتصبدی‬ ‫فشػَدُ؛‬ ‫آػیب‬ ِ‫هٌطق‬ ‫دس‬ ‫ؿْشی‬ ‫فضبی‬ ‫غٌبی‬ ٍ ِ‫تَػع‬ ‫ایجبد‬ ‫ثشای‬ ِ‫تَػع‬ ‫هحشک‬ ‫ّبی‬ ُ‫پشٍط‬ ‫ًقؾ‬ ‫اص‬ ‫گیشی‬ ُ‫ثْش‬-ِ‫اقیبًَػی‬‫؛‬
  • 35. Objectives ‫تـشیح‬‫دس‬ ‫ثشاثش‬ ‫فشصتْبی‬ ‫گؼتشؽ‬ ٍ ‫تشٍیج‬ ‫ثشای‬ ُ‫دٌّذ‬ ِ‫تَػع‬ ‫ػیبػتْبی‬ ‫ساػتبی‬ ‫دس‬ ‫ّبیی‬ ِ‫تَصی‬ ‫تفؼیش‬ ٍ ٍ ‫آػیب‬ ‫هٌبطق‬ ‫دس‬ ‫تجعیض‬ ‫اص‬ ‫فبسغ‬ ٍ ‫ؿوَل‬ ِ‫ّو‬ ٍ ‫فشاگیش‬ ‫ؿْشّبی‬ ‫ایجبد‬ ٍ ‫ًبثؼبهبى‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬ ‫اقیبًَػیِ؛‬ ‫اجشا‬ ٍ ‫هـی‬ ‫خط‬ ‫ثیي‬ ِ‫فبصل‬ ٍ ‫ؿکبف‬ ‫حزف‬ ‫ثشای‬ ‫اجشا‬ ‫قبثل‬ ٍ ‫هوکي‬ ‫ساّکبسّبی‬ ‫یبفتي‬(‫اجشای‬ ٍ ‫ػیبػتْب‬ ‫آًْب‬)‫اص‬ ِ‫ک‬ ‫تجشثیبتی‬ ٍ ‫دسػْب‬ ٍ ‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬ ‫ثشسػی‬ ‫طشیق‬ ‫اص‬ ‫ؿْشی‬ ‫ػبصی‬ ُ‫ثبصصًذ‬ ٌِ‫صهی‬ ‫دس‬ ‫آػیب‬ ِ‫هٌطق‬-‫اػت؛‬ ُ‫ؿذ‬ ِ‫گشفت‬ ‫فشا‬ ِ‫اقیبًَػی‬ ‫اجشایی‬ ‫ّبی‬ ِ‫ثشًبه‬ ٍ ‫ّب‬ ِ‫ثیبًی‬ ‫ساػتبی‬ ‫دس‬ ‫ػئَل‬ ‫اجشایی‬ ِ‫ثشًبه‬ ‫اجشای‬ ‫دس‬ ‫هـبسکت‬APMCHUDُ‫ٍیظ‬ ِ‫ث‬ ، ٍُ‫گش‬ ‫کبس‬ ِ‫ثشًبه‬2‫ػبکٌبى‬ ‫ثشای‬ ‫ثشاثش‬ ‫ّبی‬ ‫فشصت‬ ‫ایجبد‬ ٍ ‫ًبثؼبهبى‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ‫ثشای‬ ‫ػکًَتگبّْب‬ ‫ایي‬ Elaborate recommendations for developing policies for promoting equal opportunities in slums and creating inclusive cities without discrimination in Asia and the Pacific; Find feasible solutions to bridge the gap between policy and practice in urban regeneration by reviewing best practices and lessons learnt in the Asia Pacific region; Contribute to implementing the Seoul Implementation Plan in anticipation of the APMCHUD declarations and implementation plans, in particular WG2 Slum Upgrading toward Equal Opportunity;
  • 36. Objectives ‫ًبثؼبهبى؛‬ ٍ ‫غیشسػوی‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ٍ ‫ؿٌبػبیی‬ ٌِ‫صهی‬ ‫دس‬ ‫اطالعبت‬ ‫تجبدل‬ ٍ ‫هجبصی؛‬ ‫علوی‬ ِ‫کویت‬ ‫طشیق‬ ‫اص‬ ‫اطالعبت‬ ‫تجبدل‬ ‫هؤثش‬ ‫ّبی‬ َُ‫ؿی‬ ٍ ‫ساّْب‬ ‫ثشسػی‬ ‫اص‬ ‫پغ‬ ِ‫تَػع‬ ‫کبس‬ ‫دػتَس‬ ‫تصَیت‬ ‫هَسد‬ ‫دس‬ ‫هتحذ‬ ‫هلل‬ ‫ػبصهبى‬ ‫ًـؼت‬ ‫ًتبیج‬ ِ‫ث‬ ِ‫تَج‬2015‫ّبیی‬ ِ‫تَصی‬ ‫تـشیح‬ ‫ثشای‬ ‫هتحذ‬ ‫هلل‬ ‫ؿْشی‬ ‫پبیذاس‬ ِ‫تَػع‬ ٍ ‫هؼکي‬ ‫کٌفشاًغ‬ ‫دس‬ ‫جذیذ‬ ‫ؿْشی‬ ‫کبس‬ ‫دػتَس‬ ٌِ‫صهی‬ ‫دس‬(‫ّجیتبت‬3.) Share experiences on slum identification and slum upgrading; Examine ways and means of effective information sharing through the Virtual Scientific Committee; and Take note of the results of the United Nations Summit to adopt the post-2015 development agenda to elaborate recommendations for a new Urban Agenda in the United Nations Conference on Housing and Sustainable Urban Development (Habitat III) in 2016.
  • 37. Theme The main theme of the 3rd RSUWG Expert Meeting is "Slum Upgrading: Bridging the Gap between Policy and Practice". Under this theme the Meeting will explore four elaborated sub-themes with regards to the Seoul Implementation Plan: 1-Best Practices Share knowledge and experiences by contributing to a best practices database established by the WG2 Secretariat; 2-Slum Identification Indicators Review the lessons learnt in testing slum identification indicators in pilot areas for inclusion in the slum upgrading database; ‫اص‬ ‫اػهت‬ ‫عجهبست‬ ‫ؿهْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کبسگش‬ ‫تخصصی‬ ‫ًـؼت‬ ‫ػَهیي‬ ‫هضوَى‬:«‫ثْؼهبصی‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬:‫اجشا‬ ٍ ‫هـی‬ ‫خط‬ ‫هیبى‬ ‫پل‬ ‫ایجبد‬»(‫آًْهب‬ ‫اجهشای‬ ٍ ‫ػیبػهتْب‬.)،‫هضهوَى‬ ‫ایهي‬ ‫چْهبسچَة‬ ‫دس‬ ‫گیشد‬ ‫هی‬ ‫قشاس‬ ‫دقیق‬ ‫ثشسػی‬ ‫هَسد‬ ‫ًـؼت‬ ‫ایي‬ ‫دس‬ ‫ػئَل‬ ‫اجشایی‬ ِ‫ثشًبه‬ ِ‫ث‬ ِ‫تَج‬ ‫ثب‬ ‫هـشٍح‬ ‫جبًجی‬ ‫هضوَى‬ ‫چْبس‬: •‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬:‫ًهبم‬ ‫ّوهیي‬ ِ‫ثه‬ ‫اطالعهبتی‬ ‫پبیگهبّی‬ ‫دس‬ ‫هـبسکت‬ ‫ثب‬ ‫تجشثیبت‬ ٍ ‫داًؾ‬ ‫تجبدل‬(ُ‫پبیگهب‬ ‫عولکشدی‬ ‫ّبی‬ ًَِ‫ًو‬ ‫ثْتشیي‬ ‫اطالعبتی‬)ٍُ‫کبسگش‬ ًِ‫دثیشخب‬ ِ‫ک‬2‫اػت؛‬ ُ‫کشد‬ ‫ایجبد‬ •‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ؿٌبػبیی‬ ‫ّبی‬ ‫ؿبخص‬:‫ؿٌبػبیی‬ ‫ػٌجؾ‬ ٌِ‫صهی‬ ‫دس‬ ِ‫ک‬ ‫ّبیی‬ ُ‫آهَص‬ ‫ثشسػی‬ ٍ ‫هشٍس‬ ‫ًبثؼهبهبى‬ ‫ػکًَتگبّْبی‬ ‫ثْؼبصی‬ ‫اطالعبتی‬ ُ‫پبیگب‬ ‫دس‬ ‫کشدى‬ ‫لحبظ‬ ‫ثشای‬ ‫آصهبیـی‬ ‫هٌبطق‬ ‫دس‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫اػت؛‬ ُ‫ؿذ‬ ِ‫فشاگشفت‬
  • 38. Theme 3-Slum Upgrading Indicators Review the lessons learnt in testing slum upgrading indicators in pilot areas for inclusion in the slum upgrading database; and 4-Virtual Scientific Committee Review the results of user analysis of the Virtual Scientific Committee to increase the level and scope of participation. •‫ؿهْشی‬ ‫ًبثؼهبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ّبی‬ ‫ؿبخص‬:‫ؿٌبػهبیی‬ ‫ػهٌجؾ‬ ِ‫صهیٌه‬ ‫دس‬ ِ‫که‬ ‫ّهبیی‬ ُ‫آههَص‬ ‫ثشسػهی‬ ٍ ‫ههشٍس‬ ‫ثْؼهبصی‬ ‫اطالعهبتی‬ ُ‫پبیگب‬ ‫دس‬ ‫کشدى‬ ‫لحبظ‬ ‫ثشای‬ ‫آصهبیـی‬ ‫هٌبطق‬ ‫دس‬ ‫ؿْشی‬ ‫ًبثؼبهبى‬ ‫هٌبطق‬ ‫ثْؼبصی‬ ‫ّبی‬ ‫ؿبخص‬ ‫اػت؛‬ ُ‫ؿذ‬ ِ‫فشاگشفت‬ ‫ًبثؼبهبى‬ ‫ػکًَتگبّْبی‬ •‫هجبصی‬ ‫علوی‬ ِ‫کویت‬:ُ‫گؼهتش‬ ٍ ‫ػطح‬ ‫افضایؾ‬ ‫ثشای‬ ‫هجبصی‬ ‫علوی‬ ِ‫کویت‬ ‫اص‬ ‫کبسثشاى‬ ‫تحلیل‬ ‫ًتبیج‬ ‫ثشسػی‬ ٍ ‫هشٍس‬ ‫هـبسکت‬.
  • 39. 2nd Meeting of the Bureau of APMCHUD Holding 2nd Meeting of the Bureau of APMCHUD in the first of December 2015 in Tehran.
  • 40.
  • 41. Venue, Hotel and Accommodation ‫هحل‬‫ًشست‬ٍ‫اقبهت‬‫سٍسبی‬‫ّیبت‬‫ّب‬ٍ‫ًوبیٌذگی‬‫ّبی‬‫آًبى‬‫دس‬‫ّتل‬‫پٌج‬ُ‫ستبس‬ِ‫الل‬‫هی‬‫ثبشذ‬ٍٍ‫سصس‬‫اص‬‫طشیق‬ًِ‫دثیشخب‬ ‫ًشست‬‫اًجبم‬‫هی‬‫گیشد‬. ِ‫کلی‬ٌِ‫ّضی‬‫ّبی‬‫اقبهت‬‫،پزیشایی‬ٍ‫حول‬ٍ‫ًقل‬‫دس‬‫سطح‬‫شْش‬‫تْشاى‬‫تَسط‬‫ششکت‬‫عوشاى‬ٍ‫ثْسبصی‬‫شْشی‬‫ایشاى‬‫پَشش‬ ُ‫داد‬‫هی‬‫شَد‬.  The meeting and Reservations for Heads of Delegations and the Delegates will be made through the Secretariat at the Five-Star Laleh Hotel.  As a courtesy for the Third meeting of the Working Group all accommodations and transportation costs during the meeting in the city of Tehran will be covered by UDRC.
  • 42. Holding of the third meeting of the Regional Slum Upgrading Working Group in November of 2015. To establish the full regional virtual Scientific Advisory Board and invite all regional countries to present their experts for membership in it. ‫ًشست‬ ‫سَهیي‬ ‫برگساری‬‫هٌاطق‬ ‫بْسازی‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کارگر‬ ‫تخصصی‬ ‫ًابساهاى‬‫ًَاهبرسال‬ ‫در‬ ‫شْری‬2015. ‫برای‬ ِ‫هٌطق‬ ‫کشَرّای‬ ‫توام‬ ‫از‬ ‫دعَت‬ ٍ ًِ‫دبیرخا‬ ‫علوی‬ ‫ّیات‬ ‫کردى‬ ‫ای‬ ِ‫هٌطق‬ ‫ایي‬ ‫در‬ ‫عضَیت‬ ‫برای‬ ‫آًْا‬ ‫هتخصصیي‬ ‫هعرفی‬ًِ‫بذ‬ Future Action
  • 43. Notification Working Group meeting to the relevant countries Emphasis on the presence of member countries in the Third Meeting of the Regional Slum Upgrading Working Group Attending member countries in the virtual scientific board Attending ambassadors and experts representing the relevant countries in the opening ceremony Expectations ‫هزتثط‬ ‫کطَرّای‬ ِ‫ت‬ ٍُ‫کارگز‬ ‫ًطست‬ ‫رساًی‬ ‫اطالع‬ ‫هذکَر‬ ‫ًطست‬ ‫در‬ ‫ای‬ ِ‫هٌطق‬ ٍُ‫کارگز‬ َ‫عض‬ ‫کطَرّای‬ ‫حضَر‬ ‫تز‬ ‫تاکیذ‬ ‫هجاسی‬ ‫علوی‬ ِ‫کویت‬ ‫در‬ ٍُ‫کارگز‬ َ‫عض‬ ‫کطَرّای‬ ‫حضَر‬ ‫ًطست‬ ِ‫افتتاحی‬ ‫در‬ ‫هزتثط‬ ‫کطَرّای‬ ‫ّای‬ ‫ًوایٌذگی‬ ‫کارضٌاساى‬ ٍ ‫سفزا‬ ‫حضَر‬
  • 44. We look forward to the active participation of your delegation at the Third meeting of the Working Group. ‫در‬ ‫شوا‬ ُ‫ًوایٌذ‬ ‫فعال‬ ‫حضَر‬ ‫اًتظار‬ ‫در‬‫سَهیي‬ ‫ّستین‬ ٍُ‫کارگر‬ ‫ًشست‬.
  • 45. Thank you for your time