                              Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed
                              Martin Corporation, for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL85000.
Achieving High Penetrations of PV: Streamlining
Interconnection and Managing Variability in a Utility
Distribution System
The Department of Energy, EPRI, Sandia and NREL have joined
forces in this workshop. It will focus on PV systems operating in
the utility system:
 Operational issues
 Update interconnection rules and regulatory actions
 Address PV lessons learned from high penetration scenarios
 Identify best practices for distributed generation problem
   mitigation
 Discuss technology advancements.
The Learning Objectives Are to:
 Describe how high penetrations of PV will affect the utility
  system, its design and operation
 Discuss national interconnection standards and codes, efforts
  and latest best practices on PV interconnection regulations
  from around the country
 Explain utility information needs, processes, and procedures
  for connecting PV systems to the grid
 Discuss inverter manufacturer hardware, firmware and
  software requirements in light of changing interconnection
  codes and standards
 Describe research and updated procedures for
  interconnection of PV on distribution feeders and
  transmission
 Solicit feedback to identify additional issues, approaches and
  recommendations for future actions
Regulatory Landscape for High Penetration PV in
 the Distribution System
 (Roger Hill, SNL - moderator)
 Updating Interconnection Screens and Standards (Mike
  Coddington, NREL)
 California PUC Rule 21 and Hawaii PUC Rule 14H (Kevin Fox,
  IREC)
 California Solar Initiative RD&D Work Effort (Kristen Nicole,
  EPRI)
 Technical Issues Identified in FERC Proceedings (Roger Hill,
  SNL)
 Moderated Discussion
Challenges and Issues for Interconnecting High
Penetrations of PV on the Distribution System
(Kevin Fox, IREC - moderator)
Overview of Key Challenges and Mitigation Options for Utilities
in Managing Distributed PV – Managing PV Variability (Robert
Broderick, SNL)
 Understanding and Addressing High-penetration PV Issues
   Through Analysis of PV Integration in Florida Utility Circuits
   (Rick Meeker, FSU)
 Case Study Examples Illustrating Modeling of PV for
   Distribution Planning and Analysisdeling PV on Distribution
   Systems (Jeff Smith, EPRI)
 Integrating Renewable Energy in PJM (Kenneth Schuyler, PJM
   Interconnection
 Moderated Discussion
Technology Advancements in Power
  Electronics and Advanced Inverter Solutions
  (Kristen Nicole, EPRI - moderator)
 Monitoring and Visualization Efforts for PV and Distribution
  Systems (Jason Bank- NREL)
 Looking Ahead – EPRI R&D – Advanced Technologies to
  Manage and Integrate Distributed PV (Aminul Huque, EPRI)
 Updating National Interconnection Standards for Advanced
  Inverter Capabilities (David Bassett, Consultant)
 Advanced Grid Integration Features, (Carl Lennox, SunPower
  Corporation)
 Moderated Discussion
Concluding Discussion
    (Co-moderated by Hill and Coddington)
   Remaining Issues
   Desired Outcomes
   Recommendations
   Actionable items
Technical Issues Identified in FERC
Proceedings
 On February 16 SEIA petitioned FERC for a
  rulemaking
 The PV market has made great progress with many
  thousands of systems installed
 The issues are not necessarily new but with
  increased system penetration they become more
  pronounced
 The DOE program has been working on the issues
 On July 17, FERC held a technical conference
Sandia’s Photovoltaics and Grid
    Integration Program Areas
- Integrated Inverters,                                       - Inverter, systems
  Controllers                                                   performance models
- Microgrid architectures                  Testing,           - Lab-based
- Micro-electronics                        Evaluation,          characterization
- Thin Wafers                R&D                              - New lab capabilities
- In-line diagnostics                      Characterization     (e.g. array simulator)
- CPV systems
- etc                                                         - System Reliability
                                                              - Grid Integration/Storage
- New systems                                                 - Building integration and
  configurations                                                energy management
- Grid penetration                                            - SEGIS
                                   Applications
- Market Transformation            Development,
                                                              - Direct industry support
     Market Barriers               Support
                                                              - Benchmarking/field T&E
     Non-hardware BOS
                                                              - Analyses
- Information Products




                       www.sandia.gov/pv publications
Market Transformation
   -Soft Costs
Market Transformation promotes the commercialization of solar technologies by
addressing non-technical issues that act as barriers to the adoption of solar energy
technologies. The Market Transformation effort identifies and prioritizes
significant barriers beyond traditional "cost" issues and develops specific activities
and external partnerships to address those barriers.

Goals: To                                                                       Objectives: To Inform
Increase Market                              DOD                                Policy and
                                             Energy
Penetration                                  Surety                             Regulatory Environment
                                        Interconnection

                                Developer             PV Market
                                Utility               Value
                                Workshops
                         Installation                           Risks &
                         & Inspection                           Insurance

                 Solar in Utility
                 Portfolio                                     Information Products

            Structural      Visual       Regulator        Technical     Water Resource
            Codes           Impacts      Training         Assistance    Issues


                          Regulatory/Policy
Technical Issues Identified
 There is a need for transparent rules, provide a clear
  predictable path to interconnection for DG
 “Difficult to obtain, let alone understand, the
  rigorous technical justification for 1. Certain per-
  circuit limits, 2. Process and timeline for processing
  interconnection studies, and basis for
  interconnection upgrade requirements mandated by
  individual utilities, a gap in the regulatory system.”
Technical Issues Identified
 The 15% rule is overly conservative
 100% of minimum daytime load
 Transmission providers must make peak and
  minimum load data available
 Increase size threshold for fast track from 2 MW to
  10 MW
 Expedited review by third party experts
Technical Issues Identified
 Large numbers of installations is proof changes not
  needed, not a barrier
 Need for modeling, standard load profiles, minimum
  load data , transfer to smart metering, and smart
  grid, comparable access to basic information for
  wholesale market access
 Include CA settlement test-- CA Settlement includes
  Supplemental review that includes a Penetration
  Test, Power Quality and Voltage Fluctuation test, and
  safety and reliability test as part of a supplemental
  review
Technical Issues Identified
 Variable operations of solar
 NARUC --maintain state jurisdiction, takes costs and
  resources for minimum load data
 Don’t wait for IEEE standards to address
  interconnection issues
 Queuing as an issue
 PGE advises caps by voltage of lines rough estimate
  of 15% applied
Technical Issues Identified in
FERC Proceedings
   Rural areas less robust grid
   Technical conference
   Pre-application process
   Transactional costs
   Varying line capacity by differing voltages
Other Technical Issues
   Distribution automation
   Load switching
   Flicker
   Static system voltage levels
   Utility system protection
   Islanding detection
   Fault current contribution
   Voltage and current harmonic distortion issues,
   Stability issues
   Automatic transfer
   Customer owned transformer design

Contenu connexe

Tendances

Print statcom operation on wind
Print statcom operation on windPrint statcom operation on wind
Print statcom operation on windOmkar Koduri
 
Demand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive FacilityDemand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive FacilitySchneider Electric
 
The True Value of Grid Reliability
The True Value of Grid ReliabilityThe True Value of Grid Reliability
The True Value of Grid ReliabilityEchelon Corporation
 
emPower: Accurately Valuing Distributed Energy Resources
emPower: Accurately Valuing Distributed Energy ResourcesemPower: Accurately Valuing Distributed Energy Resources
emPower: Accurately Valuing Distributed Energy ResourcesPrivate Consultants
 
Customer centricity - new choices with ICT solutions for Smart Grid
Customer centricity - new choices with ICT solutions for Smart GridCustomer centricity - new choices with ICT solutions for Smart Grid
Customer centricity - new choices with ICT solutions for Smart GridArtemy Voroshilov
 
PowerLogic® energy & power
PowerLogic® energy & powerPowerLogic® energy & power
PowerLogic® energy & poweralexandriaweber
 
20110817 icontrol english_combined
20110817 icontrol english_combined20110817 icontrol english_combined
20110817 icontrol english_combinedcleantechventures
 
Value of Distributed Energy Resources (VDER) Presentation
Value of Distributed Energy Resources (VDER) PresentationValue of Distributed Energy Resources (VDER) Presentation
Value of Distributed Energy Resources (VDER) PresentationDavid Katz
 
Smart grid implementation challenges in ghana
Smart grid implementation challenges in ghanaSmart grid implementation challenges in ghana
Smart grid implementation challenges in ghanaEmmanuel Attah Marfo
 
BSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewBSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewGerry Locke
 
Smart Grid Report 2009 June
Smart Grid Report 2009 JuneSmart Grid Report 2009 June
Smart Grid Report 2009 Juneguest92ca1c8
 
Utilities Datapower.2
Utilities Datapower.2Utilities Datapower.2
Utilities Datapower.2David White
 
[Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District [Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District Schneider Electric
 
SDG&E's Energy Storage and EV Proposed Rate Case
SDG&E's Energy Storage and EV Proposed Rate CaseSDG&E's Energy Storage and EV Proposed Rate Case
SDG&E's Energy Storage and EV Proposed Rate CaseUCSD-Strategic-Energy
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overviewSchneider Electric
 

Tendances (20)

Print statcom operation on wind
Print statcom operation on windPrint statcom operation on wind
Print statcom operation on wind
 
Thesis Body
Thesis BodyThesis Body
Thesis Body
 
9.27.12
9.27.129.27.12
9.27.12
 
Demand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive FacilityDemand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive Facility
 
The True Value of Grid Reliability
The True Value of Grid ReliabilityThe True Value of Grid Reliability
The True Value of Grid Reliability
 
emPower: Accurately Valuing Distributed Energy Resources
emPower: Accurately Valuing Distributed Energy ResourcesemPower: Accurately Valuing Distributed Energy Resources
emPower: Accurately Valuing Distributed Energy Resources
 
Customer centricity - new choices with ICT solutions for Smart Grid
Customer centricity - new choices with ICT solutions for Smart GridCustomer centricity - new choices with ICT solutions for Smart Grid
Customer centricity - new choices with ICT solutions for Smart Grid
 
Smart grid'
Smart grid'Smart grid'
Smart grid'
 
PowerLogic® energy & power
PowerLogic® energy & powerPowerLogic® energy & power
PowerLogic® energy & power
 
20110817 icontrol english_combined
20110817 icontrol english_combined20110817 icontrol english_combined
20110817 icontrol english_combined
 
Value of Distributed Energy Resources (VDER) Presentation
Value of Distributed Energy Resources (VDER) PresentationValue of Distributed Energy Resources (VDER) Presentation
Value of Distributed Energy Resources (VDER) Presentation
 
Smart grid implementation challenges in ghana
Smart grid implementation challenges in ghanaSmart grid implementation challenges in ghana
Smart grid implementation challenges in ghana
 
BSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewBSI Smart Grid Technologies Review
BSI Smart Grid Technologies Review
 
10 fn s32
10 fn s3210 fn s32
10 fn s32
 
Smart Grid Report 2009 June
Smart Grid Report 2009 JuneSmart Grid Report 2009 June
Smart Grid Report 2009 June
 
Utilities Datapower.2
Utilities Datapower.2Utilities Datapower.2
Utilities Datapower.2
 
Main paper
Main paperMain paper
Main paper
 
[Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District [Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District
 
SDG&E's Energy Storage and EV Proposed Rate Case
SDG&E's Energy Storage and EV Proposed Rate CaseSDG&E's Energy Storage and EV Proposed Rate Case
SDG&E's Energy Storage and EV Proposed Rate Case
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overview
 

En vedette

Grid Impacts And Solutions Of Renewables At High Penetration Levels
Grid Impacts And Solutions Of Renewables At High Penetration LevelsGrid Impacts And Solutions Of Renewables At High Penetration Levels
Grid Impacts And Solutions Of Renewables At High Penetration LevelsEnslin
 
IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311IEA_RETD
 
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon PowerFlinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Powerjames hamilton
 
Senior project presentation
Senior project presentationSenior project presentation
Senior project presentationTim Heath
 
Utilities demin plant sulphuric acid leak lessons learned
Utilities demin plant sulphuric acid leak lessons learnedUtilities demin plant sulphuric acid leak lessons learned
Utilities demin plant sulphuric acid leak lessons learnedAlan Bassett
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utilitychirag patel
 
Preparation for presentation
Preparation for presentationPreparation for presentation
Preparation for presentationWisnu Dewobroto
 
Project Presentation with Notes Brian Anderson
Project Presentation with Notes Brian AndersonProject Presentation with Notes Brian Anderson
Project Presentation with Notes Brian AndersonBrian Anderson
 
How to Prepare for presentation
How to Prepare for presentationHow to Prepare for presentation
How to Prepare for presentationSushil Mahato
 
[ENGLISH] Preparation for a presentation - Part 1
[ENGLISH] Preparation for a presentation - Part 1[ENGLISH] Preparation for a presentation - Part 1
[ENGLISH] Preparation for a presentation - Part 1Son Nguyen Hoai
 
Steam System Technology Basics
Steam System Technology BasicsSteam System Technology Basics
Steam System Technology BasicsCarotek
 
Central Utility Plant Roundtable
Central Utility Plant RoundtableCentral Utility Plant Roundtable
Central Utility Plant RoundtableSebesta Blomberg
 
17425 plant utility
17425  plant utility17425  plant utility
17425 plant utilitysoni_nits
 
Brian D. Thomas Sr. - Resume - consultant -021216
Brian D. Thomas Sr. - Resume - consultant -021216Brian D. Thomas Sr. - Resume - consultant -021216
Brian D. Thomas Sr. - Resume - consultant -021216Brian Thomas
 
Visual Matter, a full service Creative & Marketing agency. We specialize in c...
Visual Matter, a full service Creative & Marketing agency. We specialize in c...Visual Matter, a full service Creative & Marketing agency. We specialize in c...
Visual Matter, a full service Creative & Marketing agency. We specialize in c...VisualMatter
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 finalJohn Chowdhury
 
The future of tire plants
The future of tire plants The future of tire plants
The future of tire plants PelmarGroup
 

En vedette (20)

17 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v117 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v1
 
Grid Impacts And Solutions Of Renewables At High Penetration Levels
Grid Impacts And Solutions Of Renewables At High Penetration LevelsGrid Impacts And Solutions Of Renewables At High Penetration Levels
Grid Impacts And Solutions Of Renewables At High Penetration Levels
 
IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311IEA-RETD RE-INTEGRATION 20150311
IEA-RETD RE-INTEGRATION 20150311
 
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon PowerFlinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
 
Senior project presentation
Senior project presentationSenior project presentation
Senior project presentation
 
Utilities demin plant sulphuric acid leak lessons learned
Utilities demin plant sulphuric acid leak lessons learnedUtilities demin plant sulphuric acid leak lessons learned
Utilities demin plant sulphuric acid leak lessons learned
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Preparation for presentation
Preparation for presentationPreparation for presentation
Preparation for presentation
 
Project Presentation with Notes Brian Anderson
Project Presentation with Notes Brian AndersonProject Presentation with Notes Brian Anderson
Project Presentation with Notes Brian Anderson
 
How to Prepare for presentation
How to Prepare for presentationHow to Prepare for presentation
How to Prepare for presentation
 
[ENGLISH] Preparation for a presentation - Part 1
[ENGLISH] Preparation for a presentation - Part 1[ENGLISH] Preparation for a presentation - Part 1
[ENGLISH] Preparation for a presentation - Part 1
 
Steam System Technology Basics
Steam System Technology BasicsSteam System Technology Basics
Steam System Technology Basics
 
Central Utility Plant Roundtable
Central Utility Plant RoundtableCentral Utility Plant Roundtable
Central Utility Plant Roundtable
 
17425 plant utility
17425  plant utility17425  plant utility
17425 plant utility
 
Brian D. Thomas Sr. - Resume - consultant -021216
Brian D. Thomas Sr. - Resume - consultant -021216Brian D. Thomas Sr. - Resume - consultant -021216
Brian D. Thomas Sr. - Resume - consultant -021216
 
Visual Matter, a full service Creative & Marketing agency. We specialize in c...
Visual Matter, a full service Creative & Marketing agency. We specialize in c...Visual Matter, a full service Creative & Marketing agency. We specialize in c...
Visual Matter, a full service Creative & Marketing agency. We specialize in c...
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 final
 
The future of tire plants
The future of tire plants The future of tire plants
The future of tire plants
 
cost-estimation-tutorial
cost-estimation-tutorialcost-estimation-tutorial
cost-estimation-tutorial
 
Utilities
UtilitiesUtilities
Utilities
 

Similaire à Achieving High Penetrations of PV by Roger Hill

Roadmap subgroup sgip montreal meeting
Roadmap subgroup   sgip montreal meetingRoadmap subgroup   sgip montreal meeting
Roadmap subgroup sgip montreal meetingKarthik Krishna
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV Smarter Grid Solutions
 
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesDigital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesMoustafa Shahin
 
Distribution Automation Challenges
Distribution Automation ChallengesDistribution Automation Challenges
Distribution Automation ChallengesMohammad Abdullah
 
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab OPAL-RT TECHNOLOGIES
 
TestbedLikun_final
TestbedLikun_finalTestbedLikun_final
TestbedLikun_finalLikun Lin
 
De Martini - UCLA SMERC conf. Mar 22, 2013
De Martini - UCLA SMERC conf.  Mar 22, 2013De Martini - UCLA SMERC conf.  Mar 22, 2013
De Martini - UCLA SMERC conf. Mar 22, 2013Paul De Martini
 
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...Power System Operation
 
Investigation of the challenges in establishing plug and play low voltage dc ...
Investigation of the challenges in establishing plug and play low voltage dc ...Investigation of the challenges in establishing plug and play low voltage dc ...
Investigation of the challenges in establishing plug and play low voltage dc ...PromiseBeshel
 
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...nilesh405711
 
AnnaUniversity electives.pdf
AnnaUniversity electives.pdfAnnaUniversity electives.pdf
AnnaUniversity electives.pdfKandavelEee
 
Cyber Resiliency 20120420
Cyber Resiliency 20120420Cyber Resiliency 20120420
Cyber Resiliency 20120420Steve Goeringer
 

Similaire à Achieving High Penetrations of PV by Roger Hill (20)

Roadmap subgroup sgip montreal meeting
Roadmap subgroup   sgip montreal meetingRoadmap subgroup   sgip montreal meeting
Roadmap subgroup sgip montreal meeting
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
 
Power related issues requiring SmartGrids solutions
Power related issues requiring SmartGrids solutionsPower related issues requiring SmartGrids solutions
Power related issues requiring SmartGrids solutions
 
DER Integration Testbed at a Glance
DER Integration Testbed at a GlanceDER Integration Testbed at a Glance
DER Integration Testbed at a Glance
 
2.4_Overview of Microgrid Research, Development, and Resiliency Analysis_Hovs...
2.4_Overview of Microgrid Research, Development, and Resiliency Analysis_Hovs...2.4_Overview of Microgrid Research, Development, and Resiliency Analysis_Hovs...
2.4_Overview of Microgrid Research, Development, and Resiliency Analysis_Hovs...
 
Microgrid Testbed at a Glance
Microgrid Testbed at a GlanceMicrogrid Testbed at a Glance
Microgrid Testbed at a Glance
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV
 
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy ResourcesDigital Grid Technologies for Smooth Integration of Renewable Energy Resources
Digital Grid Technologies for Smooth Integration of Renewable Energy Resources
 
Distribution Automation Challenges
Distribution Automation ChallengesDistribution Automation Challenges
Distribution Automation Challenges
 
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
 
TestbedLikun_final
TestbedLikun_finalTestbedLikun_final
TestbedLikun_final
 
De Martini - UCLA SMERC conf. Mar 22, 2013
De Martini - UCLA SMERC conf.  Mar 22, 2013De Martini - UCLA SMERC conf.  Mar 22, 2013
De Martini - UCLA SMERC conf. Mar 22, 2013
 
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...
Evaluation of Utility Advanced Distribution Management System (ADMS) and Prot...
 
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
 
Investigation of the challenges in establishing plug and play low voltage dc ...
Investigation of the challenges in establishing plug and play low voltage dc ...Investigation of the challenges in establishing plug and play low voltage dc ...
Investigation of the challenges in establishing plug and play low voltage dc ...
 
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...
A_Review_of_Cybersecurity_in_Grid-Connected_Power_Electronics_Converters_Vuln...
 
AnnaUniversity electives.pdf
AnnaUniversity electives.pdfAnnaUniversity electives.pdf
AnnaUniversity electives.pdf
 
Cyber Resiliency 20120420
Cyber Resiliency 20120420Cyber Resiliency 20120420
Cyber Resiliency 20120420
 
Alasiri Tosin
Alasiri TosinAlasiri Tosin
Alasiri Tosin
 

Plus de Sandia National Laboratories: Energy & Climate: Renewables

Plus de Sandia National Laboratories: Energy & Climate: Renewables (20)

M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339rM4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
 
22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project
 
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project
 
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
 
13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...
 
12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data
 
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
 

Dernier

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 

Dernier (20)

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 

Achieving High Penetrations of PV by Roger Hill

  • 1. Achieving High Penetrations of PV: Streamlining Interconnection and Managing Variability in a Utility Distribution System Photos placed in horizontal position with even amount of white space Roger Hill between photos and header Principal Member of Technical Staff Photovoltaics and Grid Integration Sandia National Laboratories rrhill@sandia.gov Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL85000.
  • 2. Achieving High Penetrations of PV: Streamlining Interconnection and Managing Variability in a Utility Distribution System The Department of Energy, EPRI, Sandia and NREL have joined forces in this workshop. It will focus on PV systems operating in the utility system:  Operational issues  Update interconnection rules and regulatory actions  Address PV lessons learned from high penetration scenarios  Identify best practices for distributed generation problem mitigation  Discuss technology advancements.
  • 3. The Learning Objectives Are to:  Describe how high penetrations of PV will affect the utility system, its design and operation  Discuss national interconnection standards and codes, efforts and latest best practices on PV interconnection regulations from around the country  Explain utility information needs, processes, and procedures for connecting PV systems to the grid  Discuss inverter manufacturer hardware, firmware and software requirements in light of changing interconnection codes and standards  Describe research and updated procedures for interconnection of PV on distribution feeders and transmission  Solicit feedback to identify additional issues, approaches and recommendations for future actions
  • 4. Regulatory Landscape for High Penetration PV in the Distribution System (Roger Hill, SNL - moderator)  Updating Interconnection Screens and Standards (Mike Coddington, NREL)  California PUC Rule 21 and Hawaii PUC Rule 14H (Kevin Fox, IREC)  California Solar Initiative RD&D Work Effort (Kristen Nicole, EPRI)  Technical Issues Identified in FERC Proceedings (Roger Hill, SNL)  Moderated Discussion
  • 5. Challenges and Issues for Interconnecting High Penetrations of PV on the Distribution System (Kevin Fox, IREC - moderator) Overview of Key Challenges and Mitigation Options for Utilities in Managing Distributed PV – Managing PV Variability (Robert Broderick, SNL)  Understanding and Addressing High-penetration PV Issues Through Analysis of PV Integration in Florida Utility Circuits (Rick Meeker, FSU)  Case Study Examples Illustrating Modeling of PV for Distribution Planning and Analysisdeling PV on Distribution Systems (Jeff Smith, EPRI)  Integrating Renewable Energy in PJM (Kenneth Schuyler, PJM Interconnection  Moderated Discussion
  • 6. Technology Advancements in Power Electronics and Advanced Inverter Solutions (Kristen Nicole, EPRI - moderator)  Monitoring and Visualization Efforts for PV and Distribution Systems (Jason Bank- NREL)  Looking Ahead – EPRI R&D – Advanced Technologies to Manage and Integrate Distributed PV (Aminul Huque, EPRI)  Updating National Interconnection Standards for Advanced Inverter Capabilities (David Bassett, Consultant)  Advanced Grid Integration Features, (Carl Lennox, SunPower Corporation)  Moderated Discussion
  • 7. Concluding Discussion (Co-moderated by Hill and Coddington)  Remaining Issues  Desired Outcomes  Recommendations  Actionable items
  • 8.
  • 9. Technical Issues Identified in FERC Proceedings  On February 16 SEIA petitioned FERC for a rulemaking  The PV market has made great progress with many thousands of systems installed  The issues are not necessarily new but with increased system penetration they become more pronounced  The DOE program has been working on the issues  On July 17, FERC held a technical conference
  • 10. Sandia’s Photovoltaics and Grid Integration Program Areas - Integrated Inverters, - Inverter, systems Controllers performance models - Microgrid architectures Testing, - Lab-based - Micro-electronics Evaluation, characterization - Thin Wafers R&D - New lab capabilities - In-line diagnostics Characterization (e.g. array simulator) - CPV systems - etc - System Reliability - Grid Integration/Storage - New systems - Building integration and configurations energy management - Grid penetration - SEGIS Applications - Market Transformation Development, - Direct industry support Market Barriers Support - Benchmarking/field T&E Non-hardware BOS - Analyses - Information Products www.sandia.gov/pv publications
  • 11. Market Transformation -Soft Costs Market Transformation promotes the commercialization of solar technologies by addressing non-technical issues that act as barriers to the adoption of solar energy technologies. The Market Transformation effort identifies and prioritizes significant barriers beyond traditional "cost" issues and develops specific activities and external partnerships to address those barriers. Goals: To Objectives: To Inform Increase Market DOD Policy and Energy Penetration Surety Regulatory Environment Interconnection Developer PV Market Utility Value Workshops Installation Risks & & Inspection Insurance Solar in Utility Portfolio Information Products Structural Visual Regulator Technical Water Resource Codes Impacts Training Assistance Issues Regulatory/Policy
  • 12. Technical Issues Identified  There is a need for transparent rules, provide a clear predictable path to interconnection for DG  “Difficult to obtain, let alone understand, the rigorous technical justification for 1. Certain per- circuit limits, 2. Process and timeline for processing interconnection studies, and basis for interconnection upgrade requirements mandated by individual utilities, a gap in the regulatory system.”
  • 13. Technical Issues Identified  The 15% rule is overly conservative  100% of minimum daytime load  Transmission providers must make peak and minimum load data available  Increase size threshold for fast track from 2 MW to 10 MW  Expedited review by third party experts
  • 14. Technical Issues Identified  Large numbers of installations is proof changes not needed, not a barrier  Need for modeling, standard load profiles, minimum load data , transfer to smart metering, and smart grid, comparable access to basic information for wholesale market access  Include CA settlement test-- CA Settlement includes Supplemental review that includes a Penetration Test, Power Quality and Voltage Fluctuation test, and safety and reliability test as part of a supplemental review
  • 15. Technical Issues Identified  Variable operations of solar  NARUC --maintain state jurisdiction, takes costs and resources for minimum load data  Don’t wait for IEEE standards to address interconnection issues  Queuing as an issue  PGE advises caps by voltage of lines rough estimate of 15% applied
  • 16. Technical Issues Identified in FERC Proceedings  Rural areas less robust grid  Technical conference  Pre-application process  Transactional costs  Varying line capacity by differing voltages
  • 17. Other Technical Issues  Distribution automation  Load switching  Flicker  Static system voltage levels  Utility system protection  Islanding detection  Fault current contribution  Voltage and current harmonic distortion issues,  Stability issues  Automatic transfer  Customer owned transformer design