 A cross drainage work is a structure carrying the
discharge from a canal across a natural stream
intercepting the canal.
 Canal comes across obstructions like rivers, natural
drains and other canals.
 The various types of structures that are built to carry
the canal water across the above mentioned obstructions
are called cross drainage works.
Canal over • aqueduct
• Siphon
the drainage
aqueduct
Canal below • Super passage
the drainage • Canal siphon
Drain through • Level crossing
• Inlets and
the canal
outlets
TYPES OF AQUEDUCTS

Type Type Type
1
2
3
How does an aqueduct work?
The water was transported in concrete tunnels.
The tunnels were underground if possible.
Sometimes the tunnel had to go above
ground. Tunnels could be build with a shaft. This
shaft allowed them to take out dirt and lower
supplies to the workers.
tunnel
PROPER SITE FOR DRAINGE CROSSING:
The site selected for the cross drainage works should have
the following main characteristics,
1. It should be such that it requires minimum disturbance
regarding the approach and tail reaches of the drainage
channel.
2. Suitable foundation soil should be available at reasonable
depth.
3. Sufficient headway is available for the super structure of
the aqueduct over the H.F.L of the natural stream.
4. Suitable existing topography, geological and hydraulic
conditions for the cross drainage works at reasonable costs
LICHFIELD CANAL AQUEDUCT
Birmingham, England.
This aqueduct consist of the centre support and the
parts of the 2 abutments located adjacent to the hard
shoulders.
design of aqueduct
design of aqueduct
design of aqueduct
design of aqueduct
design of aqueduct
design of aqueduct
design of aqueduct

Contenu connexe

Tendances (20)

design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
 
Dam design
Dam designDam design
Dam design
 
Canal Regulation Work
Canal Regulation WorkCanal Regulation Work
Canal Regulation Work
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Dam construction
Dam constructionDam construction
Dam construction
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Regulation Works
Regulation WorksRegulation Works
Regulation Works
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
 
Gravity Dam
Gravity DamGravity Dam
Gravity Dam
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
design of gravity dam
design of gravity damdesign of gravity dam
design of gravity dam
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 

En vedette

Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theoriesMohsin Siddique
 
Cross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibCross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibEhtisham Habib
 
The Los Angeles Aqueduct Slideshow
The Los Angeles Aqueduct SlideshowThe Los Angeles Aqueduct Slideshow
The Los Angeles Aqueduct SlideshowChris Austin
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
Presentation on khosla's theory (Numerical Example)
Presentation on khosla's theory (Numerical Example)Presentation on khosla's theory (Numerical Example)
Presentation on khosla's theory (Numerical Example)Suman Chapagain
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-pptabhiiii4558
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processesAshish Agarwal
 
Presentazione gruppo 1
Presentazione gruppo 1Presentazione gruppo 1
Presentazione gruppo 11 A
 
Cross Drainage System for Hilly Non-metalled Roads
Cross Drainage System for Hilly Non-metalled RoadsCross Drainage System for Hilly Non-metalled Roads
Cross Drainage System for Hilly Non-metalled Roadssadique shahriar
 
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)World Resources Institute (WRI)
 
Improvement of Duty of Irrigation
Improvement of Duty of IrrigationImprovement of Duty of Irrigation
Improvement of Duty of IrrigationAamir Patni
 
Historic American Engineering Record: Los Angeles Aqueduct
Historic American Engineering Record: Los Angeles AqueductHistoric American Engineering Record: Los Angeles Aqueduct
Historic American Engineering Record: Los Angeles AqueductChris Austin
 
Historic American Engineering Record: Colorado River Aqueduct
Historic American Engineering Record: Colorado River AqueductHistoric American Engineering Record: Colorado River Aqueduct
Historic American Engineering Record: Colorado River AqueductChris Austin
 

En vedette (20)

Canal Fall
Canal FallCanal Fall
Canal Fall
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theories
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
Cross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibCross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham Habib
 
Canal Irrigation
Canal IrrigationCanal Irrigation
Canal Irrigation
 
The Los Angeles Aqueduct Slideshow
The Los Angeles Aqueduct SlideshowThe Los Angeles Aqueduct Slideshow
The Los Angeles Aqueduct Slideshow
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Presentation on khosla's theory (Numerical Example)
Presentation on khosla's theory (Numerical Example)Presentation on khosla's theory (Numerical Example)
Presentation on khosla's theory (Numerical Example)
 
Spillway
Spillway Spillway
Spillway
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt
 
Gt ppt
Gt pptGt ppt
Gt ppt
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
 
Presentazione gruppo 1
Presentazione gruppo 1Presentazione gruppo 1
Presentazione gruppo 1
 
Cross Drainage System for Hilly Non-metalled Roads
Cross Drainage System for Hilly Non-metalled RoadsCross Drainage System for Hilly Non-metalled Roads
Cross Drainage System for Hilly Non-metalled Roads
 
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)
Aqueduct CDP Corporate Water Disclosure Webinar (8 May 2013)
 
Improvement of Duty of Irrigation
Improvement of Duty of IrrigationImprovement of Duty of Irrigation
Improvement of Duty of Irrigation
 
Historic American Engineering Record: Los Angeles Aqueduct
Historic American Engineering Record: Los Angeles AqueductHistoric American Engineering Record: Los Angeles Aqueduct
Historic American Engineering Record: Los Angeles Aqueduct
 
Historic American Engineering Record: Colorado River Aqueduct
Historic American Engineering Record: Colorado River AqueductHistoric American Engineering Record: Colorado River Aqueduct
Historic American Engineering Record: Colorado River Aqueduct
 

Similaire à design of aqueduct

CROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxCROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxAjayDevgan20
 
Crossdrainageworks
CrossdrainageworksCrossdrainageworks
Crossdrainageworkssaibabu48
 
Cross drainage work
Cross drainage work Cross drainage work
Cross drainage work meetmaniya
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work holegajendra
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...Denish Jangid
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfGOWTHAM14499
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage worksJaydeep Dave
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineeringAnuj Kumar
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptxMood Naik
 

Similaire à design of aqueduct (20)

Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
CROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxCROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptx
 
Crossdrainageworks
CrossdrainageworksCrossdrainageworks
Crossdrainageworks
 
Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
Cross drainage work
Cross drainage work Cross drainage work
Cross drainage work
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Canal of design
Canal of designCanal of design
Canal of design
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Dams by muhammad ahsan riaz
Dams by muhammad ahsan riazDams by muhammad ahsan riaz
Dams by muhammad ahsan riaz
 
Drains and sewer
Drains and sewerDrains and sewer
Drains and sewer
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineering
 
Cross drainage works
Cross drainage worksCross drainage works
Cross drainage works
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptx
 

design of aqueduct

  • 1.
  • 2.
  • 3.
  • 4.  A cross drainage work is a structure carrying the discharge from a canal across a natural stream intercepting the canal.  Canal comes across obstructions like rivers, natural drains and other canals.  The various types of structures that are built to carry the canal water across the above mentioned obstructions are called cross drainage works.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Canal over • aqueduct • Siphon the drainage aqueduct Canal below • Super passage the drainage • Canal siphon Drain through • Level crossing • Inlets and the canal outlets
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. TYPES OF AQUEDUCTS Type Type Type 1 2 3
  • 22.
  • 23.
  • 24.
  • 25. How does an aqueduct work? The water was transported in concrete tunnels. The tunnels were underground if possible. Sometimes the tunnel had to go above ground. Tunnels could be build with a shaft. This shaft allowed them to take out dirt and lower supplies to the workers. tunnel
  • 26. PROPER SITE FOR DRAINGE CROSSING: The site selected for the cross drainage works should have the following main characteristics, 1. It should be such that it requires minimum disturbance regarding the approach and tail reaches of the drainage channel. 2. Suitable foundation soil should be available at reasonable depth. 3. Sufficient headway is available for the super structure of the aqueduct over the H.F.L of the natural stream. 4. Suitable existing topography, geological and hydraulic conditions for the cross drainage works at reasonable costs
  • 28.
  • 29. This aqueduct consist of the centre support and the parts of the 2 abutments located adjacent to the hard shoulders.