Quote by E. Sreedharan




"We (DMRC and its partners) have acquired the
expertise for most of the work. We have always
wanted to have a more patriotic approach in
our work and are proud that we can do the job
ourselves in such little time," says DMRC
managing director E. Sreedharan said in a
recent interview.
Executive Summary
‡ The National Capital Territory of Delhi with a population of around 14 million
  has a vehicle population of around 4 million. Bus travel is the predominant
  mass transportation system in Delhi.
‡ This has resulted in increasing traffic congestion, increasing road accidents
  and increasing air pollution. Though a number of studies were carried out and
  recommendations made to solve the mass transportation problem of Delhi, it
  was only in 1998 that the Delhi Metro Rail Corporation was formed with equal
  equity participation of the Government of India and Government of the
  Capital Territory of Delhi to plan, execute, operate and maintain the Delhi
  Metro.
‡ The Delhi Metro Rail Project is being planned and executed in four phases -
  Phase I, Phase II, Phase III and Phase IV.
‡ It consists of 3 lines - Line 1, Line 2 and Line 3. Line 1 is partly elevated rail and
  partly surface rail. Line 2 is underground metro. Line 3 is partly underground
  and partly elevated rail.
Executive Summary (Cont.)
‡   Line is completed and is operational. Phase I is scheduled for completion by 2005,
    Phase II by 2010, Phase III by 2015 and Phase IV by 2020.
‡   The project requires the deployment of several technologies - Constructional
    Technology, Rail Coach Technology, Power Systems Technology, Rail Communication
    and Control Technology, Microprocessor Controlled Smart Card Technology.
    Underground tunnel construction involves considerable risks due to uncertain
    geological conditions. The project is executed with the help of both local and
    international contractors who are contracted to design and build the facility. An
    International Consortium of Consultants oversees the work.
‡   Japan Bank for International Cooperation is extending loan to the project to the extent
    of 56% project cost. Government of India, Ministry of Urban Development and the
    Government of the National Capital Territory of Delhi are each investing 15% of the
    project cost. The remaining is met through interest-free loans and property
    development. The operation and maintenance costs are essentially met by ticket sales.
‡   People of Delhi are generally satisfied with the services offered by DMRC and are
    proud of experiencing one of the most modern, sophisticated and world-class
    technological systems. Other cities in India and abroad have shown interest in having
    metros through DMRC's services.
Key Architects

‡   The Central Road Research Institute (CRRI), New Delhi
‡   Metropolitan Transport Team (MTT) of the Indian Railways
‡   Delhi Development Authority (DDA)
‡   The Study Group of the Ministry of Railways
‡   RITES (Rail India Technical & Economic Services)
‡   Mr. E. Sreedharan, Managing Director, DMRC
Implementers/ Stakeholders
‡   The Delhi Metro Rail Corporation Ltd. (DMRC).
‡   Ministry of Railways and Ministry of Urban Affairs, Government of India.
‡   Government of the National Capital Territory of Delhi (GNCTD).
‡   Delhi Transport Corporation (DTC).
‡   Governments of Uttar Pradesh & Haryana (At a later date) General Consultants (A
    consortium of Indian and Overseas Consulting Firms).
‡   The consortium comprising ROTEM (formerly KOROS), Mitsubishi Corporation, and
    Mitsubishi Electric Corporation - manufacturers of Rolling Stock.
‡   Bharath Earth Movers Limited (BEML), the Indian Coach Builders.
‡   KSHI JV, a consortium of builders for open cut works with Maunsell, Australia engaged
    as the lead design consultant.
‡   IMCC, a consortium of builders for underground works with Mott MacDonald, UK as the
    lead design consultant.
‡   The Japan Bank for International Cooperation (JBIC).
‡   The citizens of Delhi (Those who pay and use the Metro and those who are indirectly
    benefited).
Key Objectives -
‡   The main objective of the project is to improve Delhi's urban environment by reducing traffic
    congestion and pollution. The Project is expected to help reduce traffic congestion, exhaust emissions,
    and other types of urban pollution caused by motor vehicles, and to play a large role in improving
    Delhi's transit system.
‡   Outcomes-
‡   Out of 271.45 ha of land required for the project, 237.062 ha has already been acquired. A punctuality
    of 6 minutes is being maintained at present during peak hours. This interval would gradually be reduced
    to 3 minutes when adequate traffic builds up. Train-sets of four coaches in rake have been put into
    service. They run at intervals of 8 to 10 minutes from 6 a.m. to 10 p.m. The maximum speed of the
    Metro is 80 km/h with an average stoppage time of 20 seconds at each station.
‡   Delhi Mass Rapid Transit System is essentially a ͞social sectoȑ project, whose benefits will pervade
    over wide sections of the economy. I phase will generate the following benefits to the city.
‡   21.82 lakhs commuter trips per day will be siphoned off the roads. This would mean:
‡   2,600 less buses on the roads. Increasing in average speed of buses from 10.5 km/h to 14 km/h.
‡   Metro will reduce journey time by 50 to 75 percent.
‡   Saving of 2 million man-hours per day due to reduced journey time.
‡   Saving in fuel cost worth Rs. 5 billion per year
‡   Space saving- The metro can carry traffic as 9 lanes of buses / 33 lanes of motor cars (either way)
‡   Delhi will experience a net benefit of Rs. 437.23 lacks per day. q More comfortable & safe travel for the
    commuters
‡   Reduction in atmospheric pollution levels by 50%.
Major Contracts

‡   Local Competitive Bidding, International Competitive Bidding and Progressive Indigenization are the
    modes used for contracting work.



‡ Local Competitive Bidding
‡   Design and construction of surface and elevated Lines 1 and 3 are packaged for contracting on
    design-bid-build basis through local competitive bidding.

‡ International Competitive Bidding
‡   Line 2 with its more challenging underground alignment and tight construction schedule is being
    procured through two large internationally tendered design build contracts. Following a
    competitively contested tender that required a rebid process in efforts to lower contract price
    estimates, the two design-build contracts were awarded in February 2001.
‡   The 50-month contract for the 4km-long open-cut section from Vishwa Vidyalaya to the Interstate
    Bus Terminal (ISBT) station was awarded for a tender value of Rs. 900 crores to: KSHI JV comprising
    Kumagai Gumi (Japan ʹ leader), Skanska (Sweden), Hindustan Construction (India), and Itochu
    Corporation (Japan), and with Maunsell, Australia engaged as the lead design consultant.
International Competitive Bidding (Contd.)


‡   The scheduled 60-month contract for the 7km-long, mainly bored tunnel section
    from the ISBT station to Central Secretariat, with five open-cut stations and an
    NATM mined station at Chawri Bazaar, was awarded for Rs. 1700 crores to:
    International Metro Civil Contractors (IMCC) comprising Dyckerhoff & Widmann
    (Germany ʹ leader), Shimizu Corporation (Japan), Larsen & Toubro (India),
    Samsung (Korea), IRCON International (India) and with lead design consultant Mott
    MacDonald, UK.
‡   The construction methodology for the underground Corridor was finalized after
    taking into account the availability of open space above the alignment, ground
    conditions, conditions of nearby existing structures and likely settlement in the
    vicinity.
‡   In addition to the civil works, design for the design-build contracts also includes
    station & services, ventilation, air conditioning, lighting, station finishes,
    landscaping, and the provisions for the fitting of platform edge doors at a later
    date.
‡   Delhi Metro Rail Corporation (DMRC) has awarded a contract to Alcatel TAS the
    design, installation and commissioning of the full Integrated Rail Communication
    system for the metro.
Indigenization

‡ DMRC is procuring 240 coaches of which 60 (4 trains) are
  manufactured in ROTEM, Korea.
‡ BEML Bangalore will manufacture the other 180 coaches (45
  trains). Starting with the local assembly and testing of a few
  trains, BEML will manufacture the coach shell, traction motor,
  converter, inverter unit, battery, passenger announcement
  and information system, air-conditioning units and seats. This
  will help in acquiring capability and avoiding import of trains
  for the forthcoming metro projects in Bangalore, Ahmedabad,
  Mumbai and Hyderabad.
Strengths
  Cost-effective mode of transport for the            Weakness
          general public of Delhi.                      Metro considerably more expensive
    Reduce congestion on roads making                 than the bus.
           movement easier.                            Less ridership than estimated.
  Reduce atmospheric pollution to a great
  level making the environment healthy.                High development cost
   Ultra-modern technology and visually                Displaced many economic backward
  striking design, dynamic and modern,                people.
         competitive World Class.
                                                       Difficulties in acquiring land.
One hundred per cent punctual operations


Opportunity                                           Threats
 Revenue from property development and                  A struggle on the part of those being
advertisements.
                                                      displaced, and protests, petitions,
 Potential to achieve higher ridership.
                                                      hunger strikes, negotiations and legal
 Tax rebate given to the DMRC because of the
2010 Commonwealth Games in Delhi.
                                                      action have all been initiated.
  The success of the Delhi Metro has encouraged         Security threat.
other Indian cities to seriously attempt to
introduce Metro systems.                                Risk of cost overruns and ridership
  The next Metro line in the city will be 10-15 per   shortfalls.
cent cheaper than the previous phases based on          Increase in cost of the parts.
the learning curve theory.
The Man Behind The Success Story




͞Politicians Know I Cannot Be Maneuvered͟, E Sreedharan
About the Man

‡ Elattuvalapil Sreedharan, 77, is a disciplined, simple man who
  calls himself a ͚Railway Man/Metro Man' with 36 years of
  service in the Indian Railways.
‡ Lauded for achieving the 'almost impossible' in a government-
  administered system and given extensions by the government
  after his retirement in 1990, Sreedharan comes with a
  reputation of bringing fantastic results.
‡ He almost has an obsession with deadlines. (In the early years
  of his career, it earned him 20 transfers.) Every officer in
  DMRC keeps a digital board which shows the number of days
  left for the completion of the next target.
‡ The 77-year-old civil engineer has been selected as one of the
  most outstanding Asians by Time magazine.
His other little known achievements

‡ In 1963, disaster struck the Rameshwaram island when tidal waves
  washed away the Pamban bridge connecting it with mainland Tamil
  Nadu. A passenger train was swept away, killing hundreds of persons.
‡ The Southern Railway decided to restore the bridge and set a target of six
  months. General Manager B.C. Ganguly advanced the deadline by three
  months and the Railway Board assigned the task to a 31-year-old
  executive engineer, Sreedharan. It was a tough task as it was an old
  bridge, built by the British in late-nineteenth century, with 146 spans and
  a scherzer-a steel girder which opens up for large vessels to pass under
  the                                                                  bridge.
  Sreedharan took up the challenge and advanced the deadline by a
  month, making the task tougher. He made the bridge functional in 46
  days. He achieved this by the application of some 'commonplace values'-
  discipline, punctuality and honesty-and the introduction of a new work
  culture. These traits continue.
His other little known achievements
‡ Sreedharan successfully completed another mega-project -the Konkan railway
  between Maharashtra and Mangalore. The rail-line was mooted in 1990 by then
  railway minister George Fernandes, while talking to Railway Board members.
  After studying it, Fernandes himself dismissed it as impossible.

‡ A month later, Sreedharan went to Fernandes with a well-charted out plan. "I
  told him that we will have to work in a different fashion," he recalls. Probably his
  enthusiasm infected Fernandes, who got cabinet approval for the project within
  three days. Maharashtra and Kerala immediately agreed to the project, but
  Karnataka chief minister Virendra Patil objected.

‡ Sreedharan, then a member of the Railway Board, went to Maharashtra,
  Karnataka, Goa and Kerala and got all the necessary approvals before his
  'retirement'. But retirement was not to be as Fernandes wanted him to head the
  West Coast Railway. Thus the Konkan Rail Corporation was born. It created an
  engineering marvel by laying a rail network across the mountainous Western
                                       Ghats.
IIM Lucknow Case study facts

‡ Expected passenger traffic - 21,80,000 per day.

‡ Today only 5,00,000 commuters use the metro per day.

‡ The DMRC website states that the estimated number of
  originating passengers per day in the year 2011 for Phase I
  and Phase II corridors will be 26,17,000.


  The project nevertheless is a success͙
IIM Lucknow Case study facts

‡ About 1,100 train trips operate every day with a punctuality
  of nearly 100 per cent.

‡ According to DMRC spokesperson Anuj Dayal the metro earns
  Rs 1 crore daily, of which Rs 65 lakh comes from passenger
  fare and the rest comes through associated activities like
  property development, advertisements and displays,
  consultancy and others.
DMRC- Pride of the Nation

‡ Following DMRC's success, it has been asked to prepare
  detailed project reports for metro rail transport systems, both
  in India as well as abroad.
‡ Countries that have sought its consultation for their project
  management include, Pakistan, Bangladesh, Indonesia, Sri
  Lanka , Syria, Ireland and Indonesia.
‡ According to IIM- Lucknow, due to its technical expertise,
  timely completion of projects and the corporate culture it
  operates in, DMRC has attained the readiness to compete
  with other similarly placed agencies globally.
A Cost-benefit analysis of Delhi metro
Courtesy: Indian Institute of Economic Growth, Delhi University
               Cost Financed By                Phase I   Phase II


  1) Equity (50% each by GOI & GNCTD)          30%       30%


  2) Long Term Debt (Overseas Economic         60%       56%
  Cooperation Fund, Japan) @ 3% p.a. or less


  3) Revenues From Property Development        7%        5%+ 5%
                                                         (internal
                                                         resources)




  4) Subordinate Debt                          3%        4%
The Funding
‡ More than 60 percent of the funds required for investment are
    raised as debt capital.
‡ Around 30 percent of total investments of DM are raised through
    equity capital with the Government of India (GOI) and GNCTD
    having equal shares in it.
‡ The remaining 10 percent of the investments of DM will be covered
    out of the revenues it earns.
‡ DM had been provided with the following concessions by GOI to
    make the project viable, namely
 (a) The cost of land equivalent to Rs. 2180 million has been provided
    as an interest free subordinate loan by GOI/GNCTD to be repaid by
    the DM within 5 years after the senior debt is repaid fully by the
    twentieth year of taking the loan
(b) The risk associated with the exchange rate fluctuations is borne by
    government in case of foreign debt
(c) The DM is exempted from payment of income tax, capital
    gains tax, property tax and customs duty on imports.
(d) The DM is permitted to generate resources through property
    development over a period of 6-20 years.
(e) No dividend is paid on GOI share of equity till the senior debt
    is repaid fully by the twentieth year.
A financial analysis of the Metro

Sources of revenue for the metro are (according to RITES)

‡ The Fare Box Revenues
‡ Revenue from Advertisement
‡ Revenue from Property Development

‡ The main source of revenue of the MRTS system is the fare
  box collection, which is a product of the total passenger
  ridership on the MRTS.
A financial analysis of the Metro

‡ Full ridership is expected to materialize on the metro with a fare
  comparable to the DTC bus fare of Rs. 3 per passenger trip.
‡ The financial model consisting of Rs. 5 per passenger trip and an
  annual fare increase of 7.5 per cent was considered optimal by
  RITES.
‡ Fare Sensitivity of Ridership on the Metro
  (In Rs/Passenger trip)

     Fare Rate                  Percentage Ridership
     3                          100%
     4                          90%
     5                          75%
     6                          50%
Estimates of Daily Passenger Trips by Metro
(in lakhs)
Year               Daily Passenger Trips
2002               12.63
2003               20.15
2004               23.86
2005               31.85
2006               33.17
2007               34.55
2008               35.97
2009               37.46
2010               39.01
2011               40.63
2012               41.81
2013               43.03
2014               44.29
2015               45.58
2016               46.91
2017               48.28
2018               49.69
2019               51.14
2020               52.63
2021               54.17
Estimates of Financial Flows of Revenue Earned by
DM (Phases I and II) During its Lifetime
(Rs. Million)
Year Revenue             Year Revenue         Year   Revenue

2005   15052          2018    67722          2031    128687
2006   17152          2019    74284          2032    133307
2007   19407          2020    82806          2033    134177
2008   21826          2021    92342          2034    139477
2009   24421          2022    99126          2035    140477
2010   33762          2023    106242         2036    146547
2011   37112          2024    115557         2037    147687
2012   41057          2025    116067         2038    154657
2013   44511          2026    119127         2039    155947
2014   50847          2027    119717         2040    163947
2015   49633          2028    123227         2041    165437
2016   56277          2029    123897
2017   62209          2030    127927         a ten fold increase
Identification of Economic Benefits and Costs of Metro

‡ DM contributes to the diversion of a very high proportion of
  current passenger traffic from road to Metro and serves part
  of the growing passenger traffic demand in Delhi.
‡ There will be savings in travel time for passengers still
  traveling on roads due to reduced congestion and obviously
  also for those traveling by Metro.
‡ The Metro also brings about a reduction in air pollution in
  Delhi because of the substitution of electricity for petrol and
  diesel and reduced congestion on the roads
‡ There will also be a reduction in the number of accidents on
  the roads.
Identification of Economic Benefits and Costs of Metro

‡ Reduction of government investments on road developments and
  buses as also in the private sector investment on buses, passenger
  cars and other vehicles carrying passengers.
‡ Reductions in motor vehicles͛ operation and maintenance charges
  to both the government and the private sector.
‡ There will be health and other environmental benefits to the public
  due to reduced pollution from the transport sector of Delhi.
‡ Land and house property owners gain from the increased valuation
  of house property prices due to the Metro.
‡ The Metro has the effect of increasing the income of the regional
  economy of Delhi vis a vis the rest of the Indian economy.
Identification of Economic Benefits and Costs of Metro

‡ The Metro provides employment benefits to the unskilled
  labour especially during its construction period. This labour is
  otherwise unemployed or under employed in the Indian
  economy.
Components of Economic Capital and O&M Cost
Reduction in Vehicles Due to Metro (Phases I & II)
Benefit from Reduced Vehicles

‡ The economic benefits from the reduced number of vehicles on
  Delhi roads due to the Metro could be identified as the
  following:
‡ Savings in Foreign Exchange due to reduced Fuel Consumption
‡ Reduction in Pollution
‡ Savings in Time for all passengers using Metro and Roads.
‡ Savings in Accidents.
‡ Savings in Vehicle Operating Cost (VOC) due to decongestion
  for residual traffic.
‡ Savings in Capital and Operating cost of diverted vehicles .
‡ Savings in the cost of Road Infrastructure.
Benefit from Reduced Fuel Consumption

‡ The total savings in fuel due to decongestion is the product of
  residual traffic, fuel savings norms given by the above
  formula, annual run and a conversion factor (cc to litre) in a
  RITES study.
‡ The fuel savings during the year 2011-12 due to the
  decongestion effect for cars and buses are 20,714,391 Litre
  and 38,510,952 Litre, respectively. The RITES study has
  assumed that the fuel savings of two-wheelers are roughly
  one-third of cars, which becomes 6,835,749 Litre.
Reduction in Pollution Load due to decongestion and its
  Monetary Value for the Year 2011-12 with the Assumption
  that All Vehicles Use EURO II Technology without Metro
Savings due to reduction in Pollution
Net Benefits to the Government

‡ What it gets:
          ± Fare box revenues
          ± Revenue from property development
          ± Advertisements
          ± Tax Revenues from goods or services bought for the
            metro
          ± Saved cost of road infrastructure
          ± Saved cost of operating buses
Net Benefits to the Government

‡ What it loses
           ± Heavy revenue losses due to displaced
             buses(Estimated 2400 buses will be displaced by
             2012).
           ± Investment and operation and maintenance of the
             metro.



          The net benefits for the government during the year
          2011-12 are estimated as Rs. 31760 million at 2004
          prices.
Net Benefit to the Passenger

‡ What they get:
         ± time saving for the passengers due to the Metro
         ± During the year 2011-12, these savings are
           estimated as Rs. 22090 million .
         ± benefits due to a reduction in accidents to the
           passengers due to the functioning of the Metro,
           which are estimated as Rs 448 million during the
           year 2011-12.
‡ What they pay: fares
                     ‡ The net benefits to the passengers from the
                       Metro are estimated as Rs.22440 million during
                       the year 2011-12.
Affects to the Private Transporter

‡ What they get:
         ± Save on their capital and operating costs
         ± This is estimated to be Rs. 6550 million

‡ What they lose:
         ± Lose the revenue from displaced private buses
         ± This is estimated to be Rs. 9410 million

                  ‡ resulting in a net loss of Rs. 2860 million to the
                    private transporters during the year 2011-12.
Net Benefit to the unskilled labour

‡ Benefit to the labour is the difference of working at DMRC
  and the opportunity cost

‡ Assuming that the unskilled labour cost constitutes 10 percent
  of investment cost and 5 percent of operation and
  maintenance cost of the Metro, the benefit to unskilled
  labour is estimated as Rs. 316.4 million during the year 2011-
  12.
Net Benefits to the General Public

‡ What it gets:
          ± Social premium on investment and foreign exchange
          ± Environmental benefits of reduced pollution due to
            the Metro.
  ± Social Premium: reduced fossil fuel consumption due to a
    change in the mode of transport .

          ± The net benefits to the general public from the
            Metro arising out of the social premium on foreign
            exchange is estimated as Rs. 1203.3 crores during
            the year 2011-12.
Total Benefit

‡ The government, passengers, private transporters and the
  public get total net benefits worth Rs. 52550 million in the
  year 2011-12.
Environmental Impact

‡ A detailed Environmental Impact Assessment has been done in
  1994 to minimize the negative environmental impact of the
  Project during the construction stage of the Project.
‡ For every tree cut during construction, the DMRC is planting 10
  trees in advance as compensatory afforestation. Around 26000
  trees have been planted at Najafgarh, Isapur and Rebla Khanpur.
  Through proper care 30% of trees in the alignment have been
  saved.
‡ Installation of storm water drains for disposal of wastewater,
  monitoring air and noise pollution, disposal of excavated
  materials are some of the measures taken during construction to
  minimize the damage to the environment and inconvenience to
  public.
International Certification

‡ The Delhi Metro has been awarded OHSAS 18001
  (Occupational Health and Safety Assessment sequence 18001)
  by Registro Italiano Navale India Pvt. Ltd. (RINA), Genova.
‡ The Delhi Metro Rail Corporation (DMRC) received the ISO
  14001 certificate for establishing an environmental
  management system making it the First Metro in the World to
  receive this certification at the construction stage.
First Delhi Metro Coach To Come By Air Arrives
                From Germany
Bibliography

‡ The Delhi Metro Rail Corporation has brought out a 256 page book titled " A
  Dream Revisited" (An Archival Journey into the making of the Delhi Metro Rail),
  which describes the History, Growth, New Technologies, Routes and issues
  which faced the Delhi Metro Project since its planning up to its implementation.
‡ Indian Institute of Economic Growth, Delhi University
‡ IIT Delhi research report
‡ IIM Lucknow case study on Delhi Metro
‡ ICMR India.org
‡ Wikipedia
‡ http://www.delhimetrorail.com

Contenu connexe

Tendances

The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
Vikas Saini
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
Vimal Maurya
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
gouravranjan27
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
jerry christo
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
Amit Trivedi
 

Tendances (20)

Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin bana
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Indian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the NationIndian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the Nation
 
delhi metro
delhi metrodelhi metro
delhi metro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project Management
 
12
1212
12
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training report
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
 

En vedette (11)

Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Dmrc and l&t tranning report
Dmrc and l&t tranning reportDmrc and l&t tranning report
Dmrc and l&t tranning report
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Leadership Dr. E Sreedharan Arun.Vi
Leadership Dr. E Sreedharan   Arun.ViLeadership Dr. E Sreedharan   Arun.Vi
Leadership Dr. E Sreedharan Arun.Vi
 
DMRC CMS Case Study
DMRC CMS Case StudyDMRC CMS Case Study
DMRC CMS Case Study
 
India skills upgrading safety in dmrc
India skills upgrading safety in dmrcIndia skills upgrading safety in dmrc
India skills upgrading safety in dmrc
 

Similaire à 36551105 delhi-metro

DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
Md Shadab
 
DMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORTDMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORT
POOJA SHARMA
 
Future of Mobility
Future of MobilityFuture of Mobility
Future of Mobility
Hasan Aijaz
 
Dmrc training report
Dmrc training reportDmrc training report
Dmrc training report
AshutoshKumarHappy
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
Akhil Padiga
 

Similaire à 36551105 delhi-metro (20)

36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
DMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORTDMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORT
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
Fmg 18 A Dmrc Group 2
Fmg 18 A Dmrc Group 2Fmg 18 A Dmrc Group 2
Fmg 18 A Dmrc Group 2
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Future of Mobility
Future of MobilityFuture of Mobility
Future of Mobility
 
× Le transport rapide personnalisé et systèmes de transport automatisés en Inde
×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde
× Le transport rapide personnalisé et systèmes de transport automatisés en Inde
 
Dmrc training report
Dmrc training reportDmrc training report
Dmrc training report
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
 
Metro
MetroMetro
Metro
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 

Dernier

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Dernier (20)

VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 

36551105 delhi-metro

  • 1. Let us Begin the journey through DELHI METRO
  • 2. DELHI METRO Amol Azad Rajat Singla
  • 3. Quote by E. Sreedharan "We (DMRC and its partners) have acquired the expertise for most of the work. We have always wanted to have a more patriotic approach in our work and are proud that we can do the job ourselves in such little time," says DMRC managing director E. Sreedharan said in a recent interview.
  • 4. Executive Summary ‡ The National Capital Territory of Delhi with a population of around 14 million has a vehicle population of around 4 million. Bus travel is the predominant mass transportation system in Delhi. ‡ This has resulted in increasing traffic congestion, increasing road accidents and increasing air pollution. Though a number of studies were carried out and recommendations made to solve the mass transportation problem of Delhi, it was only in 1998 that the Delhi Metro Rail Corporation was formed with equal equity participation of the Government of India and Government of the Capital Territory of Delhi to plan, execute, operate and maintain the Delhi Metro. ‡ The Delhi Metro Rail Project is being planned and executed in four phases - Phase I, Phase II, Phase III and Phase IV. ‡ It consists of 3 lines - Line 1, Line 2 and Line 3. Line 1 is partly elevated rail and partly surface rail. Line 2 is underground metro. Line 3 is partly underground and partly elevated rail.
  • 5. Executive Summary (Cont.) ‡ Line is completed and is operational. Phase I is scheduled for completion by 2005, Phase II by 2010, Phase III by 2015 and Phase IV by 2020. ‡ The project requires the deployment of several technologies - Constructional Technology, Rail Coach Technology, Power Systems Technology, Rail Communication and Control Technology, Microprocessor Controlled Smart Card Technology. Underground tunnel construction involves considerable risks due to uncertain geological conditions. The project is executed with the help of both local and international contractors who are contracted to design and build the facility. An International Consortium of Consultants oversees the work. ‡ Japan Bank for International Cooperation is extending loan to the project to the extent of 56% project cost. Government of India, Ministry of Urban Development and the Government of the National Capital Territory of Delhi are each investing 15% of the project cost. The remaining is met through interest-free loans and property development. The operation and maintenance costs are essentially met by ticket sales. ‡ People of Delhi are generally satisfied with the services offered by DMRC and are proud of experiencing one of the most modern, sophisticated and world-class technological systems. Other cities in India and abroad have shown interest in having metros through DMRC's services.
  • 6. Key Architects ‡ The Central Road Research Institute (CRRI), New Delhi ‡ Metropolitan Transport Team (MTT) of the Indian Railways ‡ Delhi Development Authority (DDA) ‡ The Study Group of the Ministry of Railways ‡ RITES (Rail India Technical & Economic Services) ‡ Mr. E. Sreedharan, Managing Director, DMRC
  • 7. Implementers/ Stakeholders ‡ The Delhi Metro Rail Corporation Ltd. (DMRC). ‡ Ministry of Railways and Ministry of Urban Affairs, Government of India. ‡ Government of the National Capital Territory of Delhi (GNCTD). ‡ Delhi Transport Corporation (DTC). ‡ Governments of Uttar Pradesh & Haryana (At a later date) General Consultants (A consortium of Indian and Overseas Consulting Firms). ‡ The consortium comprising ROTEM (formerly KOROS), Mitsubishi Corporation, and Mitsubishi Electric Corporation - manufacturers of Rolling Stock. ‡ Bharath Earth Movers Limited (BEML), the Indian Coach Builders. ‡ KSHI JV, a consortium of builders for open cut works with Maunsell, Australia engaged as the lead design consultant. ‡ IMCC, a consortium of builders for underground works with Mott MacDonald, UK as the lead design consultant. ‡ The Japan Bank for International Cooperation (JBIC). ‡ The citizens of Delhi (Those who pay and use the Metro and those who are indirectly benefited).
  • 8. Key Objectives - ‡ The main objective of the project is to improve Delhi's urban environment by reducing traffic congestion and pollution. The Project is expected to help reduce traffic congestion, exhaust emissions, and other types of urban pollution caused by motor vehicles, and to play a large role in improving Delhi's transit system. ‡ Outcomes- ‡ Out of 271.45 ha of land required for the project, 237.062 ha has already been acquired. A punctuality of 6 minutes is being maintained at present during peak hours. This interval would gradually be reduced to 3 minutes when adequate traffic builds up. Train-sets of four coaches in rake have been put into service. They run at intervals of 8 to 10 minutes from 6 a.m. to 10 p.m. The maximum speed of the Metro is 80 km/h with an average stoppage time of 20 seconds at each station. ‡ Delhi Mass Rapid Transit System is essentially a ͞social sectoȑ project, whose benefits will pervade over wide sections of the economy. I phase will generate the following benefits to the city. ‡ 21.82 lakhs commuter trips per day will be siphoned off the roads. This would mean: ‡ 2,600 less buses on the roads. Increasing in average speed of buses from 10.5 km/h to 14 km/h. ‡ Metro will reduce journey time by 50 to 75 percent. ‡ Saving of 2 million man-hours per day due to reduced journey time. ‡ Saving in fuel cost worth Rs. 5 billion per year ‡ Space saving- The metro can carry traffic as 9 lanes of buses / 33 lanes of motor cars (either way) ‡ Delhi will experience a net benefit of Rs. 437.23 lacks per day. q More comfortable & safe travel for the commuters ‡ Reduction in atmospheric pollution levels by 50%.
  • 9. Major Contracts ‡ Local Competitive Bidding, International Competitive Bidding and Progressive Indigenization are the modes used for contracting work. ‡ Local Competitive Bidding ‡ Design and construction of surface and elevated Lines 1 and 3 are packaged for contracting on design-bid-build basis through local competitive bidding. ‡ International Competitive Bidding ‡ Line 2 with its more challenging underground alignment and tight construction schedule is being procured through two large internationally tendered design build contracts. Following a competitively contested tender that required a rebid process in efforts to lower contract price estimates, the two design-build contracts were awarded in February 2001. ‡ The 50-month contract for the 4km-long open-cut section from Vishwa Vidyalaya to the Interstate Bus Terminal (ISBT) station was awarded for a tender value of Rs. 900 crores to: KSHI JV comprising Kumagai Gumi (Japan ʹ leader), Skanska (Sweden), Hindustan Construction (India), and Itochu Corporation (Japan), and with Maunsell, Australia engaged as the lead design consultant.
  • 10. International Competitive Bidding (Contd.) ‡ The scheduled 60-month contract for the 7km-long, mainly bored tunnel section from the ISBT station to Central Secretariat, with five open-cut stations and an NATM mined station at Chawri Bazaar, was awarded for Rs. 1700 crores to: International Metro Civil Contractors (IMCC) comprising Dyckerhoff & Widmann (Germany ʹ leader), Shimizu Corporation (Japan), Larsen & Toubro (India), Samsung (Korea), IRCON International (India) and with lead design consultant Mott MacDonald, UK. ‡ The construction methodology for the underground Corridor was finalized after taking into account the availability of open space above the alignment, ground conditions, conditions of nearby existing structures and likely settlement in the vicinity. ‡ In addition to the civil works, design for the design-build contracts also includes station & services, ventilation, air conditioning, lighting, station finishes, landscaping, and the provisions for the fitting of platform edge doors at a later date. ‡ Delhi Metro Rail Corporation (DMRC) has awarded a contract to Alcatel TAS the design, installation and commissioning of the full Integrated Rail Communication system for the metro.
  • 11. Indigenization ‡ DMRC is procuring 240 coaches of which 60 (4 trains) are manufactured in ROTEM, Korea. ‡ BEML Bangalore will manufacture the other 180 coaches (45 trains). Starting with the local assembly and testing of a few trains, BEML will manufacture the coach shell, traction motor, converter, inverter unit, battery, passenger announcement and information system, air-conditioning units and seats. This will help in acquiring capability and avoiding import of trains for the forthcoming metro projects in Bangalore, Ahmedabad, Mumbai and Hyderabad.
  • 12. Strengths Cost-effective mode of transport for the Weakness general public of Delhi. Metro considerably more expensive Reduce congestion on roads making than the bus. movement easier. Less ridership than estimated. Reduce atmospheric pollution to a great level making the environment healthy. High development cost Ultra-modern technology and visually Displaced many economic backward striking design, dynamic and modern, people. competitive World Class. Difficulties in acquiring land. One hundred per cent punctual operations Opportunity Threats Revenue from property development and A struggle on the part of those being advertisements. displaced, and protests, petitions, Potential to achieve higher ridership. hunger strikes, negotiations and legal Tax rebate given to the DMRC because of the 2010 Commonwealth Games in Delhi. action have all been initiated. The success of the Delhi Metro has encouraged Security threat. other Indian cities to seriously attempt to introduce Metro systems. Risk of cost overruns and ridership The next Metro line in the city will be 10-15 per shortfalls. cent cheaper than the previous phases based on Increase in cost of the parts. the learning curve theory.
  • 13. The Man Behind The Success Story ͞Politicians Know I Cannot Be Maneuvered͟, E Sreedharan
  • 14. About the Man ‡ Elattuvalapil Sreedharan, 77, is a disciplined, simple man who calls himself a ͚Railway Man/Metro Man' with 36 years of service in the Indian Railways. ‡ Lauded for achieving the 'almost impossible' in a government- administered system and given extensions by the government after his retirement in 1990, Sreedharan comes with a reputation of bringing fantastic results. ‡ He almost has an obsession with deadlines. (In the early years of his career, it earned him 20 transfers.) Every officer in DMRC keeps a digital board which shows the number of days left for the completion of the next target. ‡ The 77-year-old civil engineer has been selected as one of the most outstanding Asians by Time magazine.
  • 15. His other little known achievements ‡ In 1963, disaster struck the Rameshwaram island when tidal waves washed away the Pamban bridge connecting it with mainland Tamil Nadu. A passenger train was swept away, killing hundreds of persons. ‡ The Southern Railway decided to restore the bridge and set a target of six months. General Manager B.C. Ganguly advanced the deadline by three months and the Railway Board assigned the task to a 31-year-old executive engineer, Sreedharan. It was a tough task as it was an old bridge, built by the British in late-nineteenth century, with 146 spans and a scherzer-a steel girder which opens up for large vessels to pass under the bridge. Sreedharan took up the challenge and advanced the deadline by a month, making the task tougher. He made the bridge functional in 46 days. He achieved this by the application of some 'commonplace values'- discipline, punctuality and honesty-and the introduction of a new work culture. These traits continue.
  • 16. His other little known achievements ‡ Sreedharan successfully completed another mega-project -the Konkan railway between Maharashtra and Mangalore. The rail-line was mooted in 1990 by then railway minister George Fernandes, while talking to Railway Board members. After studying it, Fernandes himself dismissed it as impossible. ‡ A month later, Sreedharan went to Fernandes with a well-charted out plan. "I told him that we will have to work in a different fashion," he recalls. Probably his enthusiasm infected Fernandes, who got cabinet approval for the project within three days. Maharashtra and Kerala immediately agreed to the project, but Karnataka chief minister Virendra Patil objected. ‡ Sreedharan, then a member of the Railway Board, went to Maharashtra, Karnataka, Goa and Kerala and got all the necessary approvals before his 'retirement'. But retirement was not to be as Fernandes wanted him to head the West Coast Railway. Thus the Konkan Rail Corporation was born. It created an engineering marvel by laying a rail network across the mountainous Western Ghats.
  • 17. IIM Lucknow Case study facts ‡ Expected passenger traffic - 21,80,000 per day. ‡ Today only 5,00,000 commuters use the metro per day. ‡ The DMRC website states that the estimated number of originating passengers per day in the year 2011 for Phase I and Phase II corridors will be 26,17,000. The project nevertheless is a success͙
  • 18. IIM Lucknow Case study facts ‡ About 1,100 train trips operate every day with a punctuality of nearly 100 per cent. ‡ According to DMRC spokesperson Anuj Dayal the metro earns Rs 1 crore daily, of which Rs 65 lakh comes from passenger fare and the rest comes through associated activities like property development, advertisements and displays, consultancy and others.
  • 19. DMRC- Pride of the Nation ‡ Following DMRC's success, it has been asked to prepare detailed project reports for metro rail transport systems, both in India as well as abroad. ‡ Countries that have sought its consultation for their project management include, Pakistan, Bangladesh, Indonesia, Sri Lanka , Syria, Ireland and Indonesia. ‡ According to IIM- Lucknow, due to its technical expertise, timely completion of projects and the corporate culture it operates in, DMRC has attained the readiness to compete with other similarly placed agencies globally.
  • 20. A Cost-benefit analysis of Delhi metro Courtesy: Indian Institute of Economic Growth, Delhi University Cost Financed By Phase I Phase II 1) Equity (50% each by GOI & GNCTD) 30% 30% 2) Long Term Debt (Overseas Economic 60% 56% Cooperation Fund, Japan) @ 3% p.a. or less 3) Revenues From Property Development 7% 5%+ 5% (internal resources) 4) Subordinate Debt 3% 4%
  • 21. The Funding ‡ More than 60 percent of the funds required for investment are raised as debt capital. ‡ Around 30 percent of total investments of DM are raised through equity capital with the Government of India (GOI) and GNCTD having equal shares in it. ‡ The remaining 10 percent of the investments of DM will be covered out of the revenues it earns. ‡ DM had been provided with the following concessions by GOI to make the project viable, namely (a) The cost of land equivalent to Rs. 2180 million has been provided as an interest free subordinate loan by GOI/GNCTD to be repaid by the DM within 5 years after the senior debt is repaid fully by the twentieth year of taking the loan (b) The risk associated with the exchange rate fluctuations is borne by government in case of foreign debt
  • 22. (c) The DM is exempted from payment of income tax, capital gains tax, property tax and customs duty on imports. (d) The DM is permitted to generate resources through property development over a period of 6-20 years. (e) No dividend is paid on GOI share of equity till the senior debt is repaid fully by the twentieth year.
  • 23. A financial analysis of the Metro Sources of revenue for the metro are (according to RITES) ‡ The Fare Box Revenues ‡ Revenue from Advertisement ‡ Revenue from Property Development ‡ The main source of revenue of the MRTS system is the fare box collection, which is a product of the total passenger ridership on the MRTS.
  • 24. A financial analysis of the Metro ‡ Full ridership is expected to materialize on the metro with a fare comparable to the DTC bus fare of Rs. 3 per passenger trip. ‡ The financial model consisting of Rs. 5 per passenger trip and an annual fare increase of 7.5 per cent was considered optimal by RITES. ‡ Fare Sensitivity of Ridership on the Metro (In Rs/Passenger trip) Fare Rate Percentage Ridership 3 100% 4 90% 5 75% 6 50%
  • 25. Estimates of Daily Passenger Trips by Metro (in lakhs) Year Daily Passenger Trips 2002 12.63 2003 20.15 2004 23.86 2005 31.85 2006 33.17 2007 34.55 2008 35.97 2009 37.46 2010 39.01 2011 40.63 2012 41.81 2013 43.03 2014 44.29 2015 45.58 2016 46.91 2017 48.28 2018 49.69 2019 51.14 2020 52.63 2021 54.17
  • 26. Estimates of Financial Flows of Revenue Earned by DM (Phases I and II) During its Lifetime (Rs. Million) Year Revenue Year Revenue Year Revenue 2005 15052 2018 67722 2031 128687 2006 17152 2019 74284 2032 133307 2007 19407 2020 82806 2033 134177 2008 21826 2021 92342 2034 139477 2009 24421 2022 99126 2035 140477 2010 33762 2023 106242 2036 146547 2011 37112 2024 115557 2037 147687 2012 41057 2025 116067 2038 154657 2013 44511 2026 119127 2039 155947 2014 50847 2027 119717 2040 163947 2015 49633 2028 123227 2041 165437 2016 56277 2029 123897 2017 62209 2030 127927 a ten fold increase
  • 27. Identification of Economic Benefits and Costs of Metro ‡ DM contributes to the diversion of a very high proportion of current passenger traffic from road to Metro and serves part of the growing passenger traffic demand in Delhi. ‡ There will be savings in travel time for passengers still traveling on roads due to reduced congestion and obviously also for those traveling by Metro. ‡ The Metro also brings about a reduction in air pollution in Delhi because of the substitution of electricity for petrol and diesel and reduced congestion on the roads ‡ There will also be a reduction in the number of accidents on the roads.
  • 28. Identification of Economic Benefits and Costs of Metro ‡ Reduction of government investments on road developments and buses as also in the private sector investment on buses, passenger cars and other vehicles carrying passengers. ‡ Reductions in motor vehicles͛ operation and maintenance charges to both the government and the private sector. ‡ There will be health and other environmental benefits to the public due to reduced pollution from the transport sector of Delhi. ‡ Land and house property owners gain from the increased valuation of house property prices due to the Metro. ‡ The Metro has the effect of increasing the income of the regional economy of Delhi vis a vis the rest of the Indian economy.
  • 29. Identification of Economic Benefits and Costs of Metro ‡ The Metro provides employment benefits to the unskilled labour especially during its construction period. This labour is otherwise unemployed or under employed in the Indian economy.
  • 30. Components of Economic Capital and O&M Cost
  • 31. Reduction in Vehicles Due to Metro (Phases I & II)
  • 32. Benefit from Reduced Vehicles ‡ The economic benefits from the reduced number of vehicles on Delhi roads due to the Metro could be identified as the following: ‡ Savings in Foreign Exchange due to reduced Fuel Consumption ‡ Reduction in Pollution ‡ Savings in Time for all passengers using Metro and Roads. ‡ Savings in Accidents. ‡ Savings in Vehicle Operating Cost (VOC) due to decongestion for residual traffic. ‡ Savings in Capital and Operating cost of diverted vehicles . ‡ Savings in the cost of Road Infrastructure.
  • 33. Benefit from Reduced Fuel Consumption ‡ The total savings in fuel due to decongestion is the product of residual traffic, fuel savings norms given by the above formula, annual run and a conversion factor (cc to litre) in a RITES study. ‡ The fuel savings during the year 2011-12 due to the decongestion effect for cars and buses are 20,714,391 Litre and 38,510,952 Litre, respectively. The RITES study has assumed that the fuel savings of two-wheelers are roughly one-third of cars, which becomes 6,835,749 Litre.
  • 34. Reduction in Pollution Load due to decongestion and its Monetary Value for the Year 2011-12 with the Assumption that All Vehicles Use EURO II Technology without Metro
  • 35. Savings due to reduction in Pollution
  • 36. Net Benefits to the Government ‡ What it gets: ± Fare box revenues ± Revenue from property development ± Advertisements ± Tax Revenues from goods or services bought for the metro ± Saved cost of road infrastructure ± Saved cost of operating buses
  • 37. Net Benefits to the Government ‡ What it loses ± Heavy revenue losses due to displaced buses(Estimated 2400 buses will be displaced by 2012). ± Investment and operation and maintenance of the metro. The net benefits for the government during the year 2011-12 are estimated as Rs. 31760 million at 2004 prices.
  • 38. Net Benefit to the Passenger ‡ What they get: ± time saving for the passengers due to the Metro ± During the year 2011-12, these savings are estimated as Rs. 22090 million . ± benefits due to a reduction in accidents to the passengers due to the functioning of the Metro, which are estimated as Rs 448 million during the year 2011-12. ‡ What they pay: fares ‡ The net benefits to the passengers from the Metro are estimated as Rs.22440 million during the year 2011-12.
  • 39. Affects to the Private Transporter ‡ What they get: ± Save on their capital and operating costs ± This is estimated to be Rs. 6550 million ‡ What they lose: ± Lose the revenue from displaced private buses ± This is estimated to be Rs. 9410 million ‡ resulting in a net loss of Rs. 2860 million to the private transporters during the year 2011-12.
  • 40. Net Benefit to the unskilled labour ‡ Benefit to the labour is the difference of working at DMRC and the opportunity cost ‡ Assuming that the unskilled labour cost constitutes 10 percent of investment cost and 5 percent of operation and maintenance cost of the Metro, the benefit to unskilled labour is estimated as Rs. 316.4 million during the year 2011- 12.
  • 41. Net Benefits to the General Public ‡ What it gets: ± Social premium on investment and foreign exchange ± Environmental benefits of reduced pollution due to the Metro. ± Social Premium: reduced fossil fuel consumption due to a change in the mode of transport . ± The net benefits to the general public from the Metro arising out of the social premium on foreign exchange is estimated as Rs. 1203.3 crores during the year 2011-12.
  • 42. Total Benefit ‡ The government, passengers, private transporters and the public get total net benefits worth Rs. 52550 million in the year 2011-12.
  • 43. Environmental Impact ‡ A detailed Environmental Impact Assessment has been done in 1994 to minimize the negative environmental impact of the Project during the construction stage of the Project. ‡ For every tree cut during construction, the DMRC is planting 10 trees in advance as compensatory afforestation. Around 26000 trees have been planted at Najafgarh, Isapur and Rebla Khanpur. Through proper care 30% of trees in the alignment have been saved. ‡ Installation of storm water drains for disposal of wastewater, monitoring air and noise pollution, disposal of excavated materials are some of the measures taken during construction to minimize the damage to the environment and inconvenience to public.
  • 44. International Certification ‡ The Delhi Metro has been awarded OHSAS 18001 (Occupational Health and Safety Assessment sequence 18001) by Registro Italiano Navale India Pvt. Ltd. (RINA), Genova. ‡ The Delhi Metro Rail Corporation (DMRC) received the ISO 14001 certificate for establishing an environmental management system making it the First Metro in the World to receive this certification at the construction stage.
  • 45. First Delhi Metro Coach To Come By Air Arrives From Germany
  • 46.
  • 47. Bibliography ‡ The Delhi Metro Rail Corporation has brought out a 256 page book titled " A Dream Revisited" (An Archival Journey into the making of the Delhi Metro Rail), which describes the History, Growth, New Technologies, Routes and issues which faced the Delhi Metro Project since its planning up to its implementation. ‡ Indian Institute of Economic Growth, Delhi University ‡ IIT Delhi research report ‡ IIM Lucknow case study on Delhi Metro ‡ ICMR India.org ‡ Wikipedia ‡ http://www.delhimetrorail.com