SlideShare une entreprise Scribd logo
1  sur  4
RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                            MEASURES IN PLACE


         Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                            Production safety officer       Carrie Deans

                                                                                                            Assessment Date: 30.3.12
Accommodation Assessed . Eccles Sixth Form center room C19                  Assessor. Liam Belch


                                                                                                               RISK (with controls)    Additional
                               Who might be
          HAZARD                                                 PRECAUTIONS/CONTROLS                                                  Controls
                               harmed and
      potential for harm                             already in place to remove hazard, reduce risk level       L     S        R       Needed.
                               how ?
                                                                                                                                      Details Over
Hygiene And Comfort                                  •   Toilets and sinks provided within Corridor
                               Production                accommodation. Hot and Cold water, soap supplied.      1     1        1
                               Team/Crew             •   Drinking water provided in Cafe/Canteen
                                                     •   inadequate Ventilation for students, 0 openable
                                                         windows, Air conditioning and vents to supply
                                                         ventilation
                                                     •   Adequate space in classroom for students.

Trips, Slips and Falls                               •   Good Housekeeping [ cleaned daily ]                    1     2        2
[ Workplace Regs ]
                                                     •   Minimal trailing Cables.
                                                     •   Artificial Ceiling Lighting provided.
                                                     •   Carpet stained but in average condition.

Fire Hazards                                         •   Fire Alarm call points located on exit routes
                                                     •   Fire Audability tests carried out each term.
                                                     •   Full Fire evacuation carried out each term.            1     3        3
                                                     •   Fire Extinguishers located in corridors.
                                                     •   Co2 Extinguisher adjacent to door.
                                                     •   Automatic Smoke Detector [ device 73 ]
RISK (with controls)      Additional
                                       Who might be
           HAZARD                                                                PRECAUTIONS/CONTROLS                                                            Controls
                                       harmed and
       potential for harm                                            already in place to remove hazard, reduce risk level               L     S        R         Needed.
                                       how ?
                                                                                                                                                                Details Over
Hygiene And Comfort                                                 •    Toilets and sinks provided within Corridor
                                       Production                        accommodation. Hot and Cold water, soap supplied.             1      1        1
                                       Team/Crew                    •    Drinking water provided in Cafe/Canteen
                                                                    •    inadequate Ventilation for students, 0 openable
                                                                         windows, Air conditioning and vents to supply
                                                                         ventilation
                                                                    •    Adequate space in classroom for students.

Accident                                                            •    24 First Aiders on site
                                                                    •    First Aid box available in reception                          1      2        2
                                                                    •    Local First Aider
                                                                    •    Contact Reception, 2400 if in any doubt.
Electrical                                                          •    visual checks carried out.
                                                                    •    19 P.C. / Keyboard.                                           1      2        2
                                                                    •    Portable unit with T.V. and D.V.D. player. [7/08]
                                                                    •    P.A.T. Testing carried out
                                                                    •    Data Projector, Whiteboard.
                                                                    •    O.H.P. [7/07]. 1 Printer.
                                                                    •    1 Extension Lead [7/08]


The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)    LIKELIHOOD                                             (S)       SEVERITY OF HAZARD                          (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                         (LxS).
1. Hazard exists very infrequently; limited numbers             1.      Could cause minor injury only
exposed                                                         2.         Could cause major injury/3 day or more       Very high risks score 6 or 9
2. Likely to occur; hazard exists intermittently or occurs                 absence                                      Moderate risks score 3 or 4
    occasionally                                                3.         Could cause fatality/severe injury           Low priority risks score       1 or 2
3. Likely to occur soon; permanent hazard or occurs
    daily / repeatedly; many may be exposed                                                                             VERY HIGH RISKS NEED IMMEDIATE ACTION


Signature of Health & Safety Officer                  Carrie Deans                                                           Date 30.3.12

Signature of Senior member of management with         Adam Foster                                                            Date 30.2.12
Health and Safety Responsibility.
Risk assessment c19

Contenu connexe

Tendances

Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_julyChinaHarbour
 
K3 PENANGGULANGAN KEBAKARAN.pptx
K3 PENANGGULANGAN KEBAKARAN.pptxK3 PENANGGULANGAN KEBAKARAN.pptx
K3 PENANGGULANGAN KEBAKARAN.pptxZedanaDwiP
 
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...Ariyandi Yuda Prahara
 
B Part 4 Risk Assessment & Study Example By J Mc Cann
B  Part 4 Risk Assessment &  Study Example By J Mc CannB  Part 4 Risk Assessment &  Study Example By J Mc Cann
B Part 4 Risk Assessment & Study Example By J Mc CannJames McCann
 
Keep Yourself Safe In The Parking Lot: Seven Simple Solutions
Keep Yourself Safe In The Parking Lot: Seven Simple SolutionsKeep Yourself Safe In The Parking Lot: Seven Simple Solutions
Keep Yourself Safe In The Parking Lot: Seven Simple SolutionsSpencer Coursen
 
Osh standard (yellow book)
Osh standard (yellow book)Osh standard (yellow book)
Osh standard (yellow book)libro1985
 
Manual Handling of Materials by WSHCOUNCIL
Manual Handling of Materials by WSHCOUNCILManual Handling of Materials by WSHCOUNCIL
Manual Handling of Materials by WSHCOUNCILAtlantic Training, LLC.
 
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULES
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULESWORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULES
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULESAbdul Shukor
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013Fitri Ifony
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3sawkariqbal
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
A safety champion program engagement and empowerment of frontline staff to pr...
A safety champion program engagement and empowerment of frontline staff to pr...A safety champion program engagement and empowerment of frontline staff to pr...
A safety champion program engagement and empowerment of frontline staff to pr...NurseJeanette
 

Tendances (20)

Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_july
 
K3 PENANGGULANGAN KEBAKARAN.pptx
K3 PENANGGULANGAN KEBAKARAN.pptxK3 PENANGGULANGAN KEBAKARAN.pptx
K3 PENANGGULANGAN KEBAKARAN.pptx
 
Hse plan
Hse planHse plan
Hse plan
 
Safety Week Activity Report
Safety Week Activity ReportSafety Week Activity Report
Safety Week Activity Report
 
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...
Buku Pintar MIGAS INDONESIA - Sertifikasi lokasi berbahaya untuk peralatan li...
 
B Part 4 Risk Assessment & Study Example By J Mc Cann
B  Part 4 Risk Assessment &  Study Example By J Mc CannB  Part 4 Risk Assessment &  Study Example By J Mc Cann
B Part 4 Risk Assessment & Study Example By J Mc Cann
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Rischi specifici 81 2008
Rischi specifici  81 2008Rischi specifici  81 2008
Rischi specifici 81 2008
 
JHA SHELL RESTAUTRANT.
JHA SHELL RESTAUTRANT.JHA SHELL RESTAUTRANT.
JHA SHELL RESTAUTRANT.
 
Keep Yourself Safe In The Parking Lot: Seven Simple Solutions
Keep Yourself Safe In The Parking Lot: Seven Simple SolutionsKeep Yourself Safe In The Parking Lot: Seven Simple Solutions
Keep Yourself Safe In The Parking Lot: Seven Simple Solutions
 
Introduction to HSE
Introduction to HSEIntroduction to HSE
Introduction to HSE
 
3 basics of stop
3  basics of stop3  basics of stop
3 basics of stop
 
Mmc
MmcMmc
Mmc
 
Osh standard (yellow book)
Osh standard (yellow book)Osh standard (yellow book)
Osh standard (yellow book)
 
Manual Handling of Materials by WSHCOUNCIL
Manual Handling of Materials by WSHCOUNCILManual Handling of Materials by WSHCOUNCIL
Manual Handling of Materials by WSHCOUNCIL
 
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULES
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULESWORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULES
WORKPLACE SAFETY, ERGONOMICS & MANUAL HANDLING MODULES
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
 
A safety champion program engagement and empowerment of frontline staff to pr...
A safety champion program engagement and empowerment of frontline staff to pr...A safety champion program engagement and empowerment of frontline staff to pr...
A safety champion program engagement and empowerment of frontline staff to pr...
 

En vedette

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentleannemae1
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment FormBrett Tinnion
 
Animation risk assessment
Animation risk assessmentAnimation risk assessment
Animation risk assessmentNazish
 
Classroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentClassroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentMintcho Mintchev
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessmentsearchgeeksg
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templatetamz486
 
Human Factors Assessment (final)
Human Factors Assessment (final)Human Factors Assessment (final)
Human Factors Assessment (final)Michael Etienne
 
Risk assessment template sports hall
Risk assessment template sports hallRisk assessment template sports hall
Risk assessment template sports hallam05030056
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk AssessmentSearle9085
 
East High School Word Cafe Planning, Marketing and Assessment Presentation
East High School Word Cafe Planning, Marketing and Assessment PresentationEast High School Word Cafe Planning, Marketing and Assessment Presentation
East High School Word Cafe Planning, Marketing and Assessment PresentationWiseLibrarian
 
Animation risk assessment
Animation risk assessmentAnimation risk assessment
Animation risk assessmentsathma
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment formjamieboon
 
My Fire Risk Assessment Template
My Fire Risk Assessment TemplateMy Fire Risk Assessment Template
My Fire Risk Assessment Templateneiltilley
 
Risk Assessment - Georgian Theatre
Risk Assessment - Georgian TheatreRisk Assessment - Georgian Theatre
Risk Assessment - Georgian Theatrebobmackenzie98
 
Somers town origonal risk assessment
Somers town origonal risk assessmentSomers town origonal risk assessment
Somers town origonal risk assessmentnelemen
 

En vedette (20)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
LO2 - Lesson 10 - Health & Safety
LO2 - Lesson 10 - Health & SafetyLO2 - Lesson 10 - Health & Safety
LO2 - Lesson 10 - Health & Safety
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
Animation risk assessment
Animation risk assessmentAnimation risk assessment
Animation risk assessment
 
Classroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentClassroom Instruction Risk Assessment
Classroom Instruction Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Muttart Hazard Assessment
Muttart Hazard AssessmentMuttart Hazard Assessment
Muttart Hazard Assessment
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Human Factors Assessment (final)
Human Factors Assessment (final)Human Factors Assessment (final)
Human Factors Assessment (final)
 
Risk assessment template sports hall
Risk assessment template sports hallRisk assessment template sports hall
Risk assessment template sports hall
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
East High School Word Cafe Planning, Marketing and Assessment Presentation
East High School Word Cafe Planning, Marketing and Assessment PresentationEast High School Word Cafe Planning, Marketing and Assessment Presentation
East High School Word Cafe Planning, Marketing and Assessment Presentation
 
Animation risk assessment
Animation risk assessmentAnimation risk assessment
Animation risk assessment
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
My Fire Risk Assessment Template
My Fire Risk Assessment TemplateMy Fire Risk Assessment Template
My Fire Risk Assessment Template
 
Risk Assessment - Georgian Theatre
Risk Assessment - Georgian TheatreRisk Assessment - Georgian Theatre
Risk Assessment - Georgian Theatre
 
Fire Risk Assessment Master ( Flats)
Fire Risk Assessment Master ( Flats)Fire Risk Assessment Master ( Flats)
Fire Risk Assessment Master ( Flats)
 
Somers town origonal risk assessment
Somers town origonal risk assessmentSomers town origonal risk assessment
Somers town origonal risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

Similaire à Risk assessment c19 (10)

Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessmentjosh
Risk assessmentjoshRisk assessmentjosh
Risk assessmentjosh
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Honeywell 5821 Brochure
Honeywell 5821 BrochureHoneywell 5821 Brochure
Honeywell 5821 Brochure
 
ACT Hazard Assessment
ACT Hazard AssessmentACT Hazard Assessment
ACT Hazard Assessment
 
Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

Plus de smashingentertainment (20)

Evaluation 2
Evaluation 2Evaluation 2
Evaluation 2
 
Me and my movies presentation
Me and my movies presentationMe and my movies presentation
Me and my movies presentation
 
Final major project production diary by james fox 08.4.13
Final major project production diary by james fox 08.4.13Final major project production diary by james fox 08.4.13
Final major project production diary by james fox 08.4.13
 
Final major project production diary by james fox 25.2.13
Final major project production diary by james fox 25.2.13Final major project production diary by james fox 25.2.13
Final major project production diary by james fox 25.2.13
 
Iron man 3 article
Iron man 3 articleIron man 3 article
Iron man 3 article
 
Production schedule 25.02.13
Production schedule 25.02.13Production schedule 25.02.13
Production schedule 25.02.13
 
Production diary
Production diaryProduction diary
Production diary
 
Production schedule 15.04.13
Production schedule 15.04.13Production schedule 15.04.13
Production schedule 15.04.13
 
Production diary
Production diaryProduction diary
Production diary
 
57proposal
57proposal57proposal
57proposal
 
Iron man 3 article
Iron man 3 articleIron man 3 article
Iron man 3 article
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluation
 
Evaluation
EvaluationEvaluation
Evaluation
 
Me and my movies presentation
Me and my movies presentationMe and my movies presentation
Me and my movies presentation
 
Results
ResultsResults
Results
 
Music magazine questionnaire
Music magazine questionnaireMusic magazine questionnaire
Music magazine questionnaire
 
Logo designs
Logo designsLogo designs
Logo designs
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Screenshots of edits 2
Screenshots of edits 2Screenshots of edits 2
Screenshots of edits 2
 

Dernier

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 

Dernier (20)

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 

Risk assessment c19

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Production safety officer Carrie Deans Assessment Date: 30.3.12 Accommodation Assessed . Eccles Sixth Form center room C19 Assessor. Liam Belch RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort • Toilets and sinks provided within Corridor Production accommodation. Hot and Cold water, soap supplied. 1 1 1 Team/Crew • Drinking water provided in Cafe/Canteen • inadequate Ventilation for students, 0 openable windows, Air conditioning and vents to supply ventilation • Adequate space in classroom for students. Trips, Slips and Falls • Good Housekeeping [ cleaned daily ] 1 2 2 [ Workplace Regs ] • Minimal trailing Cables. • Artificial Ceiling Lighting provided. • Carpet stained but in average condition. Fire Hazards • Fire Alarm call points located on exit routes • Fire Audability tests carried out each term. • Full Fire evacuation carried out each term. 1 3 3 • Fire Extinguishers located in corridors. • Co2 Extinguisher adjacent to door. • Automatic Smoke Detector [ device 73 ]
  • 2. RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort • Toilets and sinks provided within Corridor Production accommodation. Hot and Cold water, soap supplied. 1 1 1 Team/Crew • Drinking water provided in Cafe/Canteen • inadequate Ventilation for students, 0 openable windows, Air conditioning and vents to supply ventilation • Adequate space in classroom for students. Accident • 24 First Aiders on site • First Aid box available in reception 1 2 2 • Local First Aider • Contact Reception, 2400 if in any doubt. Electrical • visual checks carried out. • 19 P.C. / Keyboard. 1 2 2 • Portable unit with T.V. and D.V.D. player. [7/08] • P.A.T. Testing carried out • Data Projector, Whiteboard. • O.H.P. [7/07]. 1 Printer. • 1 Extension Lead [7/08] The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION Signature of Health & Safety Officer Carrie Deans Date 30.3.12 Signature of Senior member of management with Adam Foster Date 30.2.12
  • 3. Health and Safety Responsibility.