Information derived or quoted from Rita Mulcahy
5 Overall Project Management
Processes with Risk Management
                           •Plan RM
          •ID & Managed    •ID Risk
                           •Qualitative
                           •Quantitative
                           •Plan Risk Responses


•Monitor & Control Risks
Risk Management Process
                               Opportunities




Threats
Concepts and Terms
Uncertainty       Lack of knowledge
Risk Factors
                  1.   How likely a risk event will occur
                  2.   Impact or amount at stake
                  3.   When it will occur
                  4.   How often it will occur


Risk Averse       Some one that does not
                  want to take on risk
Risk Tolerance    Degree of risk
                  acceptable
Risk Thresholds   Point at which risk
                  becomes unacceptable


Risk areas        Project Constraints
                  (scope, time, cost, etc)
Plan Risk Management




       •How much time should we spend?
       •Who will be involved?
       •How should we perform risk
       management?
“What will I have when I’m done with …?”

•    Risk Management Plan
    1.   Methodology
    2.   Roles & Responsibilities
    3.   Budgeting
    4.   Timing
    5.   Risk Categories
    6.   Definitions of probability & Impact
    7.   Stakeholder tolerances
    8.   Reporting & Tracking
Identify Risk
           (tools & techniques)
Documentation Reviews Documents can help
                      identify risk
Brainstorming         One idea generates
                      another
Delphi Technique      Experts participate
                      anonymously
Interviewing          Interview participants,
                      stakeholders, experts
Root Cause Analysis   Reorganized by root
                      causes to find more risk
Identify Risk

SWOT Analysis          Identifies strengths and
                       weaknesses and thus
                       risk
Checklist Analysis     Checklist of risk
                       categories to identify risk

Assumptions Analysis   Validate assumptions
                       which may lead to risk

Diagramming            Cause and effect
Techniques             diagrams and flowcharts
Outputs to Identify Risk
• Risk Register Example
Qualitative Risk Analysis
Perform Qualitative (Subjective)
        Risk Analysis
(Probability and Impact Matrix)
•Watchlist
•Risk Grouped by category
•Risk Register Updates
•    Numerically analyzing the probability and
     impact of risks
•    how risk could affect the objectives of the
     project
    1. Determine risk that warrant a response
    2. Determine overall project risk
    3. Determine quantified probability to meet project
       objectives (e.g. 75% chance)
    4. Determine cost and schedule reserves
    5. Identify risks requiring more attention
    6. Create realistic and achievable cost, schedule, or
       scope targets.
Quantitative Risk Analysis




1.   Investigate highest risks on the project
2.   Determine type of probability distribution
3.   Which risks have the most impact
4.   Determine quantified risk through EMV
     or Monte Carlo
Determine Quantitative Probability
            Impact
• Interviewing               •Expert Judgment
•Cost & Time Estimating      •EMV
•Delphi Technique            •Monte Carlo
•Use of historical records   •Decision Trees
Decision Tree – choose between
       many alternatives
                     (Impact)
Quantitative




               1.   Prioritized list of quantified risk
               2.   Amount of contingency time and cost reserves needed
               3.   Realistic and achievable completion dates and project
                    costs
               4.   The qualified probability of meeting objectives
               5.   Trends in quantitative risk analysis
“What are we going to do now
   about each top risk?”
1.        Eliminate the threats before they happen
2.        Make sure opportunities happen
3.        Decrease the probability and/or impact of threats
4.        Increase the probability and/or impact of opportunities
•         For Residual Threats
     1.       Contingency Plans
     2.       Fallback Plans
Monitor and Control Risk
Workarounds          Unplanned responses to
                     deal with problems
Risk Reassessments   Review risk plan, risk
                     register and update
                     documentation
Risk Audits
                     Prepared by PM. Prove you have identified risk, have
                     plans for major risk, risk response owners are
                            prepared.

                     How much reserve remains and how
Reserve Analysis     much is needed (checkbook)


Status Meetings      Team meetings where
                     risked is discussed
Closing of Risks     Close finished risk to
                     focus on remaining risk
Outputs of Monitor & Control Risk
1. Risk Register
                          1.   Outcomes of risk assessment and risk audits
                          2.   Updates to risk management and ID of new
                               risk
   Updates                3.   Closing of risk
                          4.   Details of what happened
                          5.   Lessons learned


2. Change Requests        Monitor & Control
                          process will uncover
                          changes
3. PM Plan Updates        Updates to schedule,
                          cost, quality, hr, etc
4. Project Doc Updates    Roles & Responsibilities, stakeholder
                          management, quality metrics

5. Organization Process   Risk templates like risk register,
                          checklists, and other data which
                          becomes historical records

  Assets Updates
Practice Exam
Practice Exam
Practice Exam
Answers
Answers
Answers
Risk Management

Contenu connexe

Tendances

Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best PracticesPMILebanonChapter
 
Assessment Of Risk Mitigation
Assessment Of Risk MitigationAssessment Of Risk Mitigation
Assessment Of Risk MitigationEneni Oduwole
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 
Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Association for Project Management
 
BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskMuna Haider
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideSlideTeam
 
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...Association for Project Management
 
Risk management in software engineering
Risk management in software engineeringRisk management in software engineering
Risk management in software engineeringdeep sharma
 
Risk management
Risk managementRisk management
Risk managementMECandPMV
 
Advanced program management risk mitigation and management
Advanced program management   risk mitigation and managementAdvanced program management   risk mitigation and management
Advanced program management risk mitigation and managementMarcus Vannini
 
Risk Management Plan Slides
Risk Management Plan SlidesRisk Management Plan Slides
Risk Management Plan Slidesvivian weeks
 

Tendances (20)

Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best Practices
 
Assessment Of Risk Mitigation
Assessment Of Risk MitigationAssessment Of Risk Mitigation
Assessment Of Risk Mitigation
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 
BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage Risk
 
Risk Analysis
Risk AnalysisRisk Analysis
Risk Analysis
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Project Management 05
Project Management 05Project Management 05
Project Management 05
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation Slide
 
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
 
Risk management
Risk managementRisk management
Risk management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management in software engineering
Risk management in software engineeringRisk management in software engineering
Risk management in software engineering
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management Primer
Risk Management PrimerRisk Management Primer
Risk Management Primer
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Advanced program management risk mitigation and management
Advanced program management   risk mitigation and managementAdvanced program management   risk mitigation and management
Advanced program management risk mitigation and management
 
Session 18 4th edition PMP
Session 18 4th edition PMPSession 18 4th edition PMP
Session 18 4th edition PMP
 
Risk Management Plan Slides
Risk Management Plan SlidesRisk Management Plan Slides
Risk Management Plan Slides
 

En vedette

PDD - Rolling Wave Planning v4
PDD - Rolling Wave Planning v4PDD - Rolling Wave Planning v4
PDD - Rolling Wave Planning v4Candi Rai
 
Risk register or Risk log - A template to list down all the indentified Risk
Risk register or Risk log - A template to list down all the indentified Risk Risk register or Risk log - A template to list down all the indentified Risk
Risk register or Risk log - A template to list down all the indentified Risk Dhawal Thakkar PMP
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013Russell Archibald
 
PMP Chap 12 - Project Procurement Management Details - Part2
PMP   Chap 12 - Project Procurement Management Details - Part2PMP   Chap 12 - Project Procurement Management Details - Part2
PMP Chap 12 - Project Procurement Management Details - Part2Anand Bobade
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement ManagementAhmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk ManagementAhmad Maharma, PMP,RMP
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Editionpankajsh10
 
Project life cycle
Project life cycleProject life cycle
Project life cycleMaryam Juma
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Editionpankajsh10
 

En vedette (14)

Learn Your Project Vocabulary
Learn Your Project VocabularyLearn Your Project Vocabulary
Learn Your Project Vocabulary
 
PDD - Rolling Wave Planning v4
PDD - Rolling Wave Planning v4PDD - Rolling Wave Planning v4
PDD - Rolling Wave Planning v4
 
Risk register or Risk log - A template to list down all the indentified Risk
Risk register or Risk log - A template to list down all the indentified Risk Risk register or Risk log - A template to list down all the indentified Risk
Risk register or Risk log - A template to list down all the indentified Risk
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013
 
Project LlifeCycle
Project LlifeCycleProject LlifeCycle
Project LlifeCycle
 
PMP Chap 12 - Project Procurement Management Details - Part2
PMP   Chap 12 - Project Procurement Management Details - Part2PMP   Chap 12 - Project Procurement Management Details - Part2
PMP Chap 12 - Project Procurement Management Details - Part2
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement Management
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk Management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 

Similaire à Risk Management

Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks ReviewDavid Tennant
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk ManagementHayat Denzi
 
NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5Future Managers
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk managements. Akhlaque
 
A Guide to Risk Management
A Guide to Risk ManagementA Guide to Risk Management
A Guide to Risk ManagementProjectCon
 
PMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementPMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementAbdullah Ahmed, PMP, RMP
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfMUST
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Agus Suhanto
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfMUST
 
Project risk management
Project risk managementProject risk management
Project risk managementBarnatuCoffee
 

Similaire à Risk Management (20)

10- PMP Training - Risk Management
10- PMP Training - Risk Management 10- PMP Training - Risk Management
10- PMP Training - Risk Management
 
Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks Review
 
Project managment 10
Project managment  10Project managment  10
Project managment 10
 
NIST 800 30 revision Sep 2012
NIST 800 30 revision  Sep 2012NIST 800 30 revision  Sep 2012
NIST 800 30 revision Sep 2012
 
Risk Chapter 11.pptx
Risk Chapter 11.pptxRisk Chapter 11.pptx
Risk Chapter 11.pptx
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
 
NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
 
A Guide to Risk Management
A Guide to Risk ManagementA Guide to Risk Management
A Guide to Risk Management
 
PMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementPMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management
Risk managementRisk management
Risk management
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdf
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdf
 
11 risk management
11 risk management11 risk management
11 risk management
 
Information systems risk assessment frame workisraf 130215042410-phpapp01
Information systems risk assessment frame workisraf 130215042410-phpapp01Information systems risk assessment frame workisraf 130215042410-phpapp01
Information systems risk assessment frame workisraf 130215042410-phpapp01
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Reliability
ReliabilityReliability
Reliability
 

Dernier

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 

Dernier (20)

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 

Risk Management

  • 1. Risk Management Prepared by Stephen Penn October 6, 2012 Information derived or quoted from Rita Mulcahy
  • 2.
  • 3. 5 Overall Project Management Processes with Risk Management •Plan RM •ID & Managed •ID Risk •Qualitative •Quantitative •Plan Risk Responses •Monitor & Control Risks
  • 4. Risk Management Process Opportunities Threats
  • 5. Concepts and Terms Uncertainty Lack of knowledge Risk Factors 1. How likely a risk event will occur 2. Impact or amount at stake 3. When it will occur 4. How often it will occur Risk Averse Some one that does not want to take on risk Risk Tolerance Degree of risk acceptable Risk Thresholds Point at which risk becomes unacceptable Risk areas Project Constraints (scope, time, cost, etc)
  • 6. Plan Risk Management •How much time should we spend? •Who will be involved? •How should we perform risk management?
  • 7. “What will I have when I’m done with …?” • Risk Management Plan 1. Methodology 2. Roles & Responsibilities 3. Budgeting 4. Timing 5. Risk Categories 6. Definitions of probability & Impact 7. Stakeholder tolerances 8. Reporting & Tracking
  • 8.
  • 9. Identify Risk (tools & techniques) Documentation Reviews Documents can help identify risk Brainstorming One idea generates another Delphi Technique Experts participate anonymously Interviewing Interview participants, stakeholders, experts Root Cause Analysis Reorganized by root causes to find more risk
  • 10. Identify Risk SWOT Analysis Identifies strengths and weaknesses and thus risk Checklist Analysis Checklist of risk categories to identify risk Assumptions Analysis Validate assumptions which may lead to risk Diagramming Cause and effect Techniques diagrams and flowcharts
  • 11. Outputs to Identify Risk • Risk Register Example
  • 13. Perform Qualitative (Subjective) Risk Analysis (Probability and Impact Matrix)
  • 14. •Watchlist •Risk Grouped by category •Risk Register Updates
  • 15. Numerically analyzing the probability and impact of risks • how risk could affect the objectives of the project 1. Determine risk that warrant a response 2. Determine overall project risk 3. Determine quantified probability to meet project objectives (e.g. 75% chance) 4. Determine cost and schedule reserves 5. Identify risks requiring more attention 6. Create realistic and achievable cost, schedule, or scope targets.
  • 16. Quantitative Risk Analysis 1. Investigate highest risks on the project 2. Determine type of probability distribution 3. Which risks have the most impact 4. Determine quantified risk through EMV or Monte Carlo
  • 17. Determine Quantitative Probability Impact • Interviewing •Expert Judgment •Cost & Time Estimating •EMV •Delphi Technique •Monte Carlo •Use of historical records •Decision Trees
  • 18. Decision Tree – choose between many alternatives (Impact)
  • 19. Quantitative 1. Prioritized list of quantified risk 2. Amount of contingency time and cost reserves needed 3. Realistic and achievable completion dates and project costs 4. The qualified probability of meeting objectives 5. Trends in quantitative risk analysis
  • 20. “What are we going to do now about each top risk?” 1. Eliminate the threats before they happen 2. Make sure opportunities happen 3. Decrease the probability and/or impact of threats 4. Increase the probability and/or impact of opportunities • For Residual Threats 1. Contingency Plans 2. Fallback Plans
  • 21.
  • 22.
  • 23.
  • 24. Monitor and Control Risk Workarounds Unplanned responses to deal with problems Risk Reassessments Review risk plan, risk register and update documentation Risk Audits Prepared by PM. Prove you have identified risk, have plans for major risk, risk response owners are prepared. How much reserve remains and how Reserve Analysis much is needed (checkbook) Status Meetings Team meetings where risked is discussed Closing of Risks Close finished risk to focus on remaining risk
  • 25. Outputs of Monitor & Control Risk 1. Risk Register 1. Outcomes of risk assessment and risk audits 2. Updates to risk management and ID of new risk Updates 3. Closing of risk 4. Details of what happened 5. Lessons learned 2. Change Requests Monitor & Control process will uncover changes 3. PM Plan Updates Updates to schedule, cost, quality, hr, etc 4. Project Doc Updates Roles & Responsibilities, stakeholder management, quality metrics 5. Organization Process Risk templates like risk register, checklists, and other data which becomes historical records Assets Updates
  • 26.

Notes de l'éditeur

  1. A project manager’s work should not focus on dealing with problems; it should focus on preventing them. How would it feel to say, “No problem; we anticipated this, and we have a plan in place that will resolve it”. Performing risk management helps prevent many problems and helps make other problems less likely. I’m by no means an expert and would like to make this as interactive as possible. So if you have a point please make it.
  2. There are 9 knowledge areas and we are talking about Risk Management the 8 th . Through risk management, the project changes from being in control of the project manager to the project manager being in control of the project. We can not stress the value of risk management enough. Risk management can greatly impact the efficiency and effectiveness of your projects and reduce stress for you and your team.
  3. The following should help you understand how each part of risk management fits into the overall project management process . Risks are identified and managed starting in initiating and are continually kept up-to-date or added to while the project is underway. The project manager and the team look at what has happened on the project, the current status of the project and what is yet to come and reassess the potential threats and opportunities. Be careful! Risk are identified and managed starting in initiating and are continually kept up-to-date or added to while the project is underway. The project manager and the team look at what has happened on the project, the current status of the project, and what is yet to come and reassess the potential threats and opportunities This Diagram is misleading because risk management can happen in any of these processes
  4. Talk about Plan Risk Management and why it’s not on this chart. This is a simpler way of thinking about risk. Where are the formal steps of ID risk, qualitative analysis, quantitative analysis, plan risk response, monitor & control risk? PM, sponsor, team, customer and other stakeholders are involved Risk management answers the following question. How will risk management be structured and how much time should we spend on it? Risk management efforts should be appropriate to the size and complexity of the project. How much time should be spent on risk management based on the needs of the project? How will the team go about performing risk management? Risk management includes risk management planning, risk identification, the qualitative and quantitative analysis of risks, risk response planning, and monitoring and controlling the risk responses. Through risk management, you work to increase the probability and impact of opportunities on the project (positive events), while decreasing the probability and impact of threats to the project (negative events) The six sequential risk management processes are listed. The risk management process is iterative. A risk event is something identified in advance that may or may not happen. If it does happen, it can have positive or negative impacts on the project. Threats are what can go wrong and negatively impact the project and opportunities are what could go right and positively affect the project.
  5. Could somebody read the terms? Examples? Risk Prone – Someone who is willing to take big risk A Risk Averse person may think of 50% probability as quiet a high probability where as Risk prone person may not think of 50% as high probability.
  6. Risk management is a very step-by-step, process-oriented part of project management, so expect to see risk management input and output questions on the exam. Keep in mind that many of the inputs to each individual risk management process are the outputs of the processes that came before it.
  7. Methodology – How you will perform risk management for the particular project. Roles & Responsibilities – “Who will do what” Budgeting – Cost of the risk management process. Timing – Should start when you have the appropriate inputs and should be repeated throughout the life of the project, the degree of risk will change over the course of the project potentially. Risk Categories – External, Internal, Technical, Unforeseeable Definitions of probability & Impact – Risk adverse vs. Risk Prone – probability and impact matrix help standardize these interpretations and also help compare risks between projects. Stakeholder tolerances – Stakeholders have a low risk tolerance than impact is high. That information should be taken into account to rank cost impacts higher than if the low tolerance was in another area. Tolerances should not be implied, but uncovered in project initiating and clarified or refined continually. Reporting – Describes reports related to RM and how they will be used and what they will include. Tracking – Auditing, documentation regarding RM
  8. Risk are identified through: Stakeholders, literature, reviews, research, nonstakeholders, etc. should be used. This is an iterative process. Everyone should be involved in risk identification! Everyone has a different perspective of the project and can provide thoughts on opportunities and threats. Smart project managers begin looking for risks as soon as a project is first discussed. High level risks is an output of the creation of the project charter.
  9. Ways to identify risk. Documentation Reviews – including charter, contracts, and planning documentation, can help identify risks. Those involved in risk identification might look at this documentation, as well as lessons learned, articles, and other documents, to help uncover risks. This used to be a trick but is now standard practice.
  10. These are other ways to identify risk/Collect requirements for projects
  11. The risk register is where most of the risk information is kept. Think of it as one document for the whole risk management process that will be constantly updated with information as Identify Risks and the later risk management processes are completed. The risk register becomes part of the project documents and is included in historical records that will be used for future projects.
  12. You need to analyze the risks, including their probability and potential impact on the project, to determine which ones warrant a response. The Perform Qualitative Risk Analysis process involves doing this analysis and creating a short list of the previously identified risk. Which risk warrant a response? Subjective Analysis Probability of each risk occurring The impact of each risk occurring
  13. This matrix may be used to sort or rate risks to determine which ones warrant an immediate response and which ones will be put onto the watch list
  14. Risk Register Updates Risk ranking comparison for the project List of prioritized risks with probability & impact ratings Risk grouped by categories List of risks for additional analysis and response List of risks requiring additional analysis Watchlist & Trends
  15. As project manager, you should always do qualitative risk analysis, but quantitative risk analysis is not required for all projects and may be skipped in favor of moving on to risk response planning. You should proceed with quantitative risk analysis only if it is worth the time and money on your project. Risk assessment refers to the technique of identifying risks through quantitative risk analysis.
  16. You need to know the following actions are part of quantitative risk analysis but not how to do them beyond what is explained in this chapter.
  17. Monte Carlo analysis uses the network diagram and estimates to “perform” the project many times and to simulate the cost or schedule the results of the project. Monte Carlo Analysis cost, schedule or time simulation To evaluate a risk, you can look at the probability or the impact, but calculating the expected monetary value is a better measure to determine an overall ranking of risks.
  18. If you have to choose between many alternatives, you should analyze how each choice benefits or hurts the project before making the decision. Decision trees can help you in this type of analysis. They are models of real situations and are used to make informed decisions about things like, “Which option should I choose?” or “How will I solve this problem?” by taking into account the associated risks, probabilities, and impacts. EMV determines overall ranking of risks. EMV = P * I (impact or outcome)
  19. What are the risks that are most likely to cause trouble? To affect the critical path? That need the most contingency reserve? “The project requires another 50,000 and two months of time to accommodate the risks on the project?” “We are 95 percent confident that we can complete this project on May 25 th for $989,000 budget?” “We only have a 75 percent chance of completing the project within the $800,000 budget.” As you repeat quantitative risk analysis during project planning and when changes are proposed, you can track changes to the overall risk of the project and see any trends.
  20. “What are we going to do now about each top risk?” In risk response planning, you find ways to reduce or eliminate threats, and you find ways to make opportunities more likely or increase their impact. “What should we do about residual risk?” Assign work involved in the responses to risk response owners When you have done risk management, your project will go smoother and faster; with significantly fewer complications, because avoidable problems were solved BEFORE they happened. You now have time to spend implementing reward systems, updating organizational process assets, creating lessons learned, preventing problems, assisting, coaching, and all the other items you might have thought you did not have time for. Can you eliminate all risk?
  21. Risk Register Updates Residual Risk –risk that remain after risk response training Contingency Plans – plans describing the specific plans that will be taken if the opportunity or risk occurs Risk Response Owners – Each risk must be assigned to somebody Secondary Risk – Any new risks created by the implementation of selected risk strategies Risk Triggers – Events that trigger the contingency response Contracts – A project manager must be involved before a contract is signed Fallback plans o- These plans are specific actions thatt will be taken if the contingency plan is not effective Reserves (contingency) Having reserves for time and cost is a required part of project management
  22. Make sure you realize that reserves are not an additional cost to a project. The risk management process should result in a decrease to the project’s projected time and cost. As risks are eliminated or their probability or impact reduced, there should be a reduction to the project’s schedule and budget. Contingency reserves are for the prespecified opportunities and threats that remain after the risk management process is completed. No matter what you do, risks will remain in the project, and there should be a time or cost allotment for them, just as cost or time is allotted to work activities on the project.
  23. Flowchart of Identify Risk to Plan Risk Response
  24. Other work that will be part of the Monitor and Control Risks process includes:
  25. Common risk management errors Risk id is completed without knowing enough about the project Project risk is evaluated using only a questionnaire, interview, or Monte Carlo analysis and thus does not provide specific risks. Risk ID ends too soon, resulting in a brief list rather than an extensive list. See page 401
  26. Risk Management – Fireman – Monitor and Control Risk - Questions