The role of Machinery in Construction Industry
STUDENT NAME: Yam Yih Hwan
STUDENT ID NO.: 0305861
SUPERVISOR: Ms Myzatul Aishah binti Kamarazaly
DATE OF SUBMISSION: 29th October 2015
P a g e 2 | 20
TABLE OF CONTENTS
LIST OF TABLES…………………………………………………….…………………3
CHAPTER 1 : INTRODUCTION………….…………………………………………….4
1.1 BACKGROUND OF THE STUDY…………………………………….4-10
1.2 NEED FOR STUDY…………………………...………………………..….11
1.3 PROBLEM STATEMENT………………………………………..…11-12
1.4 OBJECTIVES………………………………………………………….……13
1.5 SCOPE AND LIMITATIONS…………….……..…………………………13
1.6 RESEARCH DESIGN…………….…………………………….………14-15
1.7 IMPORTANCE OF RESEARCH FINDINGS……………..………………16
1.8 STRUCTURE OF THESIS………………………………….…..………16-17
1.9 RESEARCH PROGRAM CHART…………………………...…………18-19
REFERENCES……………………………………………………..……...……………20
P a g e 3 | 20
LIST OF TABLES
TABLE 1.1 : TYPES OF CONSTRUCTION EQUIPMENT IN CONSTRUCTION
INDUSTRY………………………………………………………………………..…….6
TABLE 1.2 : TYPES OF CONSTRUCTION VARY TO LEVEL OF USAGE ON
MACHINERY……………………………………………………………………….…..8
TABLE 1.3 : EVOLUTION OF LIFTING MACHINERY……………….……………10
TABLE 1.4 : TABLE OF RESEARCH DESIGN (INCLUDED TYPES OF DATA,
SOURCES OF DATA AND METHODS OF COLLECTION…………………..……..15
TABLE 1.5 : PROGRESS CHART OF SEMESTER 5…………………………….…..18
TABLE 1.6 : PROGRESS CHART OF SEMESTER 6……………………..………….19
P a g e 4 | 20
CHAPTER 1
INTRODUCTION
1.1 Background of the Study
Building are connected to the earth by foundation systems to achieve stability.
Utilities are located underground so that they are not visible and not placed in the way of
other systems. Building sites are shaped to drain water away from the structure to a safe
place. But here’s the question. How does all of these as mentioned above are built? The
answer is simple and straight forwarded, through construction.
Construction of these projects require heavy machineries to assist on many of the
work activities, without it construction cannot be carried out. At the start of the 21st
century, the construction industry is one of the largest sectors in most economies,
considerable percent of the gross domestic product (GDP) and employment a sizeable
percent of total labor force. Heavy construction machineries had reached its status. In
fact, the role of heavy construction machineries today is mission critical (refers to any
factor of a system whose failure will result in the failure of business operations) and
indirectly influences the quality of our daily lives.
P a g e 5 | 20
It is a common fact that we find a wide variety of construction machineries on
every construction sites, which make the construction jobs easy, safe and quicker.
Depending on the application, construction machines are classified into various
categories, for examples, (1) Earthmoving Equipment, (2) Construction Vehicles, (3)
Material Handling Equipment and (4) Construction Equipment. Table 1.1 shows the
Types of Construction Equipment in Construction Industry:
P a g e 6 | 20
Table 1.1: Types of Construction Equipment in Construction Industry
Earthmoving Equipment Construction Vehicles Material Handling Equipment Construction Equipment
1. Excavators 1. Dumpers 1. Cranes 1. Road Rollers
2. Loaders 2. Tankers 2. Conveyors 2. Concrete Mixers
3. Trenchers 3. Tippers 3. Forklifts 3. Pavers
4. Bull Dozers 4. Trailers 4. Hoists 4. Heavy Duty Pumps
5. Backhoe 5. Stone Crushers
6. Motor Graders
6. Tunneling & Handling
Equipment
P a g e 7 | 20
Today contractors undertake many types of construction activities that require
different types, sizes, and groupings of machineries for earth moving, excavating,
and lifting. There is a piece of equipment for practically any work activity, large or
small. Construction machineries today is specifically designed by the manufacturer
to perform certain mechanical operations that accomplish a work activity. Working
capacity is a direct function of the size of the machine and the power required for the
operation, the greater the production capacity, and the greater the cost to own and
operate (Bloch and Geitner, 2012).
Heavy construction work typically requires high-capacity machineries. These
requirements are typically affected by the large amount of work to be done at a
specific amount of time to complete it (Bloch and Geitner, 2012). This work can
further be classified into whether the construction is vertical or horizontal. Vertical
construction typically requires less surface work, earth moving, and excavating and
more lifting work. On the other hand, horizontal construction typically requires more
surface work and limited lifting.
The dependency and need for heavy construction machineries had grown
with the size and complexity of construction projects (Bloch and Geitner, 2012). The
development of automated heavy construction equipment for earth moving,
excavating, and lifting occurred in the early centuries. Operating and mechanical
principles for most types of equipment are basically the same as when they are first
created. It should be noted that mechanical operations are typical for most basic
classifications of equipment. Table 1.2 shows Types of Construction vary to Level of
Usage on Machinery:
P a g e 8 | 20
Table 1.2: Types of Construction vary to Level of Usage on Machinery
Types of
Construction
Level of Use on
Machinery
Work Activities
Residential Light  Finish site work
 Foundation Excavation
 Ground material moving
 Three-story lifting
 Pneumatic Assembly Tools
Commercial Moderate  Rough and finish site work
 Stabilizing and Compacting
 Multiple-story material and man lifting
 Ground and on-structure material moving
 Miscellaneous types of assembly
 Support Equipment
Industrial Heavy  Large volume rough and finish site work
 Stabilizing and Compacting
 Ground and on-structure material moving
 Multiple-story heavy lifting and precision placing
 Numerous miscellaneous special types of equipment for assembly and support
P a g e 9 | 20
Development of tools started with humans. Hands and teeth were the first
tools. They were used to pick, dig, break, scrape and shape. They were used to make
other tools and shelter. Simple tools were eventually used to create a better living
environment. As the tools improves, the amount and speed with which construction
work could be done increased. Therefore the scale and complexity of construction
projects increased (Bloch and Geitner, 2012).
Today it is assumed that if machineries does not exist to perform its necessary
task, buildings are unlikely to be designed and constructed. Heavy construction
machinery manufacturers are very responsive to market needs and feedback from
users. Quite simply, design development of heavy construction equipment is driven
and evolves from the needs of the user market (Bloch and Geitner, 2012).
The cost of machinery for a particular construction project varies from 10-30%
of the total cost of project, depending upon the extent of mechanization (Danso,
2014). With the growing use of machineries, it has become necessary for
construction firms to be able to acquire wide range of modern equipment to ensure
timely completion of projects. The physical needs to perform construction work have
not changed very much. The work to be done changes based on the type of project,
but the activities that have to be performed are similar for all projects. Activities
include site work, the base or foundation, structure, and associated parts or
connections. It could be a building, highway, or dam.
Development and evolution of heavy construction equipment is predictable in
many ways. If we need bigger, we build bigger. If we need something new, we build
it. Tempered by economic reality, equipment will be refined with necessity driving
the design and development just as it has from the beginning (Bloch and Geitner,
2012). That is the past and the future for heavy construction equipment development.
Table 1.3 shown an example of Evolution on Lifting Machinery:
P a g e 10 | 20
Table 1.3: Evolution on Lifting Machinery
P a g e 11 | 20
1.2 Needfor Study
What are the causes of machinery failures and the ways to prevent it? In its
simplest form, failure can be defined as any change in a machinery part or
component which causes it to be unable to perform its intended function
satisfactorily. Proper planning, selection, procurement, installation, operation,
maintenance and machinery replacement policy plays an important role in machinery
management to ensure successful completion of a project (Bloch and Geitner, 2012).
Classifications of failure causes are poor training, overrunning machine’s capability,
mechanical defects, and improper maintenance.
1.3 Problem Statement
Poor Training
Intensive training is essential for safe equipment operation. Users who do not
know how to use equipment properly are at high-risk. Pay close attention to training
manuals for devices like pneumatic rollers, power hammers, band saws and lathes.
Additionally, avoid using machinery that you have not been trained to use. This will
prevent you from making a grave error. Explain to your manager that you do not
know how to use the equipment, and ask for training instead (Friedmann, 2014). But
sometimes, as the construction site get larger, Contractors are hiring outside help to
operate the equipment without training them. As a result, those who end up driving
the machine lack the full understanding of how it works and what it is capable of
doing.
P a g e 12 | 20
Overrunning machine's capability
A lot of users tend to run machines to its maximum performance or at the
top of the engineering curve for which the machine was designed. Overrunning
the machine puts a strain on all the drives and makes breakdowns much more
likely to occur. In order to prevent this problem, users should find where a
machine's maximum performance level is and then reduce its usage to prevent it
from running it at maximum constantly (Wehrspann, 2015).
Mechanical Defects
Sometimes there is no human error involved in an injury, and it all boils
down to the machinery. Heavy machinery is known to malfunction, and the result
can be devastating for a user who is otherwise doing everything correctly (Friedmann,
2014). Reading the operator's manual is essentially important, because it tells
you how to set the machine and what parts to check before you take it into the
construction field. However, it is one step that many owners fail to do thoroughly.
The operator's manual also describes how to fix certain problems once they
happen so that owners can troubleshoot the problem themselves without having
to take more time to wait for a technician. However, many farmers may forget to
check the troubleshooting section, which can cost them even more time out of
the field.
Improper maintenance
It is important to perform a checkout on the machinery properly and on a
timely basis. Besides that, it is to do a general inspection of the machine at the
beginning of the day, like checking engine and transmission levels daily or
making sure the system is working perfectly. Taking shortcuts can lead to
downtime in the field.
P a g e 13 | 20
1.4 Objectives
Respectively, the study aims to achieve the following objectives.
1. To determine the roles of machinery in construction industry.
2. To identify the consequences of machinery in construction industry.
3. To notify the causes of machinery breakdowns and the ways to prevent it in
construction industry.
1.5 Scope and Limitations
The study will be limited to the views expressed by the Contractors using the
machineries on construction industry as well as the Suppliers which supply the
machineries to most of the construction. The focus will be on the roles of the
machinery in construction industry and the consequences with the usage of
machineries on construction site. Also, the causes of machinery breakdowns and the
ways to prevent it.
P a g e 14 | 20
1.6 ResearchDesign
The research methodology for this dissertation will be conducted by using the
following approaches, as shown in Table 1.4:
 Literature Review
The literature review focuses mainly on the reviews of related literature,
which provided the responses and attention of the Contractors and Suppliers
in Kuala Lumpur.
 Questionnaires
Questionnaires will be distributed to the Contractors and Suppliers in Kuala
Lumpur.
 Interviews
Interviews will be conducted to strengthen and resolve some complication
arising from the questionnaire survey.
P a g e 15 | 20
Table 1.4: Table of Research Design (included Types of Data, Sources of Data and Methods of Collection)
Objectives Types of Data Sources of Data Methods of Collection
1. To determine the roles of
machinery in construction
industry
 The knowledge on
machinery in construction
industry
 Internet
 Books
 Journals
 Articles
 Lectures
 Reports
 Reading
 Document Analysis
2. To identify the consequences
on machinery in construction
industry
 Consequences on the usage
of machinery in
construction industry
 Internet
 Articles
 Reports
 Document Analysis
 Reading
3. To notify the causes of
machinery breakdowns and the
ways to prevent it in
construction industry
 Causes of machinery
failures and the steps used
to prevent it
 Internet
 Articles
 Reports
 Document Analysis
 Reading
P a g e 16 | 20
1.7 Importance of ResearchFindings
Basically, this paper highlights mainly on the roles of machinery in
construction industry, and a proportional of consequences with the usage of
machinery in construction site. Last but not least, it explained what are the common
causes of machinery failure and the ways to prevent it from happening in
construction industry.
1.8 Structure of Thesis
This thesis comprise five chapters:
Chapter 1:
 The introduction which stated the background and the need of study, problem
statement, objectives, scope and limitations and importance of research
findings.
Chapter 2:
 The reviews of related literature, the roles of machinery in construction
industry, what are the consequences of these machinery in construction
industry, and the causes and solutions to machinery in construction industry.
It concludes with a section of summarizing the perceptions gained from the
literature review.
P a g e 17 | 20
Chapter 3:
 The methodology that will be used in the study. The main points of the
methodology are the overall research strategy used, the procedure used to
carry out the case study, the instruments used to collect and gather data, and
the method that will be used in data analysis.
Chapter 4:
 Data will be obtained through case study, and will be analyzed and discussed.
The data that will be discussed containing all the nature, necessary materials
required and the construction process of the case study. The results of the
analysis will be discussed from related literature.
Chapter 5:
 The conclusions from the research findings as well as the recommendations
for further investigations.
P a g e 18 | 20
1.9 ResearchProgram Chart
Table 1.5: Progress Chart of Semester 5
Activity Week
1 2 3 4 5 6 7 8 9 10 11 Sembreak 13 14
Submission and Approval
of Research title
Submission of Research
Proposal
Submission of Literature
Review and Theoretical
Framework
Completed In Progress
P a g e 19 | 20
Table 1.6: Progress Chart of Semester 6
Activity Week
1 2 3 4 5 6 7 8 Sembreak 10 11 12 13 14
Finalization and
Submission of Research
Preparation of
Questionnaires
Distribution of
Questionnaires
Data Collection and
Analysis
Conclusion
Final Report
Outstanding
P a g e 20 | 20
References
1 Bloch, H. and Geitner, F. (2012). Machinery failure analysis and troubleshooting.
Oxford: Butterworth-Heinemann.
2 Gransberg, D., Popescu, C. and Ryan, R. (2006). Construction equipment
management for engineers, estimators, and owners. Boca Raton, FL: CRC
Taylor & Francis.
3 Friedmann, A. (2014). Causes Of Heavy Machinery | Construction Sites |
Disability. [online] Phillydisabilitylawyer.com. Available at:
http://phillydisabilitylawyer.com/causes-heavy-machinery-accidents/ [Accessed
28 Oct. 2015].
4 Wehrspann, J. (2015). 10 biggest causes of machinery breakdowns (and how to
prevent them). [online] Farmindustrynews.com. Available at:
http://farmindustrynews.com/planters/10-biggest-causes-machinery-breakdowns-
and-how-prevent-them [Accessed 28 Oct. 2015].
5 Hhilifting.com, (2015). Importance of Construction Industry in the Economy and
Use of Construction Equipments | HHI Lifting. [online] Available at:
http://www.hhilifting.com/importance-of-construction-industry-in-the-economy-
and-use-of-construction-equipments/ [Accessed 28 Oct. 2015].
6 Danso, H. (2014). Poor Workmanship and Lack of plant/Equipment Problems in
the Construction Industry, 2(3), pp.60-70.

Contenu connexe

Tendances

Thesis guidelines
Thesis guidelinesThesis guidelines
Thesis guidelinesclmc83
 
INTRODUCTION AND DEFINITION TO PROJECT MANAGEMENT.ppt
INTRODUCTION AND DEFINITION   TO PROJECT MANAGEMENT.pptINTRODUCTION AND DEFINITION   TO PROJECT MANAGEMENT.ppt
INTRODUCTION AND DEFINITION TO PROJECT MANAGEMENT.pptAbraham Ncunge
 
Planning a Dinner Party for Four
Planning a Dinner Party for FourPlanning a Dinner Party for Four
Planning a Dinner Party for Fourtimwrodgers
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towersMiz Belle
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptxEr. Bam Bhandari
 
Introduction to construction project management
Introduction to construction project managementIntroduction to construction project management
Introduction to construction project managementMC Tubera
 
Entrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipEntrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipSuhas Dutta
 
CULTURE Compilation report
CULTURE Compilation reportCULTURE Compilation report
CULTURE Compilation reportShiko Foo
 
Code of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerCode of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerIr. Dr. R.Badlishah Ahmad
 
Introduction to entrepreneurship
Introduction to entrepreneurshipIntroduction to entrepreneurship
Introduction to entrepreneurshipOlwenda
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction ProductivitySunil Manjeri
 
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...FaHaD .H. NooR
 
Entrepreneurship Chap 4
Entrepreneurship Chap 4Entrepreneurship Chap 4
Entrepreneurship Chap 4Umair Arain
 
Entrepreneurship and intrapreneurship
Entrepreneurship and intrapreneurshipEntrepreneurship and intrapreneurship
Entrepreneurship and intrapreneurshipReynaldo (Rey) Lugtu
 
Bidding and awards.pptx2
Bidding and awards.pptx2Bidding and awards.pptx2
Bidding and awards.pptx2peredplatypus
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 

Tendances (20)

BS Role
BS RoleBS Role
BS Role
 
Thesis guidelines
Thesis guidelinesThesis guidelines
Thesis guidelines
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
INTRODUCTION AND DEFINITION TO PROJECT MANAGEMENT.ppt
INTRODUCTION AND DEFINITION   TO PROJECT MANAGEMENT.pptINTRODUCTION AND DEFINITION   TO PROJECT MANAGEMENT.ppt
INTRODUCTION AND DEFINITION TO PROJECT MANAGEMENT.ppt
 
Planning a Dinner Party for Four
Planning a Dinner Party for FourPlanning a Dinner Party for Four
Planning a Dinner Party for Four
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towers
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx
 
Introduction to construction project management
Introduction to construction project managementIntroduction to construction project management
Introduction to construction project management
 
Entrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - EntrepreneurshipEntrepreneurial Management (EM 01) - Entrepreneurship
Entrepreneurial Management (EM 01) - Entrepreneurship
 
CULTURE Compilation report
CULTURE Compilation reportCULTURE Compilation report
CULTURE Compilation report
 
Code of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerCode of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional Engineer
 
Introduction to entrepreneurship
Introduction to entrepreneurshipIntroduction to entrepreneurship
Introduction to entrepreneurship
 
Project management
Project managementProject management
Project management
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...
Recognizing Opportunities And Generating Ideas | Ways To Identify An Opportun...
 
Entrepreneurship Chap 4
Entrepreneurship Chap 4Entrepreneurship Chap 4
Entrepreneurship Chap 4
 
Entrepreneurship and intrapreneurship
Entrepreneurship and intrapreneurshipEntrepreneurship and intrapreneurship
Entrepreneurship and intrapreneurship
 
Bidding and awards.pptx2
Bidding and awards.pptx2Bidding and awards.pptx2
Bidding and awards.pptx2
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 

En vedette

Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)마 이환
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
Assignment 1: individual essay
Assignment 1: individual essayAssignment 1: individual essay
Assignment 1: individual essay마 이환
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines마 이환
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)마 이환
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)마 이환
 
Final interview report
Final interview reportFinal interview report
Final interview report마 이환
 
Idj compilation
Idj compilationIdj compilation
Idj compilation마 이환
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development마 이환
 
Building services i report
Building services i   reportBuilding services i   report
Building services i report마 이환
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)마 이환
 
Construction technology ii report
Construction technology ii   reportConstruction technology ii   report
Construction technology ii report마 이환
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-reportirwandavid
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 

En vedette (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
Assignment 1: individual essay
Assignment 1: individual essayAssignment 1: individual essay
Assignment 1: individual essay
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Final interview report
Final interview reportFinal interview report
Final interview report
 
Idj compilation
Idj compilationIdj compilation
Idj compilation
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Building services i report
Building services i   reportBuilding services i   report
Building services i report
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Construction technology ii report
Construction technology ii   reportConstruction technology ii   report
Construction technology ii report
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-report
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 

Similaire à Research Methodology:Introduction (Chapter 1)

CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptxmegha desai
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxmegha desai
 
IRJET- Contour Crafting (A Management Tool for Swift Construction)
IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)
IRJET- Contour Crafting (A Management Tool for Swift Construction)IRJET Journal
 
Quality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryQuality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryMichelle Madero
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
IRJET- Systematic Construction Equipment Handling in Construction Industr...
IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...
IRJET- Systematic Construction Equipment Handling in Construction Industr...IRJET Journal
 
Introduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryIntroduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryFazal-E- Jalal
 
Productivity of Concrete Placement by Dumpers in Nigeria
Productivity of Concrete Placement by Dumpers in NigeriaProductivity of Concrete Placement by Dumpers in Nigeria
Productivity of Concrete Placement by Dumpers in NigeriaIJERD Editor
 
Site-Efficiency-Report
Site-Efficiency-ReportSite-Efficiency-Report
Site-Efficiency-ReportRon Farr
 
BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learningIJRES Journal
 
Report on MULTI PROCESS MACHINE
Report on MULTI PROCESS MACHINEReport on MULTI PROCESS MACHINE
Report on MULTI PROCESS MACHINEMitesh6897
 
IRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET Journal
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Publishing House
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Journals
 
2009 41.Content.05215
2009 41.Content.052152009 41.Content.05215
2009 41.Content.05215lk314
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET Journal
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersIAEME Publication
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET Journal
 

Similaire à Research Methodology:Introduction (Chapter 1) (20)

CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptx
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
 
IRJET- Contour Crafting (A Management Tool for Swift Construction)
IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)
IRJET- Contour Crafting (A Management Tool for Swift Construction)
 
Quality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryQuality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction Industry
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
IRJET- Systematic Construction Equipment Handling in Construction Industr...
IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...
IRJET- Systematic Construction Equipment Handling in Construction Industr...
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
Introduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryIntroduction to Heavy Construction Machinery
Introduction to Heavy Construction Machinery
 
Productivity of Concrete Placement by Dumpers in Nigeria
Productivity of Concrete Placement by Dumpers in NigeriaProductivity of Concrete Placement by Dumpers in Nigeria
Productivity of Concrete Placement by Dumpers in Nigeria
 
Site-Efficiency-Report
Site-Efficiency-ReportSite-Efficiency-Report
Site-Efficiency-Report
 
Birhanu
BirhanuBirhanu
Birhanu
 
BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learning
 
Report on MULTI PROCESS MACHINE
Report on MULTI PROCESS MACHINEReport on MULTI PROCESS MACHINE
Report on MULTI PROCESS MACHINE
 
IRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro Project
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
2009 41.Content.05215
2009 41.Content.052152009 41.Content.05215
2009 41.Content.05215
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 

Plus de 마 이환

Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides마 이환
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet마 이환
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 
Organization Chart
Organization ChartOrganization Chart
Organization Chart마 이환
 
Bank guarantee
Bank guaranteeBank guarantee
Bank guarantee마 이환
 
Letter of invitation
Letter of invitationLetter of invitation
Letter of invitation마 이환
 
Virtigo holding berhad
Virtigo holding berhadVirtigo holding berhad
Virtigo holding berhad마 이환
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows마 이환
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides마 이환
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit마 이환
 
Assignment:Time Management
Assignment:Time ManagementAssignment:Time Management
Assignment:Time Management마 이환
 

Plus de 마 이환 (17)

Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Organization Chart
Organization ChartOrganization Chart
Organization Chart
 
Bank guarantee
Bank guaranteeBank guarantee
Bank guarantee
 
Letter of invitation
Letter of invitationLetter of invitation
Letter of invitation
 
Virtigo holding berhad
Virtigo holding berhadVirtigo holding berhad
Virtigo holding berhad
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit
 
Assignment:Time Management
Assignment:Time ManagementAssignment:Time Management
Assignment:Time Management
 

Dernier

Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 

Dernier (20)

YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 

Research Methodology:Introduction (Chapter 1)

  • 1. P a g e 1 | 20 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) RESEARCH PROPOSAL QSB 3933 Research Methodology The role of Machinery in Construction Industry STUDENT NAME: Yam Yih Hwan STUDENT ID NO.: 0305861 SUPERVISOR: Ms Myzatul Aishah binti Kamarazaly DATE OF SUBMISSION: 29th October 2015
  • 2. P a g e 2 | 20 TABLE OF CONTENTS LIST OF TABLES…………………………………………………….…………………3 CHAPTER 1 : INTRODUCTION………….…………………………………………….4 1.1 BACKGROUND OF THE STUDY…………………………………….4-10 1.2 NEED FOR STUDY…………………………...………………………..….11 1.3 PROBLEM STATEMENT………………………………………..…11-12 1.4 OBJECTIVES………………………………………………………….……13 1.5 SCOPE AND LIMITATIONS…………….……..…………………………13 1.6 RESEARCH DESIGN…………….…………………………….………14-15 1.7 IMPORTANCE OF RESEARCH FINDINGS……………..………………16 1.8 STRUCTURE OF THESIS………………………………….…..………16-17 1.9 RESEARCH PROGRAM CHART…………………………...…………18-19 REFERENCES……………………………………………………..……...……………20
  • 3. P a g e 3 | 20 LIST OF TABLES TABLE 1.1 : TYPES OF CONSTRUCTION EQUIPMENT IN CONSTRUCTION INDUSTRY………………………………………………………………………..…….6 TABLE 1.2 : TYPES OF CONSTRUCTION VARY TO LEVEL OF USAGE ON MACHINERY……………………………………………………………………….…..8 TABLE 1.3 : EVOLUTION OF LIFTING MACHINERY……………….……………10 TABLE 1.4 : TABLE OF RESEARCH DESIGN (INCLUDED TYPES OF DATA, SOURCES OF DATA AND METHODS OF COLLECTION…………………..……..15 TABLE 1.5 : PROGRESS CHART OF SEMESTER 5…………………………….…..18 TABLE 1.6 : PROGRESS CHART OF SEMESTER 6……………………..………….19
  • 4. P a g e 4 | 20 CHAPTER 1 INTRODUCTION 1.1 Background of the Study Building are connected to the earth by foundation systems to achieve stability. Utilities are located underground so that they are not visible and not placed in the way of other systems. Building sites are shaped to drain water away from the structure to a safe place. But here’s the question. How does all of these as mentioned above are built? The answer is simple and straight forwarded, through construction. Construction of these projects require heavy machineries to assist on many of the work activities, without it construction cannot be carried out. At the start of the 21st century, the construction industry is one of the largest sectors in most economies, considerable percent of the gross domestic product (GDP) and employment a sizeable percent of total labor force. Heavy construction machineries had reached its status. In fact, the role of heavy construction machineries today is mission critical (refers to any factor of a system whose failure will result in the failure of business operations) and indirectly influences the quality of our daily lives.
  • 5. P a g e 5 | 20 It is a common fact that we find a wide variety of construction machineries on every construction sites, which make the construction jobs easy, safe and quicker. Depending on the application, construction machines are classified into various categories, for examples, (1) Earthmoving Equipment, (2) Construction Vehicles, (3) Material Handling Equipment and (4) Construction Equipment. Table 1.1 shows the Types of Construction Equipment in Construction Industry:
  • 6. P a g e 6 | 20 Table 1.1: Types of Construction Equipment in Construction Industry Earthmoving Equipment Construction Vehicles Material Handling Equipment Construction Equipment 1. Excavators 1. Dumpers 1. Cranes 1. Road Rollers 2. Loaders 2. Tankers 2. Conveyors 2. Concrete Mixers 3. Trenchers 3. Tippers 3. Forklifts 3. Pavers 4. Bull Dozers 4. Trailers 4. Hoists 4. Heavy Duty Pumps 5. Backhoe 5. Stone Crushers 6. Motor Graders 6. Tunneling & Handling Equipment
  • 7. P a g e 7 | 20 Today contractors undertake many types of construction activities that require different types, sizes, and groupings of machineries for earth moving, excavating, and lifting. There is a piece of equipment for practically any work activity, large or small. Construction machineries today is specifically designed by the manufacturer to perform certain mechanical operations that accomplish a work activity. Working capacity is a direct function of the size of the machine and the power required for the operation, the greater the production capacity, and the greater the cost to own and operate (Bloch and Geitner, 2012). Heavy construction work typically requires high-capacity machineries. These requirements are typically affected by the large amount of work to be done at a specific amount of time to complete it (Bloch and Geitner, 2012). This work can further be classified into whether the construction is vertical or horizontal. Vertical construction typically requires less surface work, earth moving, and excavating and more lifting work. On the other hand, horizontal construction typically requires more surface work and limited lifting. The dependency and need for heavy construction machineries had grown with the size and complexity of construction projects (Bloch and Geitner, 2012). The development of automated heavy construction equipment for earth moving, excavating, and lifting occurred in the early centuries. Operating and mechanical principles for most types of equipment are basically the same as when they are first created. It should be noted that mechanical operations are typical for most basic classifications of equipment. Table 1.2 shows Types of Construction vary to Level of Usage on Machinery:
  • 8. P a g e 8 | 20 Table 1.2: Types of Construction vary to Level of Usage on Machinery Types of Construction Level of Use on Machinery Work Activities Residential Light  Finish site work  Foundation Excavation  Ground material moving  Three-story lifting  Pneumatic Assembly Tools Commercial Moderate  Rough and finish site work  Stabilizing and Compacting  Multiple-story material and man lifting  Ground and on-structure material moving  Miscellaneous types of assembly  Support Equipment Industrial Heavy  Large volume rough and finish site work  Stabilizing and Compacting  Ground and on-structure material moving  Multiple-story heavy lifting and precision placing  Numerous miscellaneous special types of equipment for assembly and support
  • 9. P a g e 9 | 20 Development of tools started with humans. Hands and teeth were the first tools. They were used to pick, dig, break, scrape and shape. They were used to make other tools and shelter. Simple tools were eventually used to create a better living environment. As the tools improves, the amount and speed with which construction work could be done increased. Therefore the scale and complexity of construction projects increased (Bloch and Geitner, 2012). Today it is assumed that if machineries does not exist to perform its necessary task, buildings are unlikely to be designed and constructed. Heavy construction machinery manufacturers are very responsive to market needs and feedback from users. Quite simply, design development of heavy construction equipment is driven and evolves from the needs of the user market (Bloch and Geitner, 2012). The cost of machinery for a particular construction project varies from 10-30% of the total cost of project, depending upon the extent of mechanization (Danso, 2014). With the growing use of machineries, it has become necessary for construction firms to be able to acquire wide range of modern equipment to ensure timely completion of projects. The physical needs to perform construction work have not changed very much. The work to be done changes based on the type of project, but the activities that have to be performed are similar for all projects. Activities include site work, the base or foundation, structure, and associated parts or connections. It could be a building, highway, or dam. Development and evolution of heavy construction equipment is predictable in many ways. If we need bigger, we build bigger. If we need something new, we build it. Tempered by economic reality, equipment will be refined with necessity driving the design and development just as it has from the beginning (Bloch and Geitner, 2012). That is the past and the future for heavy construction equipment development. Table 1.3 shown an example of Evolution on Lifting Machinery:
  • 10. P a g e 10 | 20 Table 1.3: Evolution on Lifting Machinery
  • 11. P a g e 11 | 20 1.2 Needfor Study What are the causes of machinery failures and the ways to prevent it? In its simplest form, failure can be defined as any change in a machinery part or component which causes it to be unable to perform its intended function satisfactorily. Proper planning, selection, procurement, installation, operation, maintenance and machinery replacement policy plays an important role in machinery management to ensure successful completion of a project (Bloch and Geitner, 2012). Classifications of failure causes are poor training, overrunning machine’s capability, mechanical defects, and improper maintenance. 1.3 Problem Statement Poor Training Intensive training is essential for safe equipment operation. Users who do not know how to use equipment properly are at high-risk. Pay close attention to training manuals for devices like pneumatic rollers, power hammers, band saws and lathes. Additionally, avoid using machinery that you have not been trained to use. This will prevent you from making a grave error. Explain to your manager that you do not know how to use the equipment, and ask for training instead (Friedmann, 2014). But sometimes, as the construction site get larger, Contractors are hiring outside help to operate the equipment without training them. As a result, those who end up driving the machine lack the full understanding of how it works and what it is capable of doing.
  • 12. P a g e 12 | 20 Overrunning machine's capability A lot of users tend to run machines to its maximum performance or at the top of the engineering curve for which the machine was designed. Overrunning the machine puts a strain on all the drives and makes breakdowns much more likely to occur. In order to prevent this problem, users should find where a machine's maximum performance level is and then reduce its usage to prevent it from running it at maximum constantly (Wehrspann, 2015). Mechanical Defects Sometimes there is no human error involved in an injury, and it all boils down to the machinery. Heavy machinery is known to malfunction, and the result can be devastating for a user who is otherwise doing everything correctly (Friedmann, 2014). Reading the operator's manual is essentially important, because it tells you how to set the machine and what parts to check before you take it into the construction field. However, it is one step that many owners fail to do thoroughly. The operator's manual also describes how to fix certain problems once they happen so that owners can troubleshoot the problem themselves without having to take more time to wait for a technician. However, many farmers may forget to check the troubleshooting section, which can cost them even more time out of the field. Improper maintenance It is important to perform a checkout on the machinery properly and on a timely basis. Besides that, it is to do a general inspection of the machine at the beginning of the day, like checking engine and transmission levels daily or making sure the system is working perfectly. Taking shortcuts can lead to downtime in the field.
  • 13. P a g e 13 | 20 1.4 Objectives Respectively, the study aims to achieve the following objectives. 1. To determine the roles of machinery in construction industry. 2. To identify the consequences of machinery in construction industry. 3. To notify the causes of machinery breakdowns and the ways to prevent it in construction industry. 1.5 Scope and Limitations The study will be limited to the views expressed by the Contractors using the machineries on construction industry as well as the Suppliers which supply the machineries to most of the construction. The focus will be on the roles of the machinery in construction industry and the consequences with the usage of machineries on construction site. Also, the causes of machinery breakdowns and the ways to prevent it.
  • 14. P a g e 14 | 20 1.6 ResearchDesign The research methodology for this dissertation will be conducted by using the following approaches, as shown in Table 1.4:  Literature Review The literature review focuses mainly on the reviews of related literature, which provided the responses and attention of the Contractors and Suppliers in Kuala Lumpur.  Questionnaires Questionnaires will be distributed to the Contractors and Suppliers in Kuala Lumpur.  Interviews Interviews will be conducted to strengthen and resolve some complication arising from the questionnaire survey.
  • 15. P a g e 15 | 20 Table 1.4: Table of Research Design (included Types of Data, Sources of Data and Methods of Collection) Objectives Types of Data Sources of Data Methods of Collection 1. To determine the roles of machinery in construction industry  The knowledge on machinery in construction industry  Internet  Books  Journals  Articles  Lectures  Reports  Reading  Document Analysis 2. To identify the consequences on machinery in construction industry  Consequences on the usage of machinery in construction industry  Internet  Articles  Reports  Document Analysis  Reading 3. To notify the causes of machinery breakdowns and the ways to prevent it in construction industry  Causes of machinery failures and the steps used to prevent it  Internet  Articles  Reports  Document Analysis  Reading
  • 16. P a g e 16 | 20 1.7 Importance of ResearchFindings Basically, this paper highlights mainly on the roles of machinery in construction industry, and a proportional of consequences with the usage of machinery in construction site. Last but not least, it explained what are the common causes of machinery failure and the ways to prevent it from happening in construction industry. 1.8 Structure of Thesis This thesis comprise five chapters: Chapter 1:  The introduction which stated the background and the need of study, problem statement, objectives, scope and limitations and importance of research findings. Chapter 2:  The reviews of related literature, the roles of machinery in construction industry, what are the consequences of these machinery in construction industry, and the causes and solutions to machinery in construction industry. It concludes with a section of summarizing the perceptions gained from the literature review.
  • 17. P a g e 17 | 20 Chapter 3:  The methodology that will be used in the study. The main points of the methodology are the overall research strategy used, the procedure used to carry out the case study, the instruments used to collect and gather data, and the method that will be used in data analysis. Chapter 4:  Data will be obtained through case study, and will be analyzed and discussed. The data that will be discussed containing all the nature, necessary materials required and the construction process of the case study. The results of the analysis will be discussed from related literature. Chapter 5:  The conclusions from the research findings as well as the recommendations for further investigations.
  • 18. P a g e 18 | 20 1.9 ResearchProgram Chart Table 1.5: Progress Chart of Semester 5 Activity Week 1 2 3 4 5 6 7 8 9 10 11 Sembreak 13 14 Submission and Approval of Research title Submission of Research Proposal Submission of Literature Review and Theoretical Framework Completed In Progress
  • 19. P a g e 19 | 20 Table 1.6: Progress Chart of Semester 6 Activity Week 1 2 3 4 5 6 7 8 Sembreak 10 11 12 13 14 Finalization and Submission of Research Preparation of Questionnaires Distribution of Questionnaires Data Collection and Analysis Conclusion Final Report Outstanding
  • 20. P a g e 20 | 20 References 1 Bloch, H. and Geitner, F. (2012). Machinery failure analysis and troubleshooting. Oxford: Butterworth-Heinemann. 2 Gransberg, D., Popescu, C. and Ryan, R. (2006). Construction equipment management for engineers, estimators, and owners. Boca Raton, FL: CRC Taylor & Francis. 3 Friedmann, A. (2014). Causes Of Heavy Machinery | Construction Sites | Disability. [online] Phillydisabilitylawyer.com. Available at: http://phillydisabilitylawyer.com/causes-heavy-machinery-accidents/ [Accessed 28 Oct. 2015]. 4 Wehrspann, J. (2015). 10 biggest causes of machinery breakdowns (and how to prevent them). [online] Farmindustrynews.com. Available at: http://farmindustrynews.com/planters/10-biggest-causes-machinery-breakdowns- and-how-prevent-them [Accessed 28 Oct. 2015]. 5 Hhilifting.com, (2015). Importance of Construction Industry in the Economy and Use of Construction Equipments | HHI Lifting. [online] Available at: http://www.hhilifting.com/importance-of-construction-industry-in-the-economy- and-use-of-construction-equipments/ [Accessed 28 Oct. 2015]. 6 Danso, H. (2014). Poor Workmanship and Lack of plant/Equipment Problems in the Construction Industry, 2(3), pp.60-70.