Topic : Construction Techniques
Of framed Industrial Building
SUBJECT: Construction Techniques of Steel and Concrete
Composite Structures
VIT
By Shabaz Khan
BUILDING LOCATION: MITS, MADANAPALLE-517325
Framed Industrial Building:
• Framed buildings are building structures formed by the framed
elements usually in the form of columns and beams, as well as further
strengthened as necessary by the introduction of rigid floor
membranes and external walls.
Common forms of framed building structure subdivided into 3 main
types
• 1. Insitu RC frame
• 2. Prefabricated frame
• 3. Structural steel frame
Types of Framed Industrial Building:
Frames structures can be differentiated into:
1. Rigid frame structure
Which are further subdivided into:
•Pin ended
•Fixed ended
2. Braced frame structure
Which is further subdivided into:
•Gabled frames
•Portal frames
Framed Industrial Building
 Framed structures are easily erected from pre-made members.
 These members are easily connected together in the correct
sequence to form the structural framework.
 Problems arise when large members are used and when the height of
the structure makes lifting difficult.
 In these situations a crane will be needed to lift the members into
place.
 Rectangular frames are usually made from steel but they may also be
made from concrete
Framed Industrial Building
• A framed structure is a network of beams and columns joined up to
form the skeleton framework of the building.
• The structural frame carries the total load of the building and
transfers it to the foundation.
• Cladding is fixed over the framework, or infill panels are placed
between its members, to totally enclose the space within the building
A Framed Industrial Building in course of
erection
Rectangular framed structures are used for
multi-storey buildings such as:
Office Blocks
Large Schools
Hotels
Hospitals or other similar buildings where a
multi-storey structure is required.
The floor space will incorporate a large number
of columns.
Typical structural layout of an industrial
building:
Principle factors affecting choice of frame
Principle factors affecting choice of frame
Structural Design consideration :
• 1 Foundation consideration
• 2 Standardization of members or design
• 3 Span and floor loads
• 4 Fire resistance requirement
• 5 Maintenance consideration
• 6 Integration of architectural & structural elements
Principle factors affecting choice of frame
Principle factors affecting choice of frame
Production consideration :
• 1. Availability of materials
• 2. labour and plant
• 3. Speed of construction
• 4. Availability of mechanical plants
Principle factors affecting choice of frame
Architectural Design consideration
• 1. Size and shape of site
• 2. Conditions of site
• 3. Integration of mechanical elements
• 4. Architectural or aesthetic requirements
Bracings:
• The horizontal and vertical bracings, employed in single and multi-
storey buildings, are also trusses used primarily to resist wind and
other lateral loads.
• These bracings minimize the differential deflection between the
different frames due to crane surge in industrial buildings.
• They also provide lateral support to columns in small and tall
buildings, thus increasing the buckling strength.
• Braced frames resist the wind and seismic forces, much more than
non-braced buildings.
• Steel bracing is economical, easy to erect, occupies less space and has
flexibility to design for meeting the required strength and stiffness.
Building configuration
• Typically the bays in industrial buildings have frames spanning the width
direction. Several such frames are arranged at suitable spacing to get the
required length
• Depending upon the requirement, several bays may be constructed
adjoining each other.
• The choice of structural configuration depends upon the span between the
rows of columns, the head room or clearance required the nature of
roofing material and type of lighting.
• If span is less, portal frames such as steel bents or gable frames can be
used but if span is large then buildings with trusses are used.
Examples:
Column Bases:
Steel Column to Foundation Details,
(A) Top bolt places created in base plate,
(B) Side view of column base to foundation
Column Splices
SIMPLE CONNECTION
Simple connections are assumed to transfer shear only shear at some nominal
eccentricity. Therefore such connections can be used only in non-sway frames where
the lateral loads are resisted by some alternative arrangement such as bracings or
shear walls.
Framed Industrial Building:
Location: MITS, Madanapalle
Framed Industrial Building:
Location: MITS, Madanapalle
Framed Industrial Building:
Location: MITS, Madanapalle
FRAMED INDUSTRIAL BUILDING
LOCATION: MITS, MADANAPALLE
Framed Industrial Building:Location: MITS, Madanapalle
Advantageous features of Framed Industrial
Building:
Advantageous features of framed structure
• 1. Speedy construction due to simplicity in geometry – consist of only
columns and beams (or partially by the floor slab) as the main structural
elements
• 2. Very rigid and stable – able to resist tremendous vertical (dead load) and
lateral loads (wind)
• 3. Reduced dead load – absent of thick shear wall etc.
• 4. Roofed over at an earlier stage – every floor slab being finished becomes
an cover to protect the lower floors from sun and rain
• 5. Offer large unobstructed floor areas – without obstacle between
columns
• 6. Flexible utilization of space
Advan. features of Framed Industrial Building:
(continued) .
• 7. Adaptable to almost any shape
• 8. Easily altered within limits of frame – regular or non-regular grid
system is very adaptable in spatial arrangement
• 9. Offsite preparation possible – especially for prefabricated
construction using precast concrete or structural steel elements
• 10. May be designed to accommodate movement
• 11. Acceptable distribution of natural light – window openings can be
provided easily on eternal walls
• 12. Easy to design structurally including computer design – again, due
to simple geometry
Disadvantageous features of Framed
Industrial Building:
Steel frame constructions do have a couple of disadvantages, the
most regularly cited being:
• 1) Thermal Conductivity: Steel is not known for its warmth, due to its
high efficiency in conducting heat. The insulation value of walls can
be reduced by as much as half when heat is transferred away through
steel studs, which is not good news for energy retention in a building.
Where steel frame construction is used, insulation measures need to
be put in place to counteract the thermal conductivity of steel.
• 2) Reduced Flexibility On Site:
One of the benefits of using wooden structural components is the
ability to adjust them on site. A component can be cut down to size,
nails hammered in to strengthen the join and so on. This obviously
can’t happen with steel.
Disadvantageous features of Framed
Industrial Building:
• Contd.
The measurements of steel need to be precisely calculated in advance,
because a steel fabrication is delivered to site in its final form, ready to
be slotted into the building. This is of course one of the big advantages
of Steel
• 3) Supporting Structures:
Steel frame constructions rarely work on their own. They usually
require drywall, sheathing, insulation and supplementary wooden
components to bring a building together.
CONCLUSION:
Construction Techniques Of framed Industrial Building Were Explained with an
Example of existing structure at Location: Mits, Madanapalle-517325
THANK YOU

Contenu connexe

Tendances

Tendances (20)

Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Industrial buildings
Industrial buildingsIndustrial buildings
Industrial buildings
 
Shoring
ShoringShoring
Shoring
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
TYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSTYPE OF STEEL TRUSS
TYPE OF STEEL TRUSS
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
slab concrete
slab concreteslab concrete
slab concrete
 
Roof truss
Roof trussRoof truss
Roof truss
 
Steel structure vs rcc (concrete)
Steel structure vs rcc (concrete)Steel structure vs rcc (concrete)
Steel structure vs rcc (concrete)
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Details of roofs and floors
Details of roofs and floorsDetails of roofs and floors
Details of roofs and floors
 
Steel buildings
Steel buildings  Steel buildings
Steel buildings
 
STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 

Similaire à Construction Techniques Of framed Industrial Building by Shabaz Khan

115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
Yee Len Wan
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
PREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTIONPREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTION
Anushka Bhargava
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 

Similaire à Construction Techniques Of framed Industrial Building by Shabaz Khan (20)

Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Steel frame work
Steel frame workSteel frame work
Steel frame work
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentation
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
national building code
national building codenational building code
national building code
 
highriseconstruction-150505221523-conversion-gate02.pptx
highriseconstruction-150505221523-conversion-gate02.pptxhighriseconstruction-150505221523-conversion-gate02.pptx
highriseconstruction-150505221523-conversion-gate02.pptx
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
The steel frame structures
The steel frame structuresThe steel frame structures
The steel frame structures
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
PREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTIONPREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTION
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 

Plus de Shabaz Khan

Plus de Shabaz Khan (7)

STUDY ON EFFECTIVENESS OF WATER PROOFING ADMIXTURES IN CONCRETE
STUDY ON EFFECTIVENESS OF WATER PROOFING ADMIXTURES IN CONCRETESTUDY ON EFFECTIVENESS OF WATER PROOFING ADMIXTURES IN CONCRETE
STUDY ON EFFECTIVENESS OF WATER PROOFING ADMIXTURES IN CONCRETE
 
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
 
Study of Application of RFID in developing a Automated System for Quality Man...
Study of Application of RFID in developing a Automated System for Quality Man...Study of Application of RFID in developing a Automated System for Quality Man...
Study of Application of RFID in developing a Automated System for Quality Man...
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
IMPORTANCE OF SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
IMPORTANCE OF  SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDYIMPORTANCE OF  SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
IMPORTANCE OF SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
 

Dernier

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Construction Techniques Of framed Industrial Building by Shabaz Khan

  • 1. Topic : Construction Techniques Of framed Industrial Building SUBJECT: Construction Techniques of Steel and Concrete Composite Structures VIT By Shabaz Khan BUILDING LOCATION: MITS, MADANAPALLE-517325
  • 2. Framed Industrial Building: • Framed buildings are building structures formed by the framed elements usually in the form of columns and beams, as well as further strengthened as necessary by the introduction of rigid floor membranes and external walls. Common forms of framed building structure subdivided into 3 main types • 1. Insitu RC frame • 2. Prefabricated frame • 3. Structural steel frame
  • 3. Types of Framed Industrial Building: Frames structures can be differentiated into: 1. Rigid frame structure Which are further subdivided into: •Pin ended •Fixed ended 2. Braced frame structure Which is further subdivided into: •Gabled frames •Portal frames
  • 4. Framed Industrial Building  Framed structures are easily erected from pre-made members.  These members are easily connected together in the correct sequence to form the structural framework.  Problems arise when large members are used and when the height of the structure makes lifting difficult.  In these situations a crane will be needed to lift the members into place.  Rectangular frames are usually made from steel but they may also be made from concrete
  • 5. Framed Industrial Building • A framed structure is a network of beams and columns joined up to form the skeleton framework of the building. • The structural frame carries the total load of the building and transfers it to the foundation. • Cladding is fixed over the framework, or infill panels are placed between its members, to totally enclose the space within the building
  • 6. A Framed Industrial Building in course of erection Rectangular framed structures are used for multi-storey buildings such as: Office Blocks Large Schools Hotels Hospitals or other similar buildings where a multi-storey structure is required. The floor space will incorporate a large number of columns.
  • 7. Typical structural layout of an industrial building:
  • 8. Principle factors affecting choice of frame Principle factors affecting choice of frame Structural Design consideration : • 1 Foundation consideration • 2 Standardization of members or design • 3 Span and floor loads • 4 Fire resistance requirement • 5 Maintenance consideration • 6 Integration of architectural & structural elements
  • 9. Principle factors affecting choice of frame Principle factors affecting choice of frame Production consideration : • 1. Availability of materials • 2. labour and plant • 3. Speed of construction • 4. Availability of mechanical plants
  • 10. Principle factors affecting choice of frame Architectural Design consideration • 1. Size and shape of site • 2. Conditions of site • 3. Integration of mechanical elements • 4. Architectural or aesthetic requirements
  • 11. Bracings: • The horizontal and vertical bracings, employed in single and multi- storey buildings, are also trusses used primarily to resist wind and other lateral loads. • These bracings minimize the differential deflection between the different frames due to crane surge in industrial buildings. • They also provide lateral support to columns in small and tall buildings, thus increasing the buckling strength. • Braced frames resist the wind and seismic forces, much more than non-braced buildings. • Steel bracing is economical, easy to erect, occupies less space and has flexibility to design for meeting the required strength and stiffness.
  • 12. Building configuration • Typically the bays in industrial buildings have frames spanning the width direction. Several such frames are arranged at suitable spacing to get the required length • Depending upon the requirement, several bays may be constructed adjoining each other. • The choice of structural configuration depends upon the span between the rows of columns, the head room or clearance required the nature of roofing material and type of lighting. • If span is less, portal frames such as steel bents or gable frames can be used but if span is large then buildings with trusses are used.
  • 15. Steel Column to Foundation Details, (A) Top bolt places created in base plate, (B) Side view of column base to foundation Column Splices
  • 16. SIMPLE CONNECTION Simple connections are assumed to transfer shear only shear at some nominal eccentricity. Therefore such connections can be used only in non-sway frames where the lateral loads are resisted by some alternative arrangement such as bracings or shear walls.
  • 22. Advantageous features of Framed Industrial Building: Advantageous features of framed structure • 1. Speedy construction due to simplicity in geometry – consist of only columns and beams (or partially by the floor slab) as the main structural elements • 2. Very rigid and stable – able to resist tremendous vertical (dead load) and lateral loads (wind) • 3. Reduced dead load – absent of thick shear wall etc. • 4. Roofed over at an earlier stage – every floor slab being finished becomes an cover to protect the lower floors from sun and rain • 5. Offer large unobstructed floor areas – without obstacle between columns • 6. Flexible utilization of space
  • 23. Advan. features of Framed Industrial Building: (continued) . • 7. Adaptable to almost any shape • 8. Easily altered within limits of frame – regular or non-regular grid system is very adaptable in spatial arrangement • 9. Offsite preparation possible – especially for prefabricated construction using precast concrete or structural steel elements • 10. May be designed to accommodate movement • 11. Acceptable distribution of natural light – window openings can be provided easily on eternal walls • 12. Easy to design structurally including computer design – again, due to simple geometry
  • 24. Disadvantageous features of Framed Industrial Building: Steel frame constructions do have a couple of disadvantages, the most regularly cited being: • 1) Thermal Conductivity: Steel is not known for its warmth, due to its high efficiency in conducting heat. The insulation value of walls can be reduced by as much as half when heat is transferred away through steel studs, which is not good news for energy retention in a building. Where steel frame construction is used, insulation measures need to be put in place to counteract the thermal conductivity of steel. • 2) Reduced Flexibility On Site: One of the benefits of using wooden structural components is the ability to adjust them on site. A component can be cut down to size, nails hammered in to strengthen the join and so on. This obviously can’t happen with steel.
  • 25. Disadvantageous features of Framed Industrial Building: • Contd. The measurements of steel need to be precisely calculated in advance, because a steel fabrication is delivered to site in its final form, ready to be slotted into the building. This is of course one of the big advantages of Steel • 3) Supporting Structures: Steel frame constructions rarely work on their own. They usually require drywall, sheathing, insulation and supplementary wooden components to bring a building together.
  • 26. CONCLUSION: Construction Techniques Of framed Industrial Building Were Explained with an Example of existing structure at Location: Mits, Madanapalle-517325