SlideShare une entreprise Scribd logo
1  sur  12
NORTHERN COALFIELD LIMITED
PRESENTED BY:-
ANUJ KUMAR
ELECTRICAL ENGINEERING
B.TECH FINAL YEAR
CONTENTS
Introduction
Place of training
Main substation
Classiffication of transformer
Parts of transformer
Transformer oil filteration s
NORTHERN COALFIELD LIMITED
It is subsidiary of coal India.
It was established in 1984 under the CCL. Its headquarter is singrau
NCL produced 70.02 million tons of coal in the year 2012-13.
NCL has following projects:-
Amlohri
Block-B
Bina
Dudhichua
Kakri
Khadia
Nigahi
Krishnashila
Jayant
Jhingurdah
INTRODUCTION
PLACE OF TRAINING
The place of training is Jhingurdah project in E&M department.
 E&M department has following area: -
 Main substation (33/11KV)
 Electrical and mechanical workshop
 West substation (11/6.6KV & 11/3.3KN)
 Coal handling plant
 Pumps plant
 I worked only three of them
 Main substation (33/11KV)
 Electrical workshop
 West substation (11/6.6KV & 11/3.3KN)
MAIN SUBSTATION
The supply (33/11KV) is from MPEB substation.
In this substation 05 MVA transformer are used to step
down the voltage 33KV to 11 KV.
Form this substation 11KV supply is transmitted to
following are:-
West substation
Colony
Field
CHP
TRANSFORMER
COMPONENTS OF TRANSFORMER
Core
Primary & secondary winding
Oil tank
Transformer oil
Oil inlet and outlet valve
Oil gauge/indicator
Primary and secondary terminal
Earth point
Data plate
Explosion vent
Conservator
Breather
Silica gel
Buchholz relay
Temperature gauge
Tapping switch
CLASSIFICATION OF TRANSFORMER
On the basis of output voltage
1. Step up 2.Step down
On the basis of core construction
1. Core type 2. Shell type
On the basis of no. of phase
1. Single phase 2. Three phase
On the basis of cooling system
1.Naturally cooled 2.Oil cooled
3.water cooled 4.forced air cooled
On the basis of output capacity
1.Auto transformer 2.Instrument transformer
 On the basis of commercial
1.Power transformer 2.Distribution transformer
TRANSFORMER USED IN SUBSTATION
 Current transformer
 It is step up transformer or current step down transformer.
 It convert 100-200A of primary to 1-2A of secondary.
 Potential transformer
 It is step down transformer.
 It convert 11-22KV into 50-100V.
TRANSFORMER OIL FILTRATION METHOD
Sub ststion
Sub ststion

Contenu connexe

Tendances

NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
M.Essa Khan
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
Raj Sharma
 

Tendances (20)

training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noida
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
NTPC Farakka
NTPC FarakkaNTPC Farakka
NTPC Farakka
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Manoj
ManojManoj
Manoj
 
project -2
project -2project -2
project -2
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 

En vedette

Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
Kundan Giri
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
samohi
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
Prateek Agarwal
 

En vedette (19)

TRANSFORMER PPT
TRANSFORMER PPT TRANSFORMER PPT
TRANSFORMER PPT
 
Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)
 
Coal india wcl
Coal india wclCoal india wcl
Coal india wcl
 
Transformer 1
Transformer 1Transformer 1
Transformer 1
 
Western Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportWestern Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training Report
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
 
Northern Coalfields Limited NCL
Northern Coalfields Limited NCLNorthern Coalfields Limited NCL
Northern Coalfields Limited NCL
 
NCL Singrauli project
NCL Singrauli projectNCL Singrauli project
NCL Singrauli project
 
Transformers
TransformersTransformers
Transformers
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan Sluijter
 
Coal india limited
Coal india limitedCoal india limited
Coal india limited
 
Summer training report
Summer training reportSummer training report
Summer training report
 
CSR of Coal India ltd.
CSR of Coal India ltd.CSR of Coal India ltd.
CSR of Coal India ltd.
 
Coal india ppt
Coal india pptCoal india ppt
Coal india ppt
 
Ashok Kumar Singh
Ashok Kumar SinghAshok Kumar Singh
Ashok Kumar Singh
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 

Similaire à Sub ststion

internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
qazi faisal
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
apurv rathore
 

Similaire à Sub ststion (20)

Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
PDB-presentation(1).pptx
PDB-presentation(1).pptxPDB-presentation(1).pptx
PDB-presentation(1).pptx
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
cv.doc 2016
cv.doc  2016cv.doc  2016
cv.doc 2016
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
Power distribution
Power distribution Power distribution
Power distribution
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
bhel.pptx
bhel.pptxbhel.pptx
bhel.pptx
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
 
CV
CVCV
CV
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
 
Training chp
Training chpTraining chp
Training chp
 

Dernier

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Dernier (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 

Sub ststion

  • 1. NORTHERN COALFIELD LIMITED PRESENTED BY:- ANUJ KUMAR ELECTRICAL ENGINEERING B.TECH FINAL YEAR
  • 2. CONTENTS Introduction Place of training Main substation Classiffication of transformer Parts of transformer Transformer oil filteration s
  • 3. NORTHERN COALFIELD LIMITED It is subsidiary of coal India. It was established in 1984 under the CCL. Its headquarter is singrau NCL produced 70.02 million tons of coal in the year 2012-13. NCL has following projects:- Amlohri Block-B Bina Dudhichua Kakri Khadia Nigahi Krishnashila Jayant Jhingurdah INTRODUCTION
  • 4. PLACE OF TRAINING The place of training is Jhingurdah project in E&M department.  E&M department has following area: -  Main substation (33/11KV)  Electrical and mechanical workshop  West substation (11/6.6KV & 11/3.3KN)  Coal handling plant  Pumps plant  I worked only three of them  Main substation (33/11KV)  Electrical workshop  West substation (11/6.6KV & 11/3.3KN)
  • 5. MAIN SUBSTATION The supply (33/11KV) is from MPEB substation. In this substation 05 MVA transformer are used to step down the voltage 33KV to 11 KV. Form this substation 11KV supply is transmitted to following are:- West substation Colony Field CHP
  • 7. COMPONENTS OF TRANSFORMER Core Primary & secondary winding Oil tank Transformer oil Oil inlet and outlet valve Oil gauge/indicator Primary and secondary terminal Earth point Data plate Explosion vent Conservator Breather Silica gel Buchholz relay Temperature gauge Tapping switch
  • 8. CLASSIFICATION OF TRANSFORMER On the basis of output voltage 1. Step up 2.Step down On the basis of core construction 1. Core type 2. Shell type On the basis of no. of phase 1. Single phase 2. Three phase On the basis of cooling system 1.Naturally cooled 2.Oil cooled 3.water cooled 4.forced air cooled On the basis of output capacity 1.Auto transformer 2.Instrument transformer  On the basis of commercial 1.Power transformer 2.Distribution transformer
  • 9. TRANSFORMER USED IN SUBSTATION  Current transformer  It is step up transformer or current step down transformer.  It convert 100-200A of primary to 1-2A of secondary.  Potential transformer  It is step down transformer.  It convert 11-22KV into 50-100V.