Arcelor Mittal Vanderbijlpark
Industrial Energy Efficiency
IEE Case Study
ArcelorMittal South Africa (AMSA) is the largest steel producer in Africa.
AMSA produces 4.8 million tonnes per year of saleable steel.
The plant’s steel products are manufactured in an integrated process.
Raw materials such as iron ore, coke and dolomite are charged to blast
furnaces where they are converted to liquid iron.
The liquid iron is refined in basic oxygen furnaces and electric arc
furnaces to produce liquid steel.
The liquid steel is cast into slabs, which are hot rolled into heavy plate in
a plate mill, or into coils in a strip mill.
The coils are either sold as hot rolled sheets in coil or processed further
into cold rolled and coated products, such as hot dip galvanised, electro-
galvanised and pre-painted sheet, and tinplate.
Company Profile
• First encounter with the Industrial Energy Efficiency Project (IEEP) –
Dec 2013 with UNIDO experts becoming a valuable extension of the
AMSA energy efficiency team.
• Energy management systems (EnMS) expert level training – May
2014.
• Compressed air system optimisation (CASO) 2 day training – June
2014
• Pump system optimisation (PSO) 2 day training – Mar 2014
• PSO expert level training – Jul 2014
• Fan system optimisation (FSO) 2 day training – Sep 2014
• FSO expert level training – Oct 2014
• Steam system optimisation (SSO) 2 day training – Sep 2014
• SSO expert level training – Feb 2015
• In the process of implementing EnMS – ISO 50001, energy systems
optimisation (ESO) assessments and case studies in pumps, fans,
steam and compressed air.
Arcelor Mittal VDBP - NCPC / IEEP Journey
ArcelorMittal VDBP - EnMS implementation results:
Electricity and natural gas data on baseline period 2013
Actual Savings 2016 – Approx. R105 million!
ESO Assessment Results - Case Study
Compressed air leak detection assessment R3.6 million
Pump system optimisation assessment (Ph1) R25 million
Compressed air system optimisation assessment R36 million
Steam system optimisation assessment
(Incl. power generation)
R175 million
Status of Energy Phase1 Pump Savings Projects
with the assistance of UNIDO / NCPC Funding
Plate Mill
Descaler
pump Ph1
Plate Mill
Descaler
pump Ph1&2
BF- D Furnace
cooling pumps
5 Stand South
Ph I Cool
pump
5 Stand South
Ph 2 Cool
pump
HSM-HP Pump
(after VSD’s)
Savings study
mechanism funded by
NCPC
Run best out of
3 pumps only
after pump
efficiency test
Refurbish
pumps
Run 1 pump
only
Run 1 less pump
Reduce friction
Reduce orifice
size at bypass
Automate main
pumps on/off
Analyse /
optimise in
PumpMonitor
Savings
(Rand)
R253,246 R458,557 R1,498,421 R811,992 R900,113 R2,200,000
Energy savings
(kWh p.a)
358,705 649,514 1,971,607 1,014,990 1,125,141 2,820,513
Total equipment
investment VDB
(Rand)
None
(completed)
R457,053
(completed)
R 676,640
(completed)
R30,000 R300,000 R508,000
Payback time
N/A 12 months 5.5 Months <1 month 4 months 3 months
Project status & plant
support
Completed M&V Audit Completed
Implemen -
tation
Proposal Proposal
How the Blast Furnace (BF-D) Pump System Works
Motor Data :
Rated Power 315 kW
Voltage 3 300 V
Full Load Amps 68 A
Speed 998 RPM
Pump Data :
Salweir Centrifugal Split Casing Double
suction
Model SDA 400-500
Type 400/500
Impeller Diameter 478mm
Cooling Tower
Sum
p
Heat
Exchangers
BF-D
Close
System
IN
BF-D
Close
System
OUT
BF-D Pump System - Root Cause Analysis
Pump
Station
BF-D
New Water Level increase
NPSH
Pumps to Operate close to BEP
BF-D Pump System - Root Cause Analysis
Pump operation
outside BEP
2
Inlet cavitation
Low NPSH
available
Inline strainers got
blocked restricting
flow
Plastic cooling
tower packing
collapsed and
contaminated water
Strainers at cooling
tower and pump
suction were not
effective
2.1
Cooling tower fill is
in bad state due to
ageing. End of life.
2.2
Strainers cause
high ∆P even when
clean
Design restriction
2.3
Long rusted inlet
pipes with elbows
increase pipe
resistance
Pipes ageing
2.4
One out of two inlet
valves stuck in
close position
restricting half of
the flow
Butterfly valve
sleeve damaged
during installation
cause disk to
become stuck
Installation is too
rigid. Valve had to
be forced into
position
2.5
Low level in the
sump
Water overflows to
BF-C sump
Leaking sluices
2.6
No control by
operational
personnel
2.7
Lack of
maintenance &
lubrication
1
Grease does not
enter the bearings
but stays in the
bearing cap
Bearings were not
greased by supplier
Bearings were not
greased by
maintenance
personnel
• Recommendations (without large capital) :
• Sump level increase to 100%.
• Automatic level control for top-up.
• Redesign suction pipe in order to reduce pressure loss
o Use bigger size pipe;
o Regularly clean strainers; and
o Remove elbow on inlet.
• Regularly clean heat exchangers.
• Adjust flow based on temperature.
• Confirm ΔT requirements of the ‘BF closed loop’ system and
calculate the required flow rate of the ‘open’ loop system.
• Compare flow requirements with cooling degree days.
• Operate a single pump year round.
BF-D Pump System - Root Cause Analysis
Operation
outside BEP
2
Outlet cavitation
High back
pressure
Blocked heat
exchangers
increase system
pressure
Plastic cooling
tower packing
collapsed and
contaminated
water
Strainers at cooling
tower and pump
suction were not
effective
2.1
Cooling tower fill is
in bad state due to
ageing. End of life.
2.2Heat exchangers
were not cleaned
regularly
No maintenance
plan for heat
exchangers
cleaning
2.8
Not effective and
unreliable system
for monitoring HE
pressure drop
2.9
BF-D Pump System - Root Cause Analysis
Effect of Increased Maintenance at the Right Time
on Total Operational and Energy Cost
The Plate Mill makes use of a
descaling pump system (1 out of 3
pumps in parallel) that sprays
concentrated high pressure water
onto the plate, after the heating and
rolling process, to remove any scale
that has formed on the plate.
Effect of Increased Maintenance on Total Operational and Energy Cost
Plate Mill Descaler PSO
- Worn Pump Reduce Head, Flow, Efficiency at Increase Power
Thank You
Questions ?

Contenu connexe

Tendances

ace088_subramanian_2013_o
ace088_subramanian_2013_oace088_subramanian_2013_o
ace088_subramanian_2013_o
Swami Nathan
 
Cem 350 gilbane corp mep retrofit systems overview 4 2011
Cem 350 gilbane corp mep retrofit systems overview  4 2011Cem 350 gilbane corp mep retrofit systems overview  4 2011
Cem 350 gilbane corp mep retrofit systems overview 4 2011
miresmaeil
 
An experimental investigation of engine coolant temperature on exhaust emissi...
An experimental investigation of engine coolant temperature on exhaust emissi...An experimental investigation of engine coolant temperature on exhaust emissi...
An experimental investigation of engine coolant temperature on exhaust emissi...
IAEME Publication
 
Tessol presentation - v3
Tessol   presentation - v3Tessol   presentation - v3
Tessol presentation - v3
Jas Preet
 

Tendances (19)

Thermal Power Library - Overview
Thermal Power Library - OverviewThermal Power Library - Overview
Thermal Power Library - Overview
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009
 
B3 Magnús Þór Jónsson
B3 Magnús Þór Jónsson B3 Magnús Þór Jónsson
B3 Magnús Þór Jónsson
 
Cih taco3-calc flow---web-bill
Cih taco3-calc flow---web-billCih taco3-calc flow---web-bill
Cih taco3-calc flow---web-bill
 
Wh pwr systems
Wh pwr systemsWh pwr systems
Wh pwr systems
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
ace088_subramanian_2013_o
ace088_subramanian_2013_oace088_subramanian_2013_o
ace088_subramanian_2013_o
 
Case Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent AnalysisCase Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent Analysis
 
The Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance GoalsThe Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance Goals
 
Cem 350 gilbane corp mep retrofit systems overview 4 2011
Cem 350 gilbane corp mep retrofit systems overview  4 2011Cem 350 gilbane corp mep retrofit systems overview  4 2011
Cem 350 gilbane corp mep retrofit systems overview 4 2011
 
Project review
Project reviewProject review
Project review
 
Ek portfolio.2
Ek portfolio.2Ek portfolio.2
Ek portfolio.2
 
Case Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare StudyCase Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare Study
 
SES_Southafrica Flyer
SES_Southafrica FlyerSES_Southafrica Flyer
SES_Southafrica Flyer
 
Fuel System Library Overview
Fuel System Library OverviewFuel System Library Overview
Fuel System Library Overview
 
An experimental investigation of engine coolant temperature on exhaust emissi...
An experimental investigation of engine coolant temperature on exhaust emissi...An experimental investigation of engine coolant temperature on exhaust emissi...
An experimental investigation of engine coolant temperature on exhaust emissi...
 
Rebuilding the World Trade Center
Rebuilding the World Trade CenterRebuilding the World Trade Center
Rebuilding the World Trade Center
 
Tessol presentation - v3
Tessol   presentation - v3Tessol   presentation - v3
Tessol presentation - v3
 

Similaire à Louis Bosch AMSA VDBP

Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
Raja Ratnam
 
13 higginbotham iea ghg steel workshop ap asu final
13 higginbotham iea ghg steel workshop ap asu final13 higginbotham iea ghg steel workshop ap asu final
13 higginbotham iea ghg steel workshop ap asu final
highviewpowerstorage
 

Similaire à Louis Bosch AMSA VDBP (20)

Choi.ppt
Choi.pptChoi.ppt
Choi.ppt
 
Unit_No_6.pptx
Unit_No_6.pptxUnit_No_6.pptx
Unit_No_6.pptx
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 
Product
ProductProduct
Product
 
Metal Hydride Fuel Cells, A New and Practical Approach for Backup and Emergen...
Metal Hydride Fuel Cells, A New and Practical Approach for Backup and Emergen...Metal Hydride Fuel Cells, A New and Practical Approach for Backup and Emergen...
Metal Hydride Fuel Cells, A New and Practical Approach for Backup and Emergen...
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentation
 
vdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.pptvdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.ppt
 
IRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery SystemsIRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery Systems
 
Efficiency improvement by Energy optimization programme in Energy intensive i...
Efficiency improvement by Energy optimization programme in Energy intensive i...Efficiency improvement by Energy optimization programme in Energy intensive i...
Efficiency improvement by Energy optimization programme in Energy intensive i...
 
IRJET - IC Engine Waste Heat Recovery Systems
IRJET -  	  IC Engine Waste Heat Recovery SystemsIRJET -  	  IC Engine Waste Heat Recovery Systems
IRJET - IC Engine Waste Heat Recovery Systems
 
13 higginbotham iea ghg steel workshop ap asu final
13 higginbotham iea ghg steel workshop ap asu final13 higginbotham iea ghg steel workshop ap asu final
13 higginbotham iea ghg steel workshop ap asu final
 
Improvement of Air-Swirl ratio in 4-stroke diesel engine to improve performan...
Improvement of Air-Swirl ratio in 4-stroke diesel engine to improve performan...Improvement of Air-Swirl ratio in 4-stroke diesel engine to improve performan...
Improvement of Air-Swirl ratio in 4-stroke diesel engine to improve performan...
 
Power-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion PaperPower-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion Paper
 
Air source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAYAir source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAY
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
 
European Heat Pump Summit 2019
European Heat Pump Summit 2019European Heat Pump Summit 2019
European Heat Pump Summit 2019
 
Simon Lovich, Air Engineers
Simon Lovich, Air Engineers Simon Lovich, Air Engineers
Simon Lovich, Air Engineers
 

Plus de 7391456

Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
7391456
 

Plus de 7391456 (20)

Proudly SA
Proudly SAProudly SA
Proudly SA
 
Sanedi
SanediSanedi
Sanedi
 
Cecilia Kinuthia Njenga
Cecilia Kinuthia NjengaCecilia Kinuthia Njenga
Cecilia Kinuthia Njenga
 
WWF Klaudia NCPC - 14 September 2017
WWF Klaudia NCPC - 14 September 2017WWF Klaudia NCPC - 14 September 2017
WWF Klaudia NCPC - 14 September 2017
 
New Edition Bridget Fundikwa - Green Cape
New Edition Bridget Fundikwa - Green CapeNew Edition Bridget Fundikwa - Green Cape
New Edition Bridget Fundikwa - Green Cape
 
Henry Roman
Henry RomanHenry Roman
Henry Roman
 
Chantal Ramcharan Kotze
Chantal Ramcharan KotzeChantal Ramcharan Kotze
Chantal Ramcharan Kotze
 
Harro von Blotnitz
Harro von BlotnitzHarro von Blotnitz
Harro von Blotnitz
 
Pippa Notten
Pippa NottenPippa Notten
Pippa Notten
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi
 
Claire Pengelly
Claire PengellyClaire Pengelly
Claire Pengelly
 
David Ball - Hulamin
David Ball - HulaminDavid Ball - Hulamin
David Ball - Hulamin
 
Dr Mathias Scluep Presentation
Dr Mathias Scluep PresentationDr Mathias Scluep Presentation
Dr Mathias Scluep Presentation
 
Nydia Suppen
Nydia SuppenNydia Suppen
Nydia Suppen
 
Helen Davies
Helen DaviesHelen Davies
Helen Davies
 
Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
Thabo - Waste Mgt Research & Incentives - Industrial Efficiency Conference (S...
 
Marten Jansen van Rensburg
Marten Jansen van RensburgMarten Jansen van Rensburg
Marten Jansen van Rensburg
 
Linda Godfrey - Circular Economy NCPC-SA
Linda Godfrey - Circular Economy NCPC-SALinda Godfrey - Circular Economy NCPC-SA
Linda Godfrey - Circular Economy NCPC-SA
 
Henry Nuwarinda - NCPC-SA
Henry Nuwarinda - NCPC-SAHenry Nuwarinda - NCPC-SA
Henry Nuwarinda - NCPC-SA
 
Eco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- CraigEco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- Craig
 

Dernier

Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
Monica Sydney
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
 

Dernier (20)

Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 

Louis Bosch AMSA VDBP

  • 1. Arcelor Mittal Vanderbijlpark Industrial Energy Efficiency IEE Case Study
  • 2. ArcelorMittal South Africa (AMSA) is the largest steel producer in Africa. AMSA produces 4.8 million tonnes per year of saleable steel. The plant’s steel products are manufactured in an integrated process. Raw materials such as iron ore, coke and dolomite are charged to blast furnaces where they are converted to liquid iron. The liquid iron is refined in basic oxygen furnaces and electric arc furnaces to produce liquid steel. The liquid steel is cast into slabs, which are hot rolled into heavy plate in a plate mill, or into coils in a strip mill. The coils are either sold as hot rolled sheets in coil or processed further into cold rolled and coated products, such as hot dip galvanised, electro- galvanised and pre-painted sheet, and tinplate. Company Profile
  • 3. • First encounter with the Industrial Energy Efficiency Project (IEEP) – Dec 2013 with UNIDO experts becoming a valuable extension of the AMSA energy efficiency team. • Energy management systems (EnMS) expert level training – May 2014. • Compressed air system optimisation (CASO) 2 day training – June 2014 • Pump system optimisation (PSO) 2 day training – Mar 2014 • PSO expert level training – Jul 2014 • Fan system optimisation (FSO) 2 day training – Sep 2014 • FSO expert level training – Oct 2014 • Steam system optimisation (SSO) 2 day training – Sep 2014 • SSO expert level training – Feb 2015 • In the process of implementing EnMS – ISO 50001, energy systems optimisation (ESO) assessments and case studies in pumps, fans, steam and compressed air. Arcelor Mittal VDBP - NCPC / IEEP Journey
  • 4. ArcelorMittal VDBP - EnMS implementation results: Electricity and natural gas data on baseline period 2013 Actual Savings 2016 – Approx. R105 million! ESO Assessment Results - Case Study Compressed air leak detection assessment R3.6 million Pump system optimisation assessment (Ph1) R25 million Compressed air system optimisation assessment R36 million Steam system optimisation assessment (Incl. power generation) R175 million
  • 5. Status of Energy Phase1 Pump Savings Projects with the assistance of UNIDO / NCPC Funding Plate Mill Descaler pump Ph1 Plate Mill Descaler pump Ph1&2 BF- D Furnace cooling pumps 5 Stand South Ph I Cool pump 5 Stand South Ph 2 Cool pump HSM-HP Pump (after VSD’s) Savings study mechanism funded by NCPC Run best out of 3 pumps only after pump efficiency test Refurbish pumps Run 1 pump only Run 1 less pump Reduce friction Reduce orifice size at bypass Automate main pumps on/off Analyse / optimise in PumpMonitor Savings (Rand) R253,246 R458,557 R1,498,421 R811,992 R900,113 R2,200,000 Energy savings (kWh p.a) 358,705 649,514 1,971,607 1,014,990 1,125,141 2,820,513 Total equipment investment VDB (Rand) None (completed) R457,053 (completed) R 676,640 (completed) R30,000 R300,000 R508,000 Payback time N/A 12 months 5.5 Months <1 month 4 months 3 months Project status & plant support Completed M&V Audit Completed Implemen - tation Proposal Proposal
  • 6. How the Blast Furnace (BF-D) Pump System Works Motor Data : Rated Power 315 kW Voltage 3 300 V Full Load Amps 68 A Speed 998 RPM Pump Data : Salweir Centrifugal Split Casing Double suction Model SDA 400-500 Type 400/500 Impeller Diameter 478mm Cooling Tower Sum p Heat Exchangers BF-D Close System IN BF-D Close System OUT
  • 7. BF-D Pump System - Root Cause Analysis Pump Station BF-D New Water Level increase NPSH
  • 8. Pumps to Operate close to BEP
  • 9. BF-D Pump System - Root Cause Analysis Pump operation outside BEP 2 Inlet cavitation Low NPSH available Inline strainers got blocked restricting flow Plastic cooling tower packing collapsed and contaminated water Strainers at cooling tower and pump suction were not effective 2.1 Cooling tower fill is in bad state due to ageing. End of life. 2.2 Strainers cause high ∆P even when clean Design restriction 2.3 Long rusted inlet pipes with elbows increase pipe resistance Pipes ageing 2.4 One out of two inlet valves stuck in close position restricting half of the flow Butterfly valve sleeve damaged during installation cause disk to become stuck Installation is too rigid. Valve had to be forced into position 2.5 Low level in the sump Water overflows to BF-C sump Leaking sluices 2.6 No control by operational personnel 2.7 Lack of maintenance & lubrication 1 Grease does not enter the bearings but stays in the bearing cap Bearings were not greased by supplier Bearings were not greased by maintenance personnel
  • 10. • Recommendations (without large capital) : • Sump level increase to 100%. • Automatic level control for top-up. • Redesign suction pipe in order to reduce pressure loss o Use bigger size pipe; o Regularly clean strainers; and o Remove elbow on inlet. • Regularly clean heat exchangers. • Adjust flow based on temperature. • Confirm ΔT requirements of the ‘BF closed loop’ system and calculate the required flow rate of the ‘open’ loop system. • Compare flow requirements with cooling degree days. • Operate a single pump year round. BF-D Pump System - Root Cause Analysis Operation outside BEP 2 Outlet cavitation High back pressure Blocked heat exchangers increase system pressure Plastic cooling tower packing collapsed and contaminated water Strainers at cooling tower and pump suction were not effective 2.1 Cooling tower fill is in bad state due to ageing. End of life. 2.2Heat exchangers were not cleaned regularly No maintenance plan for heat exchangers cleaning 2.8 Not effective and unreliable system for monitoring HE pressure drop 2.9
  • 11. BF-D Pump System - Root Cause Analysis
  • 12. Effect of Increased Maintenance at the Right Time on Total Operational and Energy Cost
  • 13. The Plate Mill makes use of a descaling pump system (1 out of 3 pumps in parallel) that sprays concentrated high pressure water onto the plate, after the heating and rolling process, to remove any scale that has formed on the plate. Effect of Increased Maintenance on Total Operational and Energy Cost
  • 14. Plate Mill Descaler PSO - Worn Pump Reduce Head, Flow, Efficiency at Increase Power