7Epsilon for ISO9001:2015
A Risk Based In-line Process Optimization Case Study for a
Connected Enterprise
Dr. Rajesh S. Ransing, Swansea University, UK
Dr. Meghana R. Ransing, p-matrix Ltd., UK
Presentation Id: TO5; Date: 15th November 2016; Time: 11-noon.
ASQ International Conference on Quality Standards,
November 14-15, 2016 Pittsburgh, USA
Learning Objectives
 Use in-process data and product specific process
knowledge for hypothesis generation (clause 6.1).
 Embed risk based thinking and organizational knowledge
within your organization.
 Learn 7Epsilon Vs Six Sigma.
 Understand 7Epsilon in ISO 9001:2015 context Process Inputs:
In-line Process Optimization: Case Study
 Objective:
Discover an optimal range for sensor values – if one exists.
 Process Output(s):
%Downtime for a line calculated hourly (or other defined time limit), OR
%Defective components produced in a batch.
 Process Inputs (Categorized as Sensors):
Data for all sensors and tags collected for an hour (or a defined time limit).
An ‘on-off’ switch - the number of times it is ‘on’ or ‘off’ in an hour.
Continuous or ordinal variables - a median, 5th and 95th centile values per
hour.
Categorical variables - one value for every process output value.
Product Specific Process Knowledge
Organisational process knowledge for a given product is
i. the actionable information;
ii. in form of optimal list of measurable factors and their
ranges
(Sensor 1 value 0.026 – 0.05; Sensor 2 value: 0.007 –
0.009);
iii. in order to meet desired business goals (process
outputs)
(e.g. minimize deviation from expected results, reduce %
downtime or rework time etc).
Risk Based Thinking
‘Risk Based Thinking’ is
the DNA of ISO9001:2015 & AS9100:2016
It’s not contained or isolated in one section or clause …
Risk and Opportunities Based Thinking
Clause 4.4: Quality management system and its processes
4.4.1 f: address the risks and opportunities as
determined in accordance with the requirements of 6.1
Clause 9 Performance Evaluation (and 9.3 Management Review)
9.3.2.e: the effectiveness of actions taken to address
risks and opportunities (see clause 6.1)
Clause 6.1 Actions to address risks and opportunities in order to
(i) give assurance that the QMS can achieve its intended
results,
(ii) enhance desirable effects,
(iii) prevent, or reduce undesired effects,
Clause 10 is Improvement.
What is Risk in Risk Based Thinking?
‘Risk’ in Risk Based Thinking should
• go beyond its usual interpretation in
Risk Assessment Forms,
• help trigger innovation,
• create new organisational knowledge.
What is Risk in Risk Based Thinking?
To understand ‘Risk’ in
ISO9001:2015 and
AS9100:2016 context,
we need to understand
‘Uncertainty’.
Uncertainty or Deficiency of Knowledge
Uncertainty or Deficiency of Knowledge
Uncertainty or Deficiency of Knowledge
What are your options for:
 Undertaking in-process quality improvement projects
 Implementing plant wide process optimization strategies
 Connected Enterprise, Industry 4.0, Big Data
 Satisfying requirements of the Clause 6.1of ISO9001:2015
• Prevent or Reduce Undesired (Negative) Effects
• Enhance Desired (Positive) Effects
OR
• Avoid BAD days
• Repeat GOOD days
Option 1: Plot Process Output Vs Process Input Graphs
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Option 2: Embed Risk Based Thinking via Penalty Matrices
Penalty matrices using p-matrix software
 p-matrix software analyses hundreds and thousands of penalty
matrices among factors.
 Classifies factor settings as Optimal, Avoid or No Effect.
 Ranks them in order of importance.
 At end of analysis, a process engineer would get a list of top 15-20
matrices he/she needs to look at.
 Analyses discrete and continuous parameters together in one
analysis.
 Up to 200 factors and 10 responses can be analysed at once.
 The algorithm is scalable for Big Data and In-line Analysis.
Lets make a Solemn Promise …
Confirmation Trial Plan
Process
Inputs
Minimum
Value
Maximum
Value
Optimal Range Optimal Values
Sensor 1 0.019 0.05 Top 50% > 0.026 & < 0.05
Sensor 2 0.007 0.012 Bottom 50% > 0.007 & < 0.009
Sensor 3 6.204 6.527 Top 75% < 6.299 & < 6.527
Sensor 4 7.714 8.028 Bottom 50% < 7.714 & < 7.847
In-process Quality Improvement using 7Epsilon steps
What’s New?
Organisational knowledge management (Clause 7.1.6)
Actions to address risks and opportunities (Clause 6.1)
7Epsilon = Six Sigma + Industrial Internet of Things (IIoT)
Conclusions
 Risk - An effect of uncertainty (on an expected result)
 Uncertainty == deficiency of knowledge.
 Deficiency of knowledge are opportunities for creating
additional knowledge (e.g. Risk Based Tolerance Synthesis).
 The effect of uncertainty manifests itself as deviation(s) from
expected results.
 7Epsilon’s penalty matrix approach
 quantifies the effect of uncertainty by penalizing deviation
from desired response (Clause 6.1), and
 embeds risk based tolerance synthesis and creates new
organizational knowledge (Clause 7.1.6).
Further Reading
Ransing R.S., Batbooti R.S., Giannetti C, and Ransing M.R., “A quality correlation
algorithm for tolerance synthesis in manufacturing operations”, Computers and
Industrial Engineering, Volume 93, Pages 1–11, March 2016.
Ransing R. S., Giannetti, C., Ransing, M. R., & James, M. W. (2013). A coupled
penalty matrix approach and principal component based co-linearity index
technique to discover product specific foundry process knowledge from in-
process data in order to reduce defects. Computers in Industry, 64(5), 514-523.
Giannetti, C., Ransing, M. R., Ransing, R. S. et.al (2015) “Organisational
knowledge management for defect reduction and sustainable development in
the foundry industry”, International Journal of Knowledge and Systems Science
(IJKSS), 6(3), 18-37, July-September 2015.
http://www.slideshare.net/7Epsilon/as-91002016-and-iso-90012015-clause-
93-management-review-whats-new
http://www.slideshare.net/7Epsilon/key-changes-to-iso-9001-2015-and-7-
steps-of-7-epsilon
www.7epsilon.org
7Epsilon: In-process Optimization in
a Connected Enterprise Environment

Contenu connexe

Tendances

Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
SlideTeam
 
CAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management TrainingCAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management Training
Tonex
 

Tendances (20)

Effective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiEffective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet Surti
 
Enabling excellence to quality
Enabling excellence to qualityEnabling excellence to quality
Enabling excellence to quality
 
How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?How to Determine the Root Cause Analysis Techniques in a Management System?
How to Determine the Root Cause Analysis Techniques in a Management System?
 
Risk &amp; opportunity analysis
Risk &amp; opportunity analysisRisk &amp; opportunity analysis
Risk &amp; opportunity analysis
 
Iso 9001 2015 presentation
Iso 9001 2015 presentationIso 9001 2015 presentation
Iso 9001 2015 presentation
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditing
 
Six Sigma Glossary
Six Sigma GlossarySix Sigma Glossary
Six Sigma Glossary
 
Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
 
Risk Based Thinking - RMSP "RISK MANAGEMENT SYSTEM PROCESS"
Risk Based Thinking - RMSP "RISK MANAGEMENT SYSTEM PROCESS"Risk Based Thinking - RMSP "RISK MANAGEMENT SYSTEM PROCESS"
Risk Based Thinking - RMSP "RISK MANAGEMENT SYSTEM PROCESS"
 
Upload iso 9001 2015 presentation
Upload iso 9001 2015 presentationUpload iso 9001 2015 presentation
Upload iso 9001 2015 presentation
 
Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides
 
Six sigma
Six sigmaSix sigma
Six sigma
 
How To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product DevelopmentHow To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product Development
 
Implementing an effective Electronic CAPA Management System
Implementing an effective Electronic CAPA Management SystemImplementing an effective Electronic CAPA Management System
Implementing an effective Electronic CAPA Management System
 
Quality In Outsourcing
Quality In OutsourcingQuality In Outsourcing
Quality In Outsourcing
 
Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018
 
2015 Quality Management System Vendor Benchmark
2015 Quality Management System Vendor Benchmark2015 Quality Management System Vendor Benchmark
2015 Quality Management System Vendor Benchmark
 
CAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management TrainingCAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management Training
 
PECB Webinar: Conducting Effective Quality System Audits
PECB Webinar: Conducting Effective Quality System AuditsPECB Webinar: Conducting Effective Quality System Audits
PECB Webinar: Conducting Effective Quality System Audits
 
Corrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous QualityCorrective Action – The Heart of Continuous Quality
Corrective Action – The Heart of Continuous Quality
 

En vedette

En vedette (20)

AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
 
Getting The Contex Right: Using Simple SWOT Analysis to Address ISO 9001: 201...
Getting The Contex Right: Using Simple SWOT Analysis to Address ISO 9001: 201...Getting The Contex Right: Using Simple SWOT Analysis to Address ISO 9001: 201...
Getting The Contex Right: Using Simple SWOT Analysis to Address ISO 9001: 201...
 
ISO 9001:2015 Review and Why It Is Good (10/28/16)
ISO 9001:2015 Review and Why It Is Good (10/28/16)ISO 9001:2015 Review and Why It Is Good (10/28/16)
ISO 9001:2015 Review and Why It Is Good (10/28/16)
 
ISO 9001:2015 Interpretation and Implementation (10/22/16)
ISO 9001:2015 Interpretation and Implementation (10/22/16)ISO 9001:2015 Interpretation and Implementation (10/22/16)
ISO 9001:2015 Interpretation and Implementation (10/22/16)
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 
AS9100:2016 Update and Review
AS9100:2016 Update and ReviewAS9100:2016 Update and Review
AS9100:2016 Update and Review
 
Struggling Against Nature - Preventing Human Error in the new ISO 9001 2015 S...
Struggling Against Nature - Preventing Human Error in the new ISO 9001 2015 S...Struggling Against Nature - Preventing Human Error in the new ISO 9001 2015 S...
Struggling Against Nature - Preventing Human Error in the new ISO 9001 2015 S...
 
ISO 9001 2015 DIS 4.0 Organization Context Slides 01-25-15
ISO 9001 2015 DIS 4.0 Organization Context Slides 01-25-15ISO 9001 2015 DIS 4.0 Organization Context Slides 01-25-15
ISO 9001 2015 DIS 4.0 Organization Context Slides 01-25-15
 
The Future of Management ISO 9001:2015
The Future of Management ISO 9001:2015The Future of Management ISO 9001:2015
The Future of Management ISO 9001:2015
 
ISO 9001 2015 DIS 6.0 Planning Slides
ISO 9001 2015 DIS 6.0 Planning SlidesISO 9001 2015 DIS 6.0 Planning Slides
ISO 9001 2015 DIS 6.0 Planning Slides
 
ISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
ISO 9001 2015 | Management Reviews | The Five Rules To Business ExcellenceISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
ISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
 
Introduction to ISO 9001:2015
Introduction to ISO 9001:2015Introduction to ISO 9001:2015
Introduction to ISO 9001:2015
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training Presentation
 
ISO 9001 Made Easy?
ISO 9001 Made Easy?ISO 9001 Made Easy?
ISO 9001 Made Easy?
 
How to successfully implement ISO 9001 in your company
How to successfully implement ISO 9001 in your companyHow to successfully implement ISO 9001 in your company
How to successfully implement ISO 9001 in your company
 
Project Plan For The Implementation Of An Iso9001 2000
Project Plan For The Implementation Of An Iso9001 2000Project Plan For The Implementation Of An Iso9001 2000
Project Plan For The Implementation Of An Iso9001 2000
 
Building Practical Risk Application into your QMS
Building Practical Risk Application into your QMSBuilding Practical Risk Application into your QMS
Building Practical Risk Application into your QMS
 
ISO 9001 IMPLEMENTATION METHODOLOGY
ISO 9001 IMPLEMENTATION METHODOLOGYISO 9001 IMPLEMENTATION METHODOLOGY
ISO 9001 IMPLEMENTATION METHODOLOGY
 
ISO 9001:2015 Overview. Presentation for Training (Preview)
ISO 9001:2015 Overview. Presentation for Training (Preview) ISO 9001:2015 Overview. Presentation for Training (Preview)
ISO 9001:2015 Overview. Presentation for Training (Preview)
 
ISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues WebinarISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues Webinar
 

Similaire à 7Epsilon Risk Based Thinking - ASQ International Conference on Quality Standards Presentation

18 .docx
18                                  .docx18                                  .docx
18 .docx
drennanmicah
 
Risk View - InfoSec intro
Risk View - InfoSec introRisk View - InfoSec intro
Risk View - InfoSec intro
cswinney
 
Risk View Info Sec Intro 3.4.10
Risk View   Info Sec Intro 3.4.10Risk View   Info Sec Intro 3.4.10
Risk View Info Sec Intro 3.4.10
cswinney
 

Similaire à 7Epsilon Risk Based Thinking - ASQ International Conference on Quality Standards Presentation (20)

Risk Assessment Model and its Integration into an Established Test Process
Risk Assessment Model and its Integration into an Established Test ProcessRisk Assessment Model and its Integration into an Established Test Process
Risk Assessment Model and its Integration into an Established Test Process
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7
 
18 .docx
18                                  .docx18                                  .docx
18 .docx
 
Enablers for Maturing your S&OP Processes, SherTrack
Enablers for Maturing your S&OP Processes, SherTrackEnablers for Maturing your S&OP Processes, SherTrack
Enablers for Maturing your S&OP Processes, SherTrack
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
 
Implementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost OptimizationImplementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost Optimization
 
PROMISE 2011: What Prediction Model Should Be?
PROMISE 2011: What Prediction Model Should Be?PROMISE 2011: What Prediction Model Should Be?
PROMISE 2011: What Prediction Model Should Be?
 
Quality management
Quality management Quality management
Quality management
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full report
 
Free-ebook-rex-black advanced-software-testing
Free-ebook-rex-black advanced-software-testingFree-ebook-rex-black advanced-software-testing
Free-ebook-rex-black advanced-software-testing
 
Big data and Process Safety
Big data and Process Safety Big data and Process Safety
Big data and Process Safety
 
LSSGB_Project_SimpliLearn.ppt
LSSGB_Project_SimpliLearn.pptLSSGB_Project_SimpliLearn.ppt
LSSGB_Project_SimpliLearn.ppt
 
Process Maturity Assessment
Process Maturity AssessmentProcess Maturity Assessment
Process Maturity Assessment
 
AFITC 2018 - Using Process Maturity and Agile to Strengthen Cyber Security
AFITC 2018 - Using Process Maturity and Agile to Strengthen Cyber SecurityAFITC 2018 - Using Process Maturity and Agile to Strengthen Cyber Security
AFITC 2018 - Using Process Maturity and Agile to Strengthen Cyber Security
 
Procedural Risk Management
Procedural Risk ManagementProcedural Risk Management
Procedural Risk Management
 
7Epsilon investment casting case study to satisfy requirements of clause 6-1-...
7Epsilon investment casting case study to satisfy requirements of clause 6-1-...7Epsilon investment casting case study to satisfy requirements of clause 6-1-...
7Epsilon investment casting case study to satisfy requirements of clause 6-1-...
 
Security and Risk management in SDLC Software development Life cycle
Security and Risk management in SDLC Software development Life cycleSecurity and Risk management in SDLC Software development Life cycle
Security and Risk management in SDLC Software development Life cycle
 
Risk View - InfoSec intro
Risk View - InfoSec introRisk View - InfoSec intro
Risk View - InfoSec intro
 
Risk View Info Sec Intro 3.4.10
Risk View   Info Sec Intro 3.4.10Risk View   Info Sec Intro 3.4.10
Risk View Info Sec Intro 3.4.10
 
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
 

Dernier

Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
JoseMangaJr1
 
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men 🔝mahisagar🔝 Esc...
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men  🔝mahisagar🔝   Esc...➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men  🔝mahisagar🔝   Esc...
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men 🔝mahisagar🔝 Esc...
amitlee9823
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
amitlee9823
 
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
only4webmaster01
 
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night StandCall Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
amitlee9823
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
amitlee9823
 
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Dernier (20)

Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFx
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
 
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men 🔝mahisagar🔝 Esc...
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men  🔝mahisagar🔝   Esc...➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men  🔝mahisagar🔝   Esc...
➥🔝 7737669865 🔝▻ mahisagar Call-girls in Women Seeking Men 🔝mahisagar🔝 Esc...
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
 
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 nightCheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
 
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night StandCall Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Doddaballapur Road ☎ 7737669865 🥵 Book Your One night Stand
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
 
hybrid Seed Production In Chilli & Capsicum.pptx
hybrid Seed Production In Chilli & Capsicum.pptxhybrid Seed Production In Chilli & Capsicum.pptx
hybrid Seed Production In Chilli & Capsicum.pptx
 
Capstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics ProgramCapstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics Program
 
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Nandini Layout ☎ 7737669865 🥵 Book Your One night Stand
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Call me @ 9892124323 Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
Call me @ 9892124323  Cheap Rate Call Girls in Vashi with Real Photo 100% SecureCall me @ 9892124323  Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
Call me @ 9892124323 Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
 
Predicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science ProjectPredicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science Project
 
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
 

7Epsilon Risk Based Thinking - ASQ International Conference on Quality Standards Presentation

  • 1. 7Epsilon for ISO9001:2015 A Risk Based In-line Process Optimization Case Study for a Connected Enterprise Dr. Rajesh S. Ransing, Swansea University, UK Dr. Meghana R. Ransing, p-matrix Ltd., UK Presentation Id: TO5; Date: 15th November 2016; Time: 11-noon. ASQ International Conference on Quality Standards, November 14-15, 2016 Pittsburgh, USA
  • 2. Learning Objectives  Use in-process data and product specific process knowledge for hypothesis generation (clause 6.1).  Embed risk based thinking and organizational knowledge within your organization.  Learn 7Epsilon Vs Six Sigma.  Understand 7Epsilon in ISO 9001:2015 context Process Inputs:
  • 3. In-line Process Optimization: Case Study  Objective: Discover an optimal range for sensor values – if one exists.  Process Output(s): %Downtime for a line calculated hourly (or other defined time limit), OR %Defective components produced in a batch.  Process Inputs (Categorized as Sensors): Data for all sensors and tags collected for an hour (or a defined time limit). An ‘on-off’ switch - the number of times it is ‘on’ or ‘off’ in an hour. Continuous or ordinal variables - a median, 5th and 95th centile values per hour. Categorical variables - one value for every process output value.
  • 4. Product Specific Process Knowledge Organisational process knowledge for a given product is i. the actionable information; ii. in form of optimal list of measurable factors and their ranges (Sensor 1 value 0.026 – 0.05; Sensor 2 value: 0.007 – 0.009); iii. in order to meet desired business goals (process outputs) (e.g. minimize deviation from expected results, reduce % downtime or rework time etc).
  • 5. Risk Based Thinking ‘Risk Based Thinking’ is the DNA of ISO9001:2015 & AS9100:2016 It’s not contained or isolated in one section or clause …
  • 6. Risk and Opportunities Based Thinking Clause 4.4: Quality management system and its processes 4.4.1 f: address the risks and opportunities as determined in accordance with the requirements of 6.1 Clause 9 Performance Evaluation (and 9.3 Management Review) 9.3.2.e: the effectiveness of actions taken to address risks and opportunities (see clause 6.1) Clause 6.1 Actions to address risks and opportunities in order to (i) give assurance that the QMS can achieve its intended results, (ii) enhance desirable effects, (iii) prevent, or reduce undesired effects, Clause 10 is Improvement.
  • 7. What is Risk in Risk Based Thinking? ‘Risk’ in Risk Based Thinking should • go beyond its usual interpretation in Risk Assessment Forms, • help trigger innovation, • create new organisational knowledge.
  • 8. What is Risk in Risk Based Thinking? To understand ‘Risk’ in ISO9001:2015 and AS9100:2016 context, we need to understand ‘Uncertainty’.
  • 12. What are your options for:  Undertaking in-process quality improvement projects  Implementing plant wide process optimization strategies  Connected Enterprise, Industry 4.0, Big Data  Satisfying requirements of the Clause 6.1of ISO9001:2015 • Prevent or Reduce Undesired (Negative) Effects • Enhance Desired (Positive) Effects OR • Avoid BAD days • Repeat GOOD days
  • 13. Option 1: Plot Process Output Vs Process Input Graphs
  • 14. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 15. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 16. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 17. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 18. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 19. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 20. Option 2: Embed Risk Based Thinking via Penalty Matrices
  • 21. Penalty matrices using p-matrix software  p-matrix software analyses hundreds and thousands of penalty matrices among factors.  Classifies factor settings as Optimal, Avoid or No Effect.  Ranks them in order of importance.  At end of analysis, a process engineer would get a list of top 15-20 matrices he/she needs to look at.  Analyses discrete and continuous parameters together in one analysis.  Up to 200 factors and 10 responses can be analysed at once.  The algorithm is scalable for Big Data and In-line Analysis.
  • 22. Lets make a Solemn Promise …
  • 23. Confirmation Trial Plan Process Inputs Minimum Value Maximum Value Optimal Range Optimal Values Sensor 1 0.019 0.05 Top 50% > 0.026 & < 0.05 Sensor 2 0.007 0.012 Bottom 50% > 0.007 & < 0.009 Sensor 3 6.204 6.527 Top 75% < 6.299 & < 6.527 Sensor 4 7.714 8.028 Bottom 50% < 7.714 & < 7.847
  • 24. In-process Quality Improvement using 7Epsilon steps What’s New? Organisational knowledge management (Clause 7.1.6) Actions to address risks and opportunities (Clause 6.1) 7Epsilon = Six Sigma + Industrial Internet of Things (IIoT)
  • 25. Conclusions  Risk - An effect of uncertainty (on an expected result)  Uncertainty == deficiency of knowledge.  Deficiency of knowledge are opportunities for creating additional knowledge (e.g. Risk Based Tolerance Synthesis).  The effect of uncertainty manifests itself as deviation(s) from expected results.  7Epsilon’s penalty matrix approach  quantifies the effect of uncertainty by penalizing deviation from desired response (Clause 6.1), and  embeds risk based tolerance synthesis and creates new organizational knowledge (Clause 7.1.6).
  • 26. Further Reading Ransing R.S., Batbooti R.S., Giannetti C, and Ransing M.R., “A quality correlation algorithm for tolerance synthesis in manufacturing operations”, Computers and Industrial Engineering, Volume 93, Pages 1–11, March 2016. Ransing R. S., Giannetti, C., Ransing, M. R., & James, M. W. (2013). A coupled penalty matrix approach and principal component based co-linearity index technique to discover product specific foundry process knowledge from in- process data in order to reduce defects. Computers in Industry, 64(5), 514-523. Giannetti, C., Ransing, M. R., Ransing, R. S. et.al (2015) “Organisational knowledge management for defect reduction and sustainable development in the foundry industry”, International Journal of Knowledge and Systems Science (IJKSS), 6(3), 18-37, July-September 2015. http://www.slideshare.net/7Epsilon/as-91002016-and-iso-90012015-clause- 93-management-review-whats-new http://www.slideshare.net/7Epsilon/key-changes-to-iso-9001-2015-and-7- steps-of-7-epsilon
  • 27. www.7epsilon.org 7Epsilon: In-process Optimization in a Connected Enterprise Environment