THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN
ARC INSIGHTS
By Sid Snitkin
INSIGHT# 2003-32E
AUGUST 6, 2003
Diversity in asset information roles
and stakeholder needs demands that
Asset Information Access Best
Practices include collaboration, web
access and role-based portals that
support access through visualization.
Best Practices for Asset Information Access
Keywords
CALM, EAM, Asset Information Management, CEC
Summary
ARC’s CALM (Collaborative Asset Lifecycle Management) model is a Best
Practice-based strategy for developing effective capital asset management
programs. Asset information management is a key element of all CALM
programs and applying Best Practices in this arena
should be a top priority for all asset own-
ers/operators.
A previous ARC Insight discussed Best Practices sur-
rounding the capture and maintenance of Asset
Information (ARC Insight 2003-21E – Best Practices
for Managing Asset Information). This Insight ex-
tends that discussion by addressing Best Practices for asset information ac-
cess by the many asset stakeholders internal and external to the
organization. Diversity in asset information roles and stakeholder needs
demands use of collaboration via web-based tools and role-based portals
that support access through visualization.
Analysis
Asset information is diverse and develops throughout an asset’s lifecycle.
Requirements, specifications, POs and contracts are created during plan-
ning and procurement stages. Design information for processes, facilities
and equipment, including drawings, calculations, bills of materials, installa-
tion, operation and maintenance instructions, are key information
deliverables of the asset acquisition stage. This information is subsequently
revised during installation to include actual settings and adjustments and
during the asset’s operate/maintain phase for modifications and upgrades.
Historical information about the asset’s use and maintenance are also re-
corded during this latter phase.
ARC Insights, Page 2
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
Role Is Central to Effective Information Management
Asset information plays different roles and fulfills different needs during
these various lifecycle stages. Best practices in asset information manage-
ment must respect these differences and support the unique needs of
different stakeholders in each phase.
In the early stages of planning and acquisition, information is used to de-
fine intent and to support decision making. The benefits of effective asset
information management are reduced engineering time and better deci-
sionmaking. Collaboration is a key issue while information is generally
only shared on a periodic basis to keep various groups coordinated. Web-
enabled CAD/CAE products and their associated document management
capabilities provide the Best Practice solutions for these asset information
management needs.
-6
-4
-2
0
2
4
6
1 2 3 4 5 6 7 8 9 10
-10
-9
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
8
9
10
Operate/MaintainPlan Acquire Install
Define Communicate UnderstandIntent
Decide Execute SupportUse
Engr ($) Capital ($$) Recurring ($$$)$ Impact
Periodic Prompt ImmediateTiming
Collaboration Change Control AccessIssues
CAD/CAE Doc Mgmt VisualizationSolution
-6
-4
-2
0
2
4
6
1 2 3 4 5 6 7 8 9 10
-10
-9
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
8
9
10
Operate/MaintainPlan Acquire Install
Define Communicate UnderstandIntent Define Communicate UnderstandIntent
Decide Execute SupportUse Decide Execute SupportUse
Engr ($) Capital ($$) Recurring ($$$)$ Impact Engr ($) Capital ($$) Recurring ($$$)$ Impact
Periodic Prompt ImmediateTiming Periodic Prompt ImmediateTiming
Collaboration Change Control AccessIssues Collaboration Change Control AccessIssues
CAD/CAE Doc Mgmt VisualizationSolution CAD/CAE Doc Mgmt VisualizationSolution
During the manufacturing and installation stages, asset information be-
comes a key tool for communicating specifics to machine shops, fabricators,
sub-contractors, sub-tier suppliers and construction contractors. Proper
and efficient execution of these activities is the primary focus and informa-
tion questions must be resolved promptly to avoid costly delays in
complex, multi-party project schedules and expensive rework. Web-
enabled document management systems, particularly those supported by
CAD/CAE companies, are the Best Practice solution for these stages by fa-
cilitating quick access to structured document trees, tight change
management control and prompt dissemination of changes to all parties.
ARC Insights, Page 3
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
The need for asset information
recurs throughout an assets long,
useful lifetime. Effective information
management during this stage is
particularly important and offers
extremely large paybacks.
Operate/Maintain Presents Some Unique Challenges
In early asset lifecycle stages, stakeholders can anticipate their need for in-
formation. Stakeholders in operate/maintain activities rarely know what
they will need or when they will need it. But when the need arises, their
need is immediate as there can be huge costs associated with even minutes
of downtime. Therefore, asset information management in this stage must
support the most rapid access to information facilitating rapid response and
repair to bring a piece of equipment back on-line.
During the operate/maintain stage, asset information
supports the effective use of assets by the
owner/operator. Getting the maximum Return-on-
Assets (ROA) requires operators to understand how
the equipment is supposed to work under all condi-
tions. Continuous improvement programs like ARC’s
Operational Excellence (OpX) and Overall Equipment
Effectiveness (OEE) likewise require an understanding of the optimum po-
tential of each asset. Effective maintenance programs focus on minimizing
unplanned downtime and require a clear understanding of the asset’s de-
sign and operating failure modes to establish appropriate maintenance
strategies and optimal parts inventories. Since these needs recur during an
asset’s useful life, effective asset information management can provide the
greatest benefits during this stage.
Stakeholders’ diversity is another distinguishing feature of the oper-
ate/maintain lifecycle stage. In earlier stages, stakeholders are specialists
who continuously work on capital asset design and installation. They are
comfortable with more technical forms of asset information and access
methods. During the operate/maintain stage, stakeholders are production
and supporting personnel in maintenance, parts management, purchasing,
accounting, etc. While they can describe the asset and its location in com-
mon terms, they often have no idea about specific asset names or
equipment codes, nor care to learn this information. Interfaces requiring
this information hinder employee’s timely access to information leading to
inefficiencies at the most critical times.
Visualization Provides Role-Based Portal Capabilities
Role-based portals are recognized as a Best Practice for information access.
Portal technology enables users to navigate through widely distributed in-
ARC Insights, Page 4
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
formation without having to know the location of the information or the
characteristics of different systems. Portals that support the needs of spe-
cific organizational roles amplify the benefits of portal technology by
delivering only the right information in the most useful form for the user.
Role-based portals provide an ideal approach for accessing information for
assets in the Operate/Maintain lifecycle stage. But such portals must rec-
ognize that they support both power and casual users of asset information.
They must exploit the fact that these users recognize capital assets as the
physical objects they see on a day-to-day basis and use this as the basis for
information access. Asset-information portals that support structured, “hot
spot enabled” pictures, 3D drawings and sketches capture this capability
and are considered a Best Practice approach in this arena.
Recommendations
• Get everyone in your organization to recognize the importance of com-
prehensive, accurate asset information and ensure that all lifecycle
stages for new assets are managed with asset information in an elec-
tronically accessible format being a key deliverable.
• Review your current information accessing capabilities for assets in the
operate/maintain stage against the Best Practice approaches discussed
in this report. Do these capabilities meet the demanding needs of op-
erations, maintenance and other asset information stakeholders? If not,
investigate how role-based portals and visualization could benefit your
company.
Please help us improve our deliverables to you – take our survey linked to this
transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further
information, contact your account manager or the author at srsnitkin@arcweb.com.
Recommended circulation: All EAS clients. ARC Insights are published and
copyrighted by ARC Advisory Group. The information is proprietary to ARC and
no part of it may be reproduced without prior permission from ARC.

Contenu connexe

Plus de ARC Advisory Group

Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelARC Advisory Group
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum ARC Advisory Group
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...ARC Advisory Group
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...ARC Advisory Group
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum ARC Advisory Group
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...ARC Advisory Group
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum ARC Advisory Group
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortARC Advisory Group
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumARC Advisory Group
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?ARC Advisory Group
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersARC Advisory Group
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsARC Advisory Group
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesARC Advisory Group
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingARC Advisory Group
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairARC Advisory Group
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003ARC Advisory Group
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureARC Advisory Group
 
Business Process Unification: CMM Gets Real
Business Process Unification: CMM Gets RealBusiness Process Unification: CMM Gets Real
Business Process Unification: CMM Gets RealARC Advisory Group
 

Plus de ARC Advisory Group (20)

Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the Future
 
Business Process Unification: CMM Gets Real
Business Process Unification: CMM Gets RealBusiness Process Unification: CMM Gets Real
Business Process Unification: CMM Gets Real
 

Dernier

Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 

Dernier (20)

Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 

Best Practices for Asset Information Access

  • 1. THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN ARC INSIGHTS By Sid Snitkin INSIGHT# 2003-32E AUGUST 6, 2003 Diversity in asset information roles and stakeholder needs demands that Asset Information Access Best Practices include collaboration, web access and role-based portals that support access through visualization. Best Practices for Asset Information Access Keywords CALM, EAM, Asset Information Management, CEC Summary ARC’s CALM (Collaborative Asset Lifecycle Management) model is a Best Practice-based strategy for developing effective capital asset management programs. Asset information management is a key element of all CALM programs and applying Best Practices in this arena should be a top priority for all asset own- ers/operators. A previous ARC Insight discussed Best Practices sur- rounding the capture and maintenance of Asset Information (ARC Insight 2003-21E – Best Practices for Managing Asset Information). This Insight ex- tends that discussion by addressing Best Practices for asset information ac- cess by the many asset stakeholders internal and external to the organization. Diversity in asset information roles and stakeholder needs demands use of collaboration via web-based tools and role-based portals that support access through visualization. Analysis Asset information is diverse and develops throughout an asset’s lifecycle. Requirements, specifications, POs and contracts are created during plan- ning and procurement stages. Design information for processes, facilities and equipment, including drawings, calculations, bills of materials, installa- tion, operation and maintenance instructions, are key information deliverables of the asset acquisition stage. This information is subsequently revised during installation to include actual settings and adjustments and during the asset’s operate/maintain phase for modifications and upgrades. Historical information about the asset’s use and maintenance are also re- corded during this latter phase.
  • 2. ARC Insights, Page 2 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com Role Is Central to Effective Information Management Asset information plays different roles and fulfills different needs during these various lifecycle stages. Best practices in asset information manage- ment must respect these differences and support the unique needs of different stakeholders in each phase. In the early stages of planning and acquisition, information is used to de- fine intent and to support decision making. The benefits of effective asset information management are reduced engineering time and better deci- sionmaking. Collaboration is a key issue while information is generally only shared on a periodic basis to keep various groups coordinated. Web- enabled CAD/CAE products and their associated document management capabilities provide the Best Practice solutions for these asset information management needs. -6 -4 -2 0 2 4 6 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 Operate/MaintainPlan Acquire Install Define Communicate UnderstandIntent Decide Execute SupportUse Engr ($) Capital ($$) Recurring ($$$)$ Impact Periodic Prompt ImmediateTiming Collaboration Change Control AccessIssues CAD/CAE Doc Mgmt VisualizationSolution -6 -4 -2 0 2 4 6 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 Operate/MaintainPlan Acquire Install Define Communicate UnderstandIntent Define Communicate UnderstandIntent Decide Execute SupportUse Decide Execute SupportUse Engr ($) Capital ($$) Recurring ($$$)$ Impact Engr ($) Capital ($$) Recurring ($$$)$ Impact Periodic Prompt ImmediateTiming Periodic Prompt ImmediateTiming Collaboration Change Control AccessIssues Collaboration Change Control AccessIssues CAD/CAE Doc Mgmt VisualizationSolution CAD/CAE Doc Mgmt VisualizationSolution During the manufacturing and installation stages, asset information be- comes a key tool for communicating specifics to machine shops, fabricators, sub-contractors, sub-tier suppliers and construction contractors. Proper and efficient execution of these activities is the primary focus and informa- tion questions must be resolved promptly to avoid costly delays in complex, multi-party project schedules and expensive rework. Web- enabled document management systems, particularly those supported by CAD/CAE companies, are the Best Practice solution for these stages by fa- cilitating quick access to structured document trees, tight change management control and prompt dissemination of changes to all parties.
  • 3. ARC Insights, Page 3 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com The need for asset information recurs throughout an assets long, useful lifetime. Effective information management during this stage is particularly important and offers extremely large paybacks. Operate/Maintain Presents Some Unique Challenges In early asset lifecycle stages, stakeholders can anticipate their need for in- formation. Stakeholders in operate/maintain activities rarely know what they will need or when they will need it. But when the need arises, their need is immediate as there can be huge costs associated with even minutes of downtime. Therefore, asset information management in this stage must support the most rapid access to information facilitating rapid response and repair to bring a piece of equipment back on-line. During the operate/maintain stage, asset information supports the effective use of assets by the owner/operator. Getting the maximum Return-on- Assets (ROA) requires operators to understand how the equipment is supposed to work under all condi- tions. Continuous improvement programs like ARC’s Operational Excellence (OpX) and Overall Equipment Effectiveness (OEE) likewise require an understanding of the optimum po- tential of each asset. Effective maintenance programs focus on minimizing unplanned downtime and require a clear understanding of the asset’s de- sign and operating failure modes to establish appropriate maintenance strategies and optimal parts inventories. Since these needs recur during an asset’s useful life, effective asset information management can provide the greatest benefits during this stage. Stakeholders’ diversity is another distinguishing feature of the oper- ate/maintain lifecycle stage. In earlier stages, stakeholders are specialists who continuously work on capital asset design and installation. They are comfortable with more technical forms of asset information and access methods. During the operate/maintain stage, stakeholders are production and supporting personnel in maintenance, parts management, purchasing, accounting, etc. While they can describe the asset and its location in com- mon terms, they often have no idea about specific asset names or equipment codes, nor care to learn this information. Interfaces requiring this information hinder employee’s timely access to information leading to inefficiencies at the most critical times. Visualization Provides Role-Based Portal Capabilities Role-based portals are recognized as a Best Practice for information access. Portal technology enables users to navigate through widely distributed in-
  • 4. ARC Insights, Page 4 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com formation without having to know the location of the information or the characteristics of different systems. Portals that support the needs of spe- cific organizational roles amplify the benefits of portal technology by delivering only the right information in the most useful form for the user. Role-based portals provide an ideal approach for accessing information for assets in the Operate/Maintain lifecycle stage. But such portals must rec- ognize that they support both power and casual users of asset information. They must exploit the fact that these users recognize capital assets as the physical objects they see on a day-to-day basis and use this as the basis for information access. Asset-information portals that support structured, “hot spot enabled” pictures, 3D drawings and sketches capture this capability and are considered a Best Practice approach in this arena. Recommendations • Get everyone in your organization to recognize the importance of com- prehensive, accurate asset information and ensure that all lifecycle stages for new assets are managed with asset information in an elec- tronically accessible format being a key deliverable. • Review your current information accessing capabilities for assets in the operate/maintain stage against the Best Practice approaches discussed in this report. Do these capabilities meet the demanding needs of op- erations, maintenance and other asset information stakeholders? If not, investigate how role-based portals and visualization could benefit your company. Please help us improve our deliverables to you – take our survey linked to this transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further information, contact your account manager or the author at srsnitkin@arcweb.com. Recommended circulation: All EAS clients. ARC Insights are published and copyrighted by ARC Advisory Group. The information is proprietary to ARC and no part of it may be reproduced without prior permission from ARC.