SlideShare une entreprise Scribd logo
1  sur  33
Balancing growth in both
OGX programmes!
Tier 1 and Tier 2 oGIP and oGCDP
“My entity has high goals in both oGIP
and oGCDP”
“My entity has both oGIP and oGCDP as
national focus programmes”
“How do we
manage this?”
Here are
some solutions!
1. Create an OD
Model that allows
growth in both
programmes
together
2. Balancing
support from
Marketing AND TM
3. Entity Process
optimization/standa
rdization
1. Create an OD
Model that allows
growth in both
programmes
together
2. Balancing
support from
Marketing AND TM
3. Entity Process
optimization/standa
rdization
1. Create an OD
Model that allows
growth in both
programmes
together
Base it on the number of LCs you have:
1. More than 15 LCs
2. 5-10 LCs along with some expansion
initiatives
3. 5-10 LCs, no expansion initiatives
4. 4-5 LCs along with some expansion
initiatives
More than 15 LCs
• Split focus between LCs as you have enough LCs
• Focus can be split in a way that LCs having
oGCDP focus are also maybe doing iGIP and LCs
have oGIP focus are doing more iGCDP
• If you have expansions as well, it is ideal that the
expansions are focused on one of the two OGX
Programmes (NOT ON BOTH)
• In terms of implementation, MCVP oGCDP to
focus on oGCDP growth LCs to ensure oGCDP
growth and supports these LCs with balancing
OGX in GIP and GCDP. MCVP oGIP to focus on
oGIP growth LCs to ensure oGIP growth and
supports these LCs with balancing oGCDP and
oGIP!
• Supply and Demand allocation and education to
be done to LCs accordingly
5-10 LCs with some expansions
• Split focus between LCs – NO LC growing a LOT
(in absolute or relative numbers) in one of the
OGX Programmes should be focusing on the other
• Capitalize on your expansion entities and have a
very good coaching model to ensure growth of one
of the two OGX Programmes through entity
expansions
• The other option is to have 4-6 LCs growing in
both OGX Programmes however only between 25-
30% relative growth and no more than that – in
this case you can focus on having the right LC
Structures and back office support to drive both
OGX Programmes
• Again here, synergy between MCVP for oGIP and
MCVP oGCDP is extremely important
• If MCVP OGX only, focus on 2 OGX not suggested
OR get an MC Manager for one of the 2 OGX!
5-10 LCs, no expansions
• Even if both OGX Programmes are the focus, the relative
growth on any of them cannot be more than 30-40%
overall because without expansions it is difficult to make
it happen
• If your oGCDP Process is very well optimized and you feel
oGCDP growth will be natural, focus on only increasing
efficiency in oGCDP so that more members can focus on
oGIP
• In this case almost all LCs might have to do oGIP (or at
least 6-7) and the other LCs can do a lot of oGCDP + the
LCs doing oGIP have members doing oGCDP at very high
efficiency
• MCVP Marketing supporting LCs in both oGIP and
oGCDP Marketing
• In LCs needing to grow a lot in both programmes the
MCVP Marketing, TM or OD can be the coach
• In LCs with oGCDP focus, oGCDP can be the coach and
LCs focusing more on oGIP, MCVP oGIP can be the coach
Below 5 LCs with expansions
• In general, it is best to have only one of the OGX
Programmes as FOCUS (high growth percentage) and
either start up the other or have a lower/balanced growth
%
• Eg: If you are already growing oGCDP, then you can
have higher ambition in oGCDP and start up oGIP OR if
you are doing both oGIP and oGCDP you can also have
high relative and absolute growth goals for oGIP and
sustain growth in oGCDP
• Some part of either oGIP or oGCDP (suggested is oGCDP)
growth can come from expansion initiatives so that LCs
can focus more on oGIP
• In this case, the MC can work with LCs on big university
partnerships for oGCDP that can completely optimize the
raising process, post which LCs can work more with oGIP
and build capacity for oGCDP Matching and delivery
• The above points are different scenarios/examples
depending on your reality
Entities having BELOW 5 LCs and no intention/capacity to
create or manage expansions should stick to doing one of the
OGX Programmes – preferably oGCDP
What about Entities having less than 5 LCs?
1. Create an OD
Model that allows
growth in both
programmes
together
2. Balancing
support from
Marketing AND TM
3. Entity Process
optimization/standa
rdization
2. Balancing
support from
Marketing AND TM
Marketing and TM Structures and
JD at an MC and LC level Ma
Timeline + process of promotion for
TMP/TLP, oGCDP and oGIP
2. Balancing
support from
Marketing AND TM
Marketing and TM Structures and
JD at an LC level
Brand Teams
• Each Member can handle 1-2 subproducts/issues in the Programmes
• Market Research
• Participate in the synergy meetings with the equivalent teams in oGX
function
• Leads the development of the content marketing strategy for Their
main subproducts/ issues
• It is recommended that someone with graphic design abilities is also
within each team
• Have members within each team ASSIGNED TO GIP, GCDP
AND TMP TLP
LCVP Comm/
Marketing
Brand Team
TL 1
Members
Members
Brand Team
2
Channel Mgr.
Channel Mgr.
Comms Team
Members
Members
Special Comms Team
• Builds and Aligns the over-all content strategy of their
respective channels to ensure that these spaces
continue to contribute more customers and promoters
for AIESEC
• Works with the brand teams to ensure that marketing
content is aligned
• Includes management of social media channels,
website, online registrations, campus relations, media,
PR etc.
LCVP JD
• Designs Marketing Strategy with oGCDP and oGIP to ensure a well
designed product- customer flow*
• Leads Proper and Strong Brand management in the LC
• Recruitment Period:
• Leads the creation and implementation of the marketing strategy
across the different GIP Sub Products and GCDP Issues and
channels
• Ensures that his/ her members are on track and the campaign is
running according to timeline
Marketing Team Structure 1
Marketing team structure 2
70++
Realisations
120++
Raised
300++
(Ideally, Sign up to Raise
Conversion rate is
greater than 30%)
Sample Backwards Planning if oGIP goal is higher than 50 Re for the LC
Based on Statistics, how
many Raises do you nee to
get this many realisations?
Based on your average conversion
rate, how many Sign-ups do you need
to get this many raises?
STARTHERE
NOTE:
• Marketing team has 10+ members (including LCVP)
• Marketing Team needs to focus on scaling up their market reach fortheir
current developed brands under focus Programme (oGIP/oGCDP/TMP/TLP)
• High Volume LC’s need to especially work on optimising their processes and
investing in IT innovations in order to increase their production capacity,
These LC’s can work with the MC to develop these evolutions
• Don’t expand the team too much horizontally
LCVP Comm/
Marketing
Brand Team
TL
Member 1
Member 2
Member 3
Brand Team TL
Member 1
Member 2
Member 3
Brand Team
TL
Member 1
Member 2
Member 3
Comms
Team TL
Member 1
Member 2
Member 3
• Be very clear how many members in the Marketing team are driving oGIP,
how many members are driving oGCDP Goals and how many members are
driving TMP Recruitment
• Their Goals for sign up, conversion and raise should be based on the
programme they are driving
• JD should be based on the programme they are driving
IMPORTANT
• When calculating productivity for oGIP in the LC or MC, for number of
members contributing to oGIP add the number of members from marketing
team whose goals and JD is about driving oGIP growth. Eg: 3 out of 7
members are working on oGIP and 4 on oGCDP then 3 members are included
into oGIP productivity data and 4 into oGCDP Productivity data
Calculating productivity
TM Structure option 1
NOTE:
• TM Team has 2 core teams, one focused on building capacity and the
other focused on Learning and Team Minimums implementation
• Number of people needed is generally 8-10 people between both
teams
• It is advised to have a TL for Capacity due to activities linked to
promotion, recruitment and pipeline management and the need to
lead recruitment teams
• TL for L&D only if the LC needs it and if you have pipeline for
someone who is experienced to manage the role
• Try to have some people in TM with experience in doing exchange so
that they understand the connection between TM and Operations
better
LCVP TM
TL Capacity
Members
Members
TL L&D
Members
LCVP TM JD:
• Plans for number of members needed and education cycle using planning framework in synergy with exchange functions and marketing
• Leads the capacity and Learning team to ensure coordination of all activities within TM and the right synergy with other programmes and
functions
• Focused on driving IXP in the LC (especially if the LC wants to grow in any one or both of the OGX programmes)
• Responsible to ensure implementation and detailed tracking of team minimums
• Identifying key TM Challenge in the LC along with EB team and with support from MC to create the right strategy and action steps for TM to
drive exchange
• In this case, the capacity team is managing overall CAPACITY in the LC and L&D team support is customized to programmes, however focused on
both OGX Programmes
TM Structure Option 1
LCVP TM
TL Capacity
Members
Members
TL L&D
Members
TL Capacity JD
• Coordinate recruitment activities in the Synergy
with Marketing
• Tracking of number of members in each area
and by each process
• Pipeline management to ensure the LC always has
capacity to deliver
• Work with LCVP to ensure the right structures
• Key focus should be the two OGX programmes
TL L&D JD
• Coordinate education and L&D in the LC
• Created education cycle based on exchange and
recruitment timeline
• FOCUS ON BOTH OGX PROGRAMMES!
• Tracking of increase in performance over a period
of time, time it takes to perform, TMP Retention
rate etc
Members are needed in
Capacity team mainly to
support recruitment
promotion and selection
coordination
TM structure option 2
LCVP TM
Capacity
Team
Member 1
Member 2
ALTERNATE Structure for this LC
LCVP TM
Capacity
Team
Member 1
Member 2
Programme
coordinators
Programme 1
Programme 2
Programme
Coordinators
Programme 3
Programme 4
• Programme coordinators are in the
programme teams (in this case oGCDP and
oGIP mainly) in order to ensure the right
L&D and implementation of team minimums
• In this case the programme coordinators are
still coordinating with LCVP TM but work in
the respective programme teams to ensure
focused support
In TM option 2
KPIs: Number of
members in functions
and programmes, Time
for new member to
start performing
MoS: Increase in Productivity
it is even more important to measure productivity by
programme to ensure back office is really supporting
programmes in the right way and the right function (or
people) are supporting the right programme
Here the programme coordinators are meant to make
the synergy even better so ensure they are very well
trained and have experience in operations preferably.
• Be very clear how many members in the TM team are driving oGIP, how many
members are driving oGCDP Goals and how many members are driving TMP
Recruitment
• Their KPIs should be related to capacity or L&D and more specifically related to the
key challenge you are trying to solve
• TM KPIs should be measurable
• JD should be based on the programme they are driving
• TM team has to support all programmes LC is running but pay special effort to the
focus programme
IMPORTANT
• Ensure members in TM have the right understanding of exchange and
preferably have done exchange
• People with AIESEC XP of 6-12 months minimum in TM teams
Profile of members in
TM
Marketing and TM Structures and
JD at an LC level
What is the MCs role here?
• The MC VP TM in synergy with Marketing, GIP and GCDP
ensure that LCs are planning for capacity (number of members
and structures) in the right way, the MC should track this
• The MCVP OD works with the MCVP TM to align structures
across LCs based on the OD Model
• The MCVP OD works with TM, Marketing and all programmes
to align education cycle to the 2 OGX Programmes
• MCVP TM and MCVP OD work on ensuring that LCs know how
to support OGX and ICX (especially through TM)
• The MC to ALIGN PROMOTION TIMELINE for TMP/TLP, oGCDP
and oGIP and create the right product packages for each
2. Balancing
support from
Marketing AND TM
Timeline + process of promotion for
TMP/TLP, oGCDP and oGIP
2. Balancing
support from
Marketing AND TM
1. IXP
Types of IXP
Re integration
Members going on
exchange
Timeline
January February March April May June
Reintegration
Go on exchange!
So what is our focus right
Now?
Now look at this:
New members going on Exchange this
summer!
January February March April May June
Reintegration
Go on exchange!
Member Recruitment
StrategiesforMC
Planning and Tracking
• Have a clear goal for IXP (per programme and for each month)
• Track the contribution of IXP to GCDP and GIP goals, in terms of
RA MA RE and talent capacity in local teams.
LC’s management
• Create national R&R campaign for LC’s
• Define IXP focus according to MC / LC strategy (focus on GCDP or
GIP)
• Make sure there’s a clear responsable at local level for IXP goal (VP
TM & VP Comm).
National Conference Cycle
• Include Exchange experience in your education cycle, every member
should plan in their career plan a GCDP XP.
• Promote the opportunity of being TMP TLP for EP’s in OPS and EP
preparation seminars.
Strategies for LC
Start Up LC
• Big Focus on
reintegration to start
having talent capacity in
your LC. Allocation
according to LC needs.
• All the members need to
have in mind to go on
Exchange.
• Embed into Career
Planning
Intermediate
• Choose a focus for IXP,
GCDP or GIP.
• Returnees allocated in
Operations team and
sales teams.
Advanced
• Be able to drive IXP for
GCDP and GIP.
• A lot of your
membership is going
on Exchange, you have
off peak TMP TLP
recruitment to support
operations during
summer.
High Volume
• Big amount of OGX
exchanges should come
from IXP.
• Create an IXP corner in
the LC to upscale
strategies.
2. Balancing
support from
Marketing AND TM
• Create a clear timeline for LCs about when to do GCDP and
GIP promotion – Eg: GIP OGX promotion is on going and GCDP
is right before a peak only, GIP OGX promotion for teaching
goes on simultaneously with oGCDP Promotion
• Optimize your national online attraction and conversion
channels to attract participants for both OGX programmes
• For sign ups happening through out the year, have a clear and
fast response system so that you engage every EP that signs
up and is matchable
• Segment university campus/off line markets clearly with LCs
so that LCs can do faster off line sales
• GIP EP sign ups who are not qualified, can be converted to
GCDP Eps/TMP TLP as well
• When the market is clearly split between GIP and GCDP
offline sales and team structures are aligned to this in
Marketing, high activity and balance is possible!
2. Other action steps
Balancing growth in both OGX programmes

Contenu connexe

Tendances

Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP AIESEC
 
AIESEC - Strategic Planning
AIESEC - Strategic PlanningAIESEC - Strategic Planning
AIESEC - Strategic PlanningJazmin L
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4AIESEC
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP AIESEC
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience deliveryAIESEC
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences AIESEC
 
AIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning GuideAIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning GuideGuiscardo Urso
 
Balance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaksBalance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaksAIESEC
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DAIESEC
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementAIESEC
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1AIESEC
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development AIESEC
 
OGSM Strategy Framework
OGSM Strategy FrameworkOGSM Strategy Framework
OGSM Strategy FrameworkIntelligent_ly
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsAIESEC
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksAIESEC
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1AIESEC
 
LC Development and Expansions Tier 3 and Tier 4
LC Development and Expansions Tier 3 and Tier 4LC Development and Expansions Tier 3 and Tier 4
LC Development and Expansions Tier 3 and Tier 4AIESEC
 

Tendances (20)

Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP
 
AIESEC - Strategic Planning
AIESEC - Strategic PlanningAIESEC - Strategic Planning
AIESEC - Strategic Planning
 
Lc plan how_to
Lc plan how_toLc plan how_to
Lc plan how_to
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience delivery
 
iGCDP
iGCDPiGCDP
iGCDP
 
oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences
 
AIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning GuideAIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning Guide
 
Balance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaksBalance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaks
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
 
Sales for i gcdp
Sales for i gcdpSales for i gcdp
Sales for i gcdp
 
OGSM Strategy Framework
OGSM Strategy FrameworkOGSM Strategy Framework
OGSM Strategy Framework
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaks
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1
 
LC Development and Expansions Tier 3 and Tier 4
LC Development and Expansions Tier 3 and Tier 4LC Development and Expansions Tier 3 and Tier 4
LC Development and Expansions Tier 3 and Tier 4
 

Similaire à Balancing growth in both OGX programmes

oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceAIESEC
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyAIESEC
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPAIESEC
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DAIESEC
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDAIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationAIESEC
 
Tier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODTier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODAIESEC
 
AM1415_Talent Capacity_MarComm
AM1415_Talent Capacity_MarCommAM1415_Talent Capacity_MarComm
AM1415_Talent Capacity_MarCommMei Jin Lim
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DAIESEC
 
Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015  Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015 aiesec_poland
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiersChristina Kelman
 
OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 AIESEC
 
Managing high scale or high growth non focus programme
Managing high scale or high growth non focus programmeManaging high scale or high growth non focus programme
Managing high scale or high growth non focus programmeAIESEC
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementAIESEC
 

Similaire à Balancing growth in both OGX programmes (20)

oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
 
Balance gcdp and gip
Balance gcdp and gipBalance gcdp and gip
Balance gcdp and gip
 
TM Structures
TM StructuresTM Structures
TM Structures
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JD
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
Tier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODTier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of OD
 
Marketing structures
Marketing structuresMarketing structures
Marketing structures
 
AM1415_Talent Capacity_MarComm
AM1415_Talent Capacity_MarCommAM1415_Talent Capacity_MarComm
AM1415_Talent Capacity_MarComm
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 
Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015  Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiers
 
OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2
 
TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15
 
Managing high scale or high growth non focus programme
Managing high scale or high growth non focus programmeManaging high scale or high growth non focus programme
Managing high scale or high growth non focus programme
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
OD Model
OD Model OD Model
OD Model
 
NCF Customized in oGIP
NCF Customized in oGIPNCF Customized in oGIP
NCF Customized in oGIP
 

Plus de AIESEC

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentationAIESEC
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017AIESEC
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction GuidelineAIESEC
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership SelectionAIESEC
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership PlanningAIESEC
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP AIESEC
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of whatAIESEC
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product sessionAIESEC
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAIESEC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom bookAIESEC
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odmAIESEC
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_successAIESEC
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_cultureAIESEC
 
Our role as p
Our role as pOur role as p
Our role as pAIESEC
 
P tips for planning
P tips for planningP tips for planning
P tips for planningAIESEC
 
Role of lcp
Role of lcpRole of lcp
Role of lcpAIESEC
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognitionAIESEC
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teamsAIESEC
 
Building working culture
Building working cultureBuilding working culture
Building working cultureAIESEC
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefellerAIESEC
 

Plus de AIESEC (20)

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
 
Our role as p
Our role as pOur role as p
Our role as p
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
 
Building working culture
Building working cultureBuilding working culture
Building working culture
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
 

Dernier

Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.aruny7087
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxssuserf63bd7
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 

Dernier (14)

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 

Balancing growth in both OGX programmes

  • 1. Balancing growth in both OGX programmes! Tier 1 and Tier 2 oGIP and oGCDP
  • 2. “My entity has high goals in both oGIP and oGCDP” “My entity has both oGIP and oGCDP as national focus programmes”
  • 5. 1. Create an OD Model that allows growth in both programmes together 2. Balancing support from Marketing AND TM 3. Entity Process optimization/standa rdization
  • 6. 1. Create an OD Model that allows growth in both programmes together 2. Balancing support from Marketing AND TM 3. Entity Process optimization/standa rdization
  • 7. 1. Create an OD Model that allows growth in both programmes together Base it on the number of LCs you have: 1. More than 15 LCs 2. 5-10 LCs along with some expansion initiatives 3. 5-10 LCs, no expansion initiatives 4. 4-5 LCs along with some expansion initiatives
  • 8. More than 15 LCs • Split focus between LCs as you have enough LCs • Focus can be split in a way that LCs having oGCDP focus are also maybe doing iGIP and LCs have oGIP focus are doing more iGCDP • If you have expansions as well, it is ideal that the expansions are focused on one of the two OGX Programmes (NOT ON BOTH) • In terms of implementation, MCVP oGCDP to focus on oGCDP growth LCs to ensure oGCDP growth and supports these LCs with balancing OGX in GIP and GCDP. MCVP oGIP to focus on oGIP growth LCs to ensure oGIP growth and supports these LCs with balancing oGCDP and oGIP! • Supply and Demand allocation and education to be done to LCs accordingly 5-10 LCs with some expansions • Split focus between LCs – NO LC growing a LOT (in absolute or relative numbers) in one of the OGX Programmes should be focusing on the other • Capitalize on your expansion entities and have a very good coaching model to ensure growth of one of the two OGX Programmes through entity expansions • The other option is to have 4-6 LCs growing in both OGX Programmes however only between 25- 30% relative growth and no more than that – in this case you can focus on having the right LC Structures and back office support to drive both OGX Programmes • Again here, synergy between MCVP for oGIP and MCVP oGCDP is extremely important • If MCVP OGX only, focus on 2 OGX not suggested OR get an MC Manager for one of the 2 OGX!
  • 9. 5-10 LCs, no expansions • Even if both OGX Programmes are the focus, the relative growth on any of them cannot be more than 30-40% overall because without expansions it is difficult to make it happen • If your oGCDP Process is very well optimized and you feel oGCDP growth will be natural, focus on only increasing efficiency in oGCDP so that more members can focus on oGIP • In this case almost all LCs might have to do oGIP (or at least 6-7) and the other LCs can do a lot of oGCDP + the LCs doing oGIP have members doing oGCDP at very high efficiency • MCVP Marketing supporting LCs in both oGIP and oGCDP Marketing • In LCs needing to grow a lot in both programmes the MCVP Marketing, TM or OD can be the coach • In LCs with oGCDP focus, oGCDP can be the coach and LCs focusing more on oGIP, MCVP oGIP can be the coach Below 5 LCs with expansions • In general, it is best to have only one of the OGX Programmes as FOCUS (high growth percentage) and either start up the other or have a lower/balanced growth % • Eg: If you are already growing oGCDP, then you can have higher ambition in oGCDP and start up oGIP OR if you are doing both oGIP and oGCDP you can also have high relative and absolute growth goals for oGIP and sustain growth in oGCDP • Some part of either oGIP or oGCDP (suggested is oGCDP) growth can come from expansion initiatives so that LCs can focus more on oGIP • In this case, the MC can work with LCs on big university partnerships for oGCDP that can completely optimize the raising process, post which LCs can work more with oGIP and build capacity for oGCDP Matching and delivery • The above points are different scenarios/examples depending on your reality
  • 10. Entities having BELOW 5 LCs and no intention/capacity to create or manage expansions should stick to doing one of the OGX Programmes – preferably oGCDP What about Entities having less than 5 LCs?
  • 11. 1. Create an OD Model that allows growth in both programmes together 2. Balancing support from Marketing AND TM 3. Entity Process optimization/standa rdization
  • 12. 2. Balancing support from Marketing AND TM Marketing and TM Structures and JD at an MC and LC level Ma Timeline + process of promotion for TMP/TLP, oGCDP and oGIP
  • 13. 2. Balancing support from Marketing AND TM Marketing and TM Structures and JD at an LC level
  • 14. Brand Teams • Each Member can handle 1-2 subproducts/issues in the Programmes • Market Research • Participate in the synergy meetings with the equivalent teams in oGX function • Leads the development of the content marketing strategy for Their main subproducts/ issues • It is recommended that someone with graphic design abilities is also within each team • Have members within each team ASSIGNED TO GIP, GCDP AND TMP TLP LCVP Comm/ Marketing Brand Team TL 1 Members Members Brand Team 2 Channel Mgr. Channel Mgr. Comms Team Members Members Special Comms Team • Builds and Aligns the over-all content strategy of their respective channels to ensure that these spaces continue to contribute more customers and promoters for AIESEC • Works with the brand teams to ensure that marketing content is aligned • Includes management of social media channels, website, online registrations, campus relations, media, PR etc. LCVP JD • Designs Marketing Strategy with oGCDP and oGIP to ensure a well designed product- customer flow* • Leads Proper and Strong Brand management in the LC • Recruitment Period: • Leads the creation and implementation of the marketing strategy across the different GIP Sub Products and GCDP Issues and channels • Ensures that his/ her members are on track and the campaign is running according to timeline Marketing Team Structure 1
  • 15. Marketing team structure 2 70++ Realisations 120++ Raised 300++ (Ideally, Sign up to Raise Conversion rate is greater than 30%) Sample Backwards Planning if oGIP goal is higher than 50 Re for the LC Based on Statistics, how many Raises do you nee to get this many realisations? Based on your average conversion rate, how many Sign-ups do you need to get this many raises? STARTHERE NOTE: • Marketing team has 10+ members (including LCVP) • Marketing Team needs to focus on scaling up their market reach fortheir current developed brands under focus Programme (oGIP/oGCDP/TMP/TLP) • High Volume LC’s need to especially work on optimising their processes and investing in IT innovations in order to increase their production capacity, These LC’s can work with the MC to develop these evolutions • Don’t expand the team too much horizontally LCVP Comm/ Marketing Brand Team TL Member 1 Member 2 Member 3 Brand Team TL Member 1 Member 2 Member 3 Brand Team TL Member 1 Member 2 Member 3 Comms Team TL Member 1 Member 2 Member 3
  • 16. • Be very clear how many members in the Marketing team are driving oGIP, how many members are driving oGCDP Goals and how many members are driving TMP Recruitment • Their Goals for sign up, conversion and raise should be based on the programme they are driving • JD should be based on the programme they are driving IMPORTANT
  • 17. • When calculating productivity for oGIP in the LC or MC, for number of members contributing to oGIP add the number of members from marketing team whose goals and JD is about driving oGIP growth. Eg: 3 out of 7 members are working on oGIP and 4 on oGCDP then 3 members are included into oGIP productivity data and 4 into oGCDP Productivity data Calculating productivity
  • 18. TM Structure option 1 NOTE: • TM Team has 2 core teams, one focused on building capacity and the other focused on Learning and Team Minimums implementation • Number of people needed is generally 8-10 people between both teams • It is advised to have a TL for Capacity due to activities linked to promotion, recruitment and pipeline management and the need to lead recruitment teams • TL for L&D only if the LC needs it and if you have pipeline for someone who is experienced to manage the role • Try to have some people in TM with experience in doing exchange so that they understand the connection between TM and Operations better LCVP TM TL Capacity Members Members TL L&D Members LCVP TM JD: • Plans for number of members needed and education cycle using planning framework in synergy with exchange functions and marketing • Leads the capacity and Learning team to ensure coordination of all activities within TM and the right synergy with other programmes and functions • Focused on driving IXP in the LC (especially if the LC wants to grow in any one or both of the OGX programmes) • Responsible to ensure implementation and detailed tracking of team minimums • Identifying key TM Challenge in the LC along with EB team and with support from MC to create the right strategy and action steps for TM to drive exchange • In this case, the capacity team is managing overall CAPACITY in the LC and L&D team support is customized to programmes, however focused on both OGX Programmes
  • 19. TM Structure Option 1 LCVP TM TL Capacity Members Members TL L&D Members TL Capacity JD • Coordinate recruitment activities in the Synergy with Marketing • Tracking of number of members in each area and by each process • Pipeline management to ensure the LC always has capacity to deliver • Work with LCVP to ensure the right structures • Key focus should be the two OGX programmes TL L&D JD • Coordinate education and L&D in the LC • Created education cycle based on exchange and recruitment timeline • FOCUS ON BOTH OGX PROGRAMMES! • Tracking of increase in performance over a period of time, time it takes to perform, TMP Retention rate etc Members are needed in Capacity team mainly to support recruitment promotion and selection coordination
  • 20. TM structure option 2 LCVP TM Capacity Team Member 1 Member 2 ALTERNATE Structure for this LC LCVP TM Capacity Team Member 1 Member 2 Programme coordinators Programme 1 Programme 2 Programme Coordinators Programme 3 Programme 4 • Programme coordinators are in the programme teams (in this case oGCDP and oGIP mainly) in order to ensure the right L&D and implementation of team minimums • In this case the programme coordinators are still coordinating with LCVP TM but work in the respective programme teams to ensure focused support
  • 21. In TM option 2 KPIs: Number of members in functions and programmes, Time for new member to start performing MoS: Increase in Productivity it is even more important to measure productivity by programme to ensure back office is really supporting programmes in the right way and the right function (or people) are supporting the right programme Here the programme coordinators are meant to make the synergy even better so ensure they are very well trained and have experience in operations preferably.
  • 22. • Be very clear how many members in the TM team are driving oGIP, how many members are driving oGCDP Goals and how many members are driving TMP Recruitment • Their KPIs should be related to capacity or L&D and more specifically related to the key challenge you are trying to solve • TM KPIs should be measurable • JD should be based on the programme they are driving • TM team has to support all programmes LC is running but pay special effort to the focus programme IMPORTANT
  • 23. • Ensure members in TM have the right understanding of exchange and preferably have done exchange • People with AIESEC XP of 6-12 months minimum in TM teams Profile of members in TM
  • 24. Marketing and TM Structures and JD at an LC level What is the MCs role here? • The MC VP TM in synergy with Marketing, GIP and GCDP ensure that LCs are planning for capacity (number of members and structures) in the right way, the MC should track this • The MCVP OD works with the MCVP TM to align structures across LCs based on the OD Model • The MCVP OD works with TM, Marketing and all programmes to align education cycle to the 2 OGX Programmes • MCVP TM and MCVP OD work on ensuring that LCs know how to support OGX and ICX (especially through TM) • The MC to ALIGN PROMOTION TIMELINE for TMP/TLP, oGCDP and oGIP and create the right product packages for each
  • 25. 2. Balancing support from Marketing AND TM Timeline + process of promotion for TMP/TLP, oGCDP and oGIP
  • 27. Types of IXP Re integration Members going on exchange
  • 28. Timeline January February March April May June Reintegration Go on exchange! So what is our focus right Now?
  • 29. Now look at this: New members going on Exchange this summer! January February March April May June Reintegration Go on exchange! Member Recruitment
  • 30. StrategiesforMC Planning and Tracking • Have a clear goal for IXP (per programme and for each month) • Track the contribution of IXP to GCDP and GIP goals, in terms of RA MA RE and talent capacity in local teams. LC’s management • Create national R&R campaign for LC’s • Define IXP focus according to MC / LC strategy (focus on GCDP or GIP) • Make sure there’s a clear responsable at local level for IXP goal (VP TM & VP Comm). National Conference Cycle • Include Exchange experience in your education cycle, every member should plan in their career plan a GCDP XP. • Promote the opportunity of being TMP TLP for EP’s in OPS and EP preparation seminars.
  • 31. Strategies for LC Start Up LC • Big Focus on reintegration to start having talent capacity in your LC. Allocation according to LC needs. • All the members need to have in mind to go on Exchange. • Embed into Career Planning Intermediate • Choose a focus for IXP, GCDP or GIP. • Returnees allocated in Operations team and sales teams. Advanced • Be able to drive IXP for GCDP and GIP. • A lot of your membership is going on Exchange, you have off peak TMP TLP recruitment to support operations during summer. High Volume • Big amount of OGX exchanges should come from IXP. • Create an IXP corner in the LC to upscale strategies.
  • 32. 2. Balancing support from Marketing AND TM • Create a clear timeline for LCs about when to do GCDP and GIP promotion – Eg: GIP OGX promotion is on going and GCDP is right before a peak only, GIP OGX promotion for teaching goes on simultaneously with oGCDP Promotion • Optimize your national online attraction and conversion channels to attract participants for both OGX programmes • For sign ups happening through out the year, have a clear and fast response system so that you engage every EP that signs up and is matchable • Segment university campus/off line markets clearly with LCs so that LCs can do faster off line sales • GIP EP sign ups who are not qualified, can be converted to GCDP Eps/TMP TLP as well • When the market is clearly split between GIP and GCDP offline sales and team structures are aligned to this in Marketing, high activity and balance is possible! 2. Other action steps